Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie Freudenstein (diplom) C. Menge, Th. Punz (students) + N.N. Irradiation Wim de Boer Alexander Dierlamm (PhD) Alexander Furgeri (PhD) Bonding & test center Hans Jürgen Simonis Tobias Barvich (techn.) 50% Pia Steck (techn.) NN Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD) Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom) B. Atz (techn.) Group leader: Th. Müller Technical coordinator: P. Blüm Integration & long-term test Stefan Heier (PhD) Valery Zhukov Tobias Barvich (techn.) 50% NNs
Transcript

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 1

Organigram of the CMS hardware group in Karlsruhe

Sensor quality test

Frank HartmannStefanie Freudenstein (diplom)C. Menge, Th. Punz (students) + N.N.

Irradiation Wim de BoerAlexander Dierlamm (PhD) Alexander Furgeri (PhD)

Bonding & test center

Hans Jürgen SimonisTobias Barvich (techn.) 50%Pia Steck (techn.)

NN

Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD)Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom)B. Atz (techn.)

Group leader: Th. Müller

Technical coordinator: P. Blüm

Integration & long-term test

Stefan Heier (PhD)Valery ZhukovTobias Barvich (techn.) 50%NNs

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 2

1) Readiness of the testing rooms and storage spaces

• Testing & Storage for QTC & IQC: ready!• Bonding & Testing space: ready!• Storage module:

• Space assigned -- Cabinets ordered in workshop

• Space for pre-prod (~50 modules) ready!• Testing & Storage for petals:

• for pre-prod (ready when needed)

• for production: available summer-fall (staged)

Assembly & Testing & Storage in new hall!

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 3

Operations layout at Karlsruhe

Quality test center

Visual inspectionLAB 010

ProbingLAB 326

IrradiationCyclotron, LAB 325/6

Logistic center

Bonding & test center

Integration center

~6000 sensors

5 %

1600 modules

Bonding qualified & operationalTest station operationalX-check in progress(already done with Ac in ex-line 1)

Fast testLAB 013

DiagnosticLAB 316

Bonding repairLAB 013

storage

Longterm test(Petal)

Repair

modules for 50 petals

Clean room (~30m2) tender

(to be ready Nov 2003)

qualified & operationalIrradiation restart April(hopefully)

5 % (present 100%)Hall 245

Integration on petal

1 %

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 4

2.) Readiness of Readout I (ARC)

• Aachen LED array and high voltage card ordered for full cross calibration with KA (FED-based) readout systems.

Purpose: reception and testing of hybrids!

• hyb tested: 2• reprod: fine• x-calib: waiting for calib. module • Db integration: yes• LED: Ac LEDs ordered for x-calib• software ver: 6.0b

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 5

2.) Readiness of Readout II FASTTEST (FED-based)

Purpose: fast testing after bondingmodules tested: ~15 modules tested

(prototype, expressline 1, expressline 2) reprod: fineX-calib I: see aboveX-calib II: Officially waiting for calib. module Db integration: Done, … to be commissionedLED: 4 LED arrays includedCooling: active cooling with Peltiers

possible LED readout at -10°Cpossible cosmics calibration

Fasttest IIFasttest II

Bonder

• ESD• Facemask

Already moved to final area (bonding lab)!

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 7Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 1

2/3.) Readiness of Readout III Diagnose (FED-based)

Purpose: diagnostics of faulty modules

modules tested: ~5 modules tested (prototype, expressline 1, expressline 2)

reprod, X-calib I, X-calib II, Db integration: same state as fasttest (II)LED array: (1050nm and 950nm)Movable LASER:for single strip/pitch

scans (1050/650 nm)• possibility to set probe needles,• tests with a 90Sr source• cosmics• high resolution IV• possibility to introduce CV.

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 8

2/3.) Readiness of Readout DAQ CMS-System

Purpose: Module testing

• development towards petal readout systemmodules tested: ~1 module tested reprod: fineX-calib: Not yetDb integration: YES

software ver: Lt_v.82 installed and tested with Db for one 'old' module. Update to v.90 and x-calibration is foreseen

(responsibility of V. Zhukov)

This setup will be finally used for the petal assembly!We need another one for the petal longterm testing!

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 9

4) Readiness of the LT single module set-up!

• We have NO dedicated SINGLE LT teststation!

• KA LT Plan! Use of the Fastteststation (II) with active cooling!– 1/ day: last bonded module for LT over night

– 1/week: last bonded module for LT over weekend

• 4.1) General comments on software! Fastteststation soft

• 4.2) is the LT single module set-up commissioned? FASTTEST YES

• 4.3) number of hour of running for the longest run performed 20h

• 4.4) list of missing equipment to enter into production! Ready

• 4.5) Are results obtained with ARC and LT in your lab in agreement?– Basically YES,

– final x-calibration still to be done!

• The final production LT will be done on petal basis.

Stability: Stability: Calibrated with cosmicsCalibrated with cosmics

HITMAP:

~ 20 hours run (7000 events @ 0.1 Hz)

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 11

Add. Comments on Cross CalibrationARCS <=> Karlsruhe (for all stations!)

• Several modules tested in Aachen and Karlsruhe.• Full comparison with TEC Expressline I, already presented in several

prior meetings (and partially by analysing Expressline II modules) • Many basic and analysis results already shown in several meetings!

1. pinhole tests, basic defect analysis2. TEC Expressline I & II3. single shot test beam4. Test of irradiated hybrids --- modules forseen ( active cooling)5. Ongoing scratch and high leakage current tests6. Starting of bond tests in high magnetic field @4T

KarlsruheAachen

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 12

Add. NEEDS for petal assembly and petal LT

• 1 FED

• 1 FEC

• 7+1 OEC

• LV (ordered), HV, LLN cooling plant (ordered)

• actual need for prototype petal: – 4 optical hybrids + 1 OEC (already in house, but requested for X5)

– Optical cables

– Interconnectboard inc. CCUM

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 13

A sse m b ly in K arls ru h e :

R eo rg an isa tio n w ith in th e F o rsch u n g szen tru m --> n ew lab o ra to ry -a rea in a d iffe ren t h a ll

-- ~ 3 0 m ^2 c lean ro o m fo r p e ta l-in teg ra tio n (c la ss 1 0 0 0 0 0 ) av a ilab le ju ly 2 0 0 3

-- b ig ten t (6 m x 9 m ) as a g rey ro o m fo r th e en d cap -a ssem b ly (av a ilab le au tu m n 2 0 0 3 )

In th e m ean tim e th e co m p o n en ts fo r p e ta l in teg ra tio n a re co m p iledin a n o rm al lab in o u r s tan d a rd b u ild in g .

Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 14

New Hall


Recommended