Page 1: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

City of Madera FINAL ADA Self-Evaluation and Transition Plan Update June 2010

Appendix E: Pedestrian Rights-of-Way Reports

Page 2: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sam

ple

Cu

rb R

amp

Key

Map

of D

ow

nto

wn

Co

re.

Co

mp

lete

Map

Ava

ilab

le U

po

n R

equ

est

Page 3: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 1 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.3% (8.33% max). Slopes of flared sides are 13.8% and 10.1% (10% max). There is not a 24" min. segment of straight curb on each side of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 12/3/2010 ExteriorCurb Ramp Barriers

Page 4: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 2 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max). Slopes of flared sides are 10.5% and 10.6% (10% max). Space at the bottom of the curb ramp is 27" x 48" (48" x 48" min) clear. 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 22/3/2010 ExteriorCurb Ramp Barriers

Page 5: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 3 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope at the top landing is 2.2% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 32/3/2010 ExteriorCurb Ramp Barriers

Page 6: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 4 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.4% (8.33% max). Slopes of flared sides are 12.8% and 12.9% (10% max). Slope at the top landing is 3.3% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 5 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 6 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 42/3/2010 ExteriorCurb Ramp Barriers

Page 7: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 7 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 8 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.9% (8.33% max). Slopes of flared sides are 11.7% and 13.3% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 52/3/2010 ExteriorCurb Ramp Barriers

Page 8: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 9 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.7% (8.33% max). Slopes of flared sides are 12.8% and 10.4% (10% max). Slope at top landing is 5%(2% max). 24" segment of straight curb not provided on one side of curb ramp. Space at bottom of ramp is 20" x48" (48" x48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 62/3/2010 ExteriorCurb Ramp Barriers

Page 9: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 10 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.8% (8.33% max). Slope of one flared side is 15% (10% max). Slope at the top landing is 2.2% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 72/3/2010 ExteriorCurb Ramp Barriers

Page 10: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 11 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope of one flared side is 12% (10% max). Slope at the top landing is 2.4% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks. There is also grass growing on the curb ramp.

Notes:

1127B.5 #5State: - Federal:

Page 82/3/2010 ExteriorCurb Ramp Barriers

Page 11: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 12 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at top landing is 2.8% (2% max). 24" segment straight curb not provided on either ends of the curb ramp. Space at the bottom of the ramp is 41" (48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 92/3/2010 ExteriorCurb Ramp Barriers

Page 12: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 13 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slope of one flared side is 11.9% (10% max). Slope at the top landing is 4.1% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 102/3/2010 ExteriorCurb Ramp Barriers

Page 13: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 14 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 11.1% (10% max). Level landing at the top is 42" (48" min) and slope is 3.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 15 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $30012" wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 112/3/2010 ExteriorCurb Ramp Barriers

Page 14: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 16 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $30012" wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 17 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 122/3/2010 ExteriorCurb Ramp Barriers

Page 15: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 18 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 19 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11% (8.33% max). Level landing at the top is 12" (48" min) and slope is 3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 132/3/2010 ExteriorCurb Ramp Barriers

Page 16: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 20 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 13% (10% max). Level landing at the top of the curb ramp is 44.5" (48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 21 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 2.8% (2% max) and level landing is 47" (48" min) clear.Notes:

1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 142/3/2010 ExteriorCurb Ramp Barriers

Page 17: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 22 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 3.6% (2% max) and level landing is 45" (48" min). 24" min. segment of straight curb is not provided at either ends of the curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks. Grass is growing on curb ramp.

Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 23 Priority:

Install, replace or modify curb ramp $3,500Space at the bottom of the ramp is not 48" x 48" min. clear. Curb ramp is not inside marked crossing.

Notes:

1127B.5 #4State:4.7.10Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 152/3/2010 ExteriorCurb Ramp Barriers

Page 18: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 24 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 4.5% (2% max) and level landing is 45" (48" min). 24" segment straight curb not provided on either ends of the curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 25 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at top landing is 2.7% (2% max) and level landing is 46.5"(48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 162/3/2010 ExteriorCurb Ramp Barriers

Page 19: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 26 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.8% (8.33% max). Slope of one flared side is 12.1% (10% max). Slope at top landing is 2.2% (2% max) and level landing is 39" (48" min). Space at the bottom of the ramp does not provided 48" x 48" min. clear space.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 27 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slopes of flared sides are 10.4% and 11% (10% max). Level landing at the top not provided.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" wide grooved borders is not provided at the top of the curb ramp.Notes:

1127B.5 #6State:4.7.4Federal:

Page 172/3/2010 ExteriorCurb Ramp Barriers

Page 20: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 28 Priority:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Page 182/3/2010 ExteriorCurb Ramp Barriers

Page 21: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 29 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at top landing is 2.8% (2% max). 24" segment straight curb not provided on either ends of the curb ramp. Space at the bottom of the ramp is 41" (48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 192/3/2010 ExteriorCurb Ramp Barriers

Page 22: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 30 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 202/3/2010 ExteriorCurb Ramp Barriers

Page 23: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 31 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 2.9% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 212/3/2010 ExteriorCurb Ramp Barriers

Page 24: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 32 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.4% (10% max). Slope at top landing is 3.7% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 33 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 2.5% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 222/3/2010 ExteriorCurb Ramp Barriers

Page 25: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 34 Priority:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 35 Priority:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 36 Priority:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 232/3/2010 ExteriorCurb Ramp Barriers

Page 26: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 37 Priority:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 38 Priority:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,50024" min. segment of straight curb are not provided at either ends of the curb ramp.Notes:

1127B.5 #9State:4.7.10Federal:

Page 242/3/2010 ExteriorCurb Ramp Barriers

Page 27: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 39 Priority:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 40 Priority:

Install, replace or modify curb ramp $3,500Level landing at the top is 46" (48" min). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 252/3/2010 ExteriorCurb Ramp Barriers

Page 28: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 41 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.4% (10% max). Slope at top landing is 2.6% (2% max). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 42 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 262/3/2010 ExteriorCurb Ramp Barriers

Page 29: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 43 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 3.1% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 272/3/2010 ExteriorCurb Ramp Barriers

Page 30: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 44 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max). Slope of one flared side is 10.8% (10% max). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 45 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 46 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 282/3/2010 ExteriorCurb Ramp Barriers

Page 31: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 47 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 48 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 2.6% (2% max). 24" segment of straight curb is not within markings.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Page 292/3/2010 ExteriorCurb Ramp Barriers

Page 32: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 49 Priority:

Install, replace or modify curb ramp $3,500Level landing at the top of curb ramp is 46" (48" min) long. 24" segment of straight curb is not within markings.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 50 Priority:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 51 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 302/3/2010 ExteriorCurb Ramp Barriers

Page 33: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 52 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 312/3/2010 ExteriorCurb Ramp Barriers

Page 34: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 53 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.6% (8.33% max). Slope of one flared side is 11.5% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 322/3/2010 ExteriorCurb Ramp Barriers

Page 35: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 54 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.1% (8.33% max). Slopes of flared sides are 19% and 17% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 55 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.4% (10% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Page 332/3/2010 ExteriorCurb Ramp Barriers

Page 36: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 56 Priority:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.1% (8.33% max). Slope of one flared side is 13% (10% max). Slope at the top landing is 2.3% (2% max). 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 342/3/2010 ExteriorCurb Ramp Barriers

Page 37: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 57 Priority:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,50024" segment of straight curb is not within markings.Notes:

1127B.5 #9State:4.7.10Federal:

Curb Ramp3 - 58 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 17.1% (8.33% max). Slope of one flared side is 15% (10% max). Slope at the top landing is 3.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 352/3/2010 ExteriorCurb Ramp Barriers

Page 38: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 59 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.3% (8.33% max). Slope of one flared side is 12% (10% max). Slope at the top landing is 3% (2% max) plus level landing is not marked. 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 362/3/2010 ExteriorCurb Ramp Barriers

Page 39: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 60 Priority:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.3% (8.33% max). Level landing at the top is 38.5" (48" min) long. 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 61 Priority:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500There is not 48" x 48" min. clear space provided at the bottom of the curb ramp.Notes:

1127B.5 #4State:4.7.10Federal:

Page 372/3/2010 ExteriorCurb Ramp Barriers

Page 40: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 62 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 63 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 64 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 382/3/2010 ExteriorCurb Ramp Barriers

Page 41: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 65 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.2% (8.33% max). Slopes of flared sides are both 15% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 392/3/2010 ExteriorCurb Ramp Barriers

Page 42: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 66 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.1% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 402/3/2010 ExteriorCurb Ramp Barriers

Page 43: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 67 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 15% (10% max). Slope at the top landing is 7.4% (2% max), adequate level landing is not provided.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 412/3/2010 ExteriorCurb Ramp Barriers

Page 44: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 68 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 422/3/2010 ExteriorCurb Ramp Barriers

Page 45: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 69 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.3% (8.33% max). Level landing is not provided.Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 432/3/2010 ExteriorCurb Ramp Barriers

Page 46: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 70 Priority:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $30012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 71 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max). Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 442/3/2010 ExteriorCurb Ramp Barriers

Page 47: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 72 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 452/3/2010 ExteriorCurb Ramp Barriers

Page 48: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 73 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Top level landing is 44" (48" min).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 74 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.8% (10% max).Notes:

1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 6.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Page 462/3/2010 ExteriorCurb Ramp Barriers

Page 49: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 75 Priority:

Install, replace or modify curb ramp $3,500Space at the bottom of the ramp is 46" x 48" (48" x 48" min).Notes:

1127B.5 #4State:4.7.10Federal:

Provide level landing $2,000Slope of gutter pane is 7.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 76 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.9% (8.33% max). Top level landing is not provided.Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 472/3/2010 ExteriorCurb Ramp Barriers

Page 50: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 77 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 78 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 482/3/2010 ExteriorCurb Ramp Barriers

Page 51: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 79 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.6% (8.33% max). Slope at the top landing is 6% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 492/3/2010 ExteriorCurb Ramp Barriers

Page 52: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 80 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.3% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 502/3/2010 ExteriorCurb Ramp Barriers

Page 53: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 81 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.9% (8.33% max). 24" straight segment of the curbs are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 512/3/2010 ExteriorCurb Ramp Barriers

Page 54: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 82 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slope of one flared side is 14.3% (10% max). 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 83 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 522/3/2010 ExteriorCurb Ramp Barriers

Page 55: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 84 Priority:

Install, replace or modify curb ramp $3,500 24" segment of straight curb is not within markings.Notes:

1127B.5 #9State:4.7.10Federal:

Provide level landing $2,000Slope of gutter pane is 6.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 85 Priority:

Install, replace or modify curb ramp $3,50024" straight segment is not within markings.Notes:

1127B.5 #9State:4.7.10Federal:

Provide level landing $2,000Slope of gutter pane is 8.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 532/3/2010 ExteriorCurb Ramp Barriers

Page 56: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 86 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). 24" min. straight segment of the curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 87 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10% (8.33% max). Slope of one flared side is 11.5% (10% max). 24" min. straight segment of the curbs are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 88 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 542/3/2010 ExteriorCurb Ramp Barriers

Page 57: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 89 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11% (10% max). Top level landing is 47" (48" min).Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 90 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10% (8.33% max). Slope of one flared side is 11.7% (10% max). 24" min. straight segment of the curbs are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 552/3/2010 ExteriorCurb Ramp Barriers

Page 58: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 91 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.7% (8.33% max). Slope at top landing is 2.9% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 92 Priority:

Provide level landing $2,000Slope of gutter pane is 5.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 93 Priority:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Page 562/3/2010 ExteriorCurb Ramp Barriers

Page 59: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 94 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9% (8.33% max). Slope at the top landing is 5.8% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 95 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 5.5% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 572/3/2010 ExteriorCurb Ramp Barriers

Page 60: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 96 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.6% (8.33% max). Slope at the top landing is 3.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide level landing $2,000Slope of gutter pane is 7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Page 582/3/2010 ExteriorCurb Ramp Barriers

Page 61: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 97 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14% (8.33% max). Slope at the top landing is 2.9% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 592/3/2010 ExteriorCurb Ramp Barriers

Page 62: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 98 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.5% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 99 Priority:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 602/3/2010 ExteriorCurb Ramp Barriers

Page 63: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 100 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 612/3/2010 ExteriorCurb Ramp Barriers

Page 64: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 101 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). Slope at the top landing is 6.9% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 14% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 622/3/2010 ExteriorCurb Ramp Barriers

Page 65: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 102 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 7.1% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 632/3/2010 ExteriorCurb Ramp Barriers

Page 66: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 103 Priority:

Provide level landing $2,000Slope of gutter pane is 12.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $30012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 642/3/2010 ExteriorCurb Ramp Barriers

Page 67: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 104 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slope at the top landing is 2.6% (2% max) and level landing is 31" (48" min). 24" min. straight segment of the curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 652/3/2010 ExteriorCurb Ramp Barriers

Page 68: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 105 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 106 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 662/3/2010 ExteriorCurb Ramp Barriers

Page 69: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 107 Priority:

Provide level landing $2,000Slope of gutter pane is 10.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 672/3/2010 ExteriorCurb Ramp Barriers

Page 70: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 108 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.5% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 682/3/2010 ExteriorCurb Ramp Barriers

Page 71: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 109 Priority:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 110 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.7% (8.33% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 692/3/2010 ExteriorCurb Ramp Barriers

Page 72: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 111 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope of one flared side is 13.8% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 112 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope of one flared side is 12% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 702/3/2010 ExteriorCurb Ramp Barriers

Page 73: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 113 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 114 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 115 Priority:

Provide detectable warning strip $1,000Detectable warnings are 24" the length of the walking surface of the curb ramp (36" min. wide).

Notes:

1127B.5 #7State:4.7.7Federal:

Page 712/3/2010 ExteriorCurb Ramp Barriers

Page 74: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 116 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.2% (8.33% max). Slopes of both flared sides are 13% (10% max). Slope at the top landing is 3.2% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 117 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max). Slope of one flared side is 10.2% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 722/3/2010 ExteriorCurb Ramp Barriers

Page 75: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 118 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11.4% (10% max). Top level landing is 5.9% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 119 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max). Slopes of flared sides are 19% and 15.2% (10% max). Slope at the top landing is 2.8% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 732/3/2010 ExteriorCurb Ramp Barriers

Page 76: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 120 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11% (10% max). 24" segment of straight curb not provided.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 9.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 742/3/2010 ExteriorCurb Ramp Barriers

Page 77: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 121 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max). Slope of one flared side is 11% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 752/3/2010 ExteriorCurb Ramp Barriers

Page 78: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 122 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.6% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 762/3/2010 ExteriorCurb Ramp Barriers

Page 79: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 123 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.2% (8.33% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 124 Priority:

Provide level landing $2,000Slope of gutter pane is 11.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.8% (8.33% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Page 772/3/2010 ExteriorCurb Ramp Barriers

Page 80: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 125 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max). Top level landing is 45" (48" min).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 782/3/2010 ExteriorCurb Ramp Barriers

Page 81: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 126 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 7.1% (2% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 792/3/2010 ExteriorCurb Ramp Barriers

Page 82: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 127 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 5.3% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 128 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 802/3/2010 ExteriorCurb Ramp Barriers

Page 83: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 129 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 812/3/2010 ExteriorCurb Ramp Barriers

Page 84: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 130 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.1% (8.33% max). Slope at the top landing is 7.5% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 822/3/2010 ExteriorCurb Ramp Barriers

Page 85: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 131 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 832/3/2010 ExteriorCurb Ramp Barriers

Page 86: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 132 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 842/3/2010 ExteriorCurb Ramp Barriers

Page 87: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 133 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9% (8.33% max). Slopes of flared sides are 13% and 11.7% (10% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 134 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 852/3/2010 ExteriorCurb Ramp Barriers

Page 88: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 135 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13% (8.33% max). Slopes of flared sides are 17% and 15% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 862/3/2010 ExteriorCurb Ramp Barriers

Page 89: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 136 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 137 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.5% (10% max).Notes:

1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 872/3/2010 ExteriorCurb Ramp Barriers

Page 90: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 138 Priority:

Provide level landing $2,000Slope of gutter pane is 9.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are 24" (36" min) of the length of the walking surface of the curb ramp.

Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 139 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9% (8.33% max). Slope of one flared side is 16% (10% max).Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 140 Priority:

Install, replace or modify curb ramp $3,500Level landing is not provided. Space at the bottom of the curb ramp is 39" x 48" (48" x 48" min).

Notes:

1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 882/3/2010 ExteriorCurb Ramp Barriers

Page 91: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 141 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max). Slope at the top landing is 2.6% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 142 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope at the top landing is 2.2% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 892/3/2010 ExteriorCurb Ramp Barriers

Page 92: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 143 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 144 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 902/3/2010 ExteriorCurb Ramp Barriers

Page 93: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 145 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max). Slope at the top landing is 4.9% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 912/3/2010 ExteriorCurb Ramp Barriers

Page 94: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 146 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.3% (8.33% max). Slope of one flared side is 14.5% (10% max).24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 147 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 148 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 922/3/2010 ExteriorCurb Ramp Barriers

Page 95: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 149 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 932/3/2010 ExteriorCurb Ramp Barriers

Page 96: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 150 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.6% (8.33% max). Slopes of flared sides are 15% and 13.9% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 942/3/2010 ExteriorCurb Ramp Barriers

Page 97: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 151 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.8% (8.33% max). Slope at the top landing is 2.7% (2% max). 24" min. segment of straight curb not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 152 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). 24" min. segment of straight curb not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 952/3/2010 ExteriorCurb Ramp Barriers

Page 98: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 153 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.5% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at the top landing is 2.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 154 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slopes of flared sides are 15.8% and 14% (10% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 962/3/2010 ExteriorCurb Ramp Barriers

Page 99: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 155 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). Slopes of flared sides are 11.9% & 13% (10% max). Slope at the top landing is 3.8% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 40" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 972/3/2010 ExteriorCurb Ramp Barriers

Page 100: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 156 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.1% (8.33% max). Slopes of flared sides are 12% and 15% (10% max). Slope at the top landing is 2.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 982/3/2010 ExteriorCurb Ramp Barriers

Page 101: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 157 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.4% (8.33% max). Slope of one flared side is 11.9% (10% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 992/3/2010 ExteriorCurb Ramp Barriers

Page 102: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 158 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.5% (8.33% max). Slope at the top landing is 2.6% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 159 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1002/3/2010 ExteriorCurb Ramp Barriers

Page 103: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 160 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.4% (8.33% max). Slope at the top landing is 2.7% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 161 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.5% (8.33% max). Slopes of flared sides are 14% and 15% (10% max). Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1012/3/2010 ExteriorCurb Ramp Barriers

Page 104: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 162 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.6%(8.33% max). Slopes of flared sides are 13.3% & 14.9% (10% max).Slope at the top landing is 2.5% (2% max).24" segment of straight curb are not within markings.Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 163 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.6% (8.33% max). Slope of one flared side is 13.4% (10% max). Slope at the top landing is 4.3% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1022/3/2010 ExteriorCurb Ramp Barriers

Page 105: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 164 Priority:

Provide level landing $2,000Slope of gutter pane is 8.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 165 Priority:

Provide level landing $2,000Slope of gutter pane is 7.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1032/3/2010 ExteriorCurb Ramp Barriers

Page 106: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 166 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max). Slope at the top landing is 4% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1042/3/2010 ExteriorCurb Ramp Barriers

Page 107: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 167 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 168 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.8% (8.33% max). Slopes of flared sides are 11% & 13% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1052/3/2010 ExteriorCurb Ramp Barriers

Page 108: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 169 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 170 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 171 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 6.2% (2% max). Space at the bottom of the curb ramp is 39" x 48" (48" x 48" min).

Notes:

1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 172 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1062/3/2010 ExteriorCurb Ramp Barriers

Page 109: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 173 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope at the top landing is 4.1% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1072/3/2010 ExteriorCurb Ramp Barriers

Page 110: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 174 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max). Slope at the top landing is 2.8% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 40" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 175 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.5% (8.33% max). Slope at the top landing is 2.6% (2% max). Space at the bottom of the curb ramp is 39" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1082/3/2010 ExteriorCurb Ramp Barriers

Page 111: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 176 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 6% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 38" x 48" (48" x 48" min).

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 177 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.2% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1092/3/2010 ExteriorCurb Ramp Barriers

Page 112: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 178 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 4.1% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1102/3/2010 ExteriorCurb Ramp Barriers

Page 113: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 179 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slope at the top landing is 3.4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1112/3/2010 ExteriorCurb Ramp Barriers

Page 114: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 180 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.4% (8.33% max). Slope of one flared side is 16.1% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1122/3/2010 ExteriorCurb Ramp Barriers

Page 115: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 181 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Space at the bottom of the curb ramp is 42" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1132/3/2010 ExteriorCurb Ramp Barriers

Page 116: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 182 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.8% (8.33% max). Slope at the top landing is 3.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 183 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). Slope at the top landing is 2.6% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1142/3/2010 ExteriorCurb Ramp Barriers

Page 117: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 184 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.8% (8.33% max). Slope of one flared side is 17% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 185 Priority:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1152/3/2010 ExteriorCurb Ramp Barriers

Page 118: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 186 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.9% (8.33% max). Slope of one flared side is 11.5% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1162/3/2010 ExteriorCurb Ramp Barriers

Page 119: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 187 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max). Slope at the top landing is 3.9% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1172/3/2010 ExteriorCurb Ramp Barriers

Page 120: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 188 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.6% (8.33% max). Slope at the top landing is 3.9% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 19% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 189 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1182/3/2010 ExteriorCurb Ramp Barriers

Page 121: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 190 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.4% (8.33% max). Slope at the top landing is 2.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 14.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1192/3/2010 ExteriorCurb Ramp Barriers

Page 122: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 191 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16% (8.33% max). Slope at the top landing is 3.2% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1202/3/2010 ExteriorCurb Ramp Barriers

Page 123: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 192 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max). Slope at the top landing is 3.2% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1212/3/2010 ExteriorCurb Ramp Barriers

Page 124: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 193 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.9% (8.33% max). Slopes of flared sides are 19.8% and 16.7% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1222/3/2010 ExteriorCurb Ramp Barriers

Page 125: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 194 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1232/3/2010 ExteriorCurb Ramp Barriers

Page 126: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 196 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 197 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.7% (8.33% max). Slope at the top landing is 3.5% (2% max). Space at the bottom of the curb ramp is 34" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1242/3/2010 ExteriorCurb Ramp Barriers

Page 127: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 198 Priority:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 199 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1252/3/2010 ExteriorCurb Ramp Barriers

Page 128: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 200 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.8% (10% max). Slope at the top landing is 6.5% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 201 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 2.9% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1262/3/2010 ExteriorCurb Ramp Barriers

Page 129: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 202 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.6% (8.33% max). Slope at the top landing is 3.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1272/3/2010 ExteriorCurb Ramp Barriers

Page 130: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 203 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slope at the top landing is 5.9% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 204 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.2% (8.33% max). Slope at the top landing is 2.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1282/3/2010 ExteriorCurb Ramp Barriers

Page 131: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 205 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.1% (8.33% max). Slope at the top landing is 3.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1292/3/2010 ExteriorCurb Ramp Barriers

Page 132: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 206 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.7% (8.33% max). Slope at the top landing is 2.3% (2% max) and top level landing is 45.5" (48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1302/3/2010 ExteriorCurb Ramp Barriers

Page 133: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 207 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.2% (8.33% max). Slopes of flared sides are 13.3% and 12.6% (10% max). Slope at the top landing is 3.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1312/3/2010 ExteriorCurb Ramp Barriers

Page 134: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 208 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max). Slope at the top landing is 4.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1322/3/2010 ExteriorCurb Ramp Barriers

Page 135: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 209 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope of one flared side is 15% (10% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 210 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.7% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1332/3/2010 ExteriorCurb Ramp Barriers

Page 136: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 211 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.9% (8.33% max). Slope of one flared side is 13.6% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1342/3/2010 ExteriorCurb Ramp Barriers

Page 137: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 212 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.7% (8.33% max). Top level landing is 38.5" (48" min).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1352/3/2010 ExteriorCurb Ramp Barriers

Page 138: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 213 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.9% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1362/3/2010 ExteriorCurb Ramp Barriers

Page 139: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 214 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.5% (8.33% max). Slope at the top landing is 5% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1372/3/2010 ExteriorCurb Ramp Barriers

Page 140: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 215 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max). Slopes of flared sides are 11% and 14% (10% max). Slope at the top landing is 3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1382/3/2010 ExteriorCurb Ramp Barriers

Page 141: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 216 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.7% (8.33% max). Slope at the top landing is 2.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1392/3/2010 ExteriorCurb Ramp Barriers

Page 142: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 217 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1402/3/2010 ExteriorCurb Ramp Barriers

Page 143: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 218 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.4% (8.33% max). Slopes of flared sides are 16.7% and 14% (10% max). 24" min. segment of straight curb not provided.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1412/3/2010 ExteriorCurb Ramp Barriers

Page 144: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 219 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.7% (8.33% max). Level landing not provided.Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1422/3/2010 ExteriorCurb Ramp Barriers

Page 145: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 220 Priority:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide surface texturing $30012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Page 1432/3/2010 ExteriorCurb Ramp Barriers

Page 146: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 221 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slopes of flared sides are 11.5% and 10.7% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:

1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 222 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 223 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1442/3/2010 ExteriorCurb Ramp Barriers

Page 147: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 224 Priority:

Install, replace or modify curb ramp $3,500There is a step in order to access the path of travel. Install curb ramp.Notes:

1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 225 Priority:

Install, replace or modify curb ramp $3,500There is a step in order to access the path of travel. Install curb ramp.Notes:

1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 226 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 227 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 228 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 229 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1452/3/2010 ExteriorCurb Ramp Barriers

Page 148: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 230 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 231 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 232 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 233 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 234 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 235 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1462/3/2010 ExteriorCurb Ramp Barriers

Page 149: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 236 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 237 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 238 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 239 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 240 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 241 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1472/3/2010 ExteriorCurb Ramp Barriers

Page 150: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 242 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 243 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 244 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.9% (8.33% max). Slope of one flared side is 12.7% (10% max). Slope at the top landing is 3.2% (2% max) and 33" (48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1482/3/2010 ExteriorCurb Ramp Barriers

Page 151: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 245 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 3.3% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 246 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max). Slope of one flared side is 10.5% (10% max). Slope at the top landing is 3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1492/3/2010 ExteriorCurb Ramp Barriers

Page 152: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 247 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 248 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 3.5% (2% max).Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1502/3/2010 ExteriorCurb Ramp Barriers

Page 153: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 249 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 12.1% (10% max). Slope at the top landing is 3% (2% max). 24" min. straight curb is not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1512/3/2010 ExteriorCurb Ramp Barriers

Page 154: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 250 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 12.4% (10% max).Notes:

1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 6.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 251 Priority:

Provide level landing $2,000Slope of gutter pane is 9.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1522/3/2010 ExteriorCurb Ramp Barriers

Page 155: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 252 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max). Slopes of flared sides are 13% and 11.6% (10% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1532/3/2010 ExteriorCurb Ramp Barriers

Page 156: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 253 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11.9% (10% max). 24" min. straight curb is not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 11.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1542/3/2010 ExteriorCurb Ramp Barriers

Page 157: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 254 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.6% (8.33% max). Slopes of flared sides are 12.6% and 13.4% (10% max). Slope at the top landing is 4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 255 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.9% (8.33% max). Slope of one flared side is 12.7% (10% max). Slope at the top landing is 3.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1552/3/2010 ExteriorCurb Ramp Barriers

Page 158: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 256 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 257 Priority:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1562/3/2010 ExteriorCurb Ramp Barriers

Page 159: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 258 Priority:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1572/3/2010 ExteriorCurb Ramp Barriers

Page 160: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 259 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.5% (10% max).Notes:

1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1582/3/2010 ExteriorCurb Ramp Barriers

Page 161: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 260 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11.2% (10% max).Notes:

1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1592/3/2010 ExteriorCurb Ramp Barriers

Page 162: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 261 Priority:

Install, replace or modify curb ramp $3,500Top landing is not provided.Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1602/3/2010 ExteriorCurb Ramp Barriers

Page 163: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 262 Priority:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 263 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is under construction.Notes:

1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 264 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1612/3/2010 ExteriorCurb Ramp Barriers

Page 164: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 265 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 266 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is under construction.Notes:

1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 267 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is under construction.Notes:

1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 268 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is under construction.Notes:

1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 269 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1622/3/2010 ExteriorCurb Ramp Barriers

Page 165: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 270 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 271 Priority:

Install, replace or modify curb ramp $3,500Top landing is not provided.Notes:

1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 272 Priority:

Install, replace or modify curb ramp $3,500Top landing is not provided.Notes:

1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1632/3/2010 ExteriorCurb Ramp Barriers

Page 166: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 273 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.5% (8.33% max). Slopes of flared sides are 12% and 13% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 274 Priority:

Install, replace or modify curb ramp $3,500Top landing is not provided.Notes:

1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.7% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1642/3/2010 ExteriorCurb Ramp Barriers

Page 167: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 275 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 10.6% (10% max). Slope at the top landing is 2.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Page 1652/3/2010 ExteriorCurb Ramp Barriers

Page 168: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 276 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 7.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 277 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1662/3/2010 ExteriorCurb Ramp Barriers

Page 169: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 278 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 279 Priority:

Provide level landing $2,000Slope of gutter pane is 6.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1672/3/2010 ExteriorCurb Ramp Barriers

Page 170: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 280 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.9% (8.33% max). Slopes of both flared sides are 12.4% and 10.6% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1682/3/2010 ExteriorCurb Ramp Barriers

Page 171: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 281 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 6.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 282 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1692/3/2010 ExteriorCurb Ramp Barriers

Page 172: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 283 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11% (8.33% max). Slope of one flared side is 13% (10% max).Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.8% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1702/3/2010 ExteriorCurb Ramp Barriers

Page 173: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 284 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 285 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1712/3/2010 ExteriorCurb Ramp Barriers

Page 174: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 286 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 287 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slopes of both flared sides are 13% and 14% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1722/3/2010 ExteriorCurb Ramp Barriers

Page 175: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 288 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slopes of both flared sides are 18% and 20% (10% max). Slope at the top landing is 2.8% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.2% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1732/3/2010 ExteriorCurb Ramp Barriers

Page 176: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 289 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12% (8.33% max). Slopes of both flared sides are 18% and 19% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1742/3/2010 ExteriorCurb Ramp Barriers

Page 177: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 290 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.6% (8.33% max). Slopes of both flared sides are 22% and 19% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1752/3/2010 ExteriorCurb Ramp Barriers

Page 178: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 291 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.8% (8.33% max). Slopes of both flared sides are 21% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1762/3/2010 ExteriorCurb Ramp Barriers

Page 179: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 292 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.2% (8.33% max). Slopes of both flared sides are 24% (10% max). Slope at the top landing is 2.5% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1772/3/2010 ExteriorCurb Ramp Barriers

Page 180: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 293 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.6% (8.33% max). Slope at the top landing is 2.8% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1782/3/2010 ExteriorCurb Ramp Barriers

Page 181: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 294 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.5% (8.33% max). Slope of one flared side is 23% (10% max). Slope at the top landing is 2.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.3% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1792/3/2010 ExteriorCurb Ramp Barriers

Page 182: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 295 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 296 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max). Slope at the top landing is 3% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Page 1802/3/2010 ExteriorCurb Ramp Barriers

Page 183: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 297 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14% (8.33% max). Slope at the top landing is 5.6% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 298 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13% (8.33% max). Slope at the top landing is 3% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.1% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1812/3/2010 ExteriorCurb Ramp Barriers

Page 184: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 299 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max). Slope at the top landing is 2.2% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 300 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 18.6% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1822/3/2010 ExteriorCurb Ramp Barriers

Page 185: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 301 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max). Slope at the top landing is 3% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.5% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1832/3/2010 ExteriorCurb Ramp Barriers

Page 186: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 302 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 18% (8.33% max). Slope at the top landing is 5% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1842/3/2010 ExteriorCurb Ramp Barriers

Page 187: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 303 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.8% (8.33% max). Slope at the top landing is 4.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1852/3/2010 ExteriorCurb Ramp Barriers

Page 188: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 304 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.2% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 305 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1862/3/2010 ExteriorCurb Ramp Barriers

Page 189: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 306 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.5% (8.33% max). Slope at the top landing is 3% (2% max).Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 307 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.9% (8.33% max). Slope at the top landing is 2.4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1872/3/2010 ExteriorCurb Ramp Barriers

Page 190: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 308 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.3% (8.33% max). Slope at the top landing is 2.4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 309 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1882/3/2010 ExteriorCurb Ramp Barriers

Page 191: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 310 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.3% (8.33% max). Slopes of flared sides are 11% (10% max). Slope at the top landing is 5.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1892/3/2010 ExteriorCurb Ramp Barriers

Page 192: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 311 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 12% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 312 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:

1127B.5 #5State: - Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1902/3/2010 ExteriorCurb Ramp Barriers

Page 193: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 313 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max).Notes:

1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:

1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:

1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1912/3/2010 ExteriorCurb Ramp Barriers

Page 194: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Third Street Sidewalk Barriers

Page 195: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t 3r

d S

tree

t

N G St

W 3

rd S

t

N Gateway St

4-19

6

W 3

rd S

t

N G St

Page 196: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Fourth Street Sidewalk Barriers

Page 197: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- W

est

4th

Str

eet

- 1

N H St

Hwy 99

N J St

N I St

W 4

th S

t

4-80

4-10

1

4-81

4-79

N I St

Page 198: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

N Gate

way St

N H St

W 3

rd S

t

W 5

th S

tN G

St

W 4

th S

tN G

St

Sid

ewal

k B

arri

ers

- Wes

t 4t

h S

tree

t - 2

4-10

0

4-99

4-83

4-82

Page 199: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 4t

h S

tree

t - 3

N D St

E 3rd

St

E 5

th S

t

N E St

E 4th

St

4-98

4-97

4-85

4-84

4-86

N E St

N D St

E 4th

St

Page 200: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 4t

h S

tree

t - 4

N B St

E 3rd

St

E 5

th S

t

N C St

E 4th

St

4-96

4-95

4-94

4-93

4-89

4-88

4-87

N C St

N B St

Page 201: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 4t

h S

tree

t - 5

Flume St

E C

entr

al A

ve

N Lake St

E 5

th S

t

N Lake St

N A St

E 4th

St

4-92

4-90

4-91

E 4th

St

Page 202: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Fifth Street Sidewalk Barriers

Page 203: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk Barriers - West 5th Street

S G St

N Gateway St

W 4th St

W 5th St 4-36

4-37

4-38

4-39

Page 204: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 5t

h S

tree

t

N D St

E 5

th S

t

N E St

N C St

E Yo

sem

ite A

ve

E 4

th S

t

4-15

4

4-15

3

4-15

5

4-15

6

4-15

7

E 5

th S

t

N D St

Page 205: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sixth Street Sidewalk Barriers

Page 206: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t 6t

h S

tree

t - 1

Hwy 99

S I St

S H St

W 6

th S

t

W Yo

sem

ite A

ve

4-10

2

4-10

4

4-10

6

4-10

7

4-12

3

4-12

2

S I St

Page 207: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t 6t

h S

tree

t - 2

4-12

1

4-10

9

4-10

8

S Gate

way Dr

W 7

th S

t

E 6

th S

t

S G St

W 6

th S

t

W Yo

sem

ite A

ve

Page 208: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 6t

h S

tree

t -3

E 6

th S

t

S D St

S E St

E Yo

sem

ite A

ve

S C St

4-12

0 4-11

0

4-11

9

4-11

8

4-11

2

4-11

1

E 6

th S

t

S D St

S E St

Page 209: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 6t

h S

tree

t - 4

4-11

7

4-11

6

4-11

5 4-11

4

4-11

3

E 6

th S

t

S B St

S C St E Yo

sem

ite A

ve

S A St

S B St

S A St

Page 210: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Ninth Street Sidewalk Barriers

Page 211: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

©20

09 G

oogl

e - I

mag

ery

©20

09 G

eoEy

e, M

ap d

ata

©20

09 G

oogl

e -

Sid

ewal

k B

arri

ers

- Wes

t 9t

h S

tree

t - 1

4-22

2

4-22

7

4-22

8

Page 212: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

©20

09 G

oogl

e - I

mag

ery

©20

09 G

eoEy

e, M

ap d

ata

©20

09 G

oogl

e -

Sid

ewal

k B

arri

ers

- Wes

t 9t

h S

tree

t - 2

4-22

6

4-22

3

Page 213: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Eas

t 9t

h S

tree

t

S D St

Sun

rise

Ave

Clin

ton S

t

E 9

th S

tS C

St

S B St

4-22

4-23

4-24

4-25

4-26

4-27

4-28

4-29

4-30

4-31

4-32

4-33

4-34

4-35

S C St

S B St

Page 214: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Yosemite Avenue Sidewalk Barriers

Page 215: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t Yo

sem

ite

Ave

nu

e - 1

N Q St

W Yo

sem

ite A

ve

N P St

S Q

St

W Yo

sem

ite A

ve

4-49

4-50

4-78

Page 216: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t Yo

sem

ite

Ave

nu

e - 2

W 6

th S

t

N O St

W Yo

sem

ite A

ve

S N St

W 5

th S

t

S N St

N O St

4-52

4-53

4-54

4-77

4-76

4-75

4-51

W Yo

sem

ite A

ve

Page 217: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t Yo

sem

ite

Ave

nu

e - 3

W 6

th S

t

N M St

W Yo

sem

ite A

ve

N L St

4-55

4-56

4-57

4-74

4-73

4-72

4-71

W Yo

sem

ite A

ve

Page 218: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- W

est Y

ose

mit

e A

ven

ue

- 4

W 6

th S

t

N J St

W Yo

sem

ite A

ve

N K St

N J St

N K St

4-58

4-59

4-70

4-69

4-68

4-67

4-66

4-65

Page 219: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- W

est Y

ose

mit

e A

ven

ue

- 5

W 6

th S

t

N I St

W Yo

sem

ite A

veN G

St

Hwy 99

4-60

4-61

4-62

Page 220: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t Yo

sem

ite

Ave

nu

e - 6S G

ateway St

W 6

th S

t

W Yo

sem

ite A

ve

N G St

E Yo

sem

ite A

ve

N Gateway St

4-64

4-63

Page 221: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sunrise Avenue Sidewalk Barriers

Page 222: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sun

rise

Ave

Sid

ewal

k B

arri

ers

- Su

nri

se A

ven

ue

- 1

S B St

S A St

S Lake St

Roosevelt Ave

S Lake St

S A St

4-1

4-2

4-3

4-4

4-5

4-6

4-18

4-19

4-20

4-21

Page 223: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Su

nri

se A

ven

ue

- 2

Sun

rise

Ave

Adelaid

e St

Lily

St

Wallace Ave

Hull St

Stinson St

Knox Ave

Lily St

4-7

4-8

4-9

4-10

4-11

4-12

4-13

4-14

4-15

4-16

4-17Vin

eyard A

ve

Page 224: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

B Street Sidewalk Barriers

Page 225: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

B S

tree

t - 1

E 4

th S

t

N B St E 5

th S

t

N A St

4-17

1

4-17

2 4-17

3

4-17

4

4-19

5 4-19

4

4-19

3

4-19

2

4-19

1

4-19

0

4-18

9

4-18

8

N B St

E 5

th S

t

Page 226: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

B S

tree

t - 2

E Yo

sem

ite A

ve

S B St

E 6

th S

t

N B St

4-17

6

4-18

6

4-18

7

4-17

5

S B St

S A St

Page 227: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

B S

tree

t - 3

Clinto

n St

S B St

S A St

S C St

4-18

4 4-17

7

4-17

8

4-17

9

4-18

0

4-18

1

4-18

2

4-18

3

Page 228: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

C Street Sidewalk Barriers

Page 229: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

E 4th

St

N C St

N B St

N D St

E 5th

St

N C St

E 5th

St

Sid

ewal

k B

arri

ers

- No

rth

C S

tree

t - 1

4-15

9 4-16

0

4-16

1

Page 230: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

C S

tree

t - 2

E Yo

sem

ite A

ve

N C St

N B St

N D St

E 5th

St

4-17

0

4-16

9

4-16

2

S C St

E Yo

sem

ite A

ve

Page 231: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

C S

tree

t - 3

E 6th

St

E Yo

sem

ite A

ve

S C St

S B St

S D St

4-16

3

4-16

8

S C St

Page 232: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

C S

tree

t - 4

S C St

E 7th

St

Clinto

n StS B St

S D St

E 7th

St

Clinto

n St

4-16

5

4-16

4

4-16

6

4-16

7

Page 233: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

D Street Sidewalk Barriers

Page 234: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

D S

tree

t - 1

4-10

3

4-12

4

4-13

5

4-13

6

4-13

7E

4th S

t

E 5

th S

t

N D St

N E St

N C St

N D St

E 5

th S

t

Page 235: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

D S

tree

t - 2

4-12

5

4-13

4 E

Yose

mite

Ave

N D St

E 5th

St

N E St

S D St

N C St

Page 236: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

D S

tree

t - 3

E Yo

sem

ite A

veS C St

E 6th

St

S E St

S D St

4-12

6

4-13

3

E 6th

St

Page 237: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

D S

tree

t - 4

4-10

1

S C St

E 7th

St

Clinto

n Ave

S E St

S D St

E 7th

St

4-12

7

4-12

8

4-12

9

4-13

0

4-13

1

4-13

2

Page 238: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

E Street Sidewalk Barriers

Page 239: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

E S

tree

t - 1

N Gate

way Dr

E 4th

St

N E St

E 5th

St

N D St

4-13

8

4-13

9

4-14

0

4-14

1

4-15

8

Page 240: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

E S

tree

t - 2

N Gate

way Dr

N E St

E Yose

mite

Ave

N D St

S E St

4-14

4

4-14

3

4-14

24-15

2

Page 241: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

E S

tree

t - 3

4-10

1

E 6th

St

S D St

E Yose

mite

Ave

S E St

4-14

54-

150

4-15

1S E St

Page 242: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

E S

tree

t - 4

4-14

6

4-14

7

4-14

8

4-14

9

S Gate

way Dr

S D St

E 7th

St

Clinto

n Ave

S E St

Page 243: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

G Street Sidewalk Barriers

Page 244: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

G S

tree

t - 1

N Gate

way Ave

W 5

th S

t

N G St

W Yo

sem

ite A

ve

4-40

4-47

4-48

Page 245: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- No

rth

G S

tree

t - 2

N Gate

way Ave

W 4

th S

t

W 5

th S

t

N H St

N G St

W 3

rd S

t

4-41

4-42

4-43

4-44

4-45

4-46

N G St

Page 246: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

H Street Sidewalk Barriers

Page 247: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk Barriers - North H Street

Hwy 99

N H St

W 3rd St

W 4th St

4-197

4-198

4-199

4-200

4-201

Page 248: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

I Street Sidewalk Barriers

Page 249: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

I St

reet

S I St

W 9

th S

t

W O

live

Ave

Hwy 99

S Madera Ave

4-23

1

4-23

2

Page 250: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

L Street Sidewalk Barriers

Page 251: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

L S

tree

t - 1

4-22

0

4-22

1

4-23

0

Page 252: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- So

uth

L S

tree

t - 2

4-22

9

Page 253: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

N Street Sidewalk Barriers

Page 254: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

©20

09 G

oogl

e - I

mag

ery

©20

09 G

eoEy

e, M

ap d

ata

©20

09 G

oogl

e -

Sid

ewal

k B

arri

ers

- So

uth

N S

tree

t - 1

4-22

5

4-22

4

Page 255: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Olive Avenue Sidewalk Barriers

Page 256: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

S Pine St

W Yo

sem

ite A

ve

W O

live

Ave

Cypress St

Park St

S Q St

Sid

ewal

k B

arri

ers

- Wes

t O

live

Ave

nu

e - 1

4-20

24-

203

Page 257: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t O

live

Ave

nu

e - 2

W O

live

Ave

Coyote Lane

Grove St

S Q

St

S P St

S O St

4-20

44-

205

4-20

6

4-21

84-

219

Page 258: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- W

est

Oliv

e A

ven

ue

- 3

W O

live

Ave

Stadium Rd

W 7

th S

t

S N St4-

207

4-21

7

Page 259: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t O

live

Ave

nu

e - 4

Stadium Rd

W O

live

Ave

S L St

Santa Cruz St

4-20

8

4-21

6

4-20

9

Page 260: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t O

live

Ave

nu

e - 5

Santa Bonita St

W O

live

Ave

S K St

Monterey St

Martin St

4-21

04-

211

4-21

44-

215

Page 261: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sid

ewal

k B

arri

ers

- Wes

t O

live

Ave

nu

e - 6

4-18

S Madera St

W O

live

Ave

S I St

4-21

2

4-21

3

Page 262: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

S Gateway D

r

E O

live

Ave

S G St

4-23

3

4-23

4

Sid

ewal

k B

arri

ers

- Eas

t O

live

Ave

nu

e - 7

Page 263: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 1 Priority:

Regrade surface $21,250From located barrier to end of block towards S. A St - Cross slope ranges from 2.1% to 4.4% (2% max). Surface material is concrete. Dimensions: 424'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 2 Priority:Regrade surface $3,920

Cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 56'3"L x 7'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 3 Priority:Regrade surface $7,280

Cross slope ranges from 2.1% to 4.3% (2% max). Surface material is concrete. Dimensions: 104'L x 7'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 4 Priority:Regrade surface $4,130

Cross slope ranges from 2.1% to 10.2% (2% max). Surface material is concrete. Dimensions: 59'L x 7'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 5 Priority:Regrade surface $7,000

Cross slope ranges from 2.1% to 11% (2% max). Surface material is concrete. Dimensions: 100'L x 7'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 6 Priority:Regrade surface $26,550

Cross slope ranges from 2.1% to 11.7% (2% max). Surface material is concrete. Dimensions: 531'L x 5'W. Cost per square feet. Entire block on the odd number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 12/3/2010 ExteriorSidewalk Barriers

Page 264: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 7 Priority:

Regrade surface $23,550Cross slope ranges from 2.1% to 3.5% (2% max). Surface material is concrete. Dimensions: 470'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 8 Priority:Regrade surface $7,150

Cross slope ranges from 2.1% to 3.3% (2% max). Surface material is concrete. Dimensions: 142'11"L x 5' to 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 9 Priority:Regrade surface $26,000

Cross slope ranges from 2.1% to 3.3% (2% max). Surface material is concrete. Dimensions: 520'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 10 Priority:Regrade surface $4,700

Cross slope ranges from 2.1% to 4.1% (2% max). Surface material is concrete. Dimensions: 94'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 11 Priority:Regrade surface $750

Running slope is 6.7% (5% max) in front of 1400 Sunrise Ave. Excess slope is caused by tree root upheaval. Surface material is concrete. Dimensions: 14'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 12 Priority:Regrade surface $2,800

From 1304 to 1308 Sunrise Ave - cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 55'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 22/3/2010 ExteriorSidewalk Barriers

Page 265: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 13 Priority:

Regrade surface $12,450Cross slope ranges from 2.1% to 4.1% (2% max). Surface material is concrete. Dimensions: 248'10"L x 5'W. Cost per square feet. Entire block on the even number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 14 Priority:Regrade surface $3,400

From 1116 to 1120 Sunrise Ave - cross slope ranges from 2.1% to 4.6% (2% max). Surface material is concrete. Dimensions: 68'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 15 Priority:Regrade surface $5,720

From the driveway of 1112 Sunrise Ave to the end of the block - cross slope ranges from 2.1% to 8.4% (2% max). Surface material is concrete. Dimensions: 143'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 16 Priority:Regrade surface $12,800

Cross slope ranges from 2.1% to 3.9% (2% max). Surface material is concrete. Dimensions: 256'L x 5'W. Cost per square feet. Entire block on the even number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 17 Priority:Regrade surface $12,800

Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 256'L x 5'W. Cost per square feet. Entire block on the even number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 32/3/2010 ExteriorSidewalk Barriers

Page 266: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 18 Priority:

Regrade surface $14,000From 804 Sunrise Ave to end of block - cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 280'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 19 Priority:Regrade surface $1,900

Cross slope ranges from 2.1% to 2.6% (2% max). Surface material is concrete. Dimensions: 38'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 20 Priority:Regrade surface $20,650

Cross slope ranges from 2.1% to 3.7% (2% max). Surface material is concrete. Dimensions: 413'L x 5'W. Cost per square feet. Entire block on the even number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 21 Priority:Regrade surface $20,650

Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete and asphalt. Dimensions: 413'L x 5'W. Cost per square feet. Entire block on the even number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 22 Priority:Regrade surface $1,250

Cross slope ranges from 2.1% to 2.8% (2% max). Surface material is concrete. Dimensions: 25'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 23 Priority:Regrade surface $2,825

Adjacent path of travel to liquor store - cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 56'5"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 42/3/2010 ExteriorSidewalk Barriers

Page 267: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 24 Priority:

Regrade surface $1,440Driveway - cross slope ranges from 5% to 6.2% (2% max). Surface material is concrete. Dimensions: 35'8"L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 25 Priority:Regrade surface $1,950

Cross slope ranges from 2.1% to 7.4% (2% max). Surface material is concrete. Dimensions: 39'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 26 Priority:Regrade surface $3,600

Cross slope ranges from 2.1% to 2.6% (2% max). Surface material is concrete. Dimensions: 72'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 27 Priority:Regrade surface $1,100

Driveway - cross slope ranges from 2.1% to 5.6% (2% max). Surface material is concrete. Dimensions: 22'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 28 Priority:Regrade surface $1,750

Adjacent to green fence - cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 34'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 29 Priority:Regrade surface $950

Running slope is 10.6% (5% max) due to tree root upheaval. Cross slope ranges from 2.1% to 2.3% (2% max). There are also 2" vertical rises present due to tree root upheavals. Surface material is concrete. Dimensions: 19'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Page 52/3/2010 ExteriorSidewalk Barriers

Page 268: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 30 Priority:

Provide a firm, stable and slip resistant surface $800Driveway is not firm or stable. Surface material is dirt. There is also a 4" vertical rise to access to access the sidewalk. Dimensions: 20'L x 4'W. Cost per linear feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 31 Priority:Regrade surface $7,550

Adjacent to red fence - cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 151'4"L x 5'W. Cost per square feet. Entire block on the even number side is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 32 Priority:Regrade surface $4,500

Cross slope ranges from 2.1% to 11.5% (2% max). There is also a 7" vertical rise due to tree root upheaval. Surface material is concrete. Dimensions: 90'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 33 Priority:Regrade surface $2,525

Adjacent to red fence - cross slope ranges from 2.1% to 3.2% (2% max). Surface material is concrete. Dimensions: 50'5"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 34 Priority:Regrade surface $1,000

Slope is 8.9% (5% max) at both ends of the driveway. Surface material is asphalt. Dimensions: 19'7"L x 5'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 35 Priority:Regrade surface $1,025

Cross slope ranges from 2.1% to 3.5% (2% max) due to tree root upheaval. Surface material is concrete. Dimensions: 20'5"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 62/3/2010 ExteriorSidewalk Barriers

Page 269: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 36 Priority:

Regrade surface $5,220From located barrier to end of block towards N. Gateway St - Slope is 6.2% (5% max) at one point. Cross slope ranges from 2.1% to 9.3% (2% max) due to driveway. Surface material is concrete. Dimensions: 87'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 37 Priority:Regrade surface $2,550

Cross slope ranges from 2.1% to 3.7% (2% max). Surface material is concrete. Dimensions: 50'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 38 Priority:Regrade surface $850

Driveway of auto repair - cross slope ranges from 2.1% to 4.3% (2% max). Surface material is concrete. Dimensions: 17'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 39 Priority:Regrade surface $4,000

Driveway of housing authority to building entrance walkway - cross slope ranges from 2.1% to 8% (2% max). Surface material is concrete. Dimensions: 80'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 40 Priority:Regrade surface $14,160

Cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 236'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 72/3/2010 ExteriorSidewalk Barriers

Page 270: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 41 Priority:

Regrade surface $720Driveway of Housing Authority - Cross slope ranges from 2.1% to 3.2% (2% max). Surface material is concrete. Dimensions: 12'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 42 Priority:Regrade surface $11,520

AAA parcel - Cross slope ranges from 2.1% to 9% (2% max). Surface material is concrete. Dimensions: 192'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 43 Priority:Regrade surface $15,120

Cross slope ranges from 2.1% to 9.7% (2% max) due to tree root upheaval. Surface material is concrete. Dimensions: 336'L x 4.5'W. Cost per square feet. Entire block is not compliant.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 44 Priority:Regrade surface $1,150

Cross slope ranges from 2.1% to 4.5% (2% max). Surface material is concrete. Dimensions: 23'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 45 Priority:Regrade surface $1,000

Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 20'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 46 Priority:Regrade surface $3,100

From one employee entrance terminus to the next employee entrance terminus - Cross slope ranges from 2.1% to 3.2% (2% max). Surface material is concrete. Dimensions: 62'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 82/3/2010 ExteriorSidewalk Barriers

Page 271: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 47 Priority:

Regrade surface $1,200Cross slope ranges from 2.1% to 4% (2% max) due to driveway. Surface material is concrete. Dimensions: 20'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 48 Priority:Regrade surface $17,640

Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 294'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 49 Priority:Regrade surface $19,500

Entire block - Cross slope ranges from 2.1% to 3% (2% max) due to uneven concrete rising. Surface material is concrete. Dimensions: 325'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 50 Priority:Regrade surface $1,000

Cross slope ranges from 2.1% to 5.5% (2% max) due to driveway. Surface material is concrete. Dimensions: 20'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 51 Priority:Regrade surface $4,080

Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 68'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 52 Priority:Regrade surface $1,260

Slope is 7.8% (5% max) at a point due to driveway. Surface material is asphalt. Dimensions: 21'L x 6'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Page 92/3/2010 ExteriorSidewalk Barriers

Page 272: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 53 Priority:

Regrade surface $1,440Cross slope ranges from 2.1% to 3.3% (2% max). Surface material is concrete. Dimensions: 24'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 54 Priority:Regrade surface $1,200

Slope is 5.8% at a point (5% max) due to driveway. Surface material is concrete. Dimensions: 20'L x 6'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 55 Priority:Provide a firm, stable and slip resistant surface $1,260

Driveway surface is unstable and not firm. Surface material is gravel. Dimensions: 21'L x 6'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 56 Priority:Regrade surface $5,640

Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. There are also potholes and cracked pavement. Dimensions: 94'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 57 Priority:Regrade surface $2,940

Cross slope ranges from 2.1% to 2.4% (2% max). Surface material is concrete. Dimensions: 49'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 58 Priority:Regrade surface $8,280

Slope is 8.2% (5% max) at a point due to cracked concrete. Cross slope ranges from 2.1% to 2.9% (2% max) due to driveway. Surface material is cracked concrete and potholes. Dimensions: 207'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Page 102/3/2010 ExteriorSidewalk Barriers

Page 273: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 59 Priority:

Regrade surface $10,860Cross slope ranges from 2.1% to 2.8% (2% max). Surface material is concrete. Dimensions: 181'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 60 Priority:Regrade surface $1,200

Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 20'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 61 Priority:Regrade surface $1,260

Cross slope ranges from 2.1% to 12% (2% max) due to driveway. Surface material is concrete. Dimensions: 21'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 62 Priority:Regrade surface $1,320

Cross slope ranges from 2.1% to 4% (2% max) due to section of the driveway. Surface material is concrete. Dimensions: 22'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 63 Priority:Regrade surface $1,480

Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 37'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 64 Priority:Regrade surface $1,860

Cross slope ranges from 2.1% to 3% (2% max) due to tree root upheaval. Surface material is concrete. Dimensions: 31'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 112/3/2010 ExteriorSidewalk Barriers

Page 274: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 65 Priority:

Regrade surface $8,220400 to 408 W. Yosemite Ave parcels - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 137'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 66 Priority:Provide a firm, stable and slip resistant surface $3,720

420 W. Yosemite Ave parcel - Surface material is cracked concrete with potholes at various spots. Dimensions: 62'L x 6'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 67 Priority:Provide a firm, stable and slip resistant surface $3,240

510 W. Yosemite Ave parcel - Surface material is cracked concrete with potholes at various spots. Dimensions: 54'L x 6'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 68 Priority:Regrade surface $840

Cross slope ranges from 2.1% to 4% (2% max) due section of the driveway. Surface material is asphalt. Dimensions: 21'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 69 Priority:Regrade surface $4,740

514 W. Yosemite Ave parcel - Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 79'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 70 Priority:Regrade surface $9,360

600 to 610 W. Yosemite Ave parcels - Cross slope ranges from 2.1% to 2.4% (2% max). Surface material is concrete. Dimensions: 156'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 122/3/2010 ExteriorSidewalk Barriers

Page 275: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 71 Priority:

Regrade surface $900700 W. Yosemite Ave parcel - Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 15'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 72 Priority:Regrade surface $1,320

Cross slope ranges from 2.1% to 3.5% (2% max) due to driveway. Surface material is concrete. Dimensions: 22'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 73 Priority:Regrade surface $8,460

712 to 720 W. Yosemite Ave parcels - Cross slope ranges from 2.1% to 2.3% (2% max). Surface material is concrete and potholes at various spots. Dimensions: 141'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 74 Priority:Regrade surface $6,180

806 to 808 W. Yosemite Ave parcels - Cross slope ranges from 2.1% to 4.2% (2% max). Surface material is concrete. Dimensions: 103'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 75 Priority:Regrade surface $1,320

Driveway between 910 and 912 W. Yosemite Ave - Cross slope ranges from 2.1% to 13% (2% max) due to driveway. Surface material is concrete. Dimensions: 21'5"L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 76 Priority:Regrade surface $5,940

912 to 916 W. Yosemite Ave parcels - Cross slope ranges from 2.1% to 3.4% (2% max). Surface material is concrete. Dimensions: 99'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 132/3/2010 ExteriorSidewalk Barriers

Page 276: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 77 Priority:

Regrade surface $2,1001006 W. Yosemite Ave parcel - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete and have various potholes. Dimensions: 35'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 78 Priority:Regrade surface $600

1016 W. Yosemite Ave parcel - Cross slope ranges from 2.1% to 3% (2% max) due to driveway. Surface material is concrete. Dimensions: 10'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 79 Priority:Regrade surface $2,080

Cross slope ranges from 2.1% to 6.2% (2% max). Surface material is concrete. Dimensions: 52'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 80 Priority:Regrade surface $2,800

Cross slope ranges from 2.1% to 3.2% (2% max) due to section of the driveway. Surface material is concrete and there are cracked pavement along the way. Dimensions: 56'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 81 Priority:Regrade surface $5,160

1958 W. 4th St parcel - Cross slope ranges from 2.1% to 4% (2% max). Surface material is concrete. Dimensions: 129'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 142/3/2010 ExteriorSidewalk Barriers

Page 277: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 82 Priority:

Regrade surface $1,350Driveway between car wash and AAA parcel - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 27'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 83 Priority:Regrade surface $1,890

Gas station - Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete. Dimensions: 27'L x 7'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 84 Priority:Regrade surface $700

Cross slope ranges from 2.1% to 2.8% (2% max). Surface material is concrete. Dimensions: 10'L x 7'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 85 Priority:Regrade surface $12,600

Entire block - Cross slope ranges from 2.1% to 4% (2% max). Surface material is concrete. Dimensions: 315'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 86 Priority:Regrade surface $15,600

Entire block - Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete. Dimensions: 312'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 87 Priority:Regrade surface $4,800

308 E. 4th St parcel - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. There is also cracked pavement. Dimensions: 96'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 152/3/2010 ExteriorSidewalk Barriers

Page 278: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 88 Priority:

Regrade surface $1,900Cross slope ranges from 2.1% to 5.3% (2% max). Surface material is concrete. Dimensions: 38'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 89 Priority:Provide a firm, stable and slip resistant surface $800

Surface of driveway is not firm nor stable. Surface material is asphalt. Dimensions: 21'7"L x 5'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 90 Priority:Repair surface $250

225 N. A Street parcel on E. 4th St side - There is a 2" vertical rise that creates a tripping hazard. Surface material is concrete. Dimensions: 75'8"L x 5'W. Grind concrete.

Notes:

1133B.7.4State:4.5.2Federal:

Walk4 - 91 Priority:Regrade surface $7,500

Cross slope ranges from 2.1% to 5% (2% max) due to tree root upheaval. Surface material is concrete. Dimensions: 150'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 92 Priority:Regrade surface $13,650

Entire block - Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. There is also cracked pavement. Dimensions: 273'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 93 Priority:Provide a firm, stable and slip resistant surface $1,550

Driveway is not firm nor stable. Surface material is asphalt. Dimensions: 31'L x 5'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Page 162/3/2010 ExteriorSidewalk Barriers

Page 279: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 94 Priority:

Provide a firm, stable and slip resistant surface $1,550There is cracked pavement. Dimensions: 31'L x 5'W. Cost per square feet.Notes:1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 95 Priority:Regrade surface $10,250

From 337 E. 4th St parcel to the end of the block towards N C St - Cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 205'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 96 Priority:Regrade surface $15,950

Entire block - Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 319'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 97 Priority:Regrade surface $8,150

Slope is 7.9% (5% max) at one point. There is also a 3" vertical rise that creates a tripping hazard. Surface material is concrete. Dimensions: 163'L x 5'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 98 Priority:Regrade surface $1,480

Slope is 6.4% (5% max) due to the driveway at the taco shop. There is also a 3" vertical rise that creates a tripping hazard. Surface material is concrete. Dimensions: 37'L x 4'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Page 172/3/2010 ExteriorSidewalk Barriers

Page 280: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 99 Priority:

Regrade surface $6,760 Slope is 7.8% (5% max) at one point. There is also a 2" vertical rise that creates a tripping hazard. Surface material is concrete. Dimensions: 169'L x 4'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 100 Priority:Regrade surface $13,400

Cross slope ranges from 2.1% to 2.8% (2% max). Surface material is concrete. Dimensions: 268'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 101 Priority:Regrade surface $12,500

Driveway of Saint Joaquin School - Cross slope ranges from 2.1% to 3.4% (2% max). Surface material is concrete. Dimensions: 250'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 102 Priority:Regrade surface $100

Transition from concrete to asphalt - Slope is 12% (5% max) at a point. Surface material is concrete. Dimensions: 2'L x 5'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 103 Priority:Regrade surface $17,550

Entire block - Slope is 6.8% (5% max) at a point due to tree root upheaval. Cross slope ranges from 2.1% to 7% (2% max). Surface material is concrete. Dimensions: 351'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 104 Priority:Regrade surface $8,000

Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 160'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 182/3/2010 ExteriorSidewalk Barriers

Page 281: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 106 Priority:

Regrade surface $1,500216 W. 6th St parcel - Cross slope ranges from 2.1% to 3.9% (2% max). Surface material is concrete. There is also cracked pavement. Dimensions: 30'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 107 Priority:Regrade surface $8,450

Cross slope ranges from 2.1% to 5% (2% max). Surface material is concrete and asphalt. Dimensions: 169'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 108 Priority:Regrade surface $13,000

Entire block except for driveway - Cross slope ranges from 2.1% to 4.4% (2% max). Surface material is concrete. There is also cracked pavement. Dimensions: 260'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 109 Priority:Regrade surface $4,500

Cross slope ranges from 2.1% to 3.6% (2% max). Surface materials are concrete and brick. Dimensions: 90'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 110 Priority:Regrade surface $5,460

Entire block - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. There is also cracked pavement. Dimensions: 91'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 192/3/2010 ExteriorSidewalk Barriers

Page 282: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 111 Priority:

Regrade surface $13,920Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Out of the entire block, dimensions not compliant: 232'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 112 Priority:Regrade surface $15,960

Entire block except for the driveway of USPS and plaza driveway- Cross slope ranges from 2.1% to 3% (2% max). Surface materials are brick and concrete. Dimensions: 266'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 113 Priority:Regrade surface $19,920

Entire block - Cross slope ranges from 2.1% to 4% (2% max). Surface materials are brick and concrete. Dimensions: 332'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 114 Priority:Regrade surface $8,850

From 201 E. 6th St to the end of the block towards S. A St - Cross slope ranges from 2.1% to 2.8% (2% max). Surface material is concrete. There are also potholes along the path of travel. Dimensions: 177'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 115 Priority:Regrade surface $9,000

From barrier point to the end of the block towards S. B St - Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. There is also cracked concrete along the path of travel. Dimensions: 180'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 202/3/2010 ExteriorSidewalk Barriers

Page 283: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 116 Priority:

Provide a firm, stable and slip resistant surface $4,100124 S. B St property on the E. 6th St side - Cracked concrete along the path of travel. Dimensions: 82'L x 5'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 117 Priority:Regrade surface $6,920

El Mercado driveway - Cross slope ranges from 2.1% to 2.9% (2% max). Surface materials are brick and concrete. Dimensions: 173'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 118 Priority:Regrade surface $13,160

Entire block - Cross slope ranges from 2.1% to 3.6% (2% max). Surface materials are brick and concrete. Dimensions: 329'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 119 Priority:Regrade surface $13,000

Entire block - Cross slope ranges from 2.1% to 4.9% (2% max). Surface materials are brick and concrete. Dimensions: 325'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 120 Priority:Regrade surface $3,240

Entire block - Cross slope ranges from 2.1% to 2.9% (2% max). Surface materials are brick and concrete. Dimensions: 81'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 121 Priority:Provide a firm, stable and slip resistant surface $13,620

There are 2" vertical rises at various spots on the block. Surface material is concrete. There is also cracked concrete along the path of travel. Out of the entire block, dimensions not compliant: 227'L x 6'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Page 212/3/2010 ExteriorSidewalk Barriers

Page 284: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 122 Priority:

Regrade surface $8,000Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 160'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 123 Priority:Regrade surface $7,400

Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. There is also cracked concrete along the path of travel. Dimensions: 148'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 124 Priority:Regrade surface $6,760

Cross slope ranges from 2.1% to 2.6% (2% max). Surface materials are brick and concrete. There is also cracked concrete along the path of travel. Out of the entire block, dimensions not compliant: 169'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 125 Priority:Regrade surface $12,000

Cross slope ranges from 2.1% to 6.7% (2% max). Surface materials are brick and concrete. There is also cracked concrete along the path of travel. Out of the entire block, dimensions not compliant: 300'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 126 Priority:Regrade surface $10,080

From USPS to 219 S. D St parcel - Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 252'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 222/3/2010 ExteriorSidewalk Barriers

Page 285: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 127 Priority:

Regrade surface $9,600From driveway of 305 S. D St (except new concrete) to 325 S. D St parcels - Cross slope ranges from 2.1% to 2.9% (2% max). Surface material is concrete. Dimensions: 240'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 128 Priority:Regrade surface $8,200

From barrier up to the blue gate of 316 S. D St parcel - Cross slope ranges from 2.1% to 3.9% (2% max). There are also cracked concrete along the path of travel. Surface materials are dirt and concrete. Dimensions: 205'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 129 Priority:Provide a firm, stable and slip resistant surface $800

308 S. D St parcel - There are cracked pavement along the path of travel. Surface material is concrete. Dimensions: 20'L x 4'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 130 Priority:Regrade surface $800

Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 20'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 131 Priority:Regrade surface $500

Cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 10'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 232/3/2010 ExteriorSidewalk Barriers

Page 286: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 132 Priority:

Regrade surface $23,000Cross slope ranges from 2.1% to 6.5% (2% max). Surface material is concrete. Out of the entire block (except driveway of 238 S. D St), dimensions not compliant: 460'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 133 Priority:Regrade surface $14,400

Entire block - Cross slope ranges from 2.1% to 5.8% (2% max). Surface material is concrete. Dimensions: 288'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 134 Priority:Regrade surface $5,840

Cross slope ranges from 2.1% to 3.4% (2% max). Surface materials are brick and concrete. Out of the entire block, dimensions out of compliance: 146'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 135 Priority:Regrade surface $4,200

Cross slope ranges from 2.1% to 9.3% (2% max) due to driveway. Surface material is concrete. Dimensions: 84'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 136 Priority:Regrade surface $1,500

Cross slope ranges from 2.1% to 7.4% (2% max) due to driveway. Surface material is concrete. Dimensions: 30'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 137 Priority:Regrade surface $300

Slope is 10% (5% max) at a point. Surface material is concrete. Dimensions: 5'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Page 242/3/2010 ExteriorSidewalk Barriers

Page 287: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 138 Priority:

Regrade surface $3,150Slope is 8.9% (5% max) at a point. Surface material is concrete. Dimensions: 63'L x 5'W. Cost per square feet.

Notes:

1133B.7.3State:4.3.7Federal:

Walk4 - 139 Priority:Provide a firm, stable and slip resistant surface $2,640

Surface is not firm or stable. Surface material is dirt. Dimensions: 66'L x 4'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 140 Priority:Regrade surface $3,650

128 E St parcel - Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete. Dimensions: 73'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 141 Priority:Regrade surface $1,040

120 E St parcel - Cross slope ranges from 2.1% to 3.6% (2% max) due to the Chamber of Commerce driveway. Surface material is concrete. Dimensions: 25'11"L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 142 Priority:Regrade surface $960

120 E St parcel between the 2 stairways - Cross slope ranges from 2.1% to 3% (2% max). Surface material is brick. Dimensions: 24'11"L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 143 Priority:Regrade surface $5,840

From the Redevelopment Center Agency driveway to the end of the block towards Yosemite - Cross slope ranges from 2.1% to 3.2% (2% max). Surface material is concrete and brick. Dimensions: 146'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 252/3/2010 ExteriorSidewalk Barriers

Page 288: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 144 Priority:

Regrade surface $14,520Entire block - Slope ranges from 5.1 to 11.5% (5% max). Surface material is concrete. Dimensions: 363'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 145 Priority:Regrade surface $13,320

From the driveway to 224 E St - Cross slope ranges from 2.1% to 6.8% (2% max). Surface material is concrete. Dimensions: 333'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 146 Priority:Regrade surface $9,960

Evans Feed and Livestock Supply - Cross slope ranges from 2.1% to 5.1% (2% max). Surface material is concrete. Dimensions: 249'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 147 Priority:Regrade surface $9,560

Madera Tribune parcel - Cross slope ranges from 2.1% to 5.3% (2% max). Surface material is concrete. Dimensions: 239'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 148 Priority:Regrade surface $960

241 E St driveway - Cross slope ranges from 2.1% to 8.1% (2% max). Surface material is concrete, with some areas that are cracked. Dimensions: 24'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 149 Priority:Regrade surface $1,800

221 E St driveway - Cross slope ranges from 2.1% to 2.6% (2% max). Surface material is brick. Dimensions: 30'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 262/3/2010 ExteriorSidewalk Barriers

Page 289: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 150 Priority:

Regrade surface $11,300Vintage Autoshop parcel on E St - Cross slope ranges from 2.1% to 5.8% (2% max). Surface material is concrete. Dimensions: 226'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 151 Priority:Regrade surface $17,850

Entire block - Cross slope ranges from 2.1% to 2.9% (2% max). Surface materials are concrete and brick. Dimensions: 357'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 152 Priority:Regrade surface $5,450

From greyhound station to the end of the block towards E 5th St - Cross slope ranges from 2.1% to 3.5% (2% max). Surface material is brick. Dimensions: 109'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 153 Priority:Regrade surface $10,100

Intermodal Facility parcel on E. 5th St - Cross slope ranges from 2.1% to 5.4% (2% max). Surface material is concrete, with areas that are cracked. Dimensions: 202'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 154 Priority:Regrade surface $2,800

Cross slope ranges from 2.1% to 3.6% (2% max). Surface materials are concrete and brick. Dimensions: 55'10"L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 272/3/2010 ExteriorSidewalk Barriers

Page 290: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 155 Priority:

Regrade surface $11,300Entire block - Slope ranges from 5.1 to 7% (5% max) at a point. Cross slope ranges from 2.1% to 3.6% (2% max). There is also a 6" drop-off. Surface materials are concrete and brick. Dimensions: 226'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 156 Priority:Regrade surface $16,700

Entire block - Cross slope ranges from 2.1% to 4.4% (2% max). Surface material is concrete. Dimensions: 334'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 157 Priority:Regrade surface $16,400

Entire block - Cross slope ranges from 2.1% to 9.7% (2% max). Surface material is concrete. Dimensions: 328'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 158 Priority:Regrade surface $17,800

Entire block - Cross slope ranges from 2.1% to 5% (2% max). Surface materials are asphalt and concrete. Dimensions: 356'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 159 Priority:Regrade surface $1,260

217 N. C St parcel - Cross slope ranges from 2.1% to 3.9% (2% max) due to driveway. Surface material is concrete. Dimensions: 21'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 282/3/2010 ExteriorSidewalk Barriers

Page 291: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 160 Priority:

Regrade surface $480211 N. C St parcel - Cross slope ranges from 2.1% to 3.5% (2% max) due to tree root upheaval. Surface material is concrete. Dimensions: 8'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 161 Priority:Regrade surface $1,260

From driveway to the end of the block towards E Yosemite Ave - Slope is 10% (5% max) at a point. Cross slope ranges from 2.1% to 5.3% (2% max) due to driveway. Surface material is concrete. Dimensions: 185'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 162 Priority:Regrade surface $11,480

Cross slope ranges from 2.1% to 4% (2% max). Surface material is concrete. Out of the entire block, dimensions out of compliance: 287'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 163 Priority:Regrade surface $30,000

From barrier until 321 S. C St parcel - Cross slope ranges from 2.1% to 4.3% (2% max). There are also 2" vertical changes and potholes on the path of travel. Surface material is concrete. Dimensions: 600'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 164 Priority:Regrade surface $2,350

From barrier until 329 S. C St parcel - Cross slope ranges from 2.1% to 2.4% (2% max). There are also 2" vertical changes and potholes on the path of travel. Surface material is concrete. Dimensions: 47'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 292/3/2010 ExteriorSidewalk Barriers

Page 292: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 165 Priority:

Regrade surface $2,850339 S. C St parcel - Cross slope ranges from 2.1% to 3.2% (2% max). Surface material is concrete. Dimensions: 57'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 166 Priority:Regrade surface $14,900

Path of travel in front of 330 S. C St parcel - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 298'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 167 Priority:Regrade surface $12,600

From 230 S. C St up to 208 S. C St parcel - Cross slope ranges from 2.1% to 4.2% (2% max). There are also 2" vertical changes and potholes on the path of travel. Surface material is concrete. Dimensions: 252'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 168 Priority:Regrade surface $14,160

Entire block - Cross slope ranges from 2.1% to 3.8% (2% max). Surface materials are brick and concrete. Dimensions: 354'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 169 Priority:Regrade surface $10,500

Cross slope ranges from 2.1% to 3.8% (2% max). Surface materials are brick and concrete. Out of the entire block, dimensions out of compliance: 210'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 302/3/2010 ExteriorSidewalk Barriers

Page 293: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 170 Priority:

Provide a firm, stable and slip resistant surface $6,500There are cracked concrete along the path of travel. Surface material is concrete. Dimensions: 130'L x 5'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 171 Priority:Regrade surface $9,550

From 224 N. B St to 214 N. B St - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 191'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 172 Priority:Provide a firm, stable and slip resistant surface $1,750

204 N. B St parcel - Surface is not firm or stable. There are cracked pavement along the path of travel. Surface material is concrete. Dimensions: 35'L x 5'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 173 Priority:Regrade surface $2,350

Entire block - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 47'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 174 Priority:Regrade surface $15,850

Entire block - Cross slope ranges from 2.1% to 8.6% (2% max). Surface material is concrete. Dimensions: 317'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 175 Priority:Regrade surface $16,350

Entire block - Cross slope ranges from 2.1% to 6.5% (2% max). Surface materials are brick and concrete. Dimensions: 327'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 312/3/2010 ExteriorSidewalk Barriers

Page 294: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 176 Priority:

Regrade surface $7,500Cross slope ranges from 2.1% to 3.2% (2% max). Surface materials are brick and concrete. Out of the entire block, dimensions out of compliance: 150'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 177 Priority:Regrade surface $2,050

222 S. B St parcel - Cross slope ranges from 2.1% to 2.6% (2% max). Surface material is concrete. Dimensions: 41'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 178 Priority:Regrade surface $3,700

224 S. B St parcel - Cross slope ranges from 2.1% to 2.5% (2% max). There is also cracked pavement along the path of travel. Surface material is concrete. Dimensions: 74'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 179 Priority:Regrade surface $4,000

300 S. B St parcel - Cross slope ranges from 2.1% to 2.6% (2% max). There are also cracked pavement along the path of travel. Surface material is concrete. Dimensions: 80'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 180 Priority:Repair surface $250

318 S. B St parcel - There is a 2" vertical rise on the path of travel.Notes:1133B.7.4State:4.5.2Federal:

Page 322/3/2010 ExteriorSidewalk Barriers

Page 295: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 181 Priority:

Regrade surface $4,350324 S. B St parcel - Cross slope ranges from 2.1% to 3% (2% max). There is also a 2" vertical rise, creating a tripping hazard. Surface material is concrete. Dimensions: 87'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 182 Priority:Regrade surface $3,200

348 S. B St parcel - Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 64'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 183 Priority:Repair surface $250

Madera Management Company Complex - There is a 2" vertical rise, creating a tripping hazard. Surface material is concrete. Dimensions: 2'L x 5'W. Cost per square feet.

Notes:

1133B.7.4State:4.5.2Federal:

Walk4 - 184 Priority:Regrade surface $1,200

201 S. B St parking lot driveway - Cross slope ranges from 2.1% to 2.3% (2% max). Surface material is brick. Dimensions: 24'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 186 Priority:Regrade surface $900

125 S. B St parcel - Cross slope ranges from 2.1% to 2.5% (2% max) near the tree. There is also cracked pavement on the path of travel. Surface material is concrete. Dimensions: 18'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 332/3/2010 ExteriorSidewalk Barriers

Page 296: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 187 Priority:

Regrade surface $8,200113 S. B St parcel to the end of the block towards E. Yosemite Ave - Cross slope ranges from 2.1% to 2.3% (2% max). Surface material is concrete. Dimensions: 164'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 188 Priority:Provide a firm, stable and slip resistant surface $2,760

107 N. B St parcel - Surface is not firm or stable. There are cracked pavement along the path of travel. Surface material is concrete. Dimensions: 46'L x 6'W. Cost per square feet.

Notes:

1124B.1, 1133B.7.1State:4.5.1Federal:

Walk4 - 189 Priority:Regrade surface $6,000

113 N. B St parcel - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 100'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 190 Priority:Regrade surface $6,180

119 N. B St parcel - Cross slope ranges from 2.1% to 5% (2% max). Surface material is concrete. Dimensions: 103'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 191 Priority:Regrade surface $4,700

From 201 to 205 N. B St - Cross slope ranges from 2.1% to 4.9% (2% max). There is also cracked pavement along the path of travel. Surface material is concrete. Dimensions: 94'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 342/3/2010 ExteriorSidewalk Barriers

Page 297: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 192 Priority:

Regrade surface $2,400209 N. B St parcel - Cross slope ranges from 2.1% to 3% (2% max). There are also cracked pavement along the path of travel. Surface material is concrete. Dimensions: 48'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 193 Priority:Regrade surface $2,500

213 N. B St parcel - Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 50'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 194 Priority:Regrade surface $2,500

217 N. B St parcel - Cross slope ranges from 2.1% to 9.1% (2% max). Surface material is concrete. Dimensions: 50'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 195 Priority:Regrade surface $2,500

221 N. B St parcel - Cross slope ranges from 2.1% to 7% (2% max). Surface material is concrete. Dimensions: 50'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 196 Priority:Regrade surface $16,300

Entire block - Cross slope ranges from 2.1% to 5.7% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 326'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 352/3/2010 ExteriorSidewalk Barriers

Page 298: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 197 Priority:

Regrade surface $1,680Cross slope ranges from 2.1% to 3% (2% max). Slope is 19% (5% max) at a point due to driveway. Surface material is concrete. Dimensions: 28'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 198 Priority:Regrade surface $2,100

Cross slope ranges from 2.1% to 3% (2% max). Slope is 20% (5% max) at 2 points due to driveway. Surface material is concrete. Dimensions: 35'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 199 Priority:Regrade surface $8,460

Cross slope ranges from 2.1% to 3.1% (2% max). Surface material is concrete. Dimensions: 141'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 200 Priority:Regrade surface $1,200

213 N. B St parcel - Slope is 23% (5% max) due to driveway. Surface material is concrete. Dimensions: 20'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 201 Priority:Regrade surface $4,800

Cross slope ranges from 2.1% to 2.2% (2% max). Surface material is concrete. Dimensions: 40'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 362/3/2010 ExteriorSidewalk Barriers

Page 299: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 202 Priority:

Regrade surface $14,850Entire block - Cross slope ranges 2.1% to 11.9% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface materials are asphalt and concrete. Dimensions: 297'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 203 Priority:Regrade surface $5,700

Entire block - Cross slope ranges from 2.1% to 4% (2% max). Slope is 7.1% (5% max) at certain points due to driveways. Surface material is concrete. Dimensions: 114'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 204 Priority:Regrade surface $6,150

Entire block - Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete. Dimensions: 123'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 205 Priority:Regrade surface $16,000

Entire block - Cross slope ranges from 2.1% to 4.5% (2% max). Surface material is concrete. Dimensions: 320'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 206 Priority:Regrade surface $7,080

Entire block - Cross slope ranges from 2.1% to 3% (2% max). Surface material is concrete. Dimensions: 118'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 372/3/2010 ExteriorSidewalk Barriers

Page 300: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 207 Priority:

Regrade surface $42,360Entire block - Cross slope ranges from 2.1% to 3.7% (2% max). Slope is 14.2% (5% max) at certain points due to driveways. Surface material is concrete. Dimensions: 706'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 208 Priority:Regrade surface $29,100

Entire block - Cross slope ranges from 2.1% to 4.8% (2% max). Surface material is concrete. Dimensions: 582'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 209 Priority:Regrade surface $11,700

Entire block - Cross slope ranges from 2.1% to 4% (2% max). Slope is 6.8% (5% max) at certain points due to driveways. Surface material is concrete. Dimensions: 234'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 210 Priority:Regrade surface $11,300

Entire block - Cross slope ranges from 2.1% to 7.2% (2% max). Slope is 9.9% (5% max) at certain points due to driveways. Surface material is concrete. Dimensions: 226'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 211 Priority:Regrade surface $16,800

Entire block - Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete. Dimensions: 336'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 382/3/2010 ExteriorSidewalk Barriers

Page 301: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 212 Priority:

Regrade surface $12,350From painted red curb to 126 W. Olive Ave - Cross slope ranges from 2.1% to 3.4% (2% max). Surface material is concrete. Dimensions: 247'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 213 Priority:Regrade surface $34,980

Bethard Square parcel on W. Olive Ave (except first 3 driveways) - Cross slope ranges from 2.1% to 4.4% (2% max). There are also cracked pavement. Surface material is concrete. Dimensions: 583'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 214 Priority:Regrade surface $3,050

Pink house parcel on W. Olive Ave - Cross slope ranges from 2.1% to 2.9% (2% max). Slope is 13.6% (5% max) at a point due to driveway. Surface material is concrete. Dimensions: 61'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 215 Priority:Regrade surface $12,000

505 W. Olive Ave parcel - Cross slope ranges from 2.1% to 2.5% (2% max). Surface material is concrete. Dimensions: 240'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 216 Priority:Regrade surface $44,450

Entire block - Cross slope ranges from 2.1% to 3.2% (2% max). Surface material is concrete. Dimensions: 889'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 392/3/2010 ExteriorSidewalk Barriers

Page 302: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 217 Priority:

Regrade surface $46,200Entire block - Cross slope ranges from 2.1% to 4.2% (2% max). Slope is 10.3% (5% max) at certain points because of driveway. Surface material is concrete. Dimensions: 924'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 218 Priority:Regrade surface $2,850

Entire block - Cross slope ranges from 2.1% to 3.9% (2% max). Surface material is concrete. Dimensions: 57'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 219 Priority:Regrade surface $24,250

Entire block - Cross slope ranges from 2.1% to 5.5% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 485'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 220 Priority:Regrade surface $1,040

Entire block - Cross slope ranges from 2.1% to 8.6% (2% max) due to driveway into the baseball field. Surface material is concrete. Dimensions: 26'L x 4'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 221 Priority:Regrade surface $44,600

From curb ramp #288 towards the end of the block - Cross slope ranges from 2.1% to 3.8% (2% max). Surface material is concrete. Dimensions: 892'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 402/3/2010 ExteriorSidewalk Barriers

Page 303: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 222 Priority:

Regrade surface $35,400Cross slope ranges from 2.1% to 4.6% (2% max). Surface material is concrete. Out of the entier block, 708'L x 5'W not compliant. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 223 Priority:Regrade surface $21,750

Entire block - Cross slope ranges from 2.1% to 2.4% (2% max). Surface material is concrete. Dimensions: 435'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 224 Priority:Regrade surface $9,750

From 312 S N St to end of block - Cross slope ranges from 2.1% to 3% (2% max). Slope is 9% (5% max) at points due to tree root upheaval. There are also 2" vertical changes. Surface material is concrete. Dimensions: 195'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 225 Priority:Regrade surface $20,300

Entire block - Cross slope ranges from 2.1% to 3.3% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 406'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 226 Priority:Regrade surface $16,100

Entire block - Cross slope ranges from 2.1% to 3.4% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 322'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 412/3/2010 ExteriorSidewalk Barriers

Page 304: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 227 Priority:

Regrade surface $16,350Entire block - Cross slope ranges from 2.1% to 2.6% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 327'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 228 Priority:Regrade surface $20,350

Entire block - Cross slope ranges from 2.1% to 2.5% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 407'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 229 Priority:Regrade surface $20,000

Entire block - Cross slope ranges from 2.1% to 5.4% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 400'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 230 Priority:Regrade surface $24,100

Entire block except 501 S L St parcel - Cross slope ranges from 2.1% to 5.5% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards. Surface material is concrete. Dimensions: 482'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 231 Priority:Regrade surface $46,400

Cross slope ranges from 2.1% to 10% (2% max). Surface materials are asphalt and concrete. Out of the entire block, 928'L x 5'W is not compliant. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 422/3/2010 ExteriorSidewalk Barriers

Page 305: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Sidewalk BarriersMadera

ExteriorWalk4 - 232 Priority:

Regrade surface $47,250Entire block - Cross slope ranges from 2.1% to 13% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 945'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Walk4 - 233 Priority:Regrade surface $30,050

Entire block - Cross slope ranges from 2.1% to 4.2% (2% max). Slope is 6.4% (5% max). There are also 2" vertical rises at various spots and cracked pavement. Surface material is concrete. Dimensions: 601'L x 5'W. Cost per square feet.

Notes:

1133B.7.1.3, 1133B.7.3State:4.3.7Federal:

Walk4 - 234 Priority:Regrade surface $11,820

Entire block - Cross slope ranges from 2.1% to 3.7% (2% max). There are also 2" vertical rises at various spots, creating tripping hazards as well as cracked pavement. Surface material is concrete. Dimensions: 197'L x 6'W. Cost per square feet.

Notes:

1133B.7.1.3State:4.3.7Federal:

Page 432/3/2010 ExteriorSidewalk Barriers

Page 306: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 1 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.3% (8.33% max). Slopes of flared sides are 13.8% and 10.1% (10% max). There is not a 24" min. segment of straight curb on each side of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 12/3/2010 ExteriorCurb Ramp Barriers

Page 307: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 2 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max). Slopes of flared sides are 10.5% and 10.6% (10% max). Space at the bottom of the curb ramp is 27" x 48" (48" x 48" min) clear. 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 22/3/2010 ExteriorCurb Ramp Barriers

Page 308: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 3 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope at the top landing is 2.2% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 32/3/2010 ExteriorCurb Ramp Barriers

Page 309: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 4 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.4% (8.33% max). Slopes of flared sides are 12.8% and 12.9% (10% max). Slope at the top landing is 3.3% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 5 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 6 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 42/3/2010 ExteriorCurb Ramp Barriers

Page 310: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 7 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 8 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 11.9% (8.33% max). Slopes of flared sides are 11.7% and 13.3% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 52/3/2010 ExteriorCurb Ramp Barriers

Page 311: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 9 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.7% (8.33% max). Slopes of flared sides are 12.8% and 10.4% (10% max). Slope at top landing is 5%(2% max). 24" segment of straight curb not provided on one side of curb ramp. Space at bottom of ramp is 20" x48" (48" x48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 62/3/2010 ExteriorCurb Ramp Barriers

Page 312: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 10 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.8% (8.33% max). Slope of one flared side is 15% (10% max). Slope at the top landing is 2.2% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 72/3/2010 ExteriorCurb Ramp Barriers

Page 313: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 11 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope of one flared side is 12% (10% max). Slope at the top landing is 2.4% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks. There is also grass growing on the curb ramp.

Notes:

1127B.5 #5State: - Federal:

Page 82/3/2010 ExteriorCurb Ramp Barriers

Page 314: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 12 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at top landing is 2.8% (2% max). 24" segment straight curb not provided on either ends of the curb ramp. Space at the bottom of the ramp is 41" (48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 92/3/2010 ExteriorCurb Ramp Barriers

Page 315: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 13 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slope of one flared side is 11.9% (10% max). Slope at the top landing is 4.1% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 102/3/2010 ExteriorCurb Ramp Barriers

Page 316: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 14 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 11.1% (10% max). Level landing at the top is 42" (48" min) and slope is 3.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 15 Priority:Repair surface $250

There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $30012" wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 112/3/2010 ExteriorCurb Ramp Barriers

Page 317: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 16 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $30012" wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 17 Priority:Repair surface $250

There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 122/3/2010 ExteriorCurb Ramp Barriers

Page 318: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 18 Priority:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 19 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 11% (8.33% max). Level landing at the top is 12" (48" min) and slope is 3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 132/3/2010 ExteriorCurb Ramp Barriers

Page 319: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 20 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 13% (10% max). Level landing at the top of the curb ramp is 44.5" (48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 21 Priority:Install, replace or modify curb ramp $3,500

Slope at top landing is 2.8% (2% max) and level landing is 47" (48" min) clear.Notes:1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 142/3/2010 ExteriorCurb Ramp Barriers

Page 320: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 22 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 3.6% (2% max) and level landing is 45" (48" min). 24" min. segment of straight curb is not provided at either ends of the curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks. Grass is growing on curb ramp.

Notes:

1127B.5 #5State: - Federal:

Curb Ramp3 - 23 Priority:Install, replace or modify curb ramp $3,500

Space at the bottom of the ramp is not 48" x 48" min. clear. Curb ramp is not inside marked crossing.

Notes:

1127B.5 #4State:4.7.10Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 152/3/2010 ExteriorCurb Ramp Barriers

Page 321: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 24 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 4.5% (2% max) and level landing is 45" (48" min). 24" segment straight curb not provided on either ends of the curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 25 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.5% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at top landing is 2.7% (2% max) and level landing is 46.5"(48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 162/3/2010 ExteriorCurb Ramp Barriers

Page 322: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 26 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.8% (8.33% max). Slope of one flared side is 12.1% (10% max). Slope at top landing is 2.2% (2% max) and level landing is 39" (48" min). Space at the bottom of the ramp does not provided 48" x 48" min. clear space.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 27 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 12.3% (8.33% max). Slopes of flared sides are 10.4% and 11% (10% max). Level landing at the top not provided.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" wide grooved borders is not provided at the top of the curb ramp.Notes:1127B.5 #6State:4.7.4Federal:

Page 172/3/2010 ExteriorCurb Ramp Barriers

Page 323: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 28 Priority:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Page 182/3/2010 ExteriorCurb Ramp Barriers

Page 324: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 29 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at top landing is 2.8% (2% max). 24" segment straight curb not provided on either ends of the curb ramp. Space at the bottom of the ramp is 41" (48" min) clear.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 192/3/2010 ExteriorCurb Ramp Barriers

Page 325: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 30 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 202/3/2010 ExteriorCurb Ramp Barriers

Page 326: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 31 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 2.9% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 212/3/2010 ExteriorCurb Ramp Barriers

Page 327: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 32 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.4% (10% max). Slope at top landing is 3.7% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 33 Priority:Install, replace or modify curb ramp $3,500

Slope at top landing is 2.5% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 222/3/2010 ExteriorCurb Ramp Barriers

Page 328: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 34 Priority:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 35 Priority:Provide level landing $2,000

Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 36 Priority:Provide level landing $2,000

Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 232/3/2010 ExteriorCurb Ramp Barriers

Page 329: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 37 Priority:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 38 Priority:Provide level landing $2,000

Slope of gutter pane is 8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,50024" min. segment of straight curb are not provided at either ends of the curb ramp.Notes:1127B.5 #9State:4.7.10Federal:

Page 242/3/2010 ExteriorCurb Ramp Barriers

Page 330: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 39 Priority:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 40 Priority:Install, replace or modify curb ramp $3,500

Level landing at the top is 46" (48" min). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 252/3/2010 ExteriorCurb Ramp Barriers

Page 331: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 41 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.4% (10% max). Slope at top landing is 2.6% (2% max). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 42 Priority:Repair surface $250

There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 262/3/2010 ExteriorCurb Ramp Barriers

Page 332: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 43 Priority:

Install, replace or modify curb ramp $3,500Slope at top landing is 3.1% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 272/3/2010 ExteriorCurb Ramp Barriers

Page 333: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 44 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max). Slope of one flared side is 10.8% (10% max). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 45 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 46 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 282/3/2010 ExteriorCurb Ramp Barriers

Page 334: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 47 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). 24" min. segment of straight curb are not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 48 Priority:Install, replace or modify curb ramp $3,500

Slope at the top landing is 2.6% (2% max). 24" segment of straight curb is not within markings.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Page 292/3/2010 ExteriorCurb Ramp Barriers

Page 335: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 49 Priority:

Install, replace or modify curb ramp $3,500Level landing at the top of curb ramp is 46" (48" min) long. 24" segment of straight curb is not within markings.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 50 Priority:Provide level landing $2,000

Slope of gutter pane is 6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 51 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 11.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 302/3/2010 ExteriorCurb Ramp Barriers

Page 336: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 52 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 312/3/2010 ExteriorCurb Ramp Barriers

Page 337: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 53 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.6% (8.33% max). Slope of one flared side is 11.5% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 322/3/2010 ExteriorCurb Ramp Barriers

Page 338: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 54 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.1% (8.33% max). Slopes of flared sides are 19% and 17% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 55 Priority:Install, replace or modify curb ramp $3,500

Slope of one flared side is 10.4% (10% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Page 332/3/2010 ExteriorCurb Ramp Barriers

Page 339: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 56 Priority:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.1% (8.33% max). Slope of one flared side is 13% (10% max). Slope at the top landing is 2.3% (2% max). 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 342/3/2010 ExteriorCurb Ramp Barriers

Page 340: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 57 Priority:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,50024" segment of straight curb is not within markings.Notes:1127B.5 #9State:4.7.10Federal:

Curb Ramp3 - 58 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 17.1% (8.33% max). Slope of one flared side is 15% (10% max). Slope at the top landing is 3.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 352/3/2010 ExteriorCurb Ramp Barriers

Page 341: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 59 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.3% (8.33% max). Slope of one flared side is 12% (10% max). Slope at the top landing is 3% (2% max) plus level landing is not marked. 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 362/3/2010 ExteriorCurb Ramp Barriers

Page 342: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 60 Priority:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.3% (8.33% max). Level landing at the top is 38.5" (48" min) long. 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 61 Priority:Provide detectable warning strip $0

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500There is not 48" x 48" min. clear space provided at the bottom of the curb ramp.Notes:1127B.5 #4State:4.7.10Federal:

Page 372/3/2010 ExteriorCurb Ramp Barriers

Page 343: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 62 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 63 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 64 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 382/3/2010 ExteriorCurb Ramp Barriers

Page 344: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 65 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.2% (8.33% max). Slopes of flared sides are both 15% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 392/3/2010 ExteriorCurb Ramp Barriers

Page 345: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 66 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.1% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 402/3/2010 ExteriorCurb Ramp Barriers

Page 346: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 67 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 15% (10% max). Slope at the top landing is 7.4% (2% max), adequate level landing is not provided.

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 412/3/2010 ExteriorCurb Ramp Barriers

Page 347: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 68 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 422/3/2010 ExteriorCurb Ramp Barriers

Page 348: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 69 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.3% (8.33% max). Level landing is not provided.Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 432/3/2010 ExteriorCurb Ramp Barriers

Page 349: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 70 Priority:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $30012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 71 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 8.8% (8.33% max). Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 442/3/2010 ExteriorCurb Ramp Barriers

Page 350: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 72 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 452/3/2010 ExteriorCurb Ramp Barriers

Page 351: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 73 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Top level landing is 44" (48" min).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 74 Priority:Install, replace or modify curb ramp $3,500

Slope of one flared side is 10.8% (10% max).Notes:1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 6.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Page 462/3/2010 ExteriorCurb Ramp Barriers

Page 352: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 75 Priority:

Install, replace or modify curb ramp $3,500Space at the bottom of the ramp is 46" x 48" (48" x 48" min).Notes:1127B.5 #4State:4.7.10Federal:

Provide level landing $2,000Slope of gutter pane is 7.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 76 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.9% (8.33% max). Top level landing is not provided.Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 472/3/2010 ExteriorCurb Ramp Barriers

Page 353: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 77 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 78 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 482/3/2010 ExteriorCurb Ramp Barriers

Page 354: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 79 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.6% (8.33% max). Slope at the top landing is 6% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 492/3/2010 ExteriorCurb Ramp Barriers

Page 355: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 80 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.3% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 502/3/2010 ExteriorCurb Ramp Barriers

Page 356: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 81 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.9% (8.33% max). 24" straight segment of the curbs are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 512/3/2010 ExteriorCurb Ramp Barriers

Page 357: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 82 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slope of one flared side is 14.3% (10% max). 24" segment of straight curb is not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 83 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 522/3/2010 ExteriorCurb Ramp Barriers

Page 358: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 84 Priority:

Install, replace or modify curb ramp $3,500 24" segment of straight curb is not within markings.Notes:1127B.5 #9State:4.7.10Federal:

Provide level landing $2,000Slope of gutter pane is 6.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a 1/2" lip at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 85 Priority:Install, replace or modify curb ramp $3,500

24" straight segment is not within markings.Notes:1127B.5 #9State:4.7.10Federal:

Provide level landing $2,000Slope of gutter pane is 8.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 532/3/2010 ExteriorCurb Ramp Barriers

Page 359: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 86 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). 24" min. straight segment of the curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 87 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10% (8.33% max). Slope of one flared side is 11.5% (10% max). 24" min. straight segment of the curbs are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 88 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 542/3/2010 ExteriorCurb Ramp Barriers

Page 360: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 89 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11% (10% max). Top level landing is 47" (48" min).Notes:1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 90 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10% (8.33% max). Slope of one flared side is 11.7% (10% max). 24" min. straight segment of the curbs are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 552/3/2010 ExteriorCurb Ramp Barriers

Page 361: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 91 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.7% (8.33% max). Slope at top landing is 2.9% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 92 Priority:Provide level landing $2,000

Slope of gutter pane is 5.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Curb Ramp3 - 93 Priority:Provide level landing $2,000

Slope of gutter pane is 7.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Page 562/3/2010 ExteriorCurb Ramp Barriers

Page 362: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 94 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9% (8.33% max). Slope at the top landing is 5.8% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 95 Priority:Install, replace or modify curb ramp $3,500

Slope at the top landing is 5.5% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 572/3/2010 ExteriorCurb Ramp Barriers

Page 363: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 96 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.6% (8.33% max). Slope at the top landing is 3.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide level landing $2,000Slope of gutter pane is 7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Page 582/3/2010 ExteriorCurb Ramp Barriers

Page 364: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 97 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14% (8.33% max). Slope at the top landing is 2.9% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 592/3/2010 ExteriorCurb Ramp Barriers

Page 365: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 98 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.5% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 99 Priority:Repair surface $250

There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 602/3/2010 ExteriorCurb Ramp Barriers

Page 366: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 100 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 612/3/2010 ExteriorCurb Ramp Barriers

Page 367: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 101 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). Slope at the top landing is 6.9% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 14% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 622/3/2010 ExteriorCurb Ramp Barriers

Page 368: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 102 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 7.1% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 632/3/2010 ExteriorCurb Ramp Barriers

Page 369: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 103 Priority:

Provide level landing $2,000Slope of gutter pane is 12.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $30012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 642/3/2010 ExteriorCurb Ramp Barriers

Page 370: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 104 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slope at the top landing is 2.6% (2% max) and level landing is 31" (48" min). 24" min. straight segment of the curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 652/3/2010 ExteriorCurb Ramp Barriers

Page 371: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 105 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 106 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 662/3/2010 ExteriorCurb Ramp Barriers

Page 372: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 107 Priority:

Provide level landing $2,000Slope of gutter pane is 10.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 672/3/2010 ExteriorCurb Ramp Barriers

Page 373: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 108 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.5% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 682/3/2010 ExteriorCurb Ramp Barriers

Page 374: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 109 Priority:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 110 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.7% (8.33% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 692/3/2010 ExteriorCurb Ramp Barriers

Page 375: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 111 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.1% (8.33% max). Slope of one flared side is 13.8% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 112 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.9% (8.33% max). Slope of one flared side is 12% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 702/3/2010 ExteriorCurb Ramp Barriers

Page 376: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 113 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 114 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 115 Priority:Provide detectable warning strip $1,000

Detectable warnings are 24" the length of the walking surface of the curb ramp (36" min. wide).

Notes:

1127B.5 #7State:4.7.7Federal:

Page 712/3/2010 ExteriorCurb Ramp Barriers

Page 377: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 116 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.2% (8.33% max). Slopes of both flared sides are 13% (10% max). Slope at the top landing is 3.2% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 117 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 8.9% (8.33% max). Slope of one flared side is 10.2% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 722/3/2010 ExteriorCurb Ramp Barriers

Page 378: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 118 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11.4% (10% max). Top level landing is 5.9% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 119 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 15% (8.33% max). Slopes of flared sides are 19% and 15.2% (10% max). Slope at the top landing is 2.8% (2% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 732/3/2010 ExteriorCurb Ramp Barriers

Page 379: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 120 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11% (10% max). 24" segment of straight curb not provided.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 9.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 742/3/2010 ExteriorCurb Ramp Barriers

Page 380: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 121 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max). Slope of one flared side is 11% (10% max). 24" segment of straight curb is not within marked crossings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 752/3/2010 ExteriorCurb Ramp Barriers

Page 381: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 122 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.6% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 762/3/2010 ExteriorCurb Ramp Barriers

Page 382: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 123 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.2% (8.33% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 124 Priority:Provide level landing $2,000

Slope of gutter pane is 11.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.8% (8.33% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Page 772/3/2010 ExteriorCurb Ramp Barriers

Page 383: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 125 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max). Top level landing is 45" (48" min).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 782/3/2010 ExteriorCurb Ramp Barriers

Page 384: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 126 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 7.1% (2% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 792/3/2010 ExteriorCurb Ramp Barriers

Page 385: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 127 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 5.3% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 128 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.1% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 802/3/2010 ExteriorCurb Ramp Barriers

Page 386: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 129 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 812/3/2010 ExteriorCurb Ramp Barriers

Page 387: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 130 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.1% (8.33% max). Slope at the top landing is 7.5% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 822/3/2010 ExteriorCurb Ramp Barriers

Page 388: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 131 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 832/3/2010 ExteriorCurb Ramp Barriers

Page 389: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 132 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 842/3/2010 ExteriorCurb Ramp Barriers

Page 390: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 133 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9% (8.33% max). Slopes of flared sides are 13% and 11.7% (10% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 134 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 852/3/2010 ExteriorCurb Ramp Barriers

Page 391: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 135 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13% (8.33% max). Slopes of flared sides are 17% and 15% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 862/3/2010 ExteriorCurb Ramp Barriers

Page 392: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 136 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max). 24" segment of straight curb are not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 137 Priority:Install, replace or modify curb ramp $3,500

Slope of one flared side is 10.5% (10% max).Notes:1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 872/3/2010 ExteriorCurb Ramp Barriers

Page 393: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 138 Priority:

Provide level landing $2,000Slope of gutter pane is 9.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are 24" (36" min) of the length of the walking surface of the curb ramp.

Notes:

1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 139 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9% (8.33% max). Slope of one flared side is 16% (10% max).Notes:1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 140 Priority:Install, replace or modify curb ramp $3,500

Level landing is not provided. Space at the bottom of the curb ramp is 39" x 48" (48" x 48" min).

Notes:

1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 882/3/2010 ExteriorCurb Ramp Barriers

Page 394: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 141 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.6% (8.33% max). Slope at the top landing is 2.6% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 142 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.1% (8.33% max). Slope at the top landing is 2.2% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 892/3/2010 ExteriorCurb Ramp Barriers

Page 395: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 143 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 144 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.9% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 902/3/2010 ExteriorCurb Ramp Barriers

Page 396: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 145 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max). Slope at the top landing is 4.9% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 912/3/2010 ExteriorCurb Ramp Barriers

Page 397: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 146 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.3% (8.33% max). Slope of one flared side is 14.5% (10% max).24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 147 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 148 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 922/3/2010 ExteriorCurb Ramp Barriers

Page 398: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 149 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 932/3/2010 ExteriorCurb Ramp Barriers

Page 399: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 150 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.6% (8.33% max). Slopes of flared sides are 15% and 13.9% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 942/3/2010 ExteriorCurb Ramp Barriers

Page 400: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 151 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.8% (8.33% max). Slope at the top landing is 2.7% (2% max). 24" min. segment of straight curb not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 152 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.2% (8.33% max). 24" min. segment of straight curb not provided on both sides of curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 952/3/2010 ExteriorCurb Ramp Barriers

Page 401: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 153 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.5% (8.33% max). Slope of one flared side is 10.3% (10% max). Slope at the top landing is 2.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 154 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 12.3% (8.33% max). Slopes of flared sides are 15.8% and 14% (10% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 962/3/2010 ExteriorCurb Ramp Barriers

Page 402: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 155 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.3% (8.33% max). Slopes of flared sides are 11.9% & 13% (10% max). Slope at the top landing is 3.8% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 40" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 972/3/2010 ExteriorCurb Ramp Barriers

Page 403: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 156 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.1% (8.33% max). Slopes of flared sides are 12% and 15% (10% max). Slope at the top landing is 2.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 982/3/2010 ExteriorCurb Ramp Barriers

Page 404: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 157 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.4% (8.33% max). Slope of one flared side is 11.9% (10% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 992/3/2010 ExteriorCurb Ramp Barriers

Page 405: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 158 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.5% (8.33% max). Slope at the top landing is 2.6% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 159 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 8.9% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1002/3/2010 ExteriorCurb Ramp Barriers

Page 406: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 160 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.4% (8.33% max). Slope at the top landing is 2.7% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 161 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 11.5% (8.33% max). Slopes of flared sides are 14% and 15% (10% max). Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1012/3/2010 ExteriorCurb Ramp Barriers

Page 407: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 162 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.6%(8.33% max). Slopes of flared sides are 13.3% & 14.9% (10% max).Slope at the top landing is 2.5% (2% max).24" segment of straight curb are not within markings.Space at the bottom of the curb ramp is 36" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 163 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 12.6% (8.33% max). Slope of one flared side is 13.4% (10% max). Slope at the top landing is 4.3% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1022/3/2010 ExteriorCurb Ramp Barriers

Page 408: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 164 Priority:

Provide level landing $2,000Slope of gutter pane is 8.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 165 Priority:Provide level landing $2,000

Slope of gutter pane is 7.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1032/3/2010 ExteriorCurb Ramp Barriers

Page 409: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 166 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max). Slope at the top landing is 4% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1042/3/2010 ExteriorCurb Ramp Barriers

Page 410: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 167 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 168 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.8% (8.33% max). Slopes of flared sides are 11% & 13% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1052/3/2010 ExteriorCurb Ramp Barriers

Page 411: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 169 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 170 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 171 Priority:Install, replace or modify curb ramp $3,500

Slope at the top landing is 6.2% (2% max). Space at the bottom of the curb ramp is 39" x 48" (48" x 48" min).

Notes:

1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 172 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1062/3/2010 ExteriorCurb Ramp Barriers

Page 412: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 173 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope at the top landing is 4.1% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1072/3/2010 ExteriorCurb Ramp Barriers

Page 413: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 174 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max). Slope at the top landing is 2.8% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 40" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 175 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 12.5% (8.33% max). Slope at the top landing is 2.6% (2% max). Space at the bottom of the curb ramp is 39" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1082/3/2010 ExteriorCurb Ramp Barriers

Page 414: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 176 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 6% (2% max). 24" segment of straight curb are not within markings. Space at the bottom of the curb ramp is 38" x 48" (48" x 48" min).

Notes:

1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 177 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 14.2% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1092/3/2010 ExteriorCurb Ramp Barriers

Page 415: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 178 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 4.1% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1102/3/2010 ExteriorCurb Ramp Barriers

Page 416: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 179 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slope at the top landing is 3.4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1112/3/2010 ExteriorCurb Ramp Barriers

Page 417: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 180 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.4% (8.33% max). Slope of one flared side is 16.1% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders are not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1122/3/2010 ExteriorCurb Ramp Barriers

Page 418: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 181 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Space at the bottom of the curb ramp is 42" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1132/3/2010 ExteriorCurb Ramp Barriers

Page 419: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 182 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.8% (8.33% max). Slope at the top landing is 3.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 183 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 9.3% (8.33% max). Slope at the top landing is 2.6% (2% max). 24" segment of straight curb are not within markings.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1142/3/2010 ExteriorCurb Ramp Barriers

Page 420: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 184 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.8% (8.33% max). Slope of one flared side is 17% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 185 Priority:Provide level landing $2,000

Slope of gutter pane is 8.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1152/3/2010 ExteriorCurb Ramp Barriers

Page 421: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 186 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.9% (8.33% max). Slope of one flared side is 11.5% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1162/3/2010 ExteriorCurb Ramp Barriers

Page 422: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 187 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max). Slope at the top landing is 3.9% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1172/3/2010 ExteriorCurb Ramp Barriers

Page 423: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 188 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.6% (8.33% max). Slope at the top landing is 3.9% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 19% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 189 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1182/3/2010 ExteriorCurb Ramp Barriers

Page 424: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 190 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.4% (8.33% max). Slope at the top landing is 2.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 14.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1192/3/2010 ExteriorCurb Ramp Barriers

Page 425: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 191 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16% (8.33% max). Slope at the top landing is 3.2% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1202/3/2010 ExteriorCurb Ramp Barriers

Page 426: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 192 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max). Slope at the top landing is 3.2% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1212/3/2010 ExteriorCurb Ramp Barriers

Page 427: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 193 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.9% (8.33% max). Slopes of flared sides are 19.8% and 16.7% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 13.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1222/3/2010 ExteriorCurb Ramp Barriers

Page 428: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 194 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1232/3/2010 ExteriorCurb Ramp Barriers

Page 429: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 196 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.5% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 197 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 11.7% (8.33% max). Slope at the top landing is 3.5% (2% max). Space at the bottom of the curb ramp is 34" x 48" (48" x 48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1242/3/2010 ExteriorCurb Ramp Barriers

Page 430: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 198 Priority:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 199 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.4% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1252/3/2010 ExteriorCurb Ramp Barriers

Page 431: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 200 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.8% (10% max). Slope at the top landing is 6.5% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 201 Priority:Install, replace or modify curb ramp $3,500

Slope at the top landing is 2.9% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1262/3/2010 ExteriorCurb Ramp Barriers

Page 432: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 202 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.6% (8.33% max). Slope at the top landing is 3.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1272/3/2010 ExteriorCurb Ramp Barriers

Page 433: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 203 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slope at the top landing is 5.9% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 204 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.2% (8.33% max). Slope at the top landing is 2.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1282/3/2010 ExteriorCurb Ramp Barriers

Page 434: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 205 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.1% (8.33% max). Slope at the top landing is 3.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 15% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1292/3/2010 ExteriorCurb Ramp Barriers

Page 435: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 206 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.7% (8.33% max). Slope at the top landing is 2.3% (2% max) and top level landing is 45.5" (48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1302/3/2010 ExteriorCurb Ramp Barriers

Page 436: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 207 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.2% (8.33% max). Slopes of flared sides are 13.3% and 12.6% (10% max). Slope at the top landing is 3.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 12.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1312/3/2010 ExteriorCurb Ramp Barriers

Page 437: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 208 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.4% (8.33% max). Slope at the top landing is 4.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1322/3/2010 ExteriorCurb Ramp Barriers

Page 438: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 209 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max). Slope of one flared side is 15% (10% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 210 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.7% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1332/3/2010 ExteriorCurb Ramp Barriers

Page 439: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 211 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.9% (8.33% max). Slope of one flared side is 13.6% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1342/3/2010 ExteriorCurb Ramp Barriers

Page 440: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 212 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.7% (8.33% max). Top level landing is 38.5" (48" min).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1352/3/2010 ExteriorCurb Ramp Barriers

Page 441: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 213 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.9% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1362/3/2010 ExteriorCurb Ramp Barriers

Page 442: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 214 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.5% (8.33% max). Slope at the top landing is 5% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1372/3/2010 ExteriorCurb Ramp Barriers

Page 443: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 215 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.8% (8.33% max). Slopes of flared sides are 11% and 14% (10% max). Slope at the top landing is 3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1382/3/2010 ExteriorCurb Ramp Barriers

Page 444: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 216 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.7% (8.33% max). Slope at the top landing is 2.7% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1392/3/2010 ExteriorCurb Ramp Barriers

Page 445: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 217 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1402/3/2010 ExteriorCurb Ramp Barriers

Page 446: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 218 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.4% (8.33% max). Slopes of flared sides are 16.7% and 14% (10% max). 24" min. segment of straight curb not provided.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1412/3/2010 ExteriorCurb Ramp Barriers

Page 447: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 219 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.7% (8.33% max). Level landing not provided.Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1422/3/2010 ExteriorCurb Ramp Barriers

Page 448: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 220 Priority:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide surface texturing $30012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Page 1432/3/2010 ExteriorCurb Ramp Barriers

Page 449: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 221 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.7% (8.33% max). Slopes of flared sides are 11.5% and 10.7% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $012" min. wide grooved borders not provided.Notes:1127B.5 #6State:4.7.4Federal:

Curb Ramp3 - 222 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 223 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1442/3/2010 ExteriorCurb Ramp Barriers

Page 450: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 224 Priority:

Install, replace or modify curb ramp $3,500There is a step in order to access the path of travel. Install curb ramp.Notes:1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 225 Priority:Install, replace or modify curb ramp $3,500

There is a step in order to access the path of travel. Install curb ramp.Notes:1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 226 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 227 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 228 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 229 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1452/3/2010 ExteriorCurb Ramp Barriers

Page 451: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 230 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 231 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 232 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 233 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 234 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 235 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1462/3/2010 ExteriorCurb Ramp Barriers

Page 452: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 236 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 237 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 238 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 239 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 240 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 241 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Page 1472/3/2010 ExteriorCurb Ramp Barriers

Page 453: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 242 Priority:

Install, replace or modify curb ramp $3,500Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 243 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is not provided at the corner of street intersection and where pedestrian way crosses a curb. Install curb ramp.

Notes:

1127B.5 #1State: - Federal:

Curb Ramp3 - 244 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.9% (8.33% max). Slope of one flared side is 12.7% (10% max). Slope at the top landing is 3.2% (2% max) and 33" (48" min).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1482/3/2010 ExteriorCurb Ramp Barriers

Page 454: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 245 Priority:

Install, replace or modify curb ramp $3,500Slope at the top landing is 3.3% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 246 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 8.9% (8.33% max). Slope of one flared side is 10.5% (10% max). Slope at the top landing is 3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1492/3/2010 ExteriorCurb Ramp Barriers

Page 455: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 247 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.9% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 248 Priority:Install, replace or modify curb ramp $3,500

Slope at the top landing is 3.5% (2% max).Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1502/3/2010 ExteriorCurb Ramp Barriers

Page 456: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 249 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 12.1% (10% max). Slope at the top landing is 3% (2% max). 24" min. straight curb is not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #4, 1127B.5 #9State:4.7.10, 4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1512/3/2010 ExteriorCurb Ramp Barriers

Page 457: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 250 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 12.4% (10% max).Notes:1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 6.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 251 Priority:Provide level landing $2,000

Slope of gutter pane is 9.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1522/3/2010 ExteriorCurb Ramp Barriers

Page 458: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 252 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max). Slopes of flared sides are 13% and 11.6% (10% max). Slope at the top landing is 2.6% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1532/3/2010 ExteriorCurb Ramp Barriers

Page 459: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 253 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11.9% (10% max). 24" min. straight curb is not provided at either ends of the curb ramp.

Notes:

1127B.5 #3, 1127B.5 #9State:4.7.10, 4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 11.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1542/3/2010 ExteriorCurb Ramp Barriers

Page 460: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 254 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.6% (8.33% max). Slopes of flared sides are 12.6% and 13.4% (10% max). Slope at the top landing is 4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 11.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 255 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 10.9% (8.33% max). Slope of one flared side is 12.7% (10% max). Slope at the top landing is 3.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1552/3/2010 ExteriorCurb Ramp Barriers

Page 461: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 256 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 257 Priority:Provide level landing $2,000

Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1562/3/2010 ExteriorCurb Ramp Barriers

Page 462: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 258 Priority:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1572/3/2010 ExteriorCurb Ramp Barriers

Page 463: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 259 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 10.5% (10% max).Notes:1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1582/3/2010 ExteriorCurb Ramp Barriers

Page 464: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 260 Priority:

Install, replace or modify curb ramp $3,500Slope of one flared side is 11.2% (10% max).Notes:1127B.5 #3State:4.7.5Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1592/3/2010 ExteriorCurb Ramp Barriers

Page 465: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 261 Priority:

Install, replace or modify curb ramp $3,500Top landing is not provided.Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1602/3/2010 ExteriorCurb Ramp Barriers

Page 466: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 262 Priority:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 263 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is under construction.Notes:1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 264 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1612/3/2010 ExteriorCurb Ramp Barriers

Page 467: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 265 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 266 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is under construction.Notes:1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 267 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is under construction.Notes:1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 268 Priority:Install, replace or modify curb ramp $3,500

Curb ramp is under construction.Notes:1127B.5 #3State:4.8.2Federal:

Curb Ramp3 - 269 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1622/3/2010 ExteriorCurb Ramp Barriers

Page 468: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 270 Priority:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 271 Priority:Install, replace or modify curb ramp $3,500

Top landing is not provided.Notes:1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 272 Priority:Install, replace or modify curb ramp $3,500

Top landing is not provided.Notes:1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1632/3/2010 ExteriorCurb Ramp Barriers

Page 469: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 273 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.5% (8.33% max). Slopes of flared sides are 12% and 13% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Curb Ramp3 - 274 Priority:Install, replace or modify curb ramp $3,500

Top landing is not provided.Notes:1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.7% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1642/3/2010 ExteriorCurb Ramp Barriers

Page 470: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 275 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.2% (8.33% max). Slope of one flared side is 10.6% (10% max). Slope at the top landing is 2.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Page 1652/3/2010 ExteriorCurb Ramp Barriers

Page 471: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 276 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 7.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 277 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1662/3/2010 ExteriorCurb Ramp Barriers

Page 472: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 278 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 8.8% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 279 Priority:Provide level landing $2,000

Slope of gutter pane is 6.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1672/3/2010 ExteriorCurb Ramp Barriers

Page 473: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 280 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.9% (8.33% max). Slopes of both flared sides are 12.4% and 10.6% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1682/3/2010 ExteriorCurb Ramp Barriers

Page 474: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 281 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 6.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 282 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 9.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1692/3/2010 ExteriorCurb Ramp Barriers

Page 475: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 283 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11% (8.33% max). Slope of one flared side is 13% (10% max).Notes:1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.8% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1702/3/2010 ExteriorCurb Ramp Barriers

Page 476: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 284 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 285 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1712/3/2010 ExteriorCurb Ramp Barriers

Page 477: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 286 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 287 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 12.3% (8.33% max). Slopes of both flared sides are 13% and 14% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1722/3/2010 ExteriorCurb Ramp Barriers

Page 478: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 288 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.3% (8.33% max). Slopes of both flared sides are 18% and 20% (10% max). Slope at the top landing is 2.8% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 6.2% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1732/3/2010 ExteriorCurb Ramp Barriers

Page 479: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 289 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12% (8.33% max). Slopes of both flared sides are 18% and 19% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1742/3/2010 ExteriorCurb Ramp Barriers

Page 480: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 290 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 11.6% (8.33% max). Slopes of both flared sides are 22% and 19% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1752/3/2010 ExteriorCurb Ramp Barriers

Page 481: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 291 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 16.8% (8.33% max). Slopes of both flared sides are 21% (10% max).

Notes:

1127B.5 #3State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1762/3/2010 ExteriorCurb Ramp Barriers

Page 482: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 292 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.2% (8.33% max). Slopes of both flared sides are 24% (10% max). Slope at the top landing is 2.5% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1772/3/2010 ExteriorCurb Ramp Barriers

Page 483: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 293 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15.6% (8.33% max). Slope at the top landing is 2.8% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1782/3/2010 ExteriorCurb Ramp Barriers

Page 484: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 294 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 12.5% (8.33% max). Slope of one flared side is 23% (10% max). Slope at the top landing is 2.2% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.3% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1792/3/2010 ExteriorCurb Ramp Barriers

Page 485: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 295 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 296 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 15% (8.33% max). Slope at the top landing is 3% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Page 1802/3/2010 ExteriorCurb Ramp Barriers

Page 486: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 297 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14% (8.33% max). Slope at the top landing is 5.6% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 5.9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 298 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 13% (8.33% max). Slope at the top landing is 3% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.1% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1812/3/2010 ExteriorCurb Ramp Barriers

Page 487: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 299 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max). Slope at the top landing is 2.2% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 300 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 18.6% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1822/3/2010 ExteriorCurb Ramp Barriers

Page 488: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 301 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 15% (8.33% max). Slope at the top landing is 3% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 8.5% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1832/3/2010 ExteriorCurb Ramp Barriers

Page 489: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 302 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 18% (8.33% max). Slope at the top landing is 5% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1842/3/2010 ExteriorCurb Ramp Barriers

Page 490: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 303 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.8% (8.33% max). Slope at the top landing is 4.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1852/3/2010 ExteriorCurb Ramp Barriers

Page 491: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 304 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.2% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 305 Priority:Provide surface texturing $0

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1862/3/2010 ExteriorCurb Ramp Barriers

Page 492: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 306 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 13.5% (8.33% max). Slope at the top landing is 3% (2% max).Notes:1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 10% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Curb Ramp3 - 307 Priority:Install, replace or modify curb ramp $3,500

Slope of curb ramp is 15.9% (8.33% max). Slope at the top landing is 2.4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 7.6% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1872/3/2010 ExteriorCurb Ramp Barriers

Page 493: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 308 Priority:

Provide surface texturing $0Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 14.3% (8.33% max). Slope at the top landing is 2.4% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 309 Priority:Provide detectable warning strip $1,000

Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1882/3/2010 ExteriorCurb Ramp Barriers

Page 494: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 310 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 10.3% (8.33% max). Slopes of flared sides are 11% (10% max). Slope at the top landing is 5.3% (2% max).

Notes:

1127B.5 #3, 1127B.5 #4State:4.7.5, 4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1892/3/2010 ExteriorCurb Ramp Barriers

Page 495: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 311 Priority:

Provide surface texturing $300Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide level landing $2,000Slope of gutter pane is 12% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Curb Ramp3 - 312 Priority:Provide surface texturing $300

Surface material does not contrast with surrounding sidewalks.Notes:1127B.5 #5State: - Federal:

Provide detectable warning strip $1,000Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $250There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1902/3/2010 ExteriorCurb Ramp Barriers

Page 496: Appendix E: Pedestrian Rights-of-Way Reports · 2016-08-26 · Curb Ramp Barriers Madera Exterior 3 - 1 Curb Ramp Priority: Install, replace or modify curb ramp $3,500 Slope of curb

Curb Ramp BarriersMadera

ExteriorCurb Ramp3 - 313 Priority:

Install, replace or modify curb ramp $3,500Slope of curb ramp is 9.9% (8.33% max).Notes:1127B.5 #3State:4.8.2Federal:

Provide level landing $2,000Slope of gutter pane is 9.4% (5% max).Notes:1127B.5 #3State:4.7.2Federal:

Provide detectable warning strip $0Detectable warnings are not provided.Notes:1127B.5 #7State:4.7.7Federal:

Repair surface $0There is a lip that is more than 1/2" at the bottom of the curb ramp. Grind lip down so that transitions from the curb ramp to the street is flushed and free of abrupt changes.

Notes:

1133B.7.4State:4.7.2Federal:

Page 1912/3/2010 ExteriorCurb Ramp Barriers


Recommended