+ All Categories
Home > Documents > Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT...

Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT...

Date post: 27-Dec-2015
Category:
Upload: johnathan-reynolds
View: 221 times
Download: 6 times
Share this document with a friend
Popular Tags:
18
Apr 17-22, 2006 1 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team
Transcript
Page 1: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 20061SOT17 @ NAOJ

SOT Initial Operation in Commissioning Phase

Y. Katsukawa (NAOJ)SOT team

Page 2: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 2

SOT initial operation overview

Y+

I Spacecraft verification and checkout phase

7-20 Before installation to the nominal orbit FPP on, initial status check CCD decontamination

II SOT instrument checkout phase (1) Instrument verification

21-29 (TBD) Before OTA top door opening Basic function check Obtain dark images

III SOT instrument checkout phase (2) First light phase

30-45 (TBD) After OTA top door opening Optical performance checkout Correlation tracker In-flight calibration

IV Performance verification phase 46- 60 (TBD)

Run all the kinds of observables with combination In-flight calibration (continued)

V Initial Science Phase for SOT core team

60d – 6months

Used for dedicated scientific purpose In-flight calibration (continued)

Page 3: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 3

(I) Spacecraft verification and checkout phase

Period: Launch Y+20 Orbit control maneuvers are carried out several

times to install the S/C to the sun-synchronous orbit.

Check-out of S/C attitude control system is also performed during this period.

NoEvent Perigee

(km)Apogee

(km)Inclination

()Date

0 Launch 243.6 590.1 97.79

1 Test maneuver 253.3 590.1 97.79 Y+3

2Perigee-up maneuver #1

441.7 590.1 97.79Y+6

3Perigee-up maneuver #2

630.0 590.1 97.79Y+11

4Perigee-up maneuver #3

630.0 630.0 97.79Y+14

5Out-of-plane maneuver #1

630.0 630.0 97.80Y+17

6 Final orbit control Y+20

Page 4: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 4

(I) Spacecraft verification and checkout phase

Y+3 Y+6

TEST Maneuver ⊿a #0

⊿a #1

⊿a #2

⊿a #3

⊿i ⊿final

RSA MSA

GAS STT

Y+11 Y+14 Y+17 Y+20

Attitude Mode

A.D. Sensor

(around Z axis)

Complete of orbit control

Launch

Final Adjustment of inclination

⊿hp≒ 10km

⊿hp≒ 188km

⊿hp≒ 188km

⊿ha≒ 40km

Y+days

Page 5: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 5

(I) Spacecraft verification and checkout phase

After a#1 (Y+6), the altitude of S/C becomes high enough, and the attitude of S/C is controlled by MWs.

During the period between Y+7 and Y+20, we plan to do initial status check (temperatures) and CCD heater operation.

Primary objective is to decontaminate the CCDs.

a#2

a#3

MDP and FPP ON

FPP and MDP OFF

CCD decontamination heater ON

CCD decontamination heater OFF

3days 1.5 days

Page 6: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 6

(II) SOT instrument checkout phase (1)

Period: Y+21 Y+28 (TBD) (1 week)From the installation to the sun-synchronous polar orbitTo opening the SOT top door

The primary objectives are (1) decontamination of M1, M2, and HDM, and (2) initial functional checkout without sunlight into the telescope.

The test items of this phases are the following– Verify function of operational heaters for OTA and FPP– Open the telescope side door – Decontamination of M1, M2, and HDM– Verify function of mechanisms (shutters, filter wheels etc.)– FG, SP, and CT image acquisition– Automatic observation by MDP table control

Obtaining dark images is also important items especially for SP because there is no shutter in the SP optical path.

Page 7: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 7

(II) SOT instrument checkout phase (1)

Y+ OTA / CTM FPP

20 CTM ON, check OTA heaters

21 OTA side-door openingDecontamination heaters ON

FPP ON / operational heaters ON

22 CCD heaters ON / Cameras ON

23 PMU ON / Mechanisms check

24 Tip-tilt mirror ON / PZT voltage test

Checkout FG table observations

25 Checkout SP table observations

26 Dark images

27 Dark images / Camera noise

28 Dark images

29 Preparation for door operation Verify obs. table for door operation

30 OTA top-door openingDecontami heaters OFFOperational heaters ON

Page 8: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 8

(II) SOT instrument checkout phase (1)

Obtaining dark images– Obtain the images with some camera setting (gain, amplifier)– Orbital variation, temperature dependence– Effect of cosmic radiation on the images

All the data taken during this period is to be down-linked at the Uchinoura station (USC).

Some of them will be down-linked at the Svalvard station (SVA) in order to test data transfer system from SVA to Japan.

Page 9: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 9

(III) SOT instrument checkout phase (2)

Period: Y+30 Y+45 (TBD) (2 weeks)First light phase after the telescope door is opened

The primary purpose of this period is verification of optical performance– Alignment with respect to sun-sensor, XRT, and EIS– Image quality and focus stability– Correlation tracker performance– Function of FG and SP observables, etc.

In-flight calibration of the instruments– Darks and flat fields– Polarization– TF wavelength tuning etc.

Page 10: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 10

(III) SOT instrument checkout phase (2)

Y+

S/C major event FG SP CT

30 OTA top-door opening

Initial optical checkCoarse focus scan

Initial optical checkCoarse focus scan

Initial optical checkCoarse focus scan

31 XRT door opening (background obs) (background obs) (CT jitter data)

32 EIS clamshell opening

(background obs) (background obs) (CT jitter data)

33 Update pointing offsets

(background obs) (background obs) CT servo-on /off

34 (background obs) (background obs) CT servo-on(ready for running)

35 Tracking start(around DC)

Fine focus scan(adjust focus)

Fine focus scan(adjust focus)

Fine focus scan

36 (Flat fields)Continuous obs

(Flat fields)Continuous obs

37 TF wavelength scan(adjust tuning)

(background obs)

38 TF wavelength scan

(background obs) CT wedge check

39 NFI observables (background obs)

Page 11: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 11

(III) SOT instrument checkout phase (2)

Y+

S/C major event

FG SP CT

40 Pointing to limb Image quality stability

Image quality stability

CT wedge check

41 Limb optic check Limb optic check

42 TF wavelength scan

(background obs)

43 NFI observables (background obs)44 Go back to DC Image quality

stabilityImage quality stability

45 NFI observables (background obs)

Page 12: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 12

(1) Top-door opening / Initial optical check

One of the most critical event in the initial operation Make the satellite pointing to the disk center Light level is continuously monitored by CT live images when the

door opening operation.

After the top-door is successfully opened, we plan to switch observation tables to carry out the initial optical checkout.– Light level check for FG (all the wavelengths), SP, and CT– SP 6301.5/6302.5 spectrum line positions and profiles– Alignment check to the sun-sensor (chromospheric features may pro

vide pointing information even in QS)

Quick focus scan and adjustment are planned to be done in real-time operation half a day after the door operation.

Page 13: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 13

(2) Background observations during the operation of the other telescopes

SOT commanding operation cannot be done during the door opening operation of the other telescopes.

We plan to run some observation tables in background with low cadence in order to verify the following items.– Data transfer from Svalvard station– Image compression efficiency– Dark images, flat fielding (by averaging many images)– Camera noise (light transfer measurement)– Alignment with respect to XRT and EIS– CT diagnostic data to get S/C jitter information– SP full FOV scanning (to check vignetting and alignment)

BFI observations (e.g. G-band) with shorter exposure can be possibly carried out without correlation tracker. Such observations with longer duration may provide information on orbital variation of image quality.

Page 14: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 14

(3) Correlation tracker servo-on / Detailed verification of optical performance

After CT servo is turned on, we can go to detailed verification and calibration of optical performance.

Fine focus scan– Image quality evaluation– Co-focus among different channels– Adjust focus position if necessary

Continuous observations for several hours with a few wavelengths– Orbital variation of image quality– Inter-channel alignment– Image quality degradation by disturbance from FPP, XRT

and EIS Flat fielding

– Flat fielding by intentionally move the tip-tilt mirror Tunable filter (TF) wavelength scan/ NFI observables

– TF spectroscopic performance– Update tuning parameters if necessary– Verification of MDP Doppler velocity compensation

Page 15: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 15

(4) Limb observation

After optical performance verification is done near the disk center, we like to go to limb observation.

The verification items in the limb observation are – S/C pointing check– Image quality and focus change between DC obs and limb ob

s– Scattered light– TF wavelength tuning, MDP Doppler compensation– Function of the correlation tracker in limb obs.

Page 16: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 16

Pointing and target selection in the first light phase

We have to know misalignment with respect to the sun sensor (ACS), XRT, and EIS as fast as possible for the secure operation.

After the satellite pointing is established, we like to track a suitable active region near the disk center if we have for verification of the optical performance (as well as scientific interest).

When the verification near the disk center is done, the limb observation is necessary to verify performance of SOT at the limb. We may go to the limb observation automatically by tracking an active region in the first light phase.

After the limb observation, we can make SOT pointing to any region.

Page 17: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 17

(IV) Performance verification (PV) phase

Period: Y+46 Y+60 (TBD) (2 weeks)After the first light phase

The primary purpose in this phase is verification of scientific performance of the SOT observables

Background:– SOT has a capability to observe various scientific targets.– Wavelength coverage

BFI 6 channels, NFI 6 channels, and SP 6302A– Many types of observables

Single image, LOS magnetograms, Stokes IQUV, and Dopplergrams– Temporal and spatial sampling

Knowledge obtained in this phase shall be used for following scientific operation.

Page 18: Apr 17-22, 20061 SOT17 @ NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.

Apr 17-22, 2006 SOT17 @ NAOJ 18

(IV) Performance verification (PV) phase

Phase-I– At first, we verify performance of high-priority

observables with a typical wavelength to verify basic scientific performance of SOT

– Only one observable or simple combination are used for long duration (several hours half a day).

– SP observations can be carried out simultaneous with FG.

Phase-II– After the verification of each observable is completed,

we make combined observations with multiple wavelengths and observables.

– SP observations can be carried out simultaneous with FG.


Recommended