+ All Categories
Home > Documents > Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM...

Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM...

Date post: 26-Oct-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
17
Application and Research Martin Fischer Ragip Akbas, Jessica Hastings, John Haymaker, Brad Jarrett, Calvin Kam, Bonsang Koo, John Kunz, Kathleen Liston, SK Lyu, Sheryl Staub-French, Vibha Singhal, Ben Suter, Pooja Trivedi
Transcript
Page 1: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Application and Research

Martin FischerRagip Akbas, Jessica Hastings, John Haymaker, Brad Jarrett,

Calvin Kam, Bonsang Koo, John Kunz, Kathleen Liston, SK Lyu, Sheryl Staub-French, Vibha Singhal, Ben Suter, Pooja Trivedi

Page 2: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Projects with 4D Models with CIFE Involvement

• San Mateo Health Center (Dillingham)• Roof for Haas School of Business (Pacific)• McWhinney Office Buildings (Neenan)• Sequus Pharmaceuticals Pilot Plant (Hathaway)• Experience Music Project (Hoffman)• Paradise Pier, DCA (WDI)• WDCH (Mortenson)• Santa Monica Hospital (URS)• Letterman, Portland Office, Bay Street (DPR)• Genentech FRCII (Hathaway-Dinwiddie)• Stata Center for CS (Beacon-Skanska)• Helsinki Univ. of Techn. Lecture Hall (Senaatti)• HK Disney (WDI)

Page 3: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Can you build the project according to this schedule?

Page 4: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Can you build the project according to this schedule?

Page 5: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

No! The Air-Handler Unit is scheduled too late

Page 6: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

WDCH: Evaluate constructibility of construction method

Page 7: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Letterman: Evaluate constructibility of design

Page 8: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Bay Street: Gain strategic insight

Page 9: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Stata Center: Understand time-space relationships

Page 10: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Paradise Pier: improve site logistics planning

“Through 4D modeling we were able to visualize concurrent activities at a macro level.”Project Manager, Owner

Page 11: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

4D greatly reduces unplanned changes

y = 374.72xR2 = 0.9312

$0

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

$1,600,000

$1,800,000

$2,000,000

$- $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000 $4,500 $5,000Total Uplanned Change by Individual Facilities ($000)

Page 12: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Recent and ongoing 4D research

• 4D WorkPlanner: Automated Generation and Evaluation of Work Spaces

• Link between 4D WorkPlanner and CMM (Construction Method Modeler)

• Extension of CMM to steel structures• Construction-focused 3D model• Intelligent link between 3D model and cost estimates• iRoom construction management scenario• iRoom highlighting and overlay• Testing of IFC• Continued observations of practice

Page 13: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

There are multiple types of time-space conflicts

Place WindowsSetup Scaffolding

Hang C-ChannelTakedown Scaffolding

Hang PH. Wall Panels, Side AHang PH. Wall Panels, Side B

Lay Roof InsulationCure Roof Insulation

5 10

1

Place WindowsSetup Scaffolding

Hang C-ChannelTakedown Scaffolding

Hang PH. Wall Panels, Side AHang PH. Wall Panels, Side B

Lay Roof InsulationCure Roof Insulation

5 10

Place WindowsSetup Scaffolding

Hang C-ChannelTakedown Scaffolding

Hang PH. Wall Panels, Side AHang PH. Wall Panels, Side B

Lay Roof InsulationCure Roof Insulation

5 10

Initial Schedule Spatial InterferenceConflict

TypeProblemCreated

2

3

Space Blockage

Construct-ability

SafetyHazard

Construct-ability

Mild Congestion

LessProductivity

Page 14: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Symbolic Product Model=

3D Components+

Working Units(conceptual groupings)

+Part-of Relations

+Support Relations

<C>

CPM Activity Network

<S>

3D Model

Time 4D VisualizationInternet

4D Visualization Bocad

Construction Method Models Templatesand

Domain Models

<CARS>

Joint Product and ProcessElaboration and Sequencing

Mechanisms

Generate 4DProduction Model

(CMM System)

4DProduction

Model

Interactive Bocad-3D - CMM interface

Page 15: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

November December

1999Task Name

Excavate Lagoon Zone3

Import, compact clay Zone3

Mesh Zone3

Concrete Zone3

Start Date

11/20/99

11/26/99

11/30/99

12/5/99

End Date

11/26/99

12/3/99

12/8/99

12/10/99

5d

6d

7d

5d

Duration

Task Name

Construct Lagoon Zone1

Construct Lagoon Zone2

Construct Lagoon Zone3

Start Date

11/1/99

11/7/99

11/20/99

End Date

11/22/99

11/25/99

12/10/99

16d

14d

15d

Construct Lagoon Zone5

Construct Lagoon Zone6

Construct Lagoon Zone4 11/27/99 12/13/99 11d

11/30/99 12/20/99 15d

12/9/99 12/28/99 14d

November December

1999Duration

Task Name

Excavate Zone3-1

Excavate Zone3-2

Excavate Zone3-3

Excavate Zone3-4

Excavate Zone3-5

Start Date

11/22/99

11/23/99

11/24/99

11/25/99

11/26/99

1d

1d

1d

1d

1d

22 23 24 25 26

Nov 99Duration Task Name

Mesh Zone 3-1

Mesh Zone 3-2

Mesh Zone 3-3

Mesh Zone 3-4

Mesh Zone 3-5

Start Date

11/30/99

12/2/99

12/4/99

12/7/99

12/8/99

2d

2d

1d

1d

1d

29 30 1 2 3 4 5 6 7 8 9

Nov 99 Dec 99Duration

Schedule Levels-of-Detail

Shape RepresentationLevels-of-Detail

Multiple levels of detail for product and process

1

2

5

4

3

1

23

45

Page 16: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

FRCII: 2D & 4D

Page 17: Application and Researchfischer/Presentations/CEE320A4DCAD.pdf · Interactive Bocad-3D - CMM interface. November December 1999 Task Name Excavate Lagoon Zone3 Import, compact clay

Next steps: Develop and test ...• ... functionality to maintain a ‘live’ 4D model

from early project planning to construction• … intuitive and interactive user interfaces,

visualizations• … links to project databases at multiple levels of

detail (cost, etc.)• … web-based 4D tools

– use of standard product/process models– xml

• … computer-based 4D analyses (cost, safety, resources, etc.)

• … metrics


Recommended