+ All Categories
Home > Documents > Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup,...

Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup,...

Date post: 03-Jan-2016
Category:
Upload: kellie-stokes
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
26
Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical & Biomolecular Engineering, Rice University
Transcript
Page 1: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases

Yi Chen, Anju Kurup, Walter Chapman

Houston, April 29 2013

Department of Chemical & Biomolecular Engineering, Rice University

Page 2: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Outline

•Introduction

1. Asphaltene deposition issue2. The ADEPT simulator and application procedure

•Field case studies

•Summary

Page 3: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Asphaltene issue in flow assurance

Flow Assurance Prediction – Operator’s Savings:• Intervention cost to remove solids: ~

300K/well-dry tree, $3,500K / well – wet tree.

• Loosing the well: ~ $50,000K to replace the well with a side track.

• Losses due to downtime: ~ $ 700K /day (for prod. of 7,000bbls/day)

Page 4: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Deposition mechanismad

vecti

on

diffusion

Page 5: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

CDaCDarZ

C

Z

C

Pe

Cd

2agp2

21

Precipitation &

Re-dissolution kinetics:

Dimensionless parameters:

Initial & boundary condition:

Kurup, A.S. et al., Energy & Fuels. 2011, 25, 4506–4516 5

z

dd

z

pp

z

agag

z

zeqeq

ff

V

LkDa

V

LkDa

V

LkDa

D

LVPe

L

vt

L

zZ

C

CC

C

CC

C

CC

,,,

,,,0

'

0

'

0

'

0,0,0 )()0,(),0(

LzZZ Z

CCC

pff

eqfpdissdiss

eqfeqfpp

rz

CC

CwhenCCDakr

CwhenCCCDar

,

,

Mathematical model

Page 6: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Thermodynamic module

Depositionmodule

Composition, Liquid density,Bubble point,

GOR, AOP, SARA Asphaltene instability,

Ceq

Depositionprofile,

Thickness,Pressure drop

Kinetic parameters

Operational conditions

Ceq

P-T profile in wellbore/pipeline

6AOP--- Asphaltene onset pressureCeq --- Asphaltene equilibrium concentration

ADEPT simulator structure

Page 7: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Appropriate Parameters

① Characterization / Recombination

②Tuning parameters to match Pb, liquid density, AOP

③Phase behavior prediction

④ Ceq calculation with P-T profile input

MW & mass percentages of all (Pseudo-) components

Asphaltene instability

Asphaltene equilibrium concentration, Ceq

Fluid composition, GOR, SARA

Deposition module

7

Thermodynamic modeling

Page 8: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

The kinetic constant of deposition in capillary-scale

⑤ determine kp & kag using reaction model

⑥fitting kd(cap) to reproduce capillary deposition flux

⑦scaling up of kd(cap) to k*d

The kinetic constants of precipitation and aggregation

The kinetic constant of deposition in field-scale

Asphaltene deposition flux, thickness, pressure drop

The asphaltene precipitated amountsThermodynamic module

8

⑧input Ceq , kp , kag , k*d , operational conditions

Deposition modeling

Page 9: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

field case 1

9

Page 10: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

10

Wellbore pressure loss is approximately 10 psi per day in the first several weeks after wellbore wash;

GOR decreases 60 ScF / STB over 4 months;

GOR increases with gas injection;

GOR sensitivity analysis is needed.

Deepwater Gulf of Mexico wellbore

Page 11: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

90 140 190 240 2900

1000

2000

3000

4000

5000

6000

7000

8000

9000onset P @GOR=669

bubble P @GOR=669

lower onset P @GOR=669

P-T trace

onset P- exp. @GOR=669

bubble P-exp. @GOR=669

T / F

P /

Psi

11

Phase behavior prediction(wellbore)

PC-SAFT EoS (VLXE / Multiflash / PVTsim)

Page 12: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

90 140 190 240 2900

1000

2000

3000

4000

5000

6000

7000

8000

9000onset P @GOR=1000

onset P @GOR=669

onset P @GOR=549

bubble P @GOR=1000

bubble P @GOR=669

bubble P @GOR=549

lower onset P @GOR=1000

lower onset P @GOR=669

lower onset P @GOR=549

P-T trace

onset P- exp. @GOR=669

bubble P-exp. @GOR=669

T / F

P /

Psi

12

Phase behavior prediction(wellbore)

GOR

GOR

Page 13: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Extract kp & kag

eqfpf

2pag

S

2pageqfp

p

CCkdt

dC

Ckdt

dC

CkCCkdt

dC

Aging Time

(hour)Precipitate amount (g)

0.166667 0.01320.333333 0.0165

0.5 0.01692 0.01674 0.0172

7.5 0.018712 0.018224 0.02

kp / s-1 2.5×10-2

kag / s-1 1.7×10-3

Batch experimental results from NMT

0 5 10 15 20 25 300.2

0.4

0.6

0.8

measured

Predicted

Time, hr

pre

cip

ita

ted

ag

gre

ga

tes

co

nc

en

tra-

tio

n, d

ime

ns

ion

les

s

Page 14: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

14Wang, J. X., et al., Dispersion Sci. Technol. 2004, 25, 287–298.

Capillary deposition test

Page 15: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

kd(cap) = 2.11×10-3 s-1

Fitting kd (cap) to make the peak of deposition flux curve predicted match the experimental observation.

15

Fitting kd(cap)

0.00 40.00 80.00 120.000.00

40.00

80.00

120.00

160.00

tubing lenth / inch

depo

sition

flux

, g/

m2/

day

Simulation with fitted kd (cap)

Expt

Page 16: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Scale up kd(cap) to k*d

kd (cap) k*d(mom) = 4.31×10-6 s-1

6

1

)(2

KTD

k

D

m

capd

m

ScFkk capdd )(*

1

2

RScF

8/77.62 etmom RD

Kurup, A.S. et al., Energy & Fuels. 2012, 26 (9), pp 5702–5710

Page 17: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

17

Deposition flux prediction (wellbore)

0 10,000 20,000-1.0E-03

4.0E-03

Distance ( ft )

CF-C

EQ

(g/m

l)

0 10,000 20,0000.0E+00

4.0E-08

8.0E-08

1.2E-07

Depo

sition

flux

(g/

cm2/

s) I II III

Precipitated particles

Flow out

Aggregation

Deposition

Flow in

CF-CEQ = 0

Re-dissolution starts

Page 18: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

0 10,000 20,0000.00

0.04

0.08

0.12

GOR=1000 GOR=669 GOR=549

Distance / ft

Dep

osit

thic

knes

s /

inc

h

18

14 days

Deposit thickness prediction (wellbore)

Page 19: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

19

GORSCF/STB

Frictional pressure drop Psi /day

549 9.45669 10.10

1000 10.89≈ 10 Psi / day (Based on 14 days)

25.0

2

Re

316.0

2

f

gg

v

D

LfPfriction

Frictional pressure drop (wellbore)

Page 20: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

field case 2

20

Page 21: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

21

• Asphaltene problem is reported.

• The total pressure drop in the first 28 days is about 648 psi.

• The asphaltene deposition situation must be estimated.

Pipeline Gulf of Mexico

Pressure 5,284 psi

Temperature 177 ⁰F

Flow rate 13482 bbl/day

Diameter 5.137 inch4.881 inch

length 52389 ft

Field information (pipeline)

Page 22: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

22

Phase behavior prediction (pipeline)

Page 23: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

Kinetic parameters

0.2

0.4

0.6

0.8

0 5 10 15 20 25 30

Aging Time, hr

Pre

cipi

tate

d am

ount

/ as

pha

l. M

ass

in 1

ml m

ixtu

re

Predicted-Set1 Measured-Set1 Predicted-Set2 Measured-Set2

Simulation with fitted kd (cap)

Expt

kp / s-1 1.32×10-3

kag / s-1 7.29×10-5

kd(cap) = 1.43×10-3 s-1

k*d(mom) 3.25×10-6 s-1

k*d(lar) 1.73×10-6 s-1

k*d(mt) 4.50×10-7 s-1

Page 24: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

24

0 10000 20000 30000 40000 50000

-0.1

-2.77555756156289E-17

0.1

0.2

0.3

Kd-Mom

Kd-Lam

Kd-MT

Distance (ft)

Dep

osit

thic

knes

s (in

)

Boundary layer Frictional ∆P(Psi)

Momentum 700

Laminar 605

Mass transfer 519

Field data= 648 Psi (28days)

Simulation results

Page 25: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

25

1. ADEPT simulator can successfully predict the asphaltene deposition in wellbore/pipeline.

2. Onset pressure and bubble pressure increases significantly with GOR increases, but the effects on lower onset pressure can be neglected;

3. Deposit location changes with GOR.

Summary

Page 26: Application of Asphaltene Deposition Tool (ADEPT) Simulator to Field Cases Yi Chen, Anju Kurup, Walter Chapman Houston, April 29 2013 Department of Chemical.

26

• Jeff Creek• Jianxin Wang• Andrew Yen • Sai Panuganti • Jill Buckley • Vargas Francisco

Acknowledgments


Recommended