28
Sec. 52 Application Volume 3: Engineering, Construction and Operations Appendix D: Pipeline Route Alternatives May 2010 Page D-1 Appendix D Pipeline Route Alternatives List of Maps Map No. Description D-1 Alternative Sites for Initiating Pump Station D-2 Alternative Sites for Kitimat Terminal D-3 Initial Pipeline Route Alternatives D-4 Pipeline Route Revisions – Kilometre Posts 0 to 20 D-5 Pipeline Route Revisions – Kilometre Posts 186 to 260 D-6 Pipeline Route Revisions – Kilometre Posts 310 to 415 D-7 Pipeline Route Revisions – Kilometre Posts 415 to 475 D-8 Pipeline Route Revisions – Kilometre Posts 475 to 535 D-9 Pipeline Route Revisions – Kilometre Posts 634 to 681 D-10 Pipeline Route Revisions – Kilometre Posts 810 to 833 D-11 Pipeline Route Revisions – Kilometre Posts 915 to 927 D-12 Pipeline Route Revisions – Kilometre Posts 955 to 1042 D-13 Pipeline Route Revisions – Kilometre Posts 1067 to 1161
Transcript

Sec. 52 Application Volume 3: Engineering, Construction and Operations Appendix D: Pipeline Route Alternatives

May 2010 Page D-1

Appendix D Pipeline Route Alternatives List of Maps

Map No. Description D-1 Alternative Sites for Initiating Pump Station D-2 Alternative Sites for Kitimat Terminal D-3 Initial Pipeline Route Alternatives D-4 Pipeline Route Revisions – Kilometre Posts 0 to 20 D-5 Pipeline Route Revisions – Kilometre Posts 186 to 260 D-6 Pipeline Route Revisions – Kilometre Posts 310 to 415 D-7 Pipeline Route Revisions – Kilometre Posts 415 to 475 D-8 Pipeline Route Revisions – Kilometre Posts 475 to 535 D-9 Pipeline Route Revisions – Kilometre Posts 634 to 681 D-10 Pipeline Route Revisions – Kilometre Posts 810 to 833 D-11 Pipeline Route Revisions – Kilometre Posts 915 to 927 D-12 Pipeline Route Revisions – Kilometre Posts 955 to 1042 D-13 Pipeline Route Revisions – Kilometre Posts 1067 to 1161

Edmonton

BruderheimStation Site

Edmonton Initiating PumpStation Alternative Site

North Saskatchewan River

Paddle R

iver

Pembina River

Sturge

on Rive

r Beaverhill Creek

Vermilion River

Bruderheim

Pembina River Moon Lake (NA)

Elk Island National Park (NP)

Miquelon Lake (PP)

Lois Hole Centennial (PP)

Thunder Lake (PP)

Wabamun Lake (PP)

Strathcona Science (PP)

KP 0KP 75KP 50

KP 25

KP 125KP 100

Cooking Lake-Blackfoot (PRA)

Beaverhill Lake Heritage Rangeland (NA)

Redwater (NA)

Opal (NA)

Parkland (NA)

Roselea (NA)

Wagner (NA)

Halfmoon Lake (NA)

Matthews Crossing (NA)

Lily Lake (NA)Bilby (NA)

Beaverhill (NA)

Isle Lake (NA)

Sundance (NA)

Park Court (NA)

Riverlot 56 (NA)

North Cooking Lake (NA)

Thorsby (NA)

Edgar T. Jones (NA)

Crippsdale (NA)

Kakina Lake (NA)

Majeau Lake (NA)George Lake (NA)

Halfway Lake (NA)

Prefontaine Brock Lakes (NA)

Sherwood Park (NA)

Pembina River (NA)

Redwater River (NA)

Dussault Lake (NA)

Lac La Nonne (NA)

Newton Lake (NA)

Clifford E. Lee (NA)

Victoria Settlement (NA)

Bear Lake (NA)

Gunn (PRA)

Antler Lake Island (NA)

Hastings Lake Islands (NA)WABAMUN 133A

ALEXIS 133

ALEXANDER 134

STONY PLAIN 135

WABAMUN 133B

STONY PLAIN 135A

Leduc

St. Albert

Fort Saskatchewan

Spruce Grove

Beaverhill LakeWabamun Lake

Big Lake

Legal

Devon

Calmar

Mundare

Gibbons

Tofield

Beaumont

Redwater

Westlock

Barrhead

Vegreville

Bon Accord

Morinville

Stony Plain

33

2

15

16

18

45

14

28

43

39

651

60

37

21

19

63

2A

14X100

33

18

2

2

2

28

43

112°0'0"W

112°40'0"W

112°40'0"W

113°20'0"W

113°20'0"W

114°0'0"W

114°0'0"W

114°40'0"W

114°40'0"W

54°0'

0"N

54°0'

0"N

53°40

'0"N

53°40

'0"N

53°20

'0"N

53°20

'0"N

PREPARED FOR

D-1Alternative Sites for the Initiating Pump StationENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary. LCC Projection (Central Meridian 120W, Standard Parallels 52N & 56N) and NAD 83 Datum.National Parks & Indian Reserves: NRCan CLAB Lv1 (May 2009); AB Provincial Parks & Protected Areas: TPR, AB Government (Sept. 2008); City and Town Locations provided by IHS Inc. (June 2008).Hydrographic Data Source: Geography Division, Statistics Canada, 2006 Boundary Files, 92-160-XWE/F, Major Road and Rail data obtained from Geogratis © Department of Natural Resources Canada. All rights reserved.

A

17 Aug 20091:500,000

0 10 205

Kilometres

LEGENDPipeline Kilometre PostPump StationTownNorthern Gateway Pipeline RouteMajor Road

Major RailwayCityIndian ReserveNational Park (NP) or Provincial Park (PP)Other Protected Area*

11-026-001

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*Alberta Protected Area Types Include:Ecological Reserve (ER), Heritage Rangeland (HR), Natural Area (NA), Provincial Recreation Area (PRA),Wilderness Area (WA), Wildland Park (WPP), Willmore Wilderness Park (WP)

 

Eagle Bay Park (PP)

Kitimat Terminal Site

Alternate Site 1

Alternate Site 2Alternate Site 3

Kitimat River

Kitimat

Kitamaat Village

KP 1150KP 1170

KP 1165 KP 1160

KP 1155KP 1172.19

Eagle Bay Park (PP)

Kitimat River Park (PP)

Coste Rocks Park (PP)

Jesse Falls Protected Area (PA)

(FR)

(FR)

KITAMAAT 2

KITAMAAT 1

BEES 6

JUGWEES 5

WALTH 3HENDERSON'S RANCH 11

KITASA 7

KUASTE 8

5100

00

5100

00

5200

00

5200

00

530000

5300

00

5960000

5960000

5970000

5970000

5980000

5980000

5990000

PREPARED FOR

D-2Alternative Sites for the Kitimat TerminalENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Facility Boundary and Kitimat Terminal Drawing, 2008 provided by WorleyParsons Calgary. UTM 9N Projection and NAD 83 Datum.National Parks & Indian Reserves: NRCan CLAB Lv1 (May 2009); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).Hydrographic Data Source: Geography Division, Statistics Canada, 2006 Boundary Files, 92-160-XWE/F., © Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

17 Aug 20091:100,000

0 2 41

Kilometres

LEGENDPipeline Kilometre PostNorthern Gateway Pipeline RouteKitimat Terminal DrawingKitimat Terminal Facility BoundaryAlternate SiteInstitutionalExisting and Proposed ResidentialExisting and Proposed RecreationalExisting and Proposed IndustrialExisting and Proposed CommercialIndian ReserveNational Park (NP) or Provincial Park (PP)Other Protected Area*BC Forest Recreation (FR)

11-026-002

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

5990000

NGP_

B-FIG

MAP-

L V

ersion

: A

*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER),Protected Area (PA), Recreation Area (RA),Wildlife Management Area (WMA)

 

Fraser River

Athab

asca

Rive

r

A

B

CDE

GrandePrairie

GrandeCache

Bruderheim

Fort St.James

BabineLake

ChistCreek

Williams Creek

Kitimat

Tazdli Wyiez Bin/Burnie-Shea Park

Morice Lake Park

Sutherland River Park

Monkman Park

Stuart River Park

St. AlbertSpruce Grove

N. Sask. River

PacificOcean

Mundare

Frase

r Rive

r

Britis

h Colu

mbia

Albert

a

Alaska

97

2

15

13

54

55

16

72

16

5

63

36

37

52

97

40

16/37

23

11

20

26

113

29

37A

27

47

43

24 1

88

39

42

32

12

27

2

53

56

22

21

9

93

20

35

28

2A

64

2A

14

59

39

49

33

18

60

26

45

16

44

QueenCharlotte

Sound

Quesnel Lake

NechakoReservoir

Nechako Reservoir

François Lake

TaklaLake

EutsukLake

Lesser SlaveLake

OotsaLake

Chilcotin R iver

Notikewin River

Beatton River

Nation River

Halfway

River

Berland

Riv

er

Telkwa River

Battle River

Cameron River

Goose River

Lobstick River

Wolf Creek

Chilako River

Klin

aklini

River

Sakwatamau

River

Stuart River

North Thompson River

Kakwa River

Little Smoky River

Simone

tte

River

Dean River

Red Deer River

Driftwood

River

Smoky River

Nass River

Chilko

River

Skeena River

Pine River

WellsGrayPark

MountRobson

Park

CaribooMountains Park

EntiakoPark

TweedsmuirPark Bowron

LakePark

KakwaPark

OminecaPark

SustutPark

Graham-LaurierPark

JasperNational

Park

BanffNational

Park

Whitecourt

Stewart

Buick

Calmar

Murdale

Attachie

Lemoray

Arras

SinclairMills

UpperFraser

Valleyview

Peace River

AliceArm

VanderhoofEndako

Bear Lake

New Hazelton

CharlieLake

Wells

O'Dell Westlock

Dunster

Barrhead

TumblerRidge

Valemount

Hinton

Redwater

BearFlat

TaylorHudson's

Hope

Chetwynd

SmithersTelkwa

Houston

Rocky Mountain House

FraserLake

One HundredMile House

Bon Accord

FrançoisLake

PinkMountain

Croydon

PouceCoupe

Sundre

MacKenzie

McLennan

McGregor

McBride

Legal

Morinville

Mayerthorpe

DraytonValley

Beaumont

Stettler

Millet

ThreeHills

CarstairsDidsbury

Innisfail

Penhold

Ponoka

BlackfaldsLacombe

Lac LaBiche

Devon

SmokyLake

SlaveLake

Wonowon

AthabascaSwan

Hills

Falher

FairviewGrimshaw

Manning

Sexsmith

SpiritRiver

Beaverlodge

Wembley

HighPrairie

FoxCreek

Edson

Bashaw

Drumheller

TrochuBowden

Eckville

Bentley

Rimbey

Vegreville

NewAiyanshGitwinksihlkw

KitamaatVillage

AnahimLake

Towdystan

HartleyBay

RedstoneAlexisCreek

TopleyPerow

Hanceville

KleenaKleene

SouthbankPriestly

Sheraton

Hazelton

PortEdward

Tofield

BurnsLake

StonyPlain

SylvanLake

Terrace

Red Deer

Edmonton

FortSt.

John

Williams Lake

Quesnel

Camrose

FortSaskatchewan

DawsonCreek

Leduc

PrinceGeorge

112°0'0"W

116°0'0"W

116°0'0"W

120°0'0"W

120°0'0"W

124°0'0"W

124°0'0"W

128°0'0"W

128°0'0"W

56°0'

0"N

56°0'

0"N

54°0'

0"N

54°0'

0"N

52°0'

0"N

52°0'

0"N

PREPARED FOR

D-3Initial Pipeline Route AlternativesENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESInitial Pipeline Route provided by WorleyParsons Calgary., LCC Projection (Central Meridian 120W, Standard Parallels 52N & 56N) and NAD 83 Datum.National Parks & Indian Reserves: NRCan CLAB Lv1 (May 2009); AB Provincial Parks: TPR, AB Government (Sept. 2008); BC Provincial Parks: ILMB, BC Government (May 2009).Hydrographic Data Source: Geography Division, Statistics Canada, 2006 Boundary Files, 92-160-XWE/F, Major Road and Rail data obtained from Geogratis © Department of Natural Resources Canada. All rights reserved.

A

13 Aug 20091:3,000,000

0 50 10025

Kilometres

LEGENDCityTownInitial Pipeline RoutePipeline Route Alternative APipeline Route Alternative BPipeline Route Alternative C

Pipeline Route Alternative DPipeline Route Alternative EMajor RoadMajor RailwayIndian ReserveNational Park or Provincial Park

11-026-003

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

B r i t i s h C o l u m b i a A l b e r t aNG

P_B-

FIGMA

P-L

Vers

ion: A

 

Elk Island National Park (NP)

Lois Hole Centennial (PP)

KP 5

KP 0

KP 40 KP 35 KP 30 KP 25 KP 20KP 15

KP 10

KP 55 KP 50 KP 45

Redwater (NA)

Opal (NA)

Halfmoon Lake (NA)

Riverlot 56 (NA)

North Bruderheim (NA)

Northwest of Bruderheim (NA)

Redwater River (NA)

Crippsdale (NA)

Victoria Settlement (NA)

Redwater (CR)

North Bruderheim (CR)

(CR)

(CR)

(CR)

BruderheimPump Station

320000

320000

340000

340000

360000

360000

380000

380000

400000

400000

5960

000

5960

000

5980

000

5980

000

PREPARED FOR

D-4Pipeline Route Revisions - Kilometre Posts 0 to 20ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 12N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-004

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*Alberta Protected Area Types Include:Ecological Reserve (ER), Heritage Rangeland (HR), Natural Area (NA),Provincial Recreation Area (PRA), Wilderness Area (WA), Wildland Park (WPP),Willmore Wilderness Park (WP)

 

Carson-Pegasus (PP)

KP 275KP 270

KP 265

KP 245

KP 240

KP 235KP 230 KP 225 KP 220

KP 260

KP 255KP 250

KP 205KP 200

KP 195

KP 190

KP 185KP 180

KP 215

KP 210

KP 175

Whitecourt Mountain (NA)

Groat Creek (PRA)

(CR)(CR)

WhitecourtPump Station

5200

00

520000

540000

540000

560000

560000

580000

580000

600000

6000

00

5980000

5980

000

6000000

6000

000

6020000

6020

000

6040000

6040

000

PREPARED FOR

D-5Pipeline Route Revisions - Kilometre Posts 186 to 260ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 11N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-005

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*Alberta Protected Area Types Include:Ecological Reserve (ER), Heritage Rangeland (HR), Natural Area (NA),Provincial Recreation Area (PRA), Wilderness Area (WA), Wildland Park (WPP),Willmore Wilderness Park (WP)

 

KP 410KP 405

KP 400

KP 395

KP 390

KP 385

KP 415

KP 380

KP 375

KP 355

KP 350

KP 345

KP 340 KP 335KP 330

KP 370

KP 365 KP 360

KP 325

KP 320

KP 315

KP 310

KP 305

Smoky RiverPump Station

4000

00

400000

420000

420000

440000

440000

460000

460000

480000

4800

00

6020000

6020

000

6040000

6040

000

6060000

6060

000

6080000

6080

000

PREPARED FOR

D-6Pipeline Route Revisions - Kilometre Posts 310 to 415ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., TransCanada Alberta System Pipeline Route Alternative provided by IHS Inc., Nov. 2008., UTM 11N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteTransCanada Alberta System Pipeline Route AlternativeNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-006

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*Alberta Protected Area Types Include:Ecological Reserve (ER), Heritage Rangeland (HR), Natural Area (NA),Provincial Recreation Area (PRA), Wilderness Area (WA), Wildland Park (WPP),Willmore Wilderness Park (WP)

 

Alberta

British Columbia

KP 505

KP 500

KP 495 KP 490

KP 485KP 480 KP 475

KP 470

KP 450 KP 445KP 440

KP 435 KP 430

KP 425

KP 465

KP 460

KP 455KP 410

KP 405

KP 400

KP 395

KP 420

KP 415

Musreau Lake (PRA)

Shuttler Flats (PRA)

Big Mountain Creek (PRA)

Smoky RiverPump Station

3200

00

320000

340000

340000

360000

360000

380000

380000

400000

400000

420000

4200

00

6060000

6060

000

6080

000

6080

000

6100000

6100

000

PREPARED FOR

D-7Pipeline Route Revisions - Kilometre Posts 415 to 475ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., TransCanada Alberta System Pipeline Route Alternative provided by IHS Inc., Nov. 2008., UTM 11N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteTransCanada Alberta System Pipeline Route AlternativeNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-007

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*Alberta Protected Area Types Include:Ecological Reserve (ER), Heritage Rangeland (HR), Natural Area (NA),Provincial Recreation Area (PRA), Wilderness Area (WA), Wildland Park (WPP),Willmore Wilderness Park (WP)

 

Albert

aBr

itish C

olumb

ia

Bearhole Lake Park (PP)

KP 550 KP 545 KP 540 KP 535 KP 530 KP 525

KP 505KP 500

KP 495KP 490

KP 485

KP 480

KP 520KP 515

KP 510

KP 475KP 470

KP 450KP 465

KP 460KP 455

Shuttler Flats (PRA)

Bearhole Lake Protected Area (PA)

(FR)

(FR)

280000

280000

300000

300000

320000

320000

340000

340000

360000

360000

6060

000

6060

000

6080

000

6080

000

6100

000

6100

000

PREPARED FOR

D-8Pipeline Route Revisions - Kilometre Posts 475 to 535ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 11N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-008

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*Alberta Protected Area Types Include:Ecological Reserve (ER), Heritage Rangeland (HR), Natural Area (NA),Provincial Recreation Area (PRA), Wilderness Area (WA), Wildland Park (WPP),Willmore Wilderness Park (WP)*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER), Protected Area (PA),Recreation Area (RA), Wildlife Management Area (WMA)

 

Monkman Park (PP)

Arctic Pacific Lakes Park (PP)

KP 705 KP 700 KP 695 KP 690KP 685

KP 680

KP 675KP 655

KP 650KP 645

KP 640

KP 635

KP 670KP 665 KP 660

KP 615

KP 610 KP 605

KP 600 KP 595

KP 630

KP 625KP 620

Tacheeda Lakes Ecological Reserve (ER)

Greg Duke Memorial Rec (FR)

Wicheeda Lake (FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

Tumbler RidgePump Station

540000

540000

560000

560000

580000

580000

600000

600000 620000

6200

00

6020

000

6020000

6040

000

6040

000

6060

000

6060

000

6080000

6080

000

PREPARED FOR

D-9Pipeline Route Revisions - Kilometre Posts 634 to 681ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 10N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-009

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER), Protected Area (PA),Recreation Area (RA), Wildlife Management Area (WMA)

 

Sutherland River Park (PP)

Stuart River Park (PP)

Mount Pope Park (PP)

Paarens Beach Park (PP)

Babine Lake Marine Park (PP)

Rubyrock Lake Park (PP)

Sowchea Bay Park (PP)

Stuart Lake Marine Park (PP)

KP 860 KP 855 KP 850 KP 845KP 840

KP 835

KP 830

KP 825KP 820

KP 815

KP 810 KP 805 KP 800

KP 900 KP 895

KP 890 KP 885 KP 880 KP 875 KP 870KP 865

Sutherland River Protected Area (PA)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR) (FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

Fort St. JamesPump Station

360000

360000

380000

380000

400000

400000

420000

420000

440000

440000

6000

000

6000

000

6020

000

6020

000

6040

000

6040

000

PREPARED FOR

D-10Pipeline Route Revisions - Kilometre Posts 810 to 833ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 10N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-010

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER), Protected Area (PA),Recreation Area (RA), Wildlife Management Area (WMA)

 

Sutherland River Park (PP)

Uncha Mountains Red Hills Park (PP)

Old Man Lake Park (PP)

Burns Lake Park (PP)

Babine Lake Marine Park (PP)

Ethel F. Wilson Memorial Park (PP)

Dead Man's Island Park (PP)

KP 945 KP 940 KP 935 KP 930KP 925 KP 920 KP 915 KP 910

KP 905KP 900 KP 895

KP 890 KP 885

KP 970

KP 880

KP 965

KP 960

KP 875 KP 870

KP 955 KP 950

Sutherland River Protected Area (PA)

Boer Mountain (FR)

Eagle Creek/opal Beds Trail (FR)

(FR)

(FR)

(FR)(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

Burns LakePump Station

280000

280000

300000

300000

320000

320000

340000

340000

360000

360000

6000

000

6000

000

6020

000

6020

000

6040

000

6040

000

PREPARED FOR

D-11Pipeline Route Revisions - Kilometre Posts 915 to 927ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 10N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

19 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-011

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER), Protected Area (PA),Recreation Area (RA), Wildlife Management Area (WMA)

 

HoustonPump Station

KP 1000

Tazdli Wyiez Bin/Burnie-Shea Park (PP)

Nanika-Kidprice Park (PP)

Nadina Mountian Park (PP)Morice Lake Park (PP)

Old Man Lake Park (PP)

KP 995

KP 990KP 985

KP 980 KP 975

KP 970 KP 965 KP 960

KP 955 KP 950

KP 1055

KP 1050 KP 1045KP 1040

KP 1035

KP 1030 KP 1025 KP 1020KP 1015 KP 1010

KP 1005

Morice River Ecological Reserve (ER)

Morice Mtn Ski Trail / Silverthorne Lake Rec. Site (FR)

Owen Hill (FR)

Thautil-burnie Lakes Trail (FR)

Lamprey Tableland Trail (FR)

Mt. Harry Davis (FR)

Owen Flats "A" & "B" (FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)(FR)

(FR)

(FR)

600000

600000

620000

620000

640000

640000

660000

660000

680000

680000

6000

000

6000

000

6020

000

6020

000

PREPARED FOR

D-12Pipeline Route Revisions - Kilometre Posts 955 to 1042ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., UTM 9N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

20 Aug 20091:250,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteNational Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-012

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER), Protected Area (PA),Recreation Area (RA), Wildlife Management Area (WMA)

 

A

B

C

TunnelTunnel

TunnelTunnel

Kitimat Terminal

Lakelse Lake Park (PP)

4.3 km

3.3 km8.8 km

8.9 km

D

ClearwaterPump Station

6.5 km

6.6 km KP 1080

Clore Tunnel

Hoult Tunnel

Morice Lake Park (PP)

Gitnadoiks River Park (PP)

Atna River Park (PP)

Tazdli Wyiez Bin/Burnie-Shea Park (PP)

Foch-Gilttoyees Park (PP)

Nanika-Kidprice Park (PP)

Lakelse Lake Wetlands Park (PP)

Hai Lake - Mount Herman Park (PP)

Lakelse Lake Park (PP)

Lower Skeena River Park (PP)

Nalbeelah Creek Wetlands Park (PP)

Kitimat River Park (PP)

KP 1070

KP 1065

KP 1150

KP 1145

KP 1140

KP 1060KP 1055

KP 1050 KP 1045 KP 1040

KP 1135

KP 1130KP 1125

KP 1120 KP 1115KP 1110

KP 1105

KP 1100

KP 1095KP 1090

KP 1170

KP 1165

KP 1085

KP 1075

KP 1160

KP 1155

KP 1172.19

Williams Creek Ecological Reserve (ER)

Burnie River Protected Area (PA)

Swan Creek Protected Area (PA)

Thautil-burnie Lakes Trail (FR)

Lamprey Tableland Trail (FR)

Tableland-kidprice Trail (FR)

Clearwater Lakes Tr. (FR)

Nanika Lake Trail (FR)

(FR)

(FR)

(FR)

(FR)(FR)

(FR)(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)

(FR)(FR)500000

500000

520000

520000

540000

540000

560000

560000

580000

580000

600000

600000

5980

000

5980

000

6000

000

6000

000

6020

000

6020

000

PREPARED FOR

D-13Pipeline Route Revisions - Kilometre Posts 1067 to 1161ENBRIDGE NORTHERN GATEWAY PROJECT

REFERENCESPipeline Route: Rev R, 2009 supplied by WorleyParsons Calgary., Initial Pipeline Route provided by WorleyParsons Calgary., Alternate routes, 2007 supplied by WorleyParsons Calgary., UTM 9N Projection and NAD 83 Datum.National Parks: NRCan CLAB Lv1 (May 2009); AB Provincial Parks, Protected Areas & Crown Reserves: TPR, AB Government (Sept. 2008); BC Provincial Parks, Protected Areas, & Forest Recreation: ILMB, BC Government (May 2009).© Topographic map reproduced under licence from Her Majesty the Queen in Right of Canada, with permission of Natural Resources Canada.

A

20 Aug 20091:300,000

0 5 102.5

Kilometres

LEGENDPipeline Kilometre PostPump StationNorthern Gateway Pipeline RouteInitial Pipeline RouteKitimat River via Davies Creek (Alternative A)Hirsch Creek South (Alternative B)Hirsch Creek North (Alternative C)Williams Creek (Alternative D)National Park (NP) or Provincial Park (PP)Other Protected Area*AB Crown Reservation (CR) or BC Forest Recreation (FR)

11-026-013

FIGURE NO.

SCALE

REVISION

DATEFIGURE ID

NGP_

B-FIG

MAP-

L V

ersion

: A

*British Columbia Protected Area Types Include:Conservancy (CV), Ecological Reserve (ER), Protected Area (PA),Recreation Area (RA), Wildlife Management Area (WMA)

 


Recommended