+ All Categories
Home > Documents > April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated...

April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated...

Date post: 13-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
66
April 17, 2012
Transcript
Page 1: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

April 17, 2012

Page 2: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

BID Boundaries

• I-395

• Anacostia River

• 15th St, SE

• S. Capitol St.

• Section of Buzzards

Point

Page 3: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• 20 mile riverwalk trail

• Nearly 500 acres

• 36+ million total SF

• 2 miles of riverfront

• 3 new parks (12.5 acres)

Page 4: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 5: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• BRAC decision consolidates space to Navy Yard (1995)

• Downtown DC approaching build-out (1997 – 2011)

• HOPE VI Capper Carrollsburg Grant & USDOT Site Selection (2001)

• Anacostia Waterfront Initiative Framework Plan (2003)

• Forest City selected to redevelop 42 Federal acres (2004)

• Baseball returns to DC & new stadium site selected in Capitol Riverfront

(2005)

• New U.S. Dept. of Trans. HQ opens adding 6,750 employees (2007)

• Nationals Park opens (2008)

• New residential towers & townhomes establish urban neighborhood and

(2008 – 2011)

• 75,000 SF of retail leases signed including 50,000 SF Harris Teeter (2011)

Page 6: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 7: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 8: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• New era of access to the river in DC

• 2 miles of riverfront frontage with docks and future marina

• “Green” neighborhood with 4 parks and part of 20 mile riverwalk trail

• One of six places to live, work, play on the water in the DC region

Page 9: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Regional transportation accessibility

• Three Metro subway lines - Green, Orange & Blue

• Two interstate freeways – I-295 & I-395

• Circulator Bus to Union Station and Red Line

• Water taxi service, charter boats and commercial ferries

• 10 – 15 min. cab ride to Reagan Airport

• Proximity to US Capitol, Downtown, and Capitol Hill Residential

• Access to Nationals Park, Arena Stage, restaurants and entertainment

Page 10: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 11: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• Riverfront destination

• Business center

• Urban neighborhood

• Neighborhood support retail

• High quality public realm

• Parks & gathering spaces

• Entertainment district

• Identity, place & historic fabric

• Urban walkability – 5 minute neighborhood,

existing walk score of ~80 – very walkable

Page 12: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 13: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Estimated

Delivery Office Sq. Ft. Retail Sq. Ft. Res. Units Hotel Rooms Total Sq. Ft. Est. Total Cost

Completed 6,888,040 182,129 2,677 204 11,225,493 $2.6 billion Under

Construction 362,000 154,500 584 0 1,171,500 $644 million

Planned 8,148,130 645,487 5,871 921 24,329,935* $5.9 billion

Totals 15,398,170 982,116 9,132 1,125 36,726,928* $9.1 billion

Source: Capitol Riverfront BID 4Q/YE 2011

•Total sq. ft. numbers include the allowed zoning by right on lots where a

building program has not yet been determined

Page 14: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

3,261 Existing/under cons. residential units, 90+% occupied (3,500+ residents,

31,906+ within 1 mile)

Navy Yard 16,000 Employees

Capitol Hill Residential

7.2 million total SF existing/under cons. office space, (35,000+ daytime population)

US DOT HQ

2 million visitors

Forest City’s The Yards

Page 15: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 16: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 17: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• 3,500+ = total estimated Capitol Riverfront population

• 90+% of existing 2,677 TOTAL units are occupied

• 31,906+ live within 1 mile of 3rd and M Street

• Forest City Foundry Lofts, 170 now over 80% leased

• Capitol Quarter Townhomes Phase II nearing completion

• Camden South Capitol 276-unit apt, under construction

• 1212 4th Street w/Harris Teeter under construction

*Capitol Riverfront BID 4Q/YE 2011

Page 18: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• 163 townhomes in phase II – construction nears completion,

100% sold out – completion in 3Q-4Q 2012

= Phase I - completed

= Phase II – completed

and under construction

Page 19: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• William C. Smith is planning 430 units targeted to

begin construction in 3Q of 2012

Page 20: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• SQ 882 Multifamily – 189 loft apartments by

DCHA/Urban Atlantic – targeting groundbreaking

by end of year – will include market rate and

affordable units – 600 block of L Street, SE

Page 21: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 22: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• 35,000+ = daytime population

• 1,200-1,400+ additional employees in 2012

• 6.9 million total SF (Private & Gov. owned)

• 362,000 SF under construction

• 16.6% = 1Q 12 private market vacancy rate*

• $45.22 = 1Q 12 avg. Class A full service asking rental rate*

• Since 2001, the CR BID has averaged 200,000 SF of office absorption per year (this does NOT include the USDOT HQ)

*CoStar, CB Richard Ellis

Page 23: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• 200 I Street – renovation nearing completion.

350,000 SF & on schedule for tenant occupancy in

summer 2012 bringing 1,200 – 1,400 new

employees

Page 24: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 25: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• Justin’s Café serving pizza, salads, sandwiches + full bar

• Cornercopia Market + Deli offers gourmet sandwiches and a small market.

• Potbelly Sandwich Works & Lot 38 Espresso Bar NOW OPEN

• Five Guys, Starbucks, Chicken Tortilla, Subway, Quiznos and other fast casual

• Harry’s Reserve open in 909 New Jersey Avenue, SE

• Barracks Row restaurant explosion Ted’s Bulletin, Cava, Matchbox, 30+ total

• CVS Pharmacy, Congressional Cleaners, and three banks

• 9 new restaurants, second cleaners and Bank of America in next 12 months

• Harris Teeter in 4Q ’13 – 1Q ’14

• 75,000 SF of retail leases signed in 2011(25,000 SF of restaurants)

Page 26: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Opening in 1Q-2Q 2012

• Lot 38 Espresso Bar

• Potbelly

• Kruba Thai & Sushi

Opening in fall 2012

• Huey’s 24/7 Diner

Opening in Summer 2012

• Park Tavern at Canal Park

Opening in 4Q 2012

• Brewery/restaurant by Neighborhood Restaurant Group

• Buzz Bakery & Lounge

• Willie’s Brew & Que

Opening in 2013

• Osteria Morini

Opening in 4Q 2013 – 1Q 2014

• Harris Teeter grocery store

Page 27: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 28: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Canal Park fall 2012

The Yards Riverfront Park

OPEN

The Riverwalk Trail

OPEN

Diamond Teague Park & Piers

OPEN

VA Ave. Park

OPEN

Riverwalk Connection

OPEN

Page 29: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 30: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 31: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 32: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 33: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 34: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 35: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 37: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 38: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 39: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 40: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

Co

urt

ya

rd

Ma

rrio

tt

M S

treet

DOT HQ

(6,750 Employees) Capitol Hill

Tower

Future

Residential

Future

Residential

Future

Residential

Future

Residential

and office

1100 NJ

Avenue

2nd Place

3rd Street

Capitol Quarter

PH II delivering

2011 through 2012

323 homes total

I S

tree

t

200 I Street

DC Government

1,200 – 1,400 new

employees Summer 2012

Page 41: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 42: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 43: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+
Page 44: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 45: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Monument & Akridge Half Street

Forest City’s The Yards

• 645,000 SF office

• 620 residential units

• 105,000 SF retail

• 200-room boutique hotel w/ bar

• Urban Marketplace in Akridge’s The Via

• Pedestrian gateway to the new ballpark

• 42 acre site fronting on the river

• 1.8M+ SF office

• 2,800+ residential units – 400 in ‘11 – ‘14

• 400,000 SF retail - 170K in ‘11 – ‘14

• Use of several historic Navy Yard

buildings in projects

• 5 acre riverfront park NOW OPEN

Page 46: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

= Foundry Lofts

Page 47: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

170 Loft Apartments

10,000 SF ground floor retail

Completed in November 2011

Now over 80% leased

Page 48: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

= Boilermaker Building

Page 49: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

45,500 SF of restaurant, retail, & office space

Delivery in 4Q 2012

(microbrewery and restaurant)

Page 50: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

= Lumber shed

Page 51: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 52: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Osteria Morini by award winning Chef Michael White

Forest City Washington offices on second floor

Construction targeted to commence in May/June

Page 53: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

= 1212 4th Street

Page 54: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

225 residential units

110,000 retail SF (50,000 SF Harris Teeter Grocery Store, 30,000 SF Health Club)

Under Construction w/delivery in 4Q 2013 – 1Q 2014

Page 55: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Existing 275,000 SF office

building (85+% leased)

Planned 196 room hotel

Planned 320 residential units

Page 56: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

370,000 SF of office

55,000 SF of retail

280 residential units

Page 57: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 58: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 59: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

• 545,000 SF of office

• 80,000 SF of retail

• 275 Residential Units

• 325 Hotel Rooms - Existing approved PUD

Florida Rock has entered into a J/V with MRP Realty

for phase I and likely phase II

Proposed change switches phase I from office to a 200

unit apartment building

Targeting 2013 for phase I groundbreaking

Page 60: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Page 61: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

New bridges well under way targeted to be completed in July 2013

Old downstream span being investigated by OP for reuse

Find out more at http://ddot.dc.gov/11thstreetbridge

Page 62: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Currently in the public scoping process of the NEPA process

Next public meeting should be in the next few months

Find out more & calendar at www.virginiaavenuetunnel.com

Page 63: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

New Bridge targeted to begin

construction in 2013 or 2014

DDOT has started land acquisition

process

Goal to have new bridge completed

between 2016 or 2017

For more information visit

http://ddot.dc.gov

Page 64: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Long term plan that will virtually

eliminate the combined sewer

overflow (CSO) problem within the

District of Columbia

For more information visit

www.dcwater.com/cleanrivers

Page 65: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

be out FRONT

Interactive and downloadable maps and resources available at

www.capitolriverfront.org

Page 66: April 17, 2012 - Capitol Riverfront · 2012. 4. 20. · be out FRONT •3,500+ = total estimated Capitol Riverfront population •90+% of existing 2,677 TOTAL units are occupied •31,906+

www.capitolriverfront.org

Ted Skirbunt

Michael Stevens Executive Director (202) 465-7079 [email protected]

Claire Schaefer Deputy Executive Director (202) 465-7087 [email protected]

Director of Real Estate Research (202) 465-7091 [email protected]

Kathleen Kruczlnicki Manager of Park Programming/Marketing (202) 465-7093 [email protected]

Bonnie Wright Office and Program Manager (202) 465-7093 [email protected]

Leon Johnson Operations Manager (202) 465-7093 [email protected]

Alfred Corbin Park Facilities Manager (202) 465-7093 [email protected]


Recommended