1April 2011
2
• 1976 Foundation• 1993 Transfer in the new main office in Monteu Roero• 1998 Certification ISO 9001• 1999 Homologation for mechanical products of safety elements in
according with AVSQ94• 2004 Mr.Guerra acquire 100% share older from• 11/2010 Successful audit Readiness rewiew ISO TS 16949• 01/2011 Successful audit ISO TS 16949 • 04/2011 ISO TS 16949 certification acquired
CHRONICLE
3
TODAY
• Mechanical Machining only• Manual Machines only • Tier 2 supplier only• Few row material supplier
YESTERDAY
• Tier 1 supplier for IVECO, Fiat Powertrain, IRISBUS, Oerlinkon Graziano , Arvin Meritor , ASTRA, BREMBO• Tier 2 supplier for VOLVO-RENAUL trucks, SAF• CNC Machine only • ISO 9001:2008 ; ISO TS 16949• Qualified Raw material suppliers• More attention to customer requirement• High quality and service product
TOMORROW• Iso 14000 Certification (2012)• Investments in automation• New production line• New Customer • Development of new prodcut with customer• Few quantity (max 100 parts, prototipes) line production
44
CONSIGLIO DI AMMINISTRAZIONECONSIGLIO DI AMMINISTRAZIONE
GUERRA F. – CHIARLE R.– RIVERA V.GUERRA F. – CHIARLE R.– RIVERA V.
ASSICUR. QUALITA’
RIVERA V.MAZZA G. (ext)
RSPP
RIVERA V.
ORGANIZATION ORGANIZATION CHART 01/09/2010CHART 01/09/2010
RESP. REPARTO
TRUCCO S.
VIRANO P.
MANUTENZIONE
CHIARLE R.
CONTROLLO QUALITA’
RIVERA D.
BORDONE A.
DIREZIONE INDUSTRIALE
GUERRA F.
COMMERCIALE
RIVERA V.
PERSONALE
CHIARLE R.Studio Bonardo (ext)
GUERRA M. (ext)
ACQUISTI
RIVERA V.SVILUPPO
PROCESSO
RIVERA V. CHIARLE R.
PRODUZIONE
CHIARLE R.
PROGRAMMAZIONE LOGISTICA
RIVERA V.
Rappresentante CDA_____________________
AMMINISTRAZIONE
MARCHISIO G.
MARKETING
Dott. FASANO GIANFRANCO (ext)
GUERRA M. (ext)
5
WORK SYSTEMS• Vertical lathe : Plateau diameter Max 1000 mm • Verical work centers: 1000x600• Horizontal work centers: 800x800• Automatic balancing machinery• Surface treatment
TESTING EQUIPMENT• Metrological room• Automatic three dimensional control unit• Ultrasound apparatus• Electronic instruments• Tension stress machine
6
PRODUCTION FOR LIGHT AND HAVY TRUCK
• Brake Drums• Wheels Hubs• Brake Disk• Engine fly-wheels and flanges• Mechanical Machining • Carrier• Assembly (hub+bear ring+ bolts+ disk)
7
BRAKE DRUMSDIMENSION: Up 700 mm
MATERIAL: Grey Cast Iron GJL 250
CARATTERISTICS: Advanced production process
• Hight material quality , RX testing
•IVECO, ASTRA
WHEELS HUBSDIMENSION: Up 700 mm
MATERIAL: Ductile Iron GJS 450
CARATTERISTICS:
•Production flexibility from 500 pcs/month to 5.000 pcs/month
•Assembled with differents components
•IVECO, ASTRA, VOLVO RENAULT
8
BRAKE DISKDIMENSION: From 150 mm to 600 mm
MATERIAL: Grey Iron GJL 250
CARATTERISTICHS:
•Assembled with hub end bolts
•IVECO
ENGINE FLY-WHEELSDIMENSION: Up 700 mm
MATERIAL: Grey Iron GJL 250, GJS 450
CARATTERISTICHS:
•Production process
•Assembled with ring
•IVECO, RENAULT, MACK spare parts
9
OTHER MECHANICAL MACHINING
• Carrier
• Satellite Carrier
• Carter
• Gear box
• Thrust block
•Diferential gear
10
OUR CUSTOMERS
• LIGHT AND HAVY TRUCK OE PRODUCER
• AGRICULTURAL MACHINE• OEM SUPPLIER• FOUNDRY
11
NUMBER EMPLOYEES
0
10
20
30
40
50
60
2005 2006 2007 2008 2009 Fst.2010
Budget2011
DirectIndirectTotal
TURNOVER0
2.0004.0006.0008.000
10.00012.000
2005 2006 2007 2008 2009 Fst.2010
Budget2011
Euro/1000
220,3212,9 212,4
199,5
206,5 208 210
185190195200205210215220225
Euro/1000
2005 2006 2007 2008 2009 Fst.2010
Budget2011
Tournover peryear eachemployees
12
POINTS OF STRENGHT• Solid financial structure with the possibility of inward investment and
acquisitions of companies manufacturing and foundries Strategic supplier in stead of customer request.
• Flexibily, we are able to produce small and big batch. • Skilled personnel• Time to market for develop the new products• Advanced and automatized production process• Quality• Price
13
THANK YOU!
FRAZIONE SANT’ANNA – LOC. RIVETTO110 12040 MONTEU ROERO (CN)
TEL.+39.0173.97.95.17 Fax +39.0173.97.97.61
www.roeromeccanica.com Email: [email protected]