+ All Categories
Home > Documents > approved-bihar-govt-proposals-for-setting-up-industries.pdf

approved-bihar-govt-proposals-for-setting-up-industries.pdf

Date post: 03-Apr-2018
Category:
Upload: sanat
View: 244 times
Download: 0 times
Share this document with a friend

of 52

Transcript
  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    1/52

    Report-3

    Proposals Approved by State Investment Promotion Board (SIPB)

    Sl.No.

    Name of the Company Proposal ProposedInvestment (InCrores Rs.)

    DirectEmploy-ment

    SIPBApproval

    date

    CM/Cabin

    approval

    1 M/S Netarhat AlumniEducational Trust (VidyaVihar Educational Trust),Purnea.

    Proposal for Establishment ofEngineering College in Purnea

    6.74 27.2.06 13.06.06

    2 M/S Indian Tractors &

    Components Pvt. Ltd., NewDelhi.(Canceling the earlier nameM/S International TractorsLtd., new name as M/SIndian Tractors &Components Pvt. Ltd. hasbeen approved)

    Proposal for production of Tractors

    and Commercial Vehicle at IndustrialArea, Fatuha

    150.00 27-2-06

    29.09.08

    29.09.07

    27.01.09

    3 M/s Oil Tech Pvt. Ltd.,Prakash Chandra Rastogi,C-110/7, I.I.T., Kanpur, U.P.

    Establishment of Solvent ExtractionPlant at Kaimur District

    59.75 150 20-3-06

    4 M/s Universal EmpireGroup, C-04/23, First Floor,Safdar Ganj Development

    Area, Haujkhas, New Delhi.

    Establishment of Medical College atBettiah District

    20-3-06

    5 M/s Gangotri Iron & SteelCo Ltd., Exhibition Road,Patna. Fax: 0612-2685959 Phone: 2665456E-mail:[email protected]

    Proposal for capacity expansion ofthe Unit and TMT and M.S. TwistedBars production

    33.8 29-3-06 22.10.06

    6 M/s Century Ply Wood Ltd.,Kolkata. CementManufacturing CompanyLtd., Sajjan Bhajanka,Chairman, 281 DeepaliPitampura, New Delhi-110034

    Proposal for establishment of oneMillion Ton/Year Cement GrindingPlant at Kahalgaon

    119.00 300 17-4-06 08.09.06

    7 M/s Hai Medicare &Research InstitutePvt.Ltd.,Patna.

    Establishment of Minority MedicalCollege at Rajabazar,Patna. 8.00 2-5-06

    8 Dr. Ashok Kumar ,MedicalWorld 4U Ltd., Sussex. U.K

    Establishment of Medical College andSuper Specialty Hospital at Patna.

    148.87 2-5-06 08.09.06

    9 M/s Adarsh Divya VikashHospital and ResearchCentre, Patna.

    Establishment of Multipurpose Medicalfacilities and Research Centre inHajipur.

    275.00 622 2.5.06

    10 Sri Vinod Kumar Chaudhry,M/s Ambedkar Medical&Technical EducationalDevelopment Trust, LohiyaNagar , Patna.

    Establishment of Medical and DentalCollege at Arrah (Bhojpur)

    35.076 2-5-06 31.07.06

    11 Dr. Rajeshwar Thakur ,Patna.

    (i) Proposal for Multi Super SpecialtyHospital in the Jay Prabha HospitalComplex K.Bagh, Patna.(ii) Establishment of Medical College(with training) of National repute.

    500.00

    300.00

    2-5-06

    12 M/s Indo-American MedicalFoundation ,USA , Dr.Purshottam Madhu.

    Establishment of Hospital and MedicalCollege within 30 KMs of Patna.

    100.00 2-5-06

    13 M/s Medi Contrivers India(P) Ltd.,Jogeshwari,Mumbai.

    Establishment of Medical College andmodernization of MJKHospital,Bettiah(W.Champara).

    700 2-5-06

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    2/52

    Report-3

    214 M/s Rajshree Sugars and

    Chemicals Ltd.,Coimbatore.

    Establishment of 5000 TCD Sugar Mill,30 MW Co-generation Plant and 60KLPD Distillery Plant at Marukia,Madhubani.

    238.50 1500 22-5-06 11.07.06

    15 M/s Raj Laxmi Udyog,C/O Jain Paper Agency ,Rajan Complex, Naya Tola, Patna.

    Off-Set Paper Printing and PaperConversion(Place has been changed form HajipurIndustrial Area to Industrial AreaFatuha in SIPB meeting on 19.05.08)

    1.645 70 19-6-06

    19.05.08

    25.07.08

    16 M/s Jesuit SocietyProvincial Residence,Patna.

    Rural Management and AlliedInstitute(Near Balmi Complex)

    10-7-06

    17 M/s Dhauladhar ImpexPvt.Ltd., F-1,GorakhNath Complex, East BoringRoad, Patna.

    Establishment of Sugar Mill 3500 TCDand 50 KLPD Distillery Plant at Bettiah.

    10-7-06

    18 M/s BrahmaputraConsortium Ltd., New Delhi

    Private Industrial Park,Bihta. 200.00 10-7-06

    19 M/s Indian GasoholLtd.,Tamilnadu.

    Proposal for setting up of Three MaizeProcessing Clusters each with fourindependent units to process 1,50,000Tons per year of Maize by each unit

    and 6,00,000 Tons per year of eachCluster.First Cluster will be established atKahalgaon and following product will bemanufactured by each maize processingCluster:-

    Quantity/yearMTS

    1.Ethanol- ]2.Pharmaceutical ]Alcohol ]

    3. Perfumery ] 160000Alcohol ]

    4.Extra Neutral ]Alcohol ]

    5.Maize Edible Oil- 178206.Co2 Cartridges-600 Cr. pieces7.Fusel Oil- 40008-Poultry & Cattle Feed- 3900009.Oxypen- 50 Cr. pieces10.Gono- 50 Cr. pieces11.Power- 200 MW12.Furfuryl Alcohol- 900013.Furfural- 990014.Acitic Acid- 334015.Formic Acid- 120016Sugarcane Top Silage- 1000017 Co2 liquefied- 1000018.Dry Ice- 10000

    7200.00 5000 11.07.08

    20 M/s Indian Glycols Ltd.,C-124, Okhla Industrial Area,Phase-1, New Delhi.

    10000TCD-Sugar Mill and 96000 KL /ADistillery and 20 MW- Co-generationPlant at Rasulpur, Ekma, Saran.

    550.00 317 10-7-06 17.08.06

    21 M/s Suncancer Hospitaland ResearchInstitute,Patna.

    Establishment of Cancer Hospital andResearch Institute

    10-7-06

    22 M/s Lord Buddha ShikshaPrathisthan, Saharsa.

    Medical College Hospital 100.00 24-7-06

    23 M/s Rajshree Sugars andChemicals Ltd.,Coimbatore.

    Establishment of 5000 TCD Sugar Mill,60 KLPD Distillery and 30 M.W Co-generation Plant in Muzaffarpur Distt.

    242.50 500 24-7-06 10.08.06

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    3/52

    Report-3

    324 M/s Dhampur Sugar Mills ,

    221 Okhla IndustrialEstate, Phase-III, New Delhi.

    5000 TCD Sugar Mill,60KLPD Distilleryand 30M.W Co-generation Plant atUdakishunganj, Madhepura

    185.00 500 24-7-06 10.8.06

    25 M/s Jay Mangla Sugar &Power Pvt. Ltd., B-41,Jagat

    Amrawati Apartment, BaileyRoad, Patna.

    5000 TCD Sugar Mill, 60 KLPDDistillery and 28 M.W Co-generationat Bahadurpur, Begusarai

    196.59 200 24-7-06 10.08.06

    26 M/s Telecomand SoftwarePvt. Ltd.,

    Katihar

    3/4 Years Course on ComputerScience

    1-8-06

    27 M/s Bharat Sugar Mills,Singhwalia, Gopalganj.

    Expansion of Sugar Mill from 2500TCD to 5000 TCD and 15 M.W Co-generation Plant

    137.00 1-8-06 15.09.06

    28 M/S Ramco Industries Ltd,Chennai

    (Canceling the earlier approvalgiven by SIPB in its meetingheld on 16.12.08 on the

    proposal for establishment ofAsbestos Cement Sheet Plant,Water Storage Plant andCement Grinding Plant ;approval for establishment of1,20,000 MT/Annum Capacityof Asbestos Cement SheetPlant and 2 Lakh MT/AnnumCapacity of Cement GrindingPlant at Industrial Area, Bihiya,Bhojpur has been given bySIPB in its meeting held on23.11.09)

    Proposal for establishment of1,20,000 MT/Annum Capacity of

    Asbestos Cement Sheet Plant and 2Lakh MT/Annum Capacity of CementGrinding Plant at Industrial Area,Bihiya, Bhojpur.

    60.20 200

    23.11.09

    16.12.08

    29 M/S S.B. Sugar Ltd., Kolkata. Establishment of 2500 TCD(Expandable up to 5000 TCD) SugarMill, 30 KLPD Alcohol Plant & 8 M.W.Co-generation Plant at Asthawan,Nalanda.

    122.40 370 1-8-06

    28-05-07

    30.08.06

    30 M/S Kamlapur Sugar &Industries Ltd., Kolkata.

    8000 TCD Sugar Mill, 120 KLPD DistilleryPlant & 26 M.W. Power Plant at Vill-Barhan- Benusar-BormamukundBlock,Dist. Siwan.

    487.80

    450 7-8-06

    17.10.06

    31 M/S Kamlapur Sugar &Industries Ltd., Kolkata.

    8000 TCD Sugar Mill, 120 KLPDDistillery Plant & 26 M.W. PowerPlant at Vill-Eraji, Orhara-Dhoni,Block-Rajaun,Dist.-Banka.

    487.80 450 7-8-06 17.10.06

    32 M/S Vikash Metal & PowerLtd., Kolkata.

    Integrated Steel Plant at Begusarai.Sponge Iron -6.5 Lacs TPA, M.S.Billet- 8Lacs TPA, Blast furnace- 2.5Lacs TPA, Captive Power Plant- 100MW

    850.00 3100 7-8-06 24.03.07

    33 M/S Shakti Sudha Industries,Boring Road,Patna.

    Establishment of MakhanaProcessing Unit & with Backward/Forward linkage

    70.00 14-8-06

    34 M/S Balmukund Lease -Fin(P) Ltd., Exhibition Road,Patna.

    5000 TCD Sugar Mill 60 KLPDAlcohol Plant & 26 M.W. Power Plantat Nariar, Baruraj, Muzaffarpur.

    202.651500 14-8-06 10.10.06

    35 M/S Riga Sugar Co.Ltd.,Netajee Subash Road,2nd Floor, Kolkata.(Consent has been given onproposal of extension ofperiod till 31.03.2011 for

    Expansion of Sugar Mill from 3500TCD to 5000 TCD, 7.7 Megawatt Co-generation Plant and 50 KLPDDistillery at Sitamadhi

    37.98 739 14-8-06

    25.02.11

    07.11.06

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    4/52

    Report-3

    4

    capacity expansion ofexisting Sugar Mill to 5000TCD in SIPB meeting heldon 25.02.11)

    36 M/S Harinagar Sugar MillsLtd. West Champaran.

    Capacity expansion of Sugar Mill from8500 TCD to 10000 TCD

    39.96 2112 14-8-06 07.09.06

    37M/S New Swadeshi SugarMills, Narkatiaganj

    (Proposal for capacityexpansion of Distillery Plantin two phases form 30 KLPDto 60 KLPD and 60 KLPD to100 KLPD has beenapproved in SIPB Meetingon 18.05.09)

    Capacity expansion of Sugar Mill from5000 TCD to 7500 TCD, capacity

    expansion of Distillery Plant from 30KLPD to 60 KLPD and 60 KLPD to 100KLPD(in two phases) and5 M.W. Co-generation Plant.

    107.40728 21-8-06

    18.05.09

    30.11.06

    38 M/s Patna Notre DameSister's Society, Patliputra,Patna.

    Establishment of Media arts andCommunication.

    3.32 21-8-06

    39 M/S Ambuja Cements Ltd. atP.O- Ambuja Nagar, Taluka-Kodinar, Dist.- Junagadh,Gujarat-362715

    Establishment of Cement GrindingPlant of 1.5 Million Ton Capacity and15 MW Co-generation Plant at Barh

    380.00 150 21-8-06

    19.02.07

    22.05.07

    11.09.07

    40 M/s Balmukund ConcastLtd., Patna.

    Capacity expansion of MS Rod andSteel Production from 28350 MTA to52350 MTA in the Bihta(Mahadeopur,Fulari)Unit.

    13.96 175 06-9-06 22.10.06

    41 M/s Harinagar Sugar MillsLtd., Harinagar, W.Champaran.(Proposal has been rectifiedfrom 45 KLPD Distillery Plantto Distillery Plant for

    production of 45 KLPDEthanol/50 KLPD TotalSpirit)

    Establishment of Distillery Plant forproduction of 45 KLPD Ethanol/50KLPD Total Spirit.

    45.00 89 06-9-06

    29.09.08

    22.10.06

    42M/s Ganga Bangali JuteTwine Mills, Begusarai.

    Establishment of 5840 MT/AnnumCapacity of Jute Yarn.

    8.83600 06-9-06

    23.02.08

    43 M/s Bihariji Flour Mills (P)Ltd., Patna City.

    Establishment of 1500 Tons/MonthParle-G Biscuit in collaboration withParle Biscuit (P) Ltd. at HajipurIndustrial Area.

    8.55 208 06-9-06 22.10.06

    44 M/s Bihar Co-operativeSugar Mill Federation Ltd.,Patna.

    5000TCD Sugar Mill, 30 KL EthylAlcohol Plant, 28 MW Co-generation Plantat Supaul.

    180.00 846 20-9-06 08.11.06

    45 M/s InternationalAmusement Ltd., (APPUGhar), New Delhi.

    Development of Mega Tourism City atLTC Ghat, Patna.

    1321.79 600 20-9-06

    46 M/s Vishnu Sugar Mills Ltd.,Gopalganj.

    Capacity expansion of Sugar Millfrom 5000 TCD to 7500 TCD.

    41.00 26-9-06 02.12.06

    47 M/s Protech Feed Pvt. Ltd.).,Hajipur.(Name has been changedfrom M/S Protech Bio-Systemto M/S Protech BiosciencesPvt. Ltd.)(Companys proposal approved bySIPB on 02.01.08 for production ofLVP in the name of M/S ProtechBiosciences Pvt. Ltd has been

    Establishment of 48,000 MT per yearcapacity Cattle and Poultry Feed unit 14.70 60

    26-9-06

    02.01.08

    27.08.10

    06.01.07

    19.03.11

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    5/52

    Report-3

    5amended and consent has beengiven for establishment of 48,000MT per year capacity Cattle andPoultry Feed unit at E.P.I.P, Hajipurin the name of M/S Protech FeedPvt. Ltd.)

    at E.P.I.P, Hajipur

    48 M/s Sharma Group ofIndustries, Aurangabad,Maharastra.

    Establishment of RPVC-pipes, SWRpipes & fittings

    7.50 9.10.06(Consent inprinciple)

    49 M/s Dhanuka Pesticides Ltd. ,New Delhi.

    Establishment of Agri Malls andMultiplex Complex.

    9.10.06(Consent in

    principle)

    50 M/s M.P. Chini Industries Ltd. ,Majahaulia, West Champaran.(Consent has been given for

    proposal of extension ofperiod till 31.12.2011 for 2

    nd

    phase capacity expansion ofSugar Mill from 4300 TCD to5000 TCD in SIPB meetingheld on 08.03.10)

    Capacity expansion of Sugar Millfrom 3500TCD to 5000 TCD.

    24.35 565 9.10.06

    08.03.10

    15.12.06

    51 M/S Hasanpur Sugar Mills,Hasanpur Road, Samastipur.

    Expansion of Sugar Mill Firstphase - 1750 TCD to 3000TCD.(Investment-Rs99.094 Crores)Second phase- 3000 TCD to 5000TCD.(Investment-Rs 50.956 Crores)

    150.050 532 23.10.06 05.01.07

    52 M/S Jagat Developers Ltd.,'Ujwal', 2nd Floor, BaileyRoad, Opposite Patna Museum

    Establishment of Super SpecialtyHospital in Bailey Road ,Patna.

    45.00 700 23.10.06(Consent in

    principlewithcondition)

    53 M/S Poorvanchal Urja Pvt.Ltd., R.Z.-1/57, TuglakabadExtension, New Delhi-110019

    Establishment of 1 MW RenewableEnergy Power Plant (Biomass BasedPower Plant in Buxar Industrial Area)

    4.00 22 23.10.06(Consent in

    principlewithcondition)

    54 M/S Indian Gasohol Ltd.,Erode, Tamilnadu Proposal for establishment of tenunits of 100% export orientedEthanol Plant of total Capacity 5.4million tons from sugarcane juice at1. Nawanagar(Buxar)2. Bikaramganj(Rohtas)3. Between Gaya and

    Aurangabad(Aurangabad)4. Between Gaya andNawada(Gaya)5. Jamui6.Lakhisarai/Monghyer7. Between Bhagalpur andKahalgaon(Bhagalpur)8. Araria/Kishanganj

    9. Katihar/Purneaand 10. Nalanda

    13557.00 50000 06.11.06 05.01.07

    55 M/s Riga Sugar Co. Ltd.,Kolkata.E-mail: [email protected]

    2500 TCD to 5000 TCD Expandable(within three years) Sugar Mill and15 Megawatts Co-generation Plant atNayagaon, Darbhanga

    161.46 400 06.09.06

    06.11.06 09.01.07

    56 M/S G.M.R. Industries Ltd.,Hyderabad, Andhra Pradesh.Pin-500016

    Proposal for establishment of 2500TCD sugar mill(Expandable up to10000 TCD),18 Megawatt Co-generation Plant and 45 KLPDDistillery Plant at Samastipur

    220.00 340 13.11.06

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    6/52

    Report-3

    657 M/S Vishnu Sugar Mills Ltd.,

    Gopalganj.Proposal for establishment of 45KLPD Distillery Plantand 15 MW Co-generation Plant infactory situated at Gopalganj

    94.06 400 13.11.06 26.12.06

    58 M/S Dhanuka PesticidesLimited, New Delhi.

    Establishment of Fruit and VegetableCentre and Packaging Centre onHajipur-Muzaffarpur High-way

    27.11.06

    59 M/S J.H.V Distilleries & SugarMills Limited, Marhowrah,Saran(Chapra)

    Establishment of 6000 TCD SugarMill , 25 MW Co-generation Plant at Marhowrah, Dist.-Saran (Chapra)

    172.54 450 04.12.06 06.02.07

    60 M/S Suprabhatam SugarIndustries Pvt. Ltd., 104-22Gaurav Tower, P.V.R. SoniaComplex, Vikash Puri, NewDelhi.

    Establishment of 5000 TCD SugarMill, 30 KLPD Ethanol Plant and 8MW Co-generation Plant atVill.-Kopa Kola, Danapur, Patna.

    230.00 210 04.12.06 18.01.07

    61 M/S P & M Infrastructure Pvt.Ltd., 47/B ,Shri Krishna Puri, Patna.

    Establishment of 3500 TCD SugarMill and 12 MW Co-generation Plantat Vill.- Sitanabad, Block- SimriBakhtiyarpur, Dist.- Saharsa.

    108.68 200 04.12.06 06.02.07

    62 M/S Dhanuka PesticidesLimited, New Delhi.

    E-mail: [email protected]:www.dhanuka.com

    Setting up of a Fully Integrated Fruitand Vegetable Processing Complex

    at Hajipur in two phases

    55.00 200 20.12.06

    63 M/S Signet HotelsConsortium, 15 B, ZaverMahal, 66, Marine Drive,Mumbai-400020E-mail: [email protected];

    [email protected]

    Establishment of world classstandard hotels at Patna, Rajgir andBodh-Gaya.

    90.00 450 20.12.06

    64 M/S Winsome InternationalLtd., Unit:-Rameshwara JuteMills, 301,ViashnoChambers(3rd.Floor)6,Brabourne Road,Kolkata-1

    Proposal for establishment of newJute Mill of 100 MT/day atPurnea/Kishanganj in Bihar

    61.00 3121 15.01.07(Consent in

    principle)

    65 M/S Braj Industries Pvt. Ltd.,P.O- Sadanandpur, Dist.-Begusarai-851211

    Proposal for manufacturing of 190Kilo Litter per Day Ethanol fromSugarcane Juice at Purnea

    82.00 120 15.01.07

    66 M/S Braj Industries Pvt. Ltd.,P.O- Sadanandpur, Dist.-Begusarai-851211

    Proposal for manufacturing of 190Kilo Litter per Day Ethanol fromSugarcane Juice at Sahpur-Kamal(Dist.-Begusarai)

    82.00 120 15.01.07 21.05.07

    67 M/S Patwari Steels Pvt. Ltd. ,6-M, Rajendra Nagar, Patna-16,

    Proposal for expansion of productioncapacity of Steel Ingot, M.S. Bar andRod and production of Cast GrindingMedia Ball.

    5.08 15.01.07Proposalnoted

    68 M/S Rego Chemicals (P)Limited, 187, Rabindra

    Sarani, Kolkata-700007

    Proposal for establishment of newJute Mill of 30 T.P.D. with 2.5 MW

    Captive Power Plant at Samastipur

    29.65 1250 01.02.07(Consent in

    principle)

    21.05.07

    69 M/S Madina EducationalWelfare Trust,Swarnim, East Boring CanalRoad, Patna.

    Establishment of EngineeringCollege at Darbhanga(Simri, P.O.-Birdipur, Dist.-Darbhanga)

    12.50 57 01.02.07(Consent in

    principle)

    10.05.08

    70 M/s Association ofManagement Studies, 17,Mall Road , MeerutCant(U.P).

    Establishment of Engineering/Management/ Medical College atChapra and Patna.

    17.50 - 01.02.07(Consent in

    principle)

    71 M/S Rakesh Eatables andGeneral Products Pvt. Ltd.,B-4, Industrial Area, Hajipur,

    Setting up a Food Processing Unit atHajipur Industrial Area/Export Zone

    1.37 16 19.02.07(Consent in

    principle)

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    7/52

    Report-3

    7Vaishali,-844101(Canceling earlier name ofthe companyM/S Rakesh Masala Pvt. Ltd,the new name as " M/SRakesh Eatables andGeneral Products Pvt. Ltd."has been approved in SIPBmeeting on 14.08.08") 14.08.08

    72 M/S Siddivinayak Trust forNature, Education andHealth,101, Shanti Kunj Apartment,T.N. Benerjee Road,Chhajjubagh, Patna-1.E-mail: [email protected]

    Setting up of Dental College andHospital at Patna

    15.10 19.02.07(Consent in

    principle)

    73 M/S Classicon VenturesLimited, Pro.-Sri Deepak Kumar Sinha/ SriRajiv Ranjan, 190/A , BoringRoad, Patna,Email:-sksinha_ritco

    @yahoo.co.in

    Establishment of 500 TCD Sugar Millwith Co-generation Power Plant atKaabh/Ayan Khan, Dist.-Patna.

    13.266 132 26.02.07(Consent inprinciple)

    21.05.07

    74 M/S Jas Infrastructure andPower Ltd, Mahabir Tower,Main Road, Ranchi(Amending the earlier

    proposal approved on11.07.08 and approval hasbeen given on change ofcompanys name from M/SJas Infrastructure Capital Pvt.Ltd. to Jas Infrastructure andPower Ltd for the same

    project on 26.05.11)

    Establishment of 2640 MW coalbased Thermal Power Plant in twophases (each phase 2x660 MW) atBanka.(Proposal for 2640 MW Thermal PowerPlant in place of 1215(9x135MW) MWThermal Power Plant)

    11120.00 5000 12.03.07(Consent inprinciple)

    12.04.07

    11.07.08

    26.05.11

    11.03.08

    75 M/S Vikash Metal & Power

    Ltd., Kolkata

    Establishment of 2x250 MW Power

    Plant at Begusarai

    1350.00 1000 12.03.07

    (Consent inprinciple)

    76 M/S Nandi Soaps PrivateLtd., Raxaul

    Establishment of soap manufacturingplant at Raxual

    6.414 142 19.03.07 21.05.07

    77 M/S Saran RenewableEnergy Pvt. Ltd., Chapra

    Generation of 240 K.W Electricityfrom Biomass based GasificationSystem at Garkha, Saran.

    1.45 14 19.03.07

    78 M/S Prachin Bharat Tourism,, Kalptaru Apartment,BangaloreE-mail: [email protected]

    Establishment of Integrated TouristPark at Nepura, Silao, Nalanda

    5.00 100 19.03.07(Consent inprinciple onconcept ofproposal)

    08.10.07

    (Consent )

    14.11.07

    79 M/S S.S. Infrastructure Pvt.Ltd., Darbhanga.

    Establishment of Ethanol Plant from2500 TCD Sugarcane Juice atSukhait, Block- Jhanjharpur, Dist.-Madhubani.

    95.04 120 19.03.07 21.05.07

    80 M/S Braj Industries Pvt. Ltd.,P.O- Sadanandpur, Dist.-Begusarai-851211

    Proposal for establishment of 180Kilo Litter Per Day EthanolProduction Plant from Sugarcane Juice atSupaul.

    82.00 120 26.03.07

    81 M/s Cement ManufacturingCo. Ltd., Kolkata.

    Proposal for establishment of 2x250MW Thermal Power Plant atKahalgaon

    1650.00 225 26.03.07

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    8/52

    Report-3

    882 M/S Pinax Steel Industries

    Pvt. Ltd.,VII/ 1&2 Industrial Estate,Patliputra, Patna-13

    Manufacturing of M.S Ingot by settingof Induction Furnace at Devkuli ,Bihta

    8.67 69 07.05.07(Consent inprinciple)

    10.05.08

    83 M/S M J & Sons Distillery &Breweries Private Ltd.,Jankivilla, Near PushpanjaliPlaza , Vasant Vihar Colony,Boring Rd., Patna-1

    Setting up of Extra Neutral AlcoholPlant based on food grains at

    Amarpur, Banka.

    36.70 375 07.05.07(Consent inprinciple)

    09.10.07

    84 M/S Vikramsheela TextilePark Ltd.,10 R.N. MukherjeeRoad, Kolkata-700001

    Establishment of Textile Park atBhagalpur

    120.00 65 28.05.07 06.11.07

    85 M/S Birla Corporation Ltd.,Birla Building,9/1,RNMukharji Road, Kolkata,-700001

    Setting up of 1 Million TPA Cementgrinding Unit at Barh, Patna.

    155.00 350 25.06.07(Consent in

    principle)

    17.06.08

    86 M/S B. K. Group ofCompanies,Park Street. Kolkata.

    Establishment of 1.5 Million TPACement manufacturing Plant nearBarauni Thermal Power Station.

    137.60 150 16.07.07(Consent in

    principle)

    87 M/S Angpradesh HandloomPark Pvt. Ltd.,Bhagalpur.

    Establishment of Handloom Parkunder Cluster Business Plan atBhagalpur.

    27.5 5000 16.07.07(Consent in

    principle)

    88 M/S Maurya Sugar Pvt. Ltd.,47/B Sahadeo Mahato Marg, SriKrishna Puri, Patna- 800001

    Setting up of 2500 TCD Sugar Mill &15 MW Co-generation Power Plant atChorma, East Champaran.

    157.93 330 13.08.07 05.02.08

    89 M/S Saran RenewableEnergy Pvt. Ltd., Chapra

    Generation of 10 MW Electricity fromBiomass based Gasification Systemat Garkha, Saran.

    50.80 20 24.09.07(Consent in

    principle)

    90 M/S Vaishali Kisan UdaySugar Mills Pvt. Ltd., Patna.(Consent has been given forestablishment of 1400 TCD

    Gur Khandsari unit at Tarwa,Majhaulia, Chochahi ChapraPanchayat, Anchal-Paru,Muzaffarpur in SIPB meetingheld on 11.08.10)

    Proposal for establishment of 5000TCD Sugar Mill, 72 KLPD EthanolPlant and 26 MW Captive PowerPlant at Vill.- Chochahi-Chapra,

    Anchal- Paru, Muzaffarpur.(Proposal for starting of 500 TCDMini Sugar Mill at Jita Chapra Block-Pakri Basrat has been approved withcondition on 17.08.09)(Proposal for establishment of1400TCD Gur Khandsari unit at Tarwa,Majhaulia, Chochahi ChapraPanchayat, Anchal-Paru,Muzaffarpur.)

    155.18

    22.5917

    440

    150

    24.09.07(Consent in

    principle)

    17.08.09

    11.08.10

    13.05.08

    91 M/S Munger Medical CollegeTrust, Munger

    Establishment of Medical College atMunger

    22.00 300 24.09.07(Consent in

    principle)

    92 M/S Sai Iron India Ltd.,

    Didarganj, Patna

    Establishment of second Rolling Mill

    in the Campus of existing Rolling Millat Sabalpur, Didarganj, Patna.

    42.39 367 24.09.07

    (Consent inprinciple)

    15.02.08

    93 M/S Maurya Sugar Pvt. Ltd.,47/B Sahadeo Mahato Marg,Sri Krishna Puri, Patna-800001

    Setting up of 3500 TCD Sugar Mill,120 KLPD Distillery Plant & 16 MWCo-generation Power Plant at Vill-Gurwalia Bishwash, Anchal-Chanpatia, Dist.- W. Champaran.

    241.95 330 24.09.07(Consent inprinciple)

    23.09.08

    94 M/S Steel Authority of IndiaLtd., Bokaro Steel Plant,Bokaro

    Establishment of 1.55 Lakh TonSteel Processing Unit at Kumarbagh,Bettiah.

    160.63 293 24.09.07(Consent inprinciple)

    11.03.08

    95 M/s Gangotri Iron & Steel CoLtd., 307 Ashiana Tower,

    Establishment of15 MTx 2 Nos.Induction Furnace, Concast unit,

    50.00 570 08.10.07(Consent in

    31.01.08

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    9/52

    Report-3

    9Exhibition Road, Patna.E-mail: [email protected]

    Oxygen Plant , Wire Rod Plant & ARerolling Mill of 300 TPD tomanufacture Thermax TMT BarsPlant at Bihta, Patna

    principle)

    96 M/S Steel Authority of IndiaLtd., Bokaro Steel Plant,Bokaro

    Establishment of 1.07 Lakh TPASteel Processing Unit at Sahdei,Vaishali

    318.75 250 08.10.07(Consent inprinciple)

    21.02.08

    97 M/S Prachin Bharat Tourism,Kalptaru Apartment,Bangalore

    Establishment of Multi MediaMuseum at Nalanda

    0.20 20 22.10.07(Consent inprinciple)

    98 M/S Globe Sugar RefineryLtd, Berger House, 5th Floor,129, Park Street, Kolkata(Change of name of thecompany from M/SKamlapur Sugar RefineryLimited to M/S Globe SugarRefinery Ltd has beenapproved in SIPB meeting on18.05.09)

    Establishment of8000 TCD Sugar Mill,

    120 KLPD Ethanol Plant and26 MW Co-generation Plant at

    Sariatpur-Chakia, East Champaran

    248.80

    106.10

    132.90

    450

    60

    30

    29.10.07(Consent in

    principle)

    18.05.09

    04.03.08

    99 M/S Jagdamba Ispat (P) Ltd.,Nasriganj, Danapur, Patna.

    Capacity expansion of 5400 MT/YearMS Ingot at present established unitat Danapur

    1.675 15 29.10.07(Consent in

    principle)

    100 M/S Babu Cold Storage,Pilkhan Road, Chura Patti,Kishanganj

    Establishment of 5200 MT/Yearcapacity Cold Storage for Vegetableand Food Preservation at ChuraPatti, Kishanganj

    1.81 07 29.10.07(Consent in

    principle)

    101 M/S Laxmivinayak VenturesPvt. Ltd., Malsalami, PatnaCity

    Establishment of one Lakh Ton /YearDetergent Powder production Plantat Hajipur.(Place has been changed from Bihtato Hajipur)

    20.00 20 29.10.07(Consent in

    principle)21.4.08

    14.06.08

    102 M/S P. M. R. EducationalTrust, 2036, 15 th MainRoad, Anna Nagar, WestChennai-600040

    Setting up of Engineering College inBihar

    35.00 02.01.08 30.03.08

    103 M/S Ganga Power & NaturalResources Ltd.,14 th Netaji Subhas Road,2nd Floor, Kolkata-700001(Name has been changedform M/S Neepaz ThermalEnergy Ltd to Adhunik Power& Natural Resources Ltd.)(Companys proposalapproved by SIPB on01.02.10 for establishment of1320 MW Thermal PowerPlant at Kahalgaon,Bhagalpur in the name ofM/S Adhunik Power &

    Natural Resources Ltd hasbeen amended and consenthas been given to establishthat project at Pirpainti Block,Bhagalpur in the new nameas M/S Ganga Power &Natural Resources Ltd in SIPBMeeting held on 29.06.10)

    Proposal for establishment of 2640MW Coal based Thermal PowerPlant in two phases at Pirpainti,Bhagalpur(Approval has been given for

    establishment of 1320 MW in placeof 1000 MW in SIPB meeting held on1.2.10)(Companys proposal approved on29.06.10 for establishment of 1320MW Thermal Power Plant at PirpaintiBlock, Bhagalpur has been amendedand approval has been given forestablishment of 2640 MW Coalbased Thermal Power Plant in two

    phases at Pirpainti, Bhagalpur inSIPB meeting held on 12.01.11)

    15079 1450 02.01.08

    09.06.08

    01.02.10

    29.06.10

    12.01.11

    23.09.08

    104 M/S Subhas Projects andMarketing Ltd., 22 CamacStreet, Block-A, 3rd Floor,Kolkata-700016

    Setting up of 1200 MW ThermalPower Plant at Rampur, Dist.-Lakhisarai, Bihar

    5000.00 400 02.01.08

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    10/52

    Report-3

    10105 M/S India Power Corporation

    Ltd., Vishwakarma, 86 C,Topsia Road(South), Kolkata-700046(Company's proposalapproved by SIPB on02.01.08 for establishment of1650 MW Coal BasedThermal Power Plant in Bihar

    has been amended andconsent has been given forestablishment of 1320(2x660) MW Coal BasedThermal Power Plant atIndragachi,Sangrampur(Areraj), EastChamparan in SIPB meetingheld on 21.07.10)

    Establishment of 1320 (2x660) MWCoal Based Thermal Power Plant atIndragachi, Sangrampur (Areraj),East Champaran

    7280.00 650 02.01.08

    21.07.10

    05.04.11

    106 M/S P & M Infrastructure Pvt.Ltd.,47/B, Sahdeo Mahto Marg,Sri Krishna Puri, Patna-1

    Setting up of Bodh Gaya Resort atBodh Gaya

    18.41 250 02.01.08(Consent inprinciple)

    107 M/S Maurya Sugar Pvt. Ltd.,

    Sri Krishna Puri, Patna-1

    Setting up of 3500 TCD expendable

    up to 6000 TCD Sugar Complex atKharkatwa, Dhonar Devli,Ramgarhwa,EastChamparan

    171.96 330 02.01.08 11.03.08

    108 M/S Nalanda PowerCompany Limited,R.P.G. Group, C.E.S.CHouse, Chaurangi Square,Kolkata- 700001(Name has been changedform M/S C.E.S.C. Limited toM/S Nalanda PowerCompany Limited)

    Setting up of 1800 MW Coal basedThermal Power Plant at Pirpainti orother suitable place.

    7290.00 02.01.08

    09.06.08

    26.03.08

    12.08.08

    109 M/S Neutral PublishingHouse Ltd.(Prabhat Khabar),

    Old By Pass Road,Kankarbagh, Patna- 20

    Proposal for establishment ofPrinting, Publishing of News Papers

    and Publishing of Periodical atPatna, Bhagalpur and Muzaffarpur

    38.62 502 25.02.08 25.07.08

    110 M/S Amrapali Foods Ltd.,Ujjawal, 2nd Floor, OppositePlanetarium, Bailey Road,Patna

    Proposal for establishment of FoodPark at Muzaffarpur, Vaishali(Hajipur).

    125.00 25.02.08

    111 M/S Bihar Agro Projects Ltd,19, R.N. Mukherjee Road,Kolkata-1

    Proposal for establishment of FoodPark at Bhagalpur

    75.00 25.02.08

    112 M/S Amit Oil Ltd., Allahabad Proposal for establishment of SolventExtraction Plant at Kaimur

    7.50 57 25.02.08 25.07.08

    113 M/S I.L. & F.S,4 B, 1st Floor, S.K. Puri,Patna

    Proposal for establishment of 500MW Power Plant in MuzaffarpurDistrict

    2223.40 500 25.02.08(withcondition)

    114 M/S Amrapali Agro FoodsPvt. Ltd., Ujjawal, 2nd Floor,Bailey Road, Patna

    Proposal for establishment of FreshFruits and Vegetable Unit atMuzaffarpur

    2.253 228 25.02.08(Consent in

    principle)

    04.06.09

    115 M/S Reliance Industries Ltd. Establishment of 5 MW Solar PowerPlant at Patna

    25.02.08(Consentinprinciple)

    116 M/S Medical World 4U Ltd.,M.D- Dr. Ashok Kumar, 49Truman Drive, High Beech,Saint Leonards-on-Sea, EastSussex, TN- 377 TH , U.K.

    Company's proposal forestablishment of Dental College andPara Medical College in the name ofLord Buddha International Institute ofMedical Science

    148.87 25.02.08

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    11/52

    Report-3

    11117 M/S Titagarh Biotech Pvt.

    Ltd., KolkataEstablishment of Jatropha basedBio-diesel Plant at Banka

    51.00 40 25.02.08

    118 M/S Punrasar Jute ParkLimited,404, Vaishno Chamber, 6,Brabourne Road, Kolkta.

    Establishment of Jute HessianCloth/Sacking Bags, Jute Yarn andJute Twine industry at MorangaIndustrial Area, Purnea(Canceling the above proposal,consent has been given for Jute Parkat Moranga Industrial Estate in SIPB

    meeting on 19.05.08)

    40.00 10000 17.03.08(Consent in

    principle)

    19.05.08

    03.08.08

    119 M/S M. D International , NS-9Industrial Area, Fatuha

    Establishment of Mineral PowderProduction Plant at Industrial Area,Fatuha

    1.8666 22 17.03.08(Consent in

    principle)

    120 M/S Tiger Warehousing ColdChain Pvt. Ltd.,508, Dalamal House,Nariman Point, J.B. Road,Mumbai, Maharastra(Company's name has beenchanged form M/S CentralWarehousing Cold Chain Pvt.Ltd to M/S TigerWarehousing Cold Chain Pvt.

    Ltd on 09.02.09,)

    Establishment of Warehousing,Container Freight and Cold Storageat Hajipur

    49.75 105 09.02.09

    17.03.08(Consent in

    principle)

    04.06.09

    121 M/S Era Agritech(I) Pvt. Ltd.,153 Okhla Industrial Area,Phase-III, New Delhi.

    Establishment of Agro BusinessCentre and Primary ProcessingCentre in Bihar

    84.70 300 17.03.08(Consent inprinciple)

    122 M/S PTC Bermaco GreenEnergy Systems Ltd.,D 73/1 TTC, Industrial Area ,Navi Mumbai(Companys name has beenchanged from M/S BermacoEnergy Systems Ltd to M/SPTC Bermaco Green EnergySystems Ltd on 29.06.09)

    Establishment of 12 MW BiomassPower Plant at Sasaram- Rohtas.

    56.7988 92 17.03.08

    29.06.09

    28.09.11

    123 M/S Navran Advanced Nano

    Products DevelopmentInternational Pvt. Ltd., 109,M.I.G, Kankarbagh Colony,Patna.

    Proposal for Production Polymerised

    Toner for Business Network LaserPrinter

    32.00 17.03.08

    124 M/S Amrapali Foods Limited,Ujjwal, II Floor, OppositePlanetarium, Bailey Road,Patna

    Proposal for expansion andModernisation of Fruits andVegetable Processing Unit at HajipurIndustrial Area.

    2.28 15 17.03.08 31.05.08

    125 M/S Maurya-Patna, BiharHotels Ltd, South GandhiMaidan, Patna

    Proposal for establishment of NewMaurya Hotel Tower and expansionof existing Hotel

    35.74 180 17.03.08(Consentwithcondition)

    126 M/S Krishak Bharti

    Cooperative Ltd.,A-10, Sector-1, Noida-201301, Dist. GautambudhNagar(U.P.)

    Proposal for establishment of 1320

    MW coal based Power Project atBihta/ Lakhisarai/Banka/Dehri

    6200.00 800 17.03.08

    (Consent inprinciple)

    127 M/S Apollo HospitalsEnterprise Limited,

    Ali Tower, 55, Greams Road,Chennai

    Establishment of state-of- art hospital,accommodation, educational andtraining infrastructure under HealthCare Infrastructure.

    40.00 376 21.04.08(Consent inprinciple)

    25.07.08

    128 M/S Maharshi DAVEducational Trust,Haryana

    Establishment of College for Engineering &Diploma Course at Muzaffarpur

    4.06 30 19.05.08 )(withcondition)

    25.07.08

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    12/52

    Report-3

    12129 M/S R.N.Dwivedi Foundation,

    PatnaEstablishment of CompositeEducational Complex at PatliputraIndustrial Estate

    10.08 227 19.05.08(Consent inprinciple withcondition)

    130 M/S Triton Energy Limited,"Indiabulls House" 448-451,Udyog Vihar, Phase-V,Gurgaon-122001

    Establishment of 1320 MW coalbased mega thermal power plant atvill Kochar, Tehsil-Barun, Dist.-

    Aurangabad.(Change of place from Navinagar,

    Aurangabad to vill- Kochar, Tehsil-Barun, Dist.-Aurangabad has beenapproved in SIPB meeting on19.10.09)

    6573.50 400 09.06.08(Consent inprinciple)

    19.10.09

    29.12.09

    131 M/S Essar Steel Limited,11 K K Road, Mahalaxmi,Mumbai-400034

    Proposal for establishment of callcenter at Bhagalpur and Patna

    250.00 2000 09.06.08

    132 M/S Jhunjhunwala VanspatiLtd.,Jhunjhunwala Bhawan, NatiImli, Varanasi(U.P)

    Establishment of 225000 MT/ARefined Edible Oil Plant at Dehri(Rohtas)

    95.00 171 11.07.08 14.08.08

    133 M/S Jay Shri RamAnnapurna Rice Mill Pvt. Ltd,Rohtas

    Establishment of Rice Mill at Kailani,Rohtas

    1.7325 10 11.07.08 14.08.08

    134 M/S India Greenfuel Pvt. Ltd.,241, Okhla Industrial Estate,Phase- III, New Delhi-110020

    Establishment of 5000 TCD SugarMill, 175 KLPD Distillery Plant and 25MW Bagasse based Co-generationPlant at Khajooriya, Areraj, EastChamparan

    240.00 325 11.07.08(Consent inprinciple)

    135 M/S Licchavi Foundation,Hajipur( Vaishali)

    Establishment of B.Ed. Teacher'sTraining Institute at Hajipur, Vaishali.

    1.61 19 11.07.08(Consentwithcondition)

    08.09.08

    136 M/S ITC Limited,Indian Tobacco Division,P.O- Basdeopur

    Munger(Bihar)-811202

    Establishment of Milk ProcessingPlant at Sitakund, Munger

    100.90 140 14.08.08

    137 M/S Ramadhar Singh ColdStorage Pvt. Ltd.,Bharhopur, Ganjpar, Ekma,Saran-841208

    Establishment of Multi Purpose andMulti Chambered Cold Storage atGanjpar, Ekma, Saran.

    3.58 26 14.08.08 15.11.08

    138 M/S Essar Power(Jharkhand) Limited,Next to Tirath Mansion, NearOver Bridge, Main Road,Ranchi

    Establishment of Thermal PowerPlant of 3x600 MW capacity atPirpainti, Bhagalpur.

    8130.00 2200 29.09.08(Consentwithcondition)

    139 M/S Jain Agro Distilleries PvtLtd.,306, Akash Deep Building,26-A, Barakhamba Road,

    New Delhi-110001

    Establishment of 45 KLPD DistilleryPlant at Bighaijaghish, Tehsil-Hathua(Mirganj, Gopalganj(Cancelling earlier approved place

    which was at Chitauli, Siwan andnew place as Bighaijaghish, Tehsil-Hathua(Mirganj), Gopalganj has beenapproved on 09.2.09)

    29.69 100 09.02.09

    29.09.08

    11.02.10

    140 M/S Astonfield RenewableResources Pvt. Ltd.,28, Naresh Mitra Sarani,Kolkata.

    Establishment of 100 MW (10x10MW) Biomass based Power Plant in10 district clusters in Bihar

    598.00 45 29.09.08

    141 M/S All India AsianEducational Foundation,3&4, Industrial Area, Jasola(Sarita Vihar), New Delhi-110025

    Proposal for opening of TechnicalInstitute at Patna.

    51.00 19 29.09.08

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    13/52

    Report-3

    13142 M/S Birsa Institute of

    Technology, Ratu Road,Ranchi

    Establishment of EngineeringCollege in Bihar.

    29.09.08

    143 M/S Narayan Chikitsalay,Rohtas

    Establishment of Medical College atSasaram Road, Jamuar, Rohtas.

    29.09.08(Consentwithcondition)

    144 M/S Malti Holy health &Welfare Society, Arrah, Pakri,Bhojpur.

    Establishment of Medical Collegeand Hospital at Arrah, Bhojpur.

    29.09.08(Consentwithcondition)

    145 M/S Sona Auto Agriculture Pvt.Ltd.,

    Abhishek Plaza, 2nd Floor,Exhibition Rd. Patna.

    Proposal for manufacturing ofAgriculture Implements unit atFatuha Industrial Area.

    12.70 59 29.09.08

    146 M/S East West PowerGeneration Company Ltd.,Maharastra

    Proposal for establishment of 1000MW coal based Thermal Power Plantat Kahalgaon/Aurangabad

    5000.00 700 18.11.08(Consent in-

    principle withcondition)

    147 M/S Sri Durga Agro EnergyLtd, Station Road, Buxar.

    Proposal for establishment of RiceMill, Solvent Extraction Plant and 15MW Co-generation Plant at Bhagra

    Kudra, Kaimur.

    141.00 265 18.11.08(Consent in-principle with

    condition)148 M/S Emergent Ventures India

    Pvt. Ltd, Gurgaon, Haryana(On request of M/S EmergentVentures India Pvt. Ltd for itsGaya project, approval hasbeen given to its newsubsidiary company namelyM/S Tathagata Bio EnergyPvt. Ltd for establishment of12 MW Biomass based PowerPlant at vill- Churi, Dist.-Gayaand for its Kaimur project alsoapproval has been given tonew SPV company namelyM/S Mundeshwari Bio EnergyPvt. Ltd for establishment of12 MW Biomass based PowerPlant at Kaimur, Bhabhua inSIPB meeting held on12.01.11)(On request of M/S EmergentVentures India Pvt. Ltd for itsRohtas project newly formedsubsidiary company M/SSanmati Bio Energy Pvt. Ltdfor 12 MW Biomass basedPower Plant at Songwa,Rohtas and for its

    Aurangabad project newlyformed subsidiary companyM/S Harit Bio Energy Pvt. Ltdfor 12 MW Biomass basedPower Plant at Barwa,

    Aurangabad have beenapprove on 26.05.11.)

    Proposal for establishment of 12 MWbiomass based Power Plant in eachdistrict namely Nalanda, Nawada,Jehanabad, Arwal, Bhojpur, Patnaand Banka.

    358.00 90 18.11.08(Consent in-

    principle withcondition)

    12.01.11

    26.05.11

    149 M/S Shahi Foundation,Gannipur, Muzaffarpur

    Proposal for establishment ofEngineering College at Dighra,Mushari, Muzaffarpur.

    6.99 38 18.11.08(Consentwithcondition)

    150 M/S ESVEEGEE STARCHAND CHEMICALS PVT.

    Proposal for establishment of MaizeProcessing Unit at Imadpur

    90.00 250 18.11.08 22.12.08

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    14/52

    Report-3

    14LTD., Ahmadabad. Raghunathpur, Block- Bhagwanpur,

    Dist.- Vaishali

    151 M/S Siddhashram Rice MillsCluster Pvt. Ltd., Rambag,Buxar.

    Proposal for establishment of RiceMill and 2 MW Rice Husk basedPower Plant at Chausa, Buxar

    14.30 250 18.11.08(Consentwithcondition)

    04.06.09

    152 M/S Manju MakhanaEnterprises Pvt. Ltd,Madhubani.(Unit's proposal approved bySIPB on 18.11.08 forestablishment of MakhanaStorage Godown andMechanised PackagingFacilities in the name of M/SManju Udyog, has beenamended and consent hasbeen given for establishmentof Makhana Processing and200 MT Warehouse at Sapta,Rahika, Madhubani in thename of M/S ManjuMakhana Enterprises Pvt.

    Ltd. in SIPB meeting held on11.08.10)

    Proposal for establishment ofMakhana Processing and 200 MTWarehouse at Sapta, Rahika,Madhubani.

    0.80 15 18.11.08

    11.08.10

    04.06.09

    153 M/S Institute of CharteredAccountant of India, FrazerRoad, Patna.

    Proposal for establishment of aBranch of Chartered Accountant ofIndia at Patna

    18.11.08(Consentwithcondition)

    154 M/S Prachin Bharat Tourism,Bangalore.

    Establishment of following proposalsbased on outsourcing:-(a) Management of Tourist

    Information Centre using newtechnology.

    (b) Development and managementof Website of Bihar StateTourism Development

    Corporation(BSTDC) using 2.0Technology.

    18.11.08(Consentwithcondition)

    155 M/S Bihar Starch Ltd,Khagaria.

    Proposal for establishment of MaizeProcessing Unit at Kothia,Kashimpur, Khagaria.

    17.11 91 18.11.08(Consent in-principle)

    28.12.08

    156 M/S Jaiprakash AssociatesLtd., New Delhi.

    Proposal for establishment ofcapacity of 1 Million Ton Flyashbased Cement Grinding Plant atMotipur, Muzaffarpur

    18.11.08(Consent in-

    principle withcondition)

    157 M/S Archi Breweries Pvt Ltd,Birchand Patel Marg, RBlock, Patna

    Proposal for establishment of BeerPlant with capacity of 1 lakh HLPAat Parew, Bihta, Patna.

    9.63 45 16.12.08

    158 M/S PTC Bermaco GreenEnergy Systems Ltd, Navi

    Mumbai, Maharastra(Earlier, in the SIPB's 63

    rd

    meeting held on 16.12.08consent was given forestablishment of Biomassbased Power Plant for 300MW(12x25 number) at 25different places and in theSIPB's 66

    thmeeting on

    29.06.09 consent was givenfor 12 MW Biomass basedPower Plant at Rohtas.

    Again on company's

    Proposal for establishment of 300MW Biomass Power Plant in 25

    different places ( 12 MW in eachplace) - Bikramganj-Rohtas, Dinara-Rohtas, Durgawati-Kaimur, Kudra-Kaimur, Dumraon-Buxar, Jagdishpur-Bhojpur, Gaunaha-West Champaran,Bettiah-West Champaran, Motihari-East Champaran, Purnea,Samastipur, Bihta-Patna, Belaganj-Gaya, Aurangabad, Marhaura-Saran,Siwan, Katihar, Saharsa, Banka,Udakishanganj-Madhepura, Rafiganj-

    Aurangabad, Rahika-Madhubani,Forbesganj-Araria, Gopalganj and

    1254.25 2300 16.12.08(Consent

    withcondition)

    28.09.11

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    15/52

    Report-3

    15request, consent has beengiven on 28.09.11 forestablishment of 312MW(26x12) Biomass basedPower Plant at 26 different

    places, Bikramganj-Rohtas,Dinara-Rohtas, Durgawati-Kaimur, Kudra-Kaimur,Dumraon-Buxar, Jagdishpur-

    Bhojpur, Gaunaha-WestChamparan, Bettiah-WestChamparan, Motihari-EastChamparan and Sasaram-Rohtas, Purnea, Samastipur,Bihta-Patna, Belaganj-Gaya,

    Aurangabad, Marhaura-Saran, Siwan, Katihar,Saharsa, Banka,Udakishanganj-Madhepura,Rafiganj-Aurangabad,Rahika-Madhubani,Forbesganj-Araria, Gopalganjand Supaul.)

    Supaul.)

    159 M/S Geneva SoftwareTechnologies Ltd, Bangalore

    Proposal for working in the field ofDisaster Information Management andEnterprise Solution at Patna.

    16.12.08

    160 M/S Meera Comtrade PvtLtd, Exhibition Road, Patna(Change of name of thecompany from M/S MeeraEnterprises to M/S MeeraComtrade Pvt Ltd has beenapproved in SIPB meeting on18.05.09)

    Proposal for establishment of ColdStorage with proposed capacity of40 MT, Agri Marketing Yard and DryWarehouse with proposed capacityof 400 MT under Rural Agri BusinessCentre at Narkatiabazar, EastChamparan.

    3.861 100 16.12.08

    18.05.09

    11.07.09

    161 M/S Bhartiya Agro ProductsPvt Ltd, Bettiah

    Proposal for establishment of ColdStorage with proposed capacity of 6150MT, Dry Warehouse with proposedcapacity of 5000 MT, Agri Input

    Marketing and Agri Output MarketingProject at Bettiah

    9.319 280 16.12.08

    162 M/S Jai Kisan Food ProductsPvt Ltd, Sasaram

    Proposal for establishment of ModernRice Mill with proposed capacity of 4 MTper hour, Warehousing with proposedcapacity of 5000 MT and Packagingproject with proposed capacity of 4 MTper hour at Chandwa, Rohtas.

    5.3851 150 16.12.08 04.06.09

    163 M/S Vindhyabasini Rice MillsCluster Pvt Ltd, Nokha,Rohtas(Change of name of thecompany from M/S SunilKumar Singh to M/S

    Vindhyabasini Rice MillsCluster Pvt Ltd has beenapproved in SIPB meeting on18.05.09)

    Proposal for establishment of ModernRice Mill with proposed capacity of 7 MTper hour, Warehouse with proposedcapacity of 10,000 MT and PackagingProject with proposed capacity of 4 MTper hour at Nokha, Rohtas.

    10.38 200 16.12.08

    18.05.09

    11.07.09

    164 M/S Shivjee Modern Rice MillPvt Ltd, Konar, Sasaram

    Proposal for establishment ofModern Rice Mill with proposedcapacity of 4 MT per hour,Warehouse with proposed capacityof 5000 MT and Packaging Projectwith proposed capacity of 4 MT perhour at Konar, Shiv Sagar, Rohtas.

    4.715 150 16.12.08 04.06.09

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    16/52

    Report-3

    16165 M/S Indsolar Renewables

    Pvt. Ltd.,Harihar Singh Road,Morabadi, Ranchi.(Canceling the company's earlierapproved proposal to set up 5 MWSolar Thermal Power Project withearlier name(Indsolar India) andapproval has been given for

    establishment of 2 MW Power Plantbased on Solar Photo VoltaicTechnology and 3 MW SolarThermal Power Generation Plantwith it's new name as IndsolarRenewables Pvt. Ltd. in SIPBmeeting on 19.10.09)

    Establishment of 2 MW Power Plantbased on Solar Photo VoltaicTechnology and 3 MW Solar ThermalPower Generation Plant at

    Aurangabad

    26.74 20 09.02.09(Consent in-principle)

    19.10.09

    166 M/S Nalanda BiscuitCompany Ltd,Khagaul Road, Nayatola,Phulwarisharif, Patna

    Proposal for capacity expansion ofexisting Biscuit manufacturing unit atPhulwarisharif from 10,750 MT peryear to 16,750 MT per year.

    3.38 269 09.02.09

    167 Prachin Bharat Tourism,Bangalore

    Establishment of MultimediaMuseum at Bodh Gaya

    0.2471 09.02.09

    168 M/S All India Asian

    Educational Foundation,3&4, Industrial Area, Jasola(Sarita Vihar), New Delhi-110025

    Establishment of Institute of Medical

    Sciences, Dental Sciences andNursing Sciences at Patna

    150.00 09.02.09

    (Consentwithcondition)

    169 M/S SREI InfrastructureFinance Limited,'Vishwakarma' 86 C, TopsiaRoad(South), Kolkata.

    Establishment of 5 MW GridInteractive Solar Power Plant atJamalpur

    116.00 30 09.02.09(Consentwithcondition)

    170 M/S Taj Trading Company,Chhatia, Bhatgama, PurneaEast, Purnea

    Establishment of Warehousing andPackaging Facility for Makhana atPurnea.

    0.936 55 09.02.09

    171 M/S Employees' StateInsurance Corporation, Patna

    Establishment of Medical Collegeand Hospital at Patna

    201.00 500 09.02.09

    172 M/S Lakhisarai BijleeCompany Pvt. Ltd., NewDelhi

    Establishment of 1320(660x2) MW Coalbased Thermal Power Project at Kajra,Lakhisarai

    6810.00 600 09.02.09 10.05.11

    173 M/S Buxar Bijlee CompanyPvt. Ltd., New Delhi

    Establishment of 1320 MW Coalbased Thermal Power Project atChausa, Buxar

    6795.00 600 09.02.09 10.05.11

    174 M/S Shristi InfrastructureDevelopment CorporationLtd. Kolkata

    Establishment of Five Star Hotel inPatna and International TouristResort at Bodh Gaya in PPP modeand Golf Course

    18.05.09(Consentwithcondition)

    175 M/S Steel Authority of IndiaLtd., Bokaro Steel Plant,Bokaro

    Establishment of Steel ProcessingUnit of TMT Bar with the capacity ofone lakh Ton per year at Gaya

    88.76 179 18.05.09 07.08.09

    176 M/S Chaitanya Gurukul Trust,

    Gopalganj.

    Establishment of Educational

    Institution as- Model School fromclass 1 to 12, Degree EngineeringCollege and Research andDevelopment at Chamanpura,Gopalganj

    30.00 200 18.05.09

    (Consent in-principle)

    177 M/S Tirupati Balajee NutritionPvt. Ltd.,Patna

    Establishment of Flour Mill with thecapacity of 45,000 MT per year atKhedalpura, Bihta, Patna.

    5.56 103 18.05.09 07.08.09

    178 M/S Royal Engineering andCold Storage Pvt. Ltd.,Siwan.

    Establishment of Cold Storage withthe Capacity of 5000 MT atPakwaliya, Dhrundha, Siwan.

    1.5 15 18.05.09 16.09.09

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    17/52

    Report-3

    17179 M/S Hindustan Petroleum

    Corporation Ltd, Mumbai.Establishment of 3500 TCD Capacityof Sugar Mill, 60 KLPD Capacity ofEthanol Plant and 20 MW Co-generation Plant at Lauriya, WestChamparan.

    304.39 375 29.06.09(Consentwithcondition)

    180 M/S Hindustan PetroleumCorporation Ltd, Mumbai.

    Establishment of 3500 TCD Capacityof Integrated Sugar Mill, 60 KLPDCapacity of Ethanol Plant and 20MW Co-generation Plant at Sugauli,

    East Champaran.

    309.15 375 29.06.09(Consentwithcondition)

    181 M/S Nibhi Industries Pvt. Ltd,Mylapore, Chennai

    Establishment of 1,00,000 (OneLakh) MT Capacity Asbestos FiberCement Corrugated Sheet, FlatSheet and Accessories and LightWeight Fly Ash Block Plant atIndustrial Growth Centre, Giddha,

    Ara(Change of place from Dariapur,Chapra to Industrial Growth Centre,Giddha, Ara has been approved inSIPB meeting on 19.10.09)

    31.00 125 29.06.09(Consentwithcondition)

    19.10.09

    182 M/S Parijat Next Gen EnergyPvt. Ltd, Bangalore.

    Establishment of 15 MW (2x7.5 MW)Biomass based Power Plant at

    Bihiya, Bhojpur.

    73.00 30 29.06.09(Consent

    withcondition)

    183 M/S Bajaj Buildcon Pvt. Ltd,Patna.

    Establishment of Resort, Water Parkand Educational Development atPatna.

    285.00 29.06.09(Consent withcondition)

    184 M/S Kanika Buildcon Pvt. Ltd,Patna

    Establishment of Mall-cum- Multiplex,Health and Medical, EducationalDevelopment and ResidentialComplex at Patna.

    365.00 29.06.09(Consentwithcondition)

    185 M/S Sukhjit Starch &Chemicals Limited,Phagwara, Punjab.

    Establishment of two Warehousewith the capacity of 5000-5000 MT atNaugachia(Bhagalpur) andGulzarbagh (Purnea).

    12.62 50 29.06.09(Consentwithcondition)

    13.12.09

    186 M/S Sahu Agro Business Pvt.Ltd, Bhagalpur. Establishment of Cold Storage withcapacity of 3000 MT, Warehousewith capacity of 1100 MT and PackHouse with the capacity of 200 MTunder R.A.B.C at Naugachia,Bhagalpur.

    4.21 64 29.06.09 13.12.09

    187 M/S Radhe Shyam ColdStorage & Foods Pvt. Ltd,Gajipur, Uttar Pradesh.

    Establishment of Fruit Pulp and JuicePlant with annual capacity of 17,500MT at Industrial Area, Pandaul,Madhubani.

    9.61 148 29.06.09 13.12.09

    188 M/S Usha Martin Ltd, NewDelhi.

    Establishment of 1200-1320 MWCoal based Thermal Power Plant atKahalgaon/ Pirpainti, Bhagalpur.

    6000.00 500 29.06.09

    189 M/S Amrapali Foundation,

    New Delhi.(Approval has been given forchange of place fromMotihari toKumarbagh(Bettiah) in SIPBmeeting held on 20.07.09)

    Establishment of Engineering

    College at Foundations Campus-Begusarai, Jamalpur andKumarbagh(Bettiah)andManagement Institute at Motipur.

    18.952 247 29.06.09

    (Consentwithcondition)

    190 M/S Advantage EducationalSociety, New Delhi.

    Establishment of Advantage MediaAcademy at off Bailey Road, Patna.

    7.00 30 29.06.09(Consentwithcondition)

    191 M/S Suman Agritech Pvt. Ltd,Indore

    Establishment of Vegetable RefinedOil and Inter-esterification unit and

    120.00 250 20.07.09 29.12.09

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    18/52

    Report-3

    18Bakery fat at Kulaharia, Ara

    192 M/S Amit metaliks Ltd,Durgapur, West Bengal.

    Establishment of Five Star Hotel atPatna Town

    168.18 309 20.07.09(Consentwithcondition)

    193 M/S Uttam Cycle Pvt. Ltd,Patna

    Establishment of CycleManufacturing Industry at Gaya-Patna Road

    50.00 75 20.07.09

    194 M/S Ganapati Biscuits Pvt.Ltd, Patna City

    Establishment of BiscuitManufacturing Unit at Bankaghat,Patna City

    14.85 300 20.07.09 13.12.09

    195 M/S Sarvottam InfrastructurePvt. Ltd, Kolkata.

    Establishment of 540 MW coal basedThermal Power Plant at Kahalgaon

    2250.00 610 17.08.09

    196 M/S I L & FS RenewableEnergy Ltd, Mumbai

    Establishment of 12 MW biomassbased Power Project at Banka.

    50.17 92 17.08.09

    197 M/S Tarouna Cold StoragePvt Ltd, Purnea

    Establishment of Cold Storage withthe capacity of 11,400 MT underR.A.B.C. at Jalalgarh, Purnea.

    7.29 60 17.08.09 13.12.09

    198 M/S Ambo Agro ProductsLtd, Kolkata

    Establishment of 200 TPD RefinedEdible Oil, 2.5 MW Captive PowerPlant, 200 TPD Rice Mill and 150TPD Flour Mill at Bhagalpur / Patna/Begusarai

    84.00 200 17.08.09

    199 M/S Ashwini Jhunjhunwala,Tilkamanjhi, Bhagalpur.

    Establishment of 100 MT ColdRoom, 500 MT Pack House,Processing Hall, 1000 MT Agri InputWarehouse and 5600 MT GrainStorage Warehouse under R.A.B.Cat Tilkamanjhi, Bhagalpur.

    5.9091 31 17.08.09

    200 M/S Hira Bharti Agro Pvt. Ltd,Bhagalpur.(Unit's proposal approved bySIPB on 17.08.09 forestablishment of 3000 MTCold Storage, 2800 MTWarehouse for grains and600 MT Pack House andCold Room under R.A.B.C. atShivnarayanpur, Kahalgaon,Bhaglapur in the name ofM/S Amit Sinha, has beenamended and consent hasbeen given for establishmentof that project in the name ofM/S Hira Bharti Agro Pvt. Ltdin SIPB meeting held on08.06.10.)

    Establishment of 3000 MT ColdStorage, 2800 MT Warehouse forgrains and 600 MT Pack House andCold Room under R.A.B.C. atShivnarayanpur, KahalgaonBhagalpur.

    4.77 38 17.08.09

    08.06.10

    201 M/S Unique Foods,Muzaffarpur

    Establishment of I. Q. F. Plant-2 MTper hour Frozen / Aseptic line 10 MTper hour, Canning Line 15 MT per

    day, Cold Room 500 MT and ModernCold Chain at Muzaffarpur.

    16.64 35 17.08.09 13.12.09

    202 M/S Ruchi Soya IndustriesLtd, Mumbai(Companys revised proposal forestablishment of Bran/ Seed De-oiledCake -1,20,000 MTA, Vanaspati /Bakery Fats/ Interestified -90,000MTA, Packaged Blended / RefinedOils-1,26,000 MTA , Expeller Oil-18000 MTA, Textured Soya Protein-15,000 MTA , Packaged Grains-22,500 MTA, Co-generation Power

    Establishment of Bran/ Seed De-oiled Cake -1,20,000 MTA,Vanaspati / Bakery Fats/ Interestified-90,000 MTA, Packaged Blended /Refined Oils-1,26,000 MTA , ExpellerOil- 18000 MTA, Textured SoyaProtein- 15,000 MTA , PackagedGrains- 22,500 MTA, 4.5 MWBiomass based Captive generationPlant and 1.5 MW Solar PV PowerPlant at Durgawati, Kaimur, Dist.-

    215.00 530 17.08.09

    15.02.10

    28.09.11

    19.04.11

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    19/52

    Report-3

    194.5 MW has been approved in SIPBmeeting on 15.02.10.)(Againon companysrequestconsent has been given for 4.5 MWBiomass based Captive generationPlant and 1.5 MW Solar PV PowerPlant in place of 4.5 MW co-generation Plant in the SIPB meetingheld on 28.09.11.)

    Bhabhua.

    203 M/S Bhagwan Agro Pvt Ltd,Rohtas

    Establishment of 4 MT per hour Modern Rice Milland 2000 MT Capacity Warehouse atNokha,Rohtas.

    3.46 90 17.08.09 13.12.09

    204 M/S Shanti Modern Rice Mill,Sasaram

    Establishment of 4 MT per hour ModernRice Mill and 1000 MT capacityWarehouse at Kaua Dehri, Block-Shivsagar, Rohtas.

    1.45 40 17.08.09 13.12.09

    205 M/S Shree HanumanjeeModern Rice Mill Pvt Ltd,Sasaram.(Company's proposal approved bySIPB on 17.08.09 for establishment of4 MT per hour Modern Rice Mill and4000 MT Capacity Warehouse at

    Vaijala, Sasaram in the name of M/SHanumanjee Modern Rice Mill PvtLtd and 5 MT per hour capacity RiceMill and 3000 MT capacityWarehouse at Baijala, Sasaram in thename of M/S Hanuman FoodProducts. As per company's request,amending the approvals given onboth proposals, consent has beengiven for one company as M/S ShreeHanumanjee Modern Rice Mill Pvt.Ltd, Rohtas for establishment of 12MT per hour Modern Rice Mill and3000 MT Warehouse at Baijala,Mokar, Rohtas in SIPB meeting held

    on 21.07.10)

    Establishment of 12 MT per hourModern Rice Mill and 3000 MTWarehouse at Baijala, Mokar, Rohtas

    9.75 50 17.08.09

    21.07.10

    13.12.09

    21.12.10

    206 M/S Dumraon Textiles Ltd,Dumraon

    Establishment of 10 MT per hourcapacity Modern Rice Mill and 2 MWCaptive Power Plant at Dumraon,Buxar.

    19.68 175 17.08.09

    207 M/S Sushila Cold Storage PvtLtd, Ara(Cancelling the earlier

    proposal approved on17.8.09, present proposal asestablishment of 7000 MTcapacity Cold Storage (5000MT capacity of Potatostorage and 2000 MT

    capacity of Fruit andVegetable storage), 2000 MTcapacity Onion storage andPrimary Processing andPackaging unit of Fruits andVegetable under RABC atGiddha Industrial Area hasbeen approved on 21.12.09)

    Establishment of 7000 MT capacityCold Storage (5000 MT capacity ofPotato storage and 2000 MTcapacity of Fruit and Vegetablestorage), 2000 MT capacity Onionstorage and Primary Processing andPackaging unit of Fruits andVegetable under RABC at GiddhaIndustrial Area

    7.05 85 17.08.09

    21.12.09

    11.03.10

    208 M/S Om Shivam ModernRice Mill Pvt Ltd, Sasaram.

    Establishment of 11 MT per hourcapacity Modern Rice Mill and 5000MT capacity Warehouse at Konar,Shivsagar, Rohtas

    5.79 55 17.08.09 13.12.09

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    20/52

    Report-3

    20209 M/S Fox Petroleum Ltd, New

    DelhiEstablishment of 30 MW PowerGeneration Plant based on dual fuel(gas & alternative fuel) technology ineach 38 districts of Bihar.

    7899.83 695 19.10.09(Consentwithcondition)

    210 M/S Gajanana AgronomyPvt. Ltd, Bettiah.

    Establishment of Multipurpose ColdStorage with the capacity of 6860MTA at Chhawani, Mehdia Bari,West Champaran.

    4.49 13 19.10.09 01.02.10

    211 M/S Aasma Foods &Beverages Pvt. Ltd., Patna.

    Establishment of Fruit & VegetableProcessing unit with the capacity of2500 MTA at EPIP, Hajipur.

    1.10 72 19.10.09 11.02.10

    212 M/S Maa Jaemangla DairyClusters Ltd., Kolkata.

    (Earlier, in the SIPB meetingheld on 19.10.09 consentwas given in the name of M/SPrashant Jalan & Associates,Kolkata for establishment of100 MT per day capacity ofSkimmed Milk Powder, PolyPack Milk, Ice-cream, Gheeand Curd production unit at

    Begusarai/ Kahalgaon,Bhagalpur.

    Again, in SIPB meeting heldon 28.09.11 consent hasbeen given in the name ofnewly formed company M/SMaa Jaemangla DairyClusters Ltd forestablishment of 44,000 MTper year capacity Ghee,Skimmed Milk Powder,Concentrated Milk,Pasteurized Poly Pack Milk,Curd/Yoghurt production unitat Mohanpur, Begusarai.

    Proposal for establishment of 44,000MT per year capacity Ghee,Skimmed Milk Powder, ConcentratedMilk, Pasteurized Poly Pack Milk,Curd/Yoghurt at Mohanpur,Begusarai.

    38.61 47 19.10.09

    28.09.11

    213 M/S Shiv Shakti ModernFlour Mills Pvt. Ltd., Raxaul,East Champaran.

    Establishment of Flour Mill with thecapacity of 120 MT per day atRaghunathpur, Ramgharwa, Raxaul,E.Champaran.

    6.144 78 19.10.09 11.02.10

    214 M/S Om Shri LaxminarayanWarehouse Shoppers Ltd,Patna.

    Establishment of Modern Rice Millwith the capacity of 24 MT per hourat Nasriganj, Danapur, Patna.

    13.62 101 19.10.09 11.02.10

    215 M/S Thakur Nikunj ColdStorage Pvt. Ltd.,Samastipur.

    Establishment of Multipurpose ColdStorage with the capacity of 6000 MTat Mathurapur, Samastipur.

    3.59 130 19.10.09 11.02.10

    216 M/S Auro SundramInternational Pvt. Ltd.,Roorkee, Dist.-Haridwar(Uttarakhand)(Companys earlier proposalapproved by SIPB on19.10.09 to set up 150 TPDcapacity Maize Processingunit for production of Maize

    Establishment of 300 TDP capacityMaize Processing unit for productionof Maize Starch and Liquid Glucoseand 03 MW in place of 2.5 MWCaptive Power Plant at Industrial

    Area, Forbesganj, Araria.

    110.00 140 19.10.09

    19.04.10

    24.06.10

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    21/52

    Report-3

    21Starch and Liquid Glucoseand 3 MW Captive PowerPlant at Industrial Area,Forbesganj, Araria has beenamended by SIPB on19.04.10 for establishment of200 MT per day capacityMaize Processing unit for

    production of Maize Starch

    and Liquid Glucose and 2.5MW Captive power Plant atthe same place.)(Earlier, in the SIPB's 83

    rd

    meeting held on 19.04.10consent was given forestablishment of 200 MT perday capacity MaizeProcessing unit forproduction of Maize Starchand Liquid Glucose and 2.5MW Captive Power Plant..

    Again on request of thecompany amending theabove proposal consent has

    been given for establishmentof 300 TPD capacity MaizeProcessing unit forproduction of Maize Starchand Liquid Glucose and 03MW in place of 2.5 MWCaptive Power Plant in SIPBmeeting held on 28.09.11)

    28.09.11

    217 M/S Vikramshila Educationaland Welfare Society, Patna.

    Establishment of ManagementInstitute in the name of Indian Schoolof Management at Vill- Sarai,Khagaul, Patna.

    15.13 44 19.10.09 01.02.10

    218 M/S Yugal Green UrjaSolutions Pvt. Ltd., New

    Delhi.

    Establishment of 750 KW Biomassbased Power Plant at Goriakothi,

    Siwan.

    3.55 20 19.10.09

    219 M/S Eco Cements Ltd.,Varanasi.

    Establishment of grinding unit ofPortland Cement, PortlandPozzolana Cement and PortlandSlag Cement with the capacity of3000 TPD and 5 MVA Captive PowerPlant at Karamnasa, Bhabhua.

    100.00 150 19.10.09

    220 M/S Simri Cold Storage PvtLtd, Simri, Samastipur.

    Establishment of 6000 MT CapacityCold Storage, 3 MT per hour Sorting/Grading Unit under R.A.B.C Schemeat Simri, Samastipur.

    4.5055 8 09.11.09 01.02.10

    221 M/S Mohan Cold Storage PvtLtd, Samastipur

    Establishment of 10,600 MTCapacity Cold Storage underR.A.B.C. Scheme at Tajpur,

    Samastipur.

    7.44 09.11.09 11.02.10

    222 M/S Lichchhwi Foods IndiaPvt Ltd, Hajipur (Vaishali).

    Establishment of 7000 MT per yearCapacity Multi Commodity ColdStorage, 2000 MT per year CapacityDeep Freezer and 2 MT per hourI.Q.F Line Freezer at Dighi Kala,Industrial Estate Hajipur

    8.72 7 09.11.09 11.02.10

    223 M/S Aqua Tech Industries,Keshrinagar, Patna

    Establishment of 60 Lakh Liter peryear Capacity Packaged DrinkingWater Unit at Rajiv Nagar, Patna

    1.66 18 09.11.09(Consentwithcondition)

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    22/52

    Report-3

    22224 M/S Sityog Educational &

    Welfare Society, PatnaEstablishment of Engineering andManagement College at

    Aurangabad.

    3.20 56 16.11.09

    225 M/S Protech Cold StoragePvt. Ltd, Muzaffarpur.

    Establishment of 10,000 MT per yearcapacity Cold Storage at Paroo,Muzaffarpur.

    4.82 26 16.11.09 11.02.10

    226 M/S Kamla Agro Pvt. Ltd,Banka

    Establishment of 6 MT per hourcapacity Rice Mill, Husk BasedPower Plant and 5000 MT capacityWarehouse at Amarpur, Banka.

    11.47 100 16.11.09 11.02.10

    227 M/S Ambo Exports Ltd,Kolkata(Company's proposalapproved by SIPB on16.11.09 for establishment of100 MT per day capacityRice Bran Oil Extraction Plantat Aurangabad Industrial

    Area has been amended andconsent has been given withcondition for establishment of500 MT per day capacityRice Bran Oil Extraction Plant

    at Kahalgaon Industrial Area,Bhagalpur on 03.05.10.)

    Establishment of 500 MT per daycapacity Rice Bran Oil ExtractionPlant at Kahalgaon Industrial Area,Bhagalpur

    25.00 114 16.11.09

    03.05.10

    228 M/S Bihar College ofEducation,Promoter- Nav Bharti Trust,Patna

    Establishment of Training College inthe name and style of Bihar Collegeof Education at Giddha Industrial

    Area, Ara.

    1.0704 17 16.11.09(Consentwithcondition)

    229 M/S Ashok Cattle and PoultryFeeds Pvt. Ltd, Darbhanga

    Establishment of 9600 MT per yearcapacity Cattle and Poultry Feed Unitat New Industrial Estate Bela,Darbhanga.

    0.8922 18 16.11.09 11.02.10

    230 M/S D.K. Agro Products,Turki, Muzaffarpur.

    Establishment of 60 Lakh Liter peryear capacity Milk Processing Plantat Turki, Muzaffarpur.

    2.15 80 16.11.09(Consentwithcondition)

    231 M/S Mirzanagar GramodyogSahyog Samiti Ltd, Hajipur.

    Establishment of Honey Processingand Packaging Plant at Mahua,Hajipur.

    1.166 14 23.11.09 25.05.10

    232 M/S Ram Pukar Cold StoragePvt. Ltd, Samastipur

    Establishment of 6500 MT capacityCold Storage at Mohiuddin Nagar,Samastipur

    5.2288 23 23.11.09 11.02.10

    233 M/S Hrideshwari Jee ModernRice Mill, Rohtas

    Establishment of 2 MT Per hourcapacity Modern Rice Mill at Saleya,

    Akori Gola, Rohtas.

    2.1283 15 23.11.09 11.02.10

    234 M/S Maurya Foods Pvt. Ltd,East Champaran

    Establishment of 8134 MT CapacityCold Storage under Rural AgriBusiness Centre at Mehsi, EastChamparan.

    5.93 37 23.11.09

    235 M/S Shree Kalu Cold StoragePvt. Ltd, Purnea.

    Establishment of 11000 MT CapacityCold Storage under Rural AgriBusiness Centre at Moranga GrowthCentre, Purnea.

    6.0430 51 23.11.09 23.04.10

    236 M/S Vaidyanath Sugar MillsPvt. Ltd, East Chamaran

    Establishment of 3500 TCD SugarMill and 12 MW Electric Co-generation Plant at Chakia,EastChamparan.

    175.00 277 23.11.09(Consentwithcondition)

    237 M/S Xaviers Girls School,Muzaffarpur

    Establishment of 10+2 Level XaviersGirls School at Industrial Area, Bela,Muzaffarpur.

    2.20 46 30.11.09

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    23/52

    Report-3

    23238 M/S Balajee Mini Steels &

    Rerolling Pvt. Ltd, PatnaEstablishment of 63000 MTAcapacity Re-rolling Mill at Bihta-Maner Road, Patna

    17.66 78 30.11.09 01.02.10

    239 M/S Sivaani AgribusinessPvt. Ltd, Gaya

    Establishment of 30 MT per daycapacity Dal Mill at Dhanua, DoviRoad, Gaya.

    3.00 20 30.11.09

    240 M/S Sadafal Dev Agro MillsPvt. Ltd, Dehri, Sasaram

    Establishment of 96 MT per daycapacity Rice Mill at Kauwa, Dehri,Sasaram.

    3.9618 45 30.11.09 11.03.10

    241 M/S Gaurav Foods and CoolConnections Pvt. Ltd, Patna

    Establishment of 45000 MTAcapacity Roller Flour Mill atDidarganj, Patna City

    4.8781 103 30.11.09 01.02.10

    242 M/S SVJ Enterprises Pvt. Ltd,Donar, Darbhanga.

    Establishment of 1(one) MT per daycapacity Honey Processing unit atDonar, Dist.-Darbhanga

    1.236 22 30.11.09 21.12.10

    243 M/S Jagran Institute ofManagement & MassCommunication, Patna.

    Proposal for establishment ofJagaran Institute of Management &Mass Communication at Bihta, Patnaof M/S Shri Puran Chandra GuptaSmarak Trust, Kanpur

    30.11.09

    244 M/S Astonfield RenewableResources Ltd, New Delhi

    Establishment of 300 MW SolarPower Plant(5-25 MW size) in first

    phase at Dist.-Gaya, Sasaram, etcand in second phase at Dist.-Muzaffarpur, Madhubani, WestChamparan, Bhojpur and Patna, etc

    4500.00 5000 30.11.09

    245 M/S Ambo Exports Ltd,Kolkata

    Establishment of 1(one) Lakh MT peryear capacity Maize PrimaryProcessing, Drying, Sorting andPackaging unit at KahalgaonIndustrial Area, Bhagalpur.

    17.00 27 07.12.09

    246 M/S Great Value Foods, NewDelhi

    Establishment of 60,000 MT per yearcapacity RTE(Ready to eat)Supplementary Nutrition FortifiedFood unit in Bihar.

    16.2903 179 07.12.09

    247 M/S Om Shri Gramin FodderFood Process Ltd, Patna(Companys proposalapproved on 07.12.09 forestablishment of 1,53,600 MTper year capacity ModernRice Mill at Phulwarisharif,Patna has been amendedand approval has been givenfor the same project atDanapur, Patna in SIPBmeeting held on 12.01.11)

    Establishment of 1,53,600 MT peryear capacity Modern Rice Mill atDanapur, Patna.

    10.14 101 07.12.09

    12.01.11(Consentwithcondition)

    248 M/S Okpet Construction &Services Pvt. Ltd, Patna.

    Establishment of 600 MT/Kilo Litreper year Fruit Pulp and JuiceProcessing unit at Simri, Darbhanga

    1.1291 21 07.12.09

    249 M/S Shree Shree DwarikajiFoods Pvt. Ltd, Patna City.

    Proposal for capacity expansion from24000 MT per year to 60000 MT peryear in the existing Flour Mill atKarmali Chak, Bypass Road, PatnaCity.

    3.77 50 21.12.09 06.01.11

    250 M/S Sano Foods Pvt. Ltd,Mumbai.

    Proposal for establishment of 3434MT capacity production unit ofVermicelli and Macroni at Danapur,Patna.

    13.39 28 21.12.09

    251 M/S Golden Dairy ProductsPvt. Ltd, Patna.

    Proposal for establishment of Ice-cream and Dairy Products unit atIndustrial Area, Hajipur.

    1.96 37 21.12.09

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    24/52

    Report-3

    24252 M/S Balmukund Cement &

    Roofings Ltd, KolkataProposal for establishment of 1.5Lakh MT capacity production unit of

    Asbestos Fiber Cement Sheet(Corrugated/Flat) and Accessories atKanti, Muzaffarpur.

    31.00 45 21.12.09

    253 M/S Bhagwan VeerHanuman Cold Storage Pvt.Ltd, Samastipur

    Proposal for establishment of 5000MT capacity Cold Storage, 2 MT perhour capacity Rice Mill andWarehouse under RABC at Industrial

    Area, Harpur Alloth, Samastipur.

    4.17 4 21.12.09 11.07.11

    254 M/S Hamara Industries,Boring Road, Patna

    Proposal for establishment of 700MT per year capacity Glucose-DProcessing and Packaging unit fromDextrose Monohydrate (100% Maizeproduct) at Industrial Area, Giddha.

    2.55 50 21.12.09 27.02.11

    255 M/S Bansal Biscuits Pvt. Ltd,Kolkata(Amending the proposalapproved on 21.12.09 forestablishment of 12,600 MT

    per year capacity Biscuitsproduction unit at EPIP,Hajipur, approval has been

    given for manufacturing of36,000 MT per year capacityBiscuit manufacturing unit atEPIP, Hajipur on 26.05.11)

    Proposal for establishment of 36000MT per year capacity Biscuitproduction unit at EPIP, HajipurIndustrial Area.

    50.57 328 21.12.09

    26.05.11

    25.05.10

    256 M/S Shyam Agro Foods &Exports Pvt. Ltd, Muzaffarpur

    Establishment of 650 MT per yearcapacity Ultra Modern Fruit and VegetableProcessing unit at Industrial Area, Bela,Muzaffarpur.

    4.96 70 04.01.10 20.02.11

    257 M/S Raghunandan TeachersTraining College,Promoter-Baba EducationalTrust, Danapur, Patna.

    Establishment of B.Ed. TeachersTraining College at Mathiyapur(Kali

    Asthan), Danapur, Patna.

    1.00 30 04.01.10

    258 M/S Glatt Solutions Pvt. Ltd,Kolkata

    (Approval was given on11.01.10 in SIPB meeting forestablishment of 03 MW Gridconnected Solar PhotoVoltaic Power Project atMuzaffarpur/Purnea.

    Again on request of thecompany approval has beengiven for same project atNawada in place ofMuzaffarpur/Purnea in SIPBmeeting on 26.05.11)

    Establishment of 3 MW GridConnected Solar Photo Voltaic

    Power Project at Nawada

    57.00 22 11.01.10

    26.05.11

    259 M/S Gokul SericultureProduction and Training

    Centre, Gokul, Pilkhi,Muzaffarpur

    Establishment of Sericulture Production andTraining Centre at Gokul, Pilkhi,

    Muzaffarpur in the name of M/S GokulSericulture Production and Training Centreby M/S Maha Lakshmi Kripa Social andEducational Welfare Society, Muzaffarpur

    2.53 65 11.01.10

    260 M/S Abacus Holdings Pvt.Ltd, Kolkata.

    Establishment of 05-05 MW GridConnected Solar Photo VoltaicPower Project at Muzaffarpur, Gaya,Bhagalpur and Purnea.

    392.48 96 11.01.10

    261 M/S Adhunik Metaliks Ltd,Kolkata(Company's proposalapproved by SIPB on

    Establishment of 2.2 MT PA capacityIntegrated Steel Plant at Kahalgaon,Pirpainti Block, Bhagalpur.

    5668.29 2187 01.02.10

    03.05.10

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    25/52

    Report-3

    2501.02.10 for establishment of2.2 MTA Integrated SteelPlant at Industrial GrowthCentre, Bhagalpur has beenamended and consent hasbeen given for establishmentof 2.2 MTPA Integrated SteelPlant at Kahalgaon, PirpaintiBlock, Bhagalpur.)

    262 M/S Bhojpur Rice Mill Pvt.Ltd, Bhojpur

    Establishment of 9600 MT per yearcapacity Rice Mill at Baradparva,District.- Bhojpur

    1.54 30 01.02.10 06.04.10

    263 M/S Maa Durga Rice Mill,Madhubani.

    Establishment of 2400 MT per yearcapacity Rice Mill at Industrial Area,Pandaul, Madhubani.

    0.4731 7 01.02.10 08.06.10

    264 M/S Raj Agrochem ProductsPvt. Ltd, Muzaffarpur.

    Establishment of 45000 MT per yearcapacity Poultry Feed and CattleFeed Unit at Bochahan, Muzaffarpur.

    5.39 41 01.02.10 16.04.10

    265 M/S Maa Shitla Rice Mill Pvt.Ltd, Purnea.

    Establishment of 14,400 MT per yearcapacity Rice Mill at Growth Centre,Moranga, Purnea.

    1.206 26 01.02.10 06.01.11

    266 M/S Bihar Hotels Ltd, Patna.

    (Companys earlier proposalapproved by SIPB on01.02.10 for establishment ofBudget Hotel at Dehri-on-Sone has been amended andconsent has been given withcondition for establishment of2-Star Hotel at Dehri-on-Sone on 19.04.10)

    Establishment of 2-Star Hotel at

    Dehri-on-Sone.

    4.79 49 01.02.10

    19.04.10(Consentwithcondition)

    267 M/S Prakash Udyog, Patna. Establishment of 1200 Kiloliter FruitDrink, 12000 Kiloliter PackagedDrinking Water and 2400 KiloliterSoda Water Production Plant atIndustrial Area, Patliputra, Patna.

    2.52 25 01.02.10

    268 M/S UAL Industries Ltd,Kolkata.(Company's proposalapproved by SIPB on01.02.10 for establishment of1,20,000 MT per yearcapacity Asbestos Cementand corrugated Sheets Plantat Bakhtiyarpur has beenamended and consent hasbeen given for establishmentof 2,33,000 MT per yearcapacity Asbestos CementSheet, Corrugated SheetsPlant in two phases at

    Goraul, Vaishali in the nameof UAL-Bihar in SIPB meetingheld on 21.07.10)

    Establishment of 2,33,000 MT peryear capacity Asbestos CementSheet and Corrugated Sheets Plantin two phases at Goraul, Vaishali inthe name of UAL-Bihar

    54.67 210 01.02.10

    21.07.10

    269 M/S Oriental Group ofInstitutes, Bhopal

    Establishment of EngineeringCollege at Patna

    59.84 300 01.02.10(Consentwithcondition)

    270 M/S Shobhnath Rice Mill Pvt.Ltd, Bhabhua.

    Establishment of 2 MT per hourcapacity Rice Mill and 1000 MTcapacity Warehouse at Kulhariya,Kaimur, Dist.-Bhabhua.

    1.15 16 01.02.10 28.03.10

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    26/52

    Report-3

    26271 M/S G. C. Foods Pvt. Ltd,

    Muzaffarpur.Establishment of 960 MT per yearcapacity Puff and Fried Snacks Foodunit at Industrial Estate, Bela,Muzaffarpur.

    1.91 23 01.02.10

    272 M/S Satbhani Agro Pvt. Ltd,Aurangabad.

    Establishment of 10 MT per hourcapacity Modern Rice Mill, 4 MT perhour capacity Sortex and Packagingunit, 7000 MT capacity Warehouseand 1.2 MW Husk based Power

    Plant at Aurangabad.

    10.77 36 01.02.10

    273 M/S Kaimur Kohinur Rice MillPvt. Ltd, Kaimur.

    Establishment of 9600 MT per yearcapacity Rice Mill at Chand, Dist.-Kaimur.

    1.53 14 01.02.10 23.04.10

    274 M/S Shrawasthi AgrotechPvt. Ltd, Lucknow.

    Establishment of 4500 MT capacityPoultry Feed unit at Giddha GrowthCentre, Ara(Bhojpur).

    6.18 30 01.02.10 04.02.11

    275 M/S Milsha Agro Exports Pvt.Ltd, Kolkata.

    Establishment of 500 MT capacityMulti Purpose Cold Storage, 10 MTPre-cooling Room, 5 MT PulpProcessing Unit in Phase-1 and 1 MTIndividual Quick Freezer in Phase-2at Hajipur Industrial Estate.

    5.60 41 15.02.10

    276 M/S Badrinarayanji AgromillsPvt. Ltd, Sasaram. Establishment of 7 MT per hourcapacity Modern Rice Mill, 3000 MTcapacity Warehouse at Usrawan,Cochas, Rohtas.

    4.50 40 15.02.10 12.05.10

    277 M/S Keshri Cold StorageAgro Products andConstruction Pvt. Ltd,Rohtas.

    Establishment of 7000 MT (5000 MTPotato and 2000 MT Onion) capacityCold Storage, 2 MT per hour Potatosorting/grading line, 2 MT per hourcapacity Modern Rice Mill and 4000MT capacity Warehouse underR.A.B.C at Dhoudhad, Sasaram

    7.17 11 15.02.10 23.04.10

    278 M/S Gayatri Soya FoodProducts, Patna.

    Proposal for establishment ofProduction unit of 960 Liter per daycapacity Soya Milk and Paneer at

    Phulwarisharif, Patna

    0.51 17 15.02.10 02.12.11

    279 M/S Nilkanth Chawal MillsPvt. Ltd, Kolkata.(Approval was given forModernisation of the existingRice Mill with the capacity of10,692 MT per year atConch, Gaya.

    Again on request of thecompany, approval has beengiven for capacity expansionfrom 54 MT per day to 90 MT

    per day in the existing RiceMill at Conch, Gaya on26.05.11)

    Proposal for Modernisation of theexisting unit of Rice Mill of 10,692MT per year capacity at Ahiyapur,Konch, Gaya.

    Proposal for capacity expansion from54 MT per day to 90 MT per day inthe existing Rice Mill at Conch,Gaya.

    3.3634

    1.2047

    19

    19

    15.02.10

    26.05.11

    25.05.10

    280 M/S ComprehensiveConsultancy Pvt. Ltd,Kolkata.

    Establishment of 5 MT per hourcapacity Rice Mill, 3 MT per hourcapacity Sorting/ Packaging,Warehouse of 4500 MT and HuskProcessing Gasifier unit at Banka,Bhagalpur.

    6.10 14 22.02.10 23.07.10

    281 M/S Sita Flour Mills Pvt. Ltd,Darbhanga

    Proposal for capacity expansion ofexisting Flour Mill from 100 MT perhour to 200 MT per hour at DonarIndustrial Area, Darbhanga.

    1.45 7 22.02.10 04.02.11

    282 M/S Shivsagar Rice Mill Pvt.Ltd,

    Establishment of 14400 MT per yearcapacity Rice Mill at Deep Nagar,

    2.05 33 22.02.10 08.06.10

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    27/52

    Report-3

    27Nalanda Maniyama Road, Nalanda.

    283 M/S Champaran Agricon Pvt.Ltd,East Champaran (Motihari)

    Establishment of 64 MT per daycapacity Rice Mill at Chandrahiya,Motihari.

    2.29 45 22.02.10

    284 M/S Auto Matrix Pvt. Ltd,Patna.

    Proposal for capacity expansion andModernization of existing unit ofService Centre and Auto Parts atPatliputra Industrial Estate.

    2.76 22 08.03.10(Consentwithcondition)

    285 M/S Kumar Tech BioProducts Pvt. Ltd, Bangalore.(Companys proposal forestablishment of 30 MW RiceHusk based Power Plant atBodh Gaya, Gaya which wasapproved in SIPB meeting on8.03.10, has been amendedand approval has been givenfor same project at KizarsaraiRoad, Gaya in SIPB meetingheld on 29.11.10)

    Establishment of 30 MW Rice Huskbased Power Plant at KizarsaraiRoad, Gaya.

    306.00 300 08.03.10(Consentwithcondition)

    29.11.10(Consentwithcondition)

    20.12.11

    286 M/S Leela Anand Fertilizer &Chemicals Pvt. Ltd, Patna

    Establishment of 60,000 MT peryear capacity N.P.K. Fertilizer unit at

    Ahiyapur, Turki, Muzaffarpur.

    7.90 67 08.03.10

    287 M/S Gokul Steels Pvt. Ltd,Patna.

    Establishment of Steel Re-rolling Millfor production of 28,800 MT per yearcapacity Steel Bar and Rod atKhusrupur, Patna.

    9.20 46 08.03.10

    288 M/S Shree Vishnu VishalPaper Mills Pvt. Ltd, Patna

    Establishment of 33,000 MT per yearcapacity Craft Paper and PaperBoard and 3 MW Captive PowerPlant at Industrial Area GrowthCentre, Giddha

    32.11 182 08.03.10

    289 M/S Amrapali Biotech IndiaPvt. Ltd, Gaziabad, U.P.(Company's proposalapproved by SIPB on

    08.03.10 for establishment of2779 MT per year capacityPickles and Corn Flakes unitat Industrial Area, Bela,Muzaffarpur has beenamended and consent hasbeen given for establishmentof 8825 MT per year capacityTomato Ketchup, Pickles,Jam and Jelly and CornFlakes unit at Chabilapur,Rajgir in SIPB meeting heldon 21.07.10)

    Establishment of 8825 MT per yearcapacity Tomato Ketchup, Pickles,Jam and Jelly and Corn Flakes unitat Chabilapur, Rajgir

    17.37 119 08.03.10

    21.07.10

    04.02.11

    290 M/S Amrit Cement Pvt. Ltd,Kolkata.

    Establishment of Cement Grindingunit of 6.60 Lakh MT per year

    capacity at Kahalgaon, Bhagalpur.

    111.28 140 08.03.10

    291 M/S Natraj Agro and HerbsPvt. Ltd, Nawada

    Establishment of 4 MT per hour capacityModern Rice Mill and 1200 MT Warehouse atKonchgaon, Warsaliganj, Nawada.

    1.48 20 08.03.10(Consentwithcondition)

    25.05.10

    292 M/S Binod ColdStorage Pvt.Ltd, Begusarai

    Establishment of 7000 MT capacityCold Storage, Sorting/Grading ofPotato and Agri Input Store underR.A.B.C. at Tilrath Devnath Industrial

    Area, Barauni, Begusarai.

    5.48 20 08.03.10(Consentwithcondition)

    06.01.11

    293 M/S Rozy Food ProcessingPvt. Ltd, Begusarai

    Proposal for capacity expansion ofexisting production unit of Spice

    0.9423 15 08.03.10(Consent

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    28/52

    Report-3

    28Powder from 500 Kg per day to 1500Kg per day at Tilrath Industrial Area,Barauni, Begusarai.

    withcondition)

    294 M/S Sri Moti Pvt. Ltd.,Chapra

    Proposal for establishment of 6500MT capacity Cold Storage, 2 MT perhour Potato Grading Line, WeighingLine-1, 500 MT Agri Input Godownand 600 MT capacity Warehouse unitunder R.A.B.C at Khalpura,

    Motinagar, Chapra.

    5.61 20 23.03.10

    295 M/S Uttri Bihar Milk FoodCompany Pvt. Ltd.,Begusarai(Amending the earlier proposalapproved in SIPB meeting on23.03.10 for the production of30,140 MT per year capacityPasteurized Milk, Chhena, Curd,Paneer, Milk Cake and Khoa atIndustrial Area, Begusarai,approval has been given for the

    production of 30,000 MT capacityPasteurized Milk, Chhena, Curd,

    Paneer, Milk Cake and Khoa atAjnul, Dalsingsarai, Samastipuron 26.05.11)

    Proposal for production of 30,000 MTcapacity Pasteurized Milk, Chhena,Curd, Paneer, Milk Cake and Khoa at

    Ajnul, Dalsingsarai, Samastipur.

    1.0918 102 23.03.10

    26.05.11

    16.08.11

    296 M/S Ambo Exports Ltd,Kolkata

    Proposal for establishment of 35 MT perday capacity Biscuit production unit atKahalgaon Industrial Area, Bhagalpur.

    17.50 204 23.03.10

    297 M/S Yashoda EnterprisesPvt. Ltd, Fatuha, Patna.

    Proposal for establishment of 3000 Litersper hour capacity Packaged Drinking Waterunit at Fatuha Industrial Area, Patna.

    1.00 24 23.03.10(Consentwithcondition)

    298 M/S Maa Mundeshwari AgroMills Pvt. Ltd., Aurangabad.

    Proposal for establishment of 4 MTper hour capacity Modern Rice Milland 1000 MT Warehouse at GrowthCentre, Aurangabad.

    2.59 30 23.03.10 02.01.12

    299 M/S Hindustan Coca-ColaBeverages Pvt. Ltd., Haryana

    Proposal for establishment of CocaCola Green Field Project for theproduction of Aerated Drinks, SoftDrinks, other Non-alcoholic Beverage,Fruit Juice/ Fruit Based Drinks andPackaged Drinking Water at Industrial

    Area, Bihta, Patna.

    100.00 100 23.03.10(Consentwithcondition)

    300 M/S Mega Rice Mill Pvt. Ltd,Jehanabad

    Proposal for establishment of 3 MTper hour capacity Rice Mill at Algana,Jehanabad.

    1.17 10 23.03.10 02.01.12

    301 M/S Rainbow Products Pvt.Ltd, Patna.(Companys proposal approvedby SIPB on 19.04.10 for

    establishment of 28,800 MT peryear capacity Rice Mill at MahuliRoad, Karmalichak, Patna City,Patna has been amended andconsent has been given forestablishment of 14,400 MT peryear capacity Rice Mill at thesame place.)

    Proposal for establishment of 14,400MT per year Capacity Rice Mill Unitat Mahuli Road, Karmalichak, PatnaCity.

    3.11 23 19.04.10

    27.08.10

    04.02.11

    302 M/S Gulshan Polyols Ltd,Delhi

    Proposal for establishment of MaizeProcessing unit for the production ofSorbitol-10,000 MT per year,Dextrose Monohydrate - 20,000 MT

    427.00 250 19.04.10

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    29/52

    Report-3

    29per year, Fructose Powder- 5,000MT per year, Liquid Glucose- 30,000MT per year and Lysine- 30,000 MTper year capacity from Maize atBegusarai.

    303 M/S Aditya Food Products,Ara(Bhojpur)

    Proposal for establishment of 21,600MT per year capacity Flour Mill inpartnership at Giddha, Ara.

    1.43 36 19.04.10

    304 M/S Harinagar Sugar MillsLtd, Harinagar.

    Proposal for establishment of 14.5MW new Power Project at Bagaha,Harinagar.

    77.50 29 19.04.10(Consent withcondition)

    10.04.11

    305 M/S Terai Ispat Ltd, Siliguri. Proposal for establishment of twoInduction Furnace of 15 MT,(SteelMelting Shop 1,05,000 MT per year)99684 MT per year capacity Re-rollingMill and 12 MW Captive Power Plant atBanka

    149.88 697 19.04.10(Consentwithcondition)

    306 M/S Durga Agronomy Pvt.Ltd, Darbhanga.

    Proposal for establishment of 8 MTper hour capacity Rice Mill and 2000MT capacity Warehouse at DonarIndustrial Area, Darbhanga.

    3.87 30 19.04.10

    307 M/S Shree Shyam Kutir

    Udyog, Muzaffarpur.

    Proposal for establishment of 480

    MT per year capacity Spice Powderand Besan Udyog at IndustrialEstate, Bela, Muzaffarpur inproprietorship.

    0.3273 15 19.04.10

    308 M/S Kunwar Apiary Pvt. Ltd,Gaya.

    Proposal for establishment of 10 MTper day capacity Honey Processingunit at Janakpur, Buniyadganj.

    1.41 20 19.04.10 06.01.11

    309 M/S Shiv Shakti Agriproductsand Rice Industries Pvt. Ltd,East Champaran.

    Proposal for establishment of 05 MTper hour capacity Modern Rice Mill atGamaharia, Raxaul.

    2.81 52 19.04.10 21.12.10

    310 M/S Kumar Industries,Darbhanga

    Proposal for establishment of 150MT per year capacity NoodleProduction unit at Industrial Area,Bela, Darbhanga in proprietorship.

    0.1681 10 19.04.10

    311 M/S Moti Babu Institute ofTechnology, New Delhi.

    Proposal for establishment ofEngineering College at Forbesganj,

    Araria.

    14.66 65 19.04.10(Consent withcondition)

    312 M/S Ambe KamakhyaAgronomy Pvt. Ltd,Begusarai

    Proposal for establishment of 5000MT per year capacity Cold Storageunder Rural Agri Business Centre atBakhri Bazar, Begusarai.

    3.91 20 19.04.10(Consentwithcondition)

    06.01.11

    313 M/S Britannia Industries Ltd,Bangalore(Karnataka)

    Proposal for establishment of 50,000MT per year capacity Bakery Productand production of Biscuit at E.P.I.P.,Hajipur.

    55.00 330 19.04.10 27.02.11

    314 M/S Hyderabad IndustriesLtd, Hyderabad.

    Proposal for establishment of 2,50,000MT per year capacity Asbestos Cement

    Sheeting Plant in two Phases atKumarbagh Industrial Area, WestChamparan.

    80.00 600 19.04.10

    315 M/S Sonamoti Agrotech Pvt.Ltd, Patna.(Earlier, in the SIPB meetingheld on 03.05.10 consentwas given for establishmentof 28,800 MT per yearcapacity Rice Mill atKarmalichak, Patna City.

    Again on request ofcompany, amending the

    Proposal for establishment of 62592MT per year capacity Modern RiceMill in place of 28,800 MT per yearcapacity at, Karmalichak, Patna City.Patna.

    22.4394 103 03.05.10

    28.09.11

    04.02.11

  • 7/28/2019 approved-bihar-govt-proposals-for-setting-up-industries.pdf

    30/52

    Report-3

    30above proposal consent hasbeen given for establishmentof 62592 MT per yearcapacity Modern Rice Mill in

    place of 28,800 MT per yearcapacity in SIPB meetingheld on 28.09.11)

    316 M/S Creation AgroProcessing Industries,

    Bhagalpur.

    Proposal for establishment of 1500MT per year capacity Chura(Pressed

    Rice) Mill at Barari Industrial Area,Bhagalpur in proprietorship.

    0.46 12 03.05.10

    317 M/S Radhika Flour Mills Pvt.Ltd, Patna.

    Proposal for establishment of 36,000MT capacity Flour Mill for productionof Maida, Atta, Suzi and Chokar atSikandarpur, Bihta.

    5.84 55 03.05.10 10.04.11

    318 M/S Khilani Agro Foods Pvt.Ltd, Hajipur.

    Proposal for establishment of 12.73Crore pieces per year capacityPreform Pet Bottle's unit at E.P.I.P.Hajipur.

    15.77 25 03.05.10

    319 M/S Jaya Nutritions Pvt. Ltd,Deedarganj Patna City.

    Proposa


Recommended