ADMINISTRATIVE EARLY DESIGN GUIDANCE PRIORITY II AFFORDABLE HOUSING FUNDED BY THE CITY OF SEATTLE OFFICE OF HOUSING APRIL 3, 2019 11045 8TH AVE NE, SEATTLE, WASHINGTON SDCI #3033672-EG PROJECT SITE
Transcript
Page 1: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

ADMINISTRATIVE EARLY DESIGN GUIDANCE

PRIORITY II AFFORDABLE HOUSING FUNDED BY THE CITY OF SEATTLE OFFICE OF HOUSING

APRIL 3, 2019

11045 8TH AVE NE, SEATTLE, WASHINGTON

SDCI #3033672-EG

PRO

JEC

T SI

TE

Page 2: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 20192

EARLY DESIGN GUIDANCE

1809 7TH AVE | STE 800SEATTLE, WA 981012 0 6 . 2 8 4 . 5 6 2 4www.v ia-arc h i tec ture.com

CONTENTS

DEVELOPMENT OBJECTIVES 3

ZONING & LAND USE SUMMARY 4

SITE ANALYSIS 5

SITE SURVEY 6

URBAN DESIGN ANALYSIS 7

PUBLIC OUTREACH 14

RELEVANT DESIGN GUIDELINES 15

SITE PLAN 16

ARCHITECTURAL MASSING CONCEPTS 17

MASSING CONCEPT - OPTION 1 18

MASSING CONCEPT - OPTION 2 20

MASSING CONCEPT - OPTION 3 22

SITE SECTION 24

SUN / SHADOW STUDIES 25

DEVELOPMENT STANDARD DEPARTURES 26

DESIGN DEVELOPMENT 29

PROJECT TEAM 32

PRIORITY II AFFORDABLE HOUSING FUNDED BY THE CITY OF SEATTLE OFFICE OF HOUSING

PROJECT SITE

SEATTLE

Page 3: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 3

DEVELOPMENT OBJECTIVES

DEVELOPMENT OBJECTIVES:

The goal of the Northaven 3 development is to add affordable senior living apartments to the existing site while creating a larger campus and community between the new development and the two existing buildings.

The Northaven 3 building will have approximately 82 dwelling units with associated services, including approximately 22 parking spaces. The building will be 5 floors over one level of half-below-grade parking. The development site is located in the north sub-area of the Northgate Urban Center, it is a mid-block parcel of a super-block bounded by NE 115th ST, NE Northgate Way, 5th Avenue NE and 8th Ave NE.

Project Goals:

• Support the development of the urban character in the evolving transit and pedestrian oriented Northgate Urban Center.

• Create a simple and thoughtfully composed building that will respect its central block site and function as part of a larger campus.

• The massing of the building is in keeping with the adjacent properties, as the neighborhood continues to evolve with added density and services.

• Create an exceptional living environment and sense of home for the building’s residents.

• Orchestrate effective parking, loading, and building services off NE 112th Street.

• The project will be certified to Evergreen Sustainable Development Standards

NE NORTHGATE WAY

5TH

AV

E N

E

PROJECT STATISTICS:

SITE AREA (SF)

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

16,266 SF

82

52,358 GFA

22

5 - 6

N

SITE 8TH

AV

E N

E

NE 115 ST

NE 112 ST

SITE

188'

-7"

76'-6"

8TH

AV

E N

E

5TH

AV

E N

E

NO

RTH

AVE

N 1

(EXI

STI

NG

)

NORTHAVEN 3(PROPOSED)

DR

IVE

WA

YLI

GH

T W

ELL

EXISTING PARKING

NORTHAVEN 2(EXISTING)

NE 112TH STPRIVATE STREET - SITE ACCESS

GARAGE ENTRY

BUILDINGENTRY

AMENITY AREA

Page 4: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 20194

ZONING & LAND USE SUMMARY

ZONING ANALYSIS

Summary of primary applicable development standards from the Seattle Municipal Code. Note that some portions are paraphrased for brevity.

Page 5: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 5

INSTITUTIONAL

INDUSTRIAL

MULTIFAMILY

SINGLE FAMILY

RETAIL/SERVICE

OFFICE

VACANT

PARKING

WAREHOUSE

UTILITY

SITE ANALYSIS

ZONING MAP CURRENT USE DIAGRAM

INSTITUTIONAL

RETAIL/SERVICE

MULTIFAMILY

SINGLE FAMILY

OFFICE

5TH

AV

E N

E

3RD

AV

E N

E

8TH

AV

E N

E

PINEH

URST W

AY N

E

NE NORTHGATE WAY

NE 115TH ST

N N

SITE SITE

ROO

SEV

ELT

WAY

NE

MIXED-USE1.

2

3.

4.

1.

23.

3

9 STORIES

5 STORIES

4 STORIES

3 STORIES

4.4.

Page 6: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 20196

5TH

AV

ENU

E N

.E.

S ITE PLAN

SITE SURVEYThe site is a 16,266 sf parcel. It is currently occupied by a 37 stall surface parking lot with associated landscaping. It had previously served the existing 198 unit Northaven I retirement community located to the east, and the Northaven II assisted living community to the south. The parcel is located within the center of the block and accessed via NE 112th ST, a 60 foot easement that connects to 5th Avenue NE.

8TH

AV

ENU

E N

.E.

+282.6’

+/-

212.

63’

+/- 70.71’+283.0’

+290.5’ +291.5’

Page 7: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 7

LEGENDPROPOSED BIKE FACILITY

EXISTING BUS ROUTE AND FUTURE RAPID RIDE ROUTES

MAJOR PEDESTRIAN ROUTE

PROJECT SITE

EXISTING BUS STOP

TRANSPORTATION

PUBLIC PARKS

FUTURE LINK STATION

FUTURE LINK ROUTE

SITE

NE NORTHGATE WAY

NE 115TH ST

BEAVER PONDS

NATURAL AREA

HUBBARD HOMESTEAD

PARK

NORTHGATE MALL (TO BE

REDEVELOPED)

INTE

RSTA

TE 5

NORTHGATE LINK STATION

(2021)

TO THE UNIVERSITY DISTRICT AND DOWNTOWN

TO SHORELINE AND LYNWOOD

5TH

AV

E N

E

8TH

AV

E N

E

3RD

AV

E N

E

NPEDESTRIAN + VEHICULAR ENTRY TO SITE

URBAN DESIGN ANALYSIS: TRANSPORTATION

Page 8: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 20198

URBAN DESIGN ANALYSIS: THE SITE AND THE CITY

URBAN CONTEXT

The project is located in an area with three major influences. It is responding to them programatically and formally. It will be both a building that reflects the emerging urban context and provides a sense of community and of home.

NORTHGATE URBAN CENTER

The Northgate Urban Center is a key retail, medical services, and educational hub for the city. The area is poised to see major growth with the arrival of Link light rail in 2021 connecting it to the UW, downtown, Sea-Tac and points north and south. As the neighborhood grows, maintaining affordability will be key. This project proposes to provide much needed affordable senior housing and services.

NEARBY NEIGHBORHOODS

Pinehurst and the adjoining neighborhoods of Maple Leaf, Haller Lake and North College Park are largely single family zoned areas. The project will provide a hub of senior activity that is adjacent to services but also still near quiet residential neighborhoods. The project will serve people in the area who are downsizing as they age or have family near by.

NORTHGATE MALL

Northgate Mall is about to embark on a major redevelopment that will see it transform from a suburban shopping center to a more walkable mixed use neighborhood that will include hundreds of apartments, shops, and offices. Its plans will make the neighborhood a safer, more walkable, and senior friendly area.

1 2 3

N

NORTH COLLEGE PARK NEIGHBORHOOD NORTHGATE MALL3

PINEHURST NEIGHBORHOOD

2

URBAN CENTER BOUNDARY

1

SITE

C

D

A

BE

FG

H

I

J

KL

HALLER LAKENEIGHBORHOOD

MAPLE LEAF NEIGHBORHOOD

22

2

NORTHGATE URBAN CENTER

NEIGHBORHOOD BOUNDARYCONTEXT IMAGES ON FOLLOwING PAGE

X

Page 9: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 9

URBAN DESIGN ANALYSIS: CONTEXT BUILDINGS

COMMUNITY ASSETSVariety of neighborhood assets including library, community center, parks, entertainment, retail, frequent transit, and light rail in 2021.

EXISTING MULTIFAMILYMid-rise housing in a mix of ages and styles.

PROPOSED MULTIFAMILYMid-rise mixed use buildings with simple massing and materials.

A

LKJ

D

H

I

GFE

CB

MAPLE LEAF NEIGHBORHOOD

Page 10: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201910

SITE

NE 112 ST

5TH

AV

E N

E

8TH

AV

E N

E

URBAN DESIGN ANALYSIS: SITE MONTAGES

1 NE 112TH ST FACING NORTH, BETWEEN 5TH AVENUE NE AND EXISTING NORTHAVEN 1 BUILDING

NE 112TH ST FACING SOUTH, BETWEEN 5TH AVENUE NE AND EXISTING NORTHAVEN 1 BUILDING2

2

1

NORTH + SOUTH INTERNAL SITE ELEVATIONS

• THE SITE IS LANDLOCKED AND HAS NO STREET FRONTAGES

• NORTHAVEN 2 AFFORDABLE ASSISTED LIVING FACILITY + ASSOCIATED OUTDOOR SPACE TO SOUTH

• NORTHAVEN 1 PARKING AND AMENITY SPACE TO NORTH

• NEIGHBORING MULTIFAMILY BUILDING TO NORTH

• MIX OF BUILDING AGES AND STYLES N

FACING PROJECT SITE

FACING PROJECT SITE

NORTHAVEN 2

NORTHAVEN 1APARTMENT BUILDING

Page 11: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 11

URBAN DESIGN ANALYSIS: SITE MONTAGES

3FACING EAST TOWARDS 5TH AVENUE NE

FACING EAST TOWARDS 8TH AVENUE NE 4

EAST + WEST INTERNAL SITE ELEVATIONS

• NORTHAVEN 1 AFFORDABLE SENIOR HOUSING TO THE EAST

• NORTHGATE PLAZA SENIOR HOUSING + PARKING TO WEST

• MIX OF BUILDING AGES AND STYLES

• SMALL SUNKEN PLAZA ADJACENT TO NORTHAVEN 1SITE

NE 112 ST

5TH

AV

E N

E

8TH

AV

E N

E

43

FACING PROJECT SITE

FACING PROJECT SITE

NORTHAVEN 1

APARTMENT BUILDINGSENIOR LIVING

Page 12: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201912

SITE

NE 112 ST

5TH

AV

E N

E

8TH

AV

E N

E

URBAN DESIGN ANALYSIS: STREET MONTAGES

LOOKING EAST FROM 5TH AVENUE NE1

1

N

PROJECT SITE BEYOND

MEDICAL OFFICE BUILDING NORTHGATE PLAZA SENIOR LIVING

Page 13: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 13

SITE

NE 112 ST

5TH

AV

E N

E

8TH

AV

E N

E

URBAN DESIGN ANALYSIS: STREET MONTAGES

LOOKING NORTH FROM NE NORTHGATE WAY 2

2

PROJECT SITE BEYOND

RETAILBANK BRANCH RETAIL PLAZA

Page 14: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201914

PUBLIC OUTREACH

Northaven Three 11045 8th Ave N Community Outreach Summary

Project Summary The Northaven Three project will be a partnership between Northaven Development and HumanGood Affordable housing to expand Northaven’s campus through the creation of more affordable senior housing in the Northgate neighborhood. The project will consist of 85 units of affordable senior independent living, serving seniors earning up to 30, 50 and 60% of AMI, adjacent to Northaven’s two existing buildings. The building’s ground floor will contain roughly 8,000 sf of community facility space for Providence ElderPlace, which will operate their PACE (Program of All Inclusive Care for the Elderly) program in the senior building.

Outreach Methods Below are the outreach methods and dates on which Northaven conducted outreach, in compliance with the 2018 Director’s Rule on Early Outreach.

The project was posted on the Early Outreach blog by Danielle Friedman on January 9, 2019.

Outreach Type

Outreach Plan Outreach Dates

Documentation Attached

In-Person Outreach

Presentation at Pinehurst Community Councilmeeting with time for questions (20 min)

2/20/19 6:30-8:30pm Amante’s Pizza

Copy of agenda andnotes from meeting,including feedbackreceived

In-Person Outreach

Drop-in hours at Northgate Community Center Publicized on project website, in direct mailing

sent 11 days prior, at Pinehurst meeting, andin email to community groups

2/25/19 5:00-6:30pm Northgate Community Center

Notes from event

Digital Outreach

Simple project webpage in English andSpanish. Accessible via direct link and fromNorthaven home page. Link included in directmailing, email, and included on materialdistributed at meetings.www.northavenseniorliving.org/northaventhree

Site live 2/11/19

Copy of projectwebpage, URL

Digital Outreach

• Email to community organizations with project info, contact, website, drop-in hours.

Email sent 2/21/19

Copy of email anddistribution list

Printed Outreach

• Mailing to 500ft radius with project info, contact, website, drop-in hours. In English and Spanish.

Mailed 2/11/19

Copy of letter Address list

Feedback Summary Feedback collected at community meetings (see attached notes) indicates overall support for the project. Concerns raised include pedestrian safety in the Northgate neighborhood, including around Northaven’s campus, as well as intra-block connectivity and open space. Otherwise, community members were primarily interested in the project’s details and timeline.

Contact information (name, email, and phone) was provided on all outreach materials: email, letters, website, at meetings, No follow up comments have been received to date.

Pinehurst Community Council Meeting 2/20/19 6:30-8:00pm Amante Pizza & Pasta 12319 Roosevelt Way NE Northaven Presentation Meeting Notes Darlene Storti, Executive Director of Northaven Senior Living, presented about Northaven’s existing campus and the new Northaven Three project. Ellen Lohe, Housing Developer at Beacon Development Group, presented on project funding and timeline. Copies of the Northaven letter sent to neighbors were distributed, and attendees were informed about the project website, staff contact, and the subsequent drop-in hours at Northgate Community Center. Roughly 15 people were in attendance. The following are questions and comments made by attendees after the presentation.

- Concern about whether the new project will include additional services to serve greater population density on the campus.

- Questions about the MHA zoning amendment process: timeline, whether there is support for the amendment, what the specific zoning request is, reasoning for the amendment provided to City Council.

- Concern about unsafe crossings on 8th and 5th avenues, desire for better and safer pedestrian connections on those streets and in the neighborhood overall.

- Suggestion to pursue City grant funding through Your Voice, Your Choice to address small scale street improvements in the area around pedestrian and senior safety.

- Comment to continue to allow access through the interior of the block for the public.

- Comment in support of providing green and open space in the interior of the block.

- Question about parking being removed compared to parking being replaced, interest in other transportation modes (ride sharing etc.)

- Question about timeline for construction and completion. Northgate Community Center Drop-In Hours 2/25/19 5:00 – 6:30pm Northgate Community Center 10510 5th Ave NE Bill Dorn, Development Director of Northaven Senior Living, and Ellen Lohe, Housing Developer at Beacon Development Group, held drop-in hours in the small meeting room at the Northgate Community Center. Drop-in hours were advertised on Northaven’s website, in an email to community groups, in a direct mailing, and at the Pinehurst Community Council meeting. However, no members of the public attended the drop-in hours specifically, although there were passers-by at the community center who viewed the presentation materials about the project put up by Northaven. No specific feedback was gathered.

Page 15: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 15

The site is in the core of the evolving Northgate Hub Urban Center. It is a neighborhood poised for change with light rail arriving in 2021 and the redevelopment of the Northgate shopping mall at the heart of the district starting soon. The area has seen increased development in the last few years and is likely to continue its evolution into a more urban neighborhood.

Amongst the changing neighborhood, the immediate project context consists primarily of older building stock of various ages and styles. The proposed building is intended to relate to the existing adjacent Northaven properties as part of a campus. The Northaven 3 building will contribute to the evolution of the neighborhood as density is added in response to the forthcoming light rail extension, spurring further utilization of existing area services.

See also pages 8 + 9

APPLICABLE CITY DESIGN GUIDELINES:

CS2-A.1 SENSE OF PLACE

CS2-C.2 MID-BLOCK SITE

CS3-A.4 EVOLVING NEIGHBORHOODS

DC2-B.1 FACADE COMPOSITION

RELEVANT DESIGN GUIDELINES

The site is already home to Northaven 1 to the east, an affordable independent living facility and Northaven 2 to the south, an affordable assisted living building. The goal of this project is to add to the existing community and enhance the overall area to create a campus community. The intent is to achieve this through building massing and composition that respects the existing buildings while strengthening the areas in between the buildings with landscape and place-making elements.

Opportunities to improve the pedestrian and automobile interactions will add to a sense of place for the residents and strengthen the connections between the buildings. This strategy is intended to enhance an existing wellness focused senior housing and services campus that is anticipated to be increasingly valuable in a rapidly growing neighborhood.

See also page 16 + 29

APPLICABLE CITY DESIGN GUIDELINES:

CS2-D.5 RESPECT FOR ADjACENT SITES

CS3-A.1 FITTING OLD AND NEW TOGETHER

PL3-A.2 ENSEMBLE OF ELEMENTS

DC2-C.3 FIT WITH THE NEIGHBORING BUILDINGS

As part of the campus vision, two woonerf style shared courts are envisioned - one at the north and one at the south. These are located between the new building and each of the two existing buildings. These are areas to blur the boundary between road and sidewalk in order to create an area more supportive of pedestrian movement while facilitating necessary service access; including resident transportation and pickup / drop off of visitors and shuttles.

These shared spaces will further strengthen the campus identity and facilitate community building for the residents.

See also page 16 + 29

APPLICABLE CITY DESIGN GUIDELINES:

DC1-IV.III ENCOURAGE THE CREATION OF MULTI-PURPOSE PARKING AREAS

DC4-D.2 HARDSCAPE MATERIALS

DC4-D.4 PLACE MAKING

EVOLVING URBAN CONTEXT BUILDING A CAMPUS SHARED ENTRY COURT

Page 16: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201916

210'

-7 1

/2"

76'-6" 19'-0"

8TH

AVE

NE

5TH

AVE

NE

35'-1

1/2

"16

0'-6

"15

'-0"

7'-0" 62'-0" 7'-6"

10'-0"

SIDEWALK

NORTHAVEN 1(EXISTING)

NORTHAVEN 3(PROPOSED)

GARAGE ENTRY

DR

IVE

WA

Y

EXISTING SIDEWALK

LIG

HT

WEL

L

EXISTING PARKING

NORTHAVEN 2(EXISTING)

NE 112TH STPRIVATE STREET - SITE ACCESS

BUILDINGENTRY

60'-0

"

NORTHAVEN 1AMENITY AREA

NORTHAVEN 1AMENITY AREA

The site is a mid-block parcel. It is part of an evolving senior housing campus with the existing Northaven 1 affordable senior independent living apartments to the east and the existing Northaven 2 affordable assisted living building to the south. Access for all three is to be provided via NE 112th ST, a private street that connects to 5th Ave NE. The building entry is proposed to be at the north of the site in close proximity to the existing entry to Northaven 1 and the pickup/drop off zone. Auto access to the semi-underground parking level is from the south, accessed by a driveway that will run between the proposed Northaven 3 and the existing Northaven 1.

SITE PLAN

N

Page 17: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 17

ARCHITECTURAL MASSING CONCEPTSOPTION 3 - PREFERRED ALTERNATIVE

PROS:• No departures required

• Code compliant

CONS:• “Bread loaf” massing

• No courtyard setback as shown in other options

• Wedding cake setbacks creates inelegant building form

PROS:• Courtyard setback provided

• Elimination of wedding cake setback, allows for more holistic facade composition

CONS:• (2) Departures required:

- Side setbacks (pg 26)

- Amenity Area (pg 27)

• Greatest setback faces parking lot to west

• Lobby oriented away from existing Northaven 1 building

PROS:• Courtyard setback provided

and oriented towards existing Northaven 1 building

• Lobby oriented towards existing Northaven 1 building

• Provides greater setbacks and privacy for residents of existing Northaven 1 building

CONS:• (2) Departures required:

- Side setbacks (pg 26)

- Amenity Area (pg 27)

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

82

52,623

21

5-6

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

82

52,873

22

5-6

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

82

52,358

22

5-6

OPTION 2OPTION 1 - CODE COMPLIANT

CIRCULATIONPARKING

COMMONS/LOBBY

RESIDENTIAL

CIRCULATIONPARKING

COMMONS/LOBBY

RESIDENTIAL

CIRCULATIONPARKING

COMMONS/LOBBY

RESIDENTIAL

35'-1 1/2"160'-6"15'-0"

10'-0"

7'-0"62'-0"

7'-6"

43'-7 1/2"151'-8"15'-4"

7'-0"62'-6"

7'-0"

7'-0"62'-0"

7'-6"

35'-1 1/2"160'-6"15'-0"

10'-0"

NNN

Page 18: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201918

OPTION 1 - CODE COMPLIANT

OPTION STATISTICSSITE AREA (SF)

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

FAR

16,266

82

52,623

21

5-6

3.24

REQUESTED DEPARTURESNONE

B1 LEVEL - ACCESS FROM NE 112TH STREET LEVEL 1 - ACCESS FROM NE 112TH STREET TYPICAL RESIDENTIAL LEVEL N

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITY

BIRD’S EYE VIEW FROM SOUTHEAST

N

43'-7 1/2"152'-0"15'-0"

7'-0"62'-6"

7'-0"

43'-7 1/2"151'-8"15'-4"7'-0"

62'-6"7'-0"

43'-7 1/2"151'-8"15'-4"

7'-0"62'-6"

7'-0"

PARKING ACCESS

Page 19: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 19

OPTION 1 - CODE COMPLIANT

STREET LEVEL VIEW - LOOKING EAST FROM NE 112TH ST

STREET LEVEL VIEW - LOOKING SOUTH FROM NORTHAVEN 1 NORTH PARKING LOT BIRD’S EYE VIEW FROM NORTHWEST

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITYN

Page 20: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201920

OPTION 2 - WESTERN TERRACE

OPTION STATISTICSSITE AREA (SF)

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

FAR

16,266

82

52,873

22

5-6

3.25

REQUESTED DEPARTURES

NTYPICAL RESIDENTIAL LEVELB1 LEVEL - ACCESS FROM NE 112TH STREET LEVEL 1 - ACCESS FROM NE 112TH STREET

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITY

BIRD’S EYE VIEW FROM SOUTHEAST

N

• 23.45.518 - TABLE B: SIDE SETBACK FROM INTERIOR LOT LINE

• 23.45.522.C: REQUIRED AMENITY AREA

• 23.54.015.TABLE D: REQUIRED LONG TERM BICYCLE PARKING

35'-1 1/2"160'-6"15'-0"

7'-0"62'-0"

7'-6"

35'-1 1/2"160'-6"15'-0"

10'-0"

7'-0"62'-0"

7'-6"35'-1 1/2"160'-6"15'-0"

10'-0"

7'-0"62'-0"

7'-6"

PARKING ACCESS

Page 21: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 21

OPTION 2 - WESTERN TERRACE

STREET LEVEL VIEW - LOOKING EAST FROM NE 112TH ST

STREET LEVEL VIEW - LOOKING SOUTH FROM NORTHAVEN 1 NORTH PARKING LOT BIRD’S EYE VIEW FROM NORTHWEST

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITYN

Page 22: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201922

OPTION 3 - EASTERN TERRACE (PREFERRED ALTERNATIVE)

OPTION STATISTICSSITE AREA (SF)

APARTMENT UNITS

GROSS FLOOR AREA (SF)

PARKING STALLS

NUMBER OF FLOORS ABOVE GRADE

FAR

16,266

82

52,358

22

5-6

3.22

REQUESTED DEPARTURES

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITY

TYPICAL RESIDENTIAL LEVELB1 LEVEL - ACCESS FROM NE 112TH STREET LEVEL 1 - ACCESS FROM NE 112TH STREET N

BIRD’S EYE VIEW FROM SOUTHEAST

• 23.45.518 - TABLE B: SIDE SETBACK FROM INTERIOR LOT LINE

• 23.45.522.C: REQUIRED AMENITY AREA

• 23.54.015.TABLE D: REQUIRED LONG TERM BICYCLE PARKING

N

7'-0"62'-0"

7'-6"

35'-1 1/2"160'-6"15'-0"

7'-0"62'-0"

7'-6"

35'-1 1/2"160'-6"15'-0"

10'-0"

7'-0"62'-0"

7'-6"

35'-1 1/2"160'-6"15'-0"

10'-0"

PARKING ACCESS

Page 23: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 23

OPTION 3 - EASTERN TERRACE (PREFERRED ALTERNATIVE)

STREET LEVEL VIEW - LOOKING EAST FROM NE 112TH ST

STREET LEVEL VIEW - LOOKING SOUTH FROM NORTHAVEN 1 NORTH PARKING LOT BIRD’S EYE VIEW FROM NORTHWEST

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITY

CIRCULATION

PARKING COMMONS/ LOBBY

RESIDENTIAL

UTILITYN

Page 24: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201924

SITE SECTION: OPTION 3 (PREFERRED ALTERNATIVE)

EXISTING NORTHAVEN 1

PROJECT SITE

PL PL

CIRCULATION

PARKING AMENITY

RESIDENTIAL

UTILITY

EXISTINGRESIDENTIAL

LEVEL 2

303'-6"

LEVEL 3

313'-6"

L0

283'-4"

LEVEL 4

323'-6"

LEVEL 5

333'-6"

ROOF

344'-6"

Avg. Grade

286'-6"

Max. Height

366'-6"

7'-0" 62'-0" 7'-6"

76'-6" 19'-0"

LEVEL 1

293'-6"11

'-0"

10'-0

"10

'-0"

10'-0

"10

'-0"

10'-2

"

80'-0

"

10'-0"8" 16'-0"

Page 25: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 25

SUN/SHADOW STUDIES: OPTION 3 (PREFERRED ALTERNATIVE)

EQUINOX SUMMER SOLSTICE WINTER SOLSTICE

9AM

NO

ON

3PM

N

Page 26: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201926

LEVEL 2

303'-6"

LEVEL 3

313'-6"

L0

283'-4"

LEVEL 4

323'-6"

LEVEL 5

333'-6"

ROOF

344'-6"

Avg. Grade

286'-6"

Max. Height

366'-6"

LEVEL 1

293'-6"

7'-0" 52'-0" 10'-0" 7'-6"

76'-6" 19'-0"

11'-0

"10

'-0"

10'-0

"10

'-0"

10'-0

"10

'-2"

20'-0

"42

'-0"

3'-0"

DEPARTURES

SMC 23.45.518.TABLE B: MR Setbacks

Side Setbacks from Interior Lot Lines

For portions of a structure:

• 42’ or less in height: 7’ average setback, 5’ minimum setback.

• Above 42 feet in height: 10’ average setback; 7’ minimum setback.

SITE SECTION LOOKING NORTH

NW AERIAL PERSPECTIVEOPTION 3: PREFERRED ALTERNATIVE

STANDARD: PROPOSED DEPARTURE: RATIONALE & APPLICABLE GUIDELINES:

A uniform 7’ setback for the west facade. A uniform 7’ facade allows for the elimination of a step in the building mass and the simplification of the facade. The 7’ minimum setback on the west side allows us to shift floor area and create a courtyard setback on the east side of the building. The eastern facade, which faces an existing residential building, will have a minimum setback of 7’-6” and an average setback of 14’-4” above the parking level, thus providing greater access to light and more privacy.

CS2-D.5 RESPECT foR ADjACENT SITESDC2-B.1 fACADE ComPoSITIoN

DEPARTURE #1 - SIDE SETBACK FROM INTERIOR LOT LINES

AREA OF PROPOSED DEPARTURE

N

3’

20’

160’-6”

Page 27: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 27

DEPARTURES

SMC 23.45.522.C: Amount of amenity area required in MR and HR zones. The required amount of amenity area in MR and HR zones is equal to 5 percent of the total gross floor area in residential use.

The proposed building has 40,474 GFA in residential use which requires 2,024 SF of amenity area.

STANDARD: PROPOSED DEPARTURE: RATIONALE & APPLICABLE GUIDELINES:

The preferred alternative requests a 75% reduction to the required on-site amenity area. The proposal is to provide 500 sf of interior common amenity and to satisfy the balance of the required on-site amenity area on the adjacent Northaven 1 site.

The project is designed to function as part of a campus in conjunction with existing Northaven 1 (to the east) and Northaven 2 (to the south), both of which are under common ownership. Residents of the proposed building will have access to the ~13,000 sf outdoor area on the Northaven 1 site as well as its interior amenities which include cafeteria, lounge, community room, and gym. This will provide a greater access to amenities than under a code compliant scheme.

CS2-A.1 SENSE of PLACECS3-A.1 fITTING oLD AND NEw ToGEThERDC4-D.4 PLACE mAkING

DEPARTURE #2 - AMENITY AREA

OPTION 3 - AMENITY PLANCAMPUS AMENITY

N

NORTHAVEN 3(PROPOSED)

NORTHAVEN 1(EXISTING)

~1,856 SF

~11,845 SF

ADDITIONAL ENCLOSED AMENITY AREAS NOT SHOWN

EXISTING AMENITY

EXISTING AMENITY

Page 28: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201928

DEPARTURES

SMC 23.54.015.TABLE D: Parking for Bicycles

D. Residential Uses

• Per Table D: Long term - 1 per dwelling unit• Per note 3: for residential uses, after the first 50

spaces are provided, additional spaces are required at three-quarters the ratio shown in Table D

• Total long term bicycle parking required: 74

STANDARD: PROPOSED DEPARTURE: RATIONALE & APPLICABLE GUIDELINES:

• 1 long term bike parking stall per 10 dwelling units

• Total long term bicycle parking proposed: 8

The space required to accommodate 1:1 bike parking in Northaven 3 places a burden on the space constrained proposed affordable senior housing project. The residents and staff of the current facilities, both independent living Northaven I and assisted living Northaven II, don’t currently utilize any on site existing bike parking.

The departure is proposed to provide a balance between the required bike parking and a more appropriate ratio for the senior demographic of the building, while providing some bike parking for those who would make use of it.

DEPARTURE #3 - REQUIRED BICYCLE PARKING

Page 29: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 29

DESIGN DEVELOPMENT: LANDSCAPE CONCEPT

The design concept is to create a campus environment through spaces between the existing and new buildings such as shared, “woonerf” like, entry courts that are intended to connect the proposed Northaven 3 and the existing Northaven 1 and 2 buildings.

The goal is to create an integrated community where residents move back and forth, create community, and share activities. This will be facilitated by having one large shared park-like gathering space.

Possible features of this area could include special paving, patterning or paint on the ground-plane; sidewalk level drive surface; plantings and planters; street furnishings. The shared entry courts will provide a strengthened campus identity to link together the network of open spaces and amenities available to residents.

APPLICABLE DESIGN GUIDELINES:

CS2-A.1 SENSE of PLACE

CS3-A.1 fITTING oLD AND NEw ToGEThER

DC2-C.3 fIT wITh NEIGhBoRING BUILDINGS

DC1-VI.III (NoRThGATE) ENCoURAGE ThE CREATIoN of mULTI-PURPoSE PARkING AREAS

DC4-D.2 hARDSCAPE mATERIALS

DC4-D.4 PLACE mAkING

NO

RTH

AV

EN 3

(P

ROPO

SED

)

SHARED ENTRY COURTSPATH TO AMENITY AREA

Page 30: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201930

DESIGN DEVELOPMENT PRECEDENTS: MASSING + MATERIALS

Page 31: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EG APRIL 3, 2019 31

DESIGN DEVELOPMENT: ADVANCEMENT OF OPTION 3

As the design progresses the intent is to develop a contemporary design that is simple, well proportioned, and elegant. Materials consistent with the affordable nature of the project are to be used in an orderly fashion to create facades that are attractive and accentuate the massing. Rhythmic fenestration will be used to add to the overall building composition while ensuring privacy and light and air for the residents.

Page 32: APRIL 3, 2019 - seattle.gov · 6 APRIL 3, 2019 SDCI #3033672-EG 5 TH AVENUE N. E. SITE PLAN SITE SURVEY The site is a 16,266sf parcel. It is currently occupied by a 37 stall surface

SDCI #3033672-EGAPRIL 3, 201932

VIA ARCHITECTURE

An award-winning design firm, VIA Architecture is one of the Pacific Northwest’s leaders in mixed-use, residential high-rise and mid-rise, assisted living, transit architecture, urban design, and sustainable community planning. Founded in 1984, VIA currently employs 52 professionals in Seattle, San Francisco, and Vancouver, BC offices, providing services to both public and private clients.

PROJECT TEAM

BEACON DEVELOPMENT GROUP

Beacon Development Group is an affordable housing consulting firm that works with West Coast nonprofits and housing authorities. As a subsidiary of HumanGood, we facilitate the funding, design, and construction of affordable housing developments for our clients, managing the entire development process from financing to construction to handing off the keys. Since 1999, Beacon has served thousands of people through the development of over 5,000 units in 87 projects, with a combined value of over $900 million dollars. We believe that when all people and families have the security of an affordable home, our entire community benefits.

525 BOREN SEATTLE, WA 403 DEXTER

SEATTLE, WA

JOSEPH ARNOLD LOFTSSEATTLE, WA

19 WEST HARRISONSEATTLE, WA

WALTON LOFTSSEATTLE, WA

PLAZA ROBERTO MAESTASSEATTLE, WA

MARKETFRONTSEATTLE, WA

COMPASS ON DEXTERSEATTLE, WA


Recommended