+ All Categories
Home > Documents > AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L...

AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L...

Date post: 13-Jul-2020
Category:
Upload: others
View: 10 times
Download: 0 times
Share this document with a friend
34
SUPPLY NETWORK ANALYZER AR5 & AR5-L series ( Code M 80111 ) (CHECK-METER Program) ( Cod. M 80225 ) INSTRUCTION MANUAL ( M98110301-03-07A ) (c) CIRCUTOR S.A.
Transcript
Page 1: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

SUPPLY NETWORK ANALYZER

AR5 & AR5-L series

( Code M 80111 )

(CHECK-METER Program)

( Cod. M 80225 )

INSTRUCTION MANUAL

( M98110301-03-07A ) (c) CIRCUTOR S.A.

Page 2: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 2

CONTENTS page 1.- BASIC INSTRUCTIONS ........................................................................ 4

1.1.- Checking the contents of your package ................................................ 4

1.2.- Safety conditions................................................................................... 4

1.3.- Connection instructions......................................................................... 4

2.- ANALYZER STARTUP .......................................................................... 5

2.1.- Loading a new program ........................................................................ 5

2.2.- Choice of the operation mode program................................................. 6

2.3.- Operation instructions ........................................................................... 6

3.- CONNECTION MODES ........................................................................ 7

4.- DATA VISUALIZATION ON DISPLAY................................................... 9

4.1.- Screen of instantaneous values............................................................ 9

4.2.- Screen for energy meter check........................................................... 10

4.3.- Warning messages ............................................................................. 11

5.- PROGRAMMING THE AR5/AR5-L CHECK-METER .......................... 11

5.1.- Set-up of Instantaneous Values.......................................................... 11

5.1.1.- SETUP menu................................................................................ 13

5.1.2.- MEASURE .................................................................................... 13

5.1.2.1.- WIRING: Circuit type............................................................... 14

5.1.2.2.- PT/CT : Transformation ratios................................................. 14

5.1.3.- COMM: Communication parameters............................................. 14

5.1.4.- CLOCK: Internal clock .................................................................. 15

5.1.5.- PASSWORD: Safety setting. ........................................................ 15

5.1.6.- RECALL: Read configuration ........................................................ 16

5.2.- DISPLAY menu................................................................................... 17

5.2.1.- CONTRAST: Screen contrast ....................................................... 17

5.2.2.- POWER FACTOR......................................................................... 17

5.3.- FILES Menu........................................................................................ 18

5.3.1.- DIR: Directory ............................................................................... 18

5.3.2.- DELETE: Deleting a file ................................................................ 18

5.3.3.- FORMAT: Formatting the AR5/AR5-L internal memory ................ 19

5.4.- Menu OFF: Enable / Disable Password. ............................................. 19

5.5.- Menu LANGUAGE.............................................................................. 19

Page 3: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 3

5.6.- Setup for energy meter check............................................................. 20

6.- Operation mode................................................................................... 21

7.- Checking energy meters...................................................................... 22

7.1.- Checking mechanic energy meters..................................................... 22

7.2.- Checking electronic energy meters..................................................... 24

7.3.- Checking electronic energy meters using the optical reader............... 26

8.- AR5/AR5-L COMMUNICATIONS ........................................................ 28

9.- TECHNICAL SPECIFICATIONS.......................................................... 29

10.- SAFETY WARNINGS .......................................................................... 31

11.- MAINTENANCE................................................................................... 31

12.- TECHNICAL SERVICE........................................................................ 31

A. CABLE ARRANGEMENT ....................................................................... 32

B. QUICK GUIDE........................................................................................ 33

C. QUICK GUIDE FOR AR5 - CHECK-METER. ......................................... 33

D. EXAMPLE OF TRANSFORMATION RELATIONS ................................. 34

Page 4: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 4

1.- BASIC INSTRUCTIONS

This manual is aimed to familiarize the user with the operation of the “CHECK-METER” program for the portable analyser model AR5/AR5-L.

To get all necessary information about operation instructions and safety warnings of the portable analyzer AR5/AR5-L consult it’s instruction manual (code M98151101).

The AR5/AR5-L analyzer loaded with the “check-meter” program permits to check both electronic or mechanic energy meters, either for active and reactive energy totalization. The Check-Meter instrument delivers an appropriate checking mode for each energy meter type.

Besides of checking energy meter utility, the analyzer provides the visualization on screen of several electrical parameters to verify the correct connection of the analyzer.

Recorded data can be downloaded from the AR5 to a PC and further analyzed by means of the PC software.

Recording data process is done by means of an liner memory. That means that once memory is full, no new data is recorded anymore.

1.1.- Checking the contents of your package After receiving the analyzer, please check the following points: a) The delivered material corresponds with your order specifications. b) After unpacking, check that the instrument has not been damaged in transit. c) The standard set includes the following items: 1 cartridge for programming the AR5/AR5-L containing the ordered operation mode

program. 1 Instruction Manual. CD containing the PC software update.

1.2.- Safety conditions The manual you hold in your hands contains information and warnings about the AR5/AR5-L that the user should respect in order to guarantee a proper operation of all the instrument functions and keep its safety conditions.

1.3.- Connection instructions Before powering and connecting the analyzer check the following points: a) Supply voltage: Through and external power supplier set. Input mains 80 V a.c. – 265 V a.c. / output to AR5/AR5-L 12V d.c. b) Frequency : 45...65 Hz. c) Maximum voltage at the voltage measuring circuit:

500 V a.c. phase-to-neutral 866 V a.c. phase-to-phase

Page 5: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 5

2.- ANALYZER STARTUP

2.1.- Loading a new program The AR5/AR5-L has an internal memory to save diverse operation mode programs to

be used by the user. Before starting this action, check that AR5/AR5-L is supplied through the power

supplier set. To load any program, follow these instructions precisely: • Turn the AR5/AR5-L off.

• It is necessary to load a coprocessor that comes in a cartridge to part, and that must settle only in the position of the coprocessor (the last position of the list)

• Connect the cartridge to the AUX input of the meter.

• Turn the meter on.

• Select with the keys [5] & [6] that you want to perform a program loading action (LOAD PROGRAM). Press [ENTER] or wait for a while to confirm this operation.

• Select the position to save the program into.

• The AR5/AR5-L will perform a test to check that the cartridge has been properly connected.

• If an inserted cartridge is detected, then the program will be loaded.

• Once the loading is completed, reset the meter.

• If no cartridge was found or a loading mistake occurred, reset the meter and redo the above steps.

A cartridge will be only valid for the analyser, which the program was for the first time loaded into.

Note on the cartridge the serial number of its related AR5/AR5-L.

Page 6: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 6

2.2.- Choice of the operation mode program The AR5/AR5-L can hold in memory different operation mode programs. The choice

of the program to be used is done when starting the AR5/AR5-L up.

• Turn the AR5/AR5-L on.

• A list of available programs will be shown on display.

• Use keys [5] & [6] to choose the desired program.

• Press [ENTER] or wait for a while to confirm this operation.

CHECK THE SETUP UP !!!! All programs have an independent setup; therefore, must be always checked to

ensure a proper operation. For instance, whether the setup is modified at the “CHECK-METER” program, these

modification will not be valid for the “ANALYSER” program, and so for any program.

2.3.- Operation instructions The AR5/AR5-L is a programmable instrument so offering diverse operation modes

which can be selected from the available programming menus (0 PROGRAMMING THE AR5/AR5-L).

Please read carefully the paragraphs involving STARTING UP (2.-) AND PROGRAMMING THE AR5/AR5-L (5) in order to select the most suitable operation mode for your requirements.

If the instrument is not used according to manufacturer’s specifications, the protection of

the instrument can be damaged.

Page 7: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 7

3.- CONNECTION MODES

A.- THREE-PHASE MODE CONNECTION DIAGRAM

B.- SINGLE-PHASE MODE CONNECTION DIAGRAM

Page 8: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 8

C.- ARON MODE CONNECTION DIAGRAM

Page 9: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 9

4.- DATA VISUALIZATION ON DISPLAY

All measured instantaneous values, as well as maximum and minimum, can be read on a 160 x 160 pixel, liquid, crystal display (back-light ability).

An indication of the type of data being displayed is shown at the upper right corner.

4.1.- Screen of instantaneous values This screen is only for the verification of a correct connection of the analyzer. So, you

can verify the correct positioning, the transforming ration setting, concord of voltage and current phases....

Energy values are partial values. The value is always reset to zero when accessing this screen. These values are not accumulated.

Pressing the key [SET] from this screen m the set-up menu is accessed. When powering the AR5/AR5-L on, the display will show:

CHECK-METER INST L1 L2 L3 IIII

Vp-n A kW kvarL KvarC P.F. Hz KVA

220 2210 2230 2220

kWh 0.000 kvarhL 0.000 kvarhC 0.000 09 / 01 / 04 17 : 31 : 29

Verification screen Voltage: Readout of the instantaneous RMS value measured at each phase (L1, L2 &

L3) and the average value of the instantaneous values of the three phases (III).

Current: Readout of the instantaneous RMS value measured at each phase (L1, L2 & L3) and the average value of the instantaneous values of the three phases (III).

Active power: The active power is calculated from instantaneous voltage and current data. The readout gives the instantaneous values of the active power of each phase and also the three phase total instantaneous active power, which is the addition of each phase value.

Inductive reactive power: The inductive reactive power is calculated from

instantaneous voltage and current data. The readout gives the instantaneous

Page 10: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 10

values of the inductive reactive power of each phase and also the three phase total instantaneous inductive reactive power, which is the addition of each phase value.

Capacitive reactive power: The capacitive reactive power is calculated from instantaneous voltage and current data. The readout gives the instantaneous values of the capacitive reactive power of each phase and also the three phase total instantaneous capacitive reactive power, which is the addition of each phase value.

Power factor: Readout of the power factor of each phase and the three phase average value.

Frequency: Readout of the instantaneous value of the frequency (Hz). Apparent power: Readout of the three phase total instantaneous apparent, which is

the addition of each phase value. Energies: Readout of the instantaneous value of the active, inductive reactive and

capacitive inductive energy accumulated. These are always reset to zero when this screen is exited.

Time and Date. (time/date): Readout of present time and date. For any modification,

see section 5.1.4.-.

4.2.- Screen for energy meter check. This screen delivers the tools to perform the energy meter check. By means of keys

[5] & [6] the position of the screen to be modified is selected. This position can be modified when pressing the key [SET].

CHECK-METER CHECK-METER

User Name User’s data

1/1 V 5/5 A

Voltage ratio setting and Current ratio setting

kWh 3Φ ?

? TURNS/IMP

Energy meter type (Active/Reactive) n.circuit’s phase

kW/turn ratio of the energy meter

? nTURNS/IMP? N turns/impulses RECORDED ?

?

KWh START

kWh END

Initial energy of the energy meter

Final energy of the energy meter

RECORD Save check

Wh METER

Wh AR5L

Measurement of the energy meter

Measurement of the AR5

- - . - %

Energy meter error

Page 11: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 11

4.3.- Warning messages Some warning messages can appear on the visualization screens. These messages

inform about the AR5/AR5-L performance:

- STOP: The analyser is not recording data.

- RECORD: The analyser is recording data.

- M. Full: Memory is full. - M.Error: There is an error in the memory. The memory must be formatted. - Analyser battery charge status. When only the symbol 3is shown, it

means that the battery is very low and the analyser might turn off at any moment.

- The battery is charging. The user can also see the accumulated battery charge level.

- Full battery charge.

- WARNING MAX 500 V: The maximum allowable phase to neutral voltage of 500 V has been exceeded during the measuring process. When measuring phase to phase voltages the limit is set at 866 V.

5.- PROGRAMMING THE AR5/AR5-L CHECK-METER

The “CHECK-METER” program has 2 different set-up menus: • AR5 Set-up. This is accessible from the screen of instantaneous values (Section 5.1.-) • Check Set-up. This is accessible from the screen of energy meter check (Section 5.6.-).

5.1.- Set-up of Instantaneous Values To accessing AR5/AR5-L setup options press the key [SET], on the instantaneous

values screen The analyzer will then inquiry for a password that consists of a key sequence to be pressed (the user has 15 seconds to press this sequence). If the default password has not been modified, then the following key sequence must be followed:

PASSWORD

[3] [SET] [5] [SET] Standard Password

Once this password is entered, the analyzer will permit the user to modify any Setup parameters.

All programs have an independent setup, therefore, the setup must be always check to ensure a proper operation, since any modification will only affect the active operation program.

Page 12: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 12

Diverse setting MENUS are available:

SETUP DISPLAY FILES CLEAR OFF LANGUAGE

INITIAL MENU

• Select one option with keys [6] & [5]. • To access any menu option use [8] or [ENTER]. • To close the menu press [3] or [ESC]. If this key is used when only the main

menu is open, this is closed. If any modification over any setup parameter was done, before closing a confirmation of setup change is requested on display.

Page 13: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 13

5.1.1.- SETUP menu The AR5/AR5-L meter can be user-configured to different performances involving its

data analysis and recording modes, as it is followed shown:

SETUP � MEASURE

COMM CLOCK PASSWORD RECALL

SETUP menu.

MEASURE � WIRING

PT/CT

4 wires / 3 wires / Aron / Single-phase. V and A transformation ratios.

COMM Baud / Parity / Bits / Stop bits.

CLOCK DD/MM/YY hh:mm:ss.

PASSWORD Setting the analyzer password

RECALL Standard. Recall Setup sure <yes > <no>.

5.1.2.- MEASURE Use this option to set measuring conditions: CONNECTION MODE SETTING ( 3 or 4

wires or single-phase) and VOLTAGE and CURRENT TRANSFORMATION RATIOS SETTING.

MEASURE : � WIRING

PT / CT

3Φ 3 Wires, 3Φ 4 Wires , Aron and1Φ Prim. V, Secon. V, Prim. I

Page 14: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 14

5.1.2.1.- WIRING: Circuit type Choose the circuit type to be analysed (rotary input). − 3Φ 4 Wires: To measure Three-phase systems with Neutral wire. − 3Φ 3 Wires: To measure Three-phase systems with Neutral wire. For this

arrangement 3 current clamps must be used. − 1Φ: To measure Single-phase systems.

5.1.2.2.- PT/CT : Transformation ratios Voltage and current transformation ratios setting. The program will sequentially

inquire for following data: − PRIM. V: Voltage transformer primary value. − SEC. V: Voltage transformer secondary value. − PRIM. I: Current transformer primary / Current clamp primary, used for

measuring the line currents. NOTE 1 : If voltage is directly measured (no voltage transformer is used), you must

set PRIM.V = 1/SECV.V = 1. NOTE 2 : PRIM. I --> This option permits to program: a) The ratio of the Current clamp to be used. b) In case of a high voltage system, the measurement will be carried out through the

secondary of current transformers. A shunt ATS-III 5 A a.c./ 2 V a.c. or CP5 clamp will be then required to enter the measurement signal into the AR5/AR5-L analyzer (Never directly connect the 5 A signal to the AR5/AR5-L.). For this case, the C.T. primary must be set at the primary value of the C.T. used for measuring purposes.

Ratio set must be modified for each Current or transformer type change to avoid measurement mistakes. Standard clamps give a voltage output (generally 2 a.c. at full-scale).

NOTE : Secondary is always set at 2 V a.c. (it is not user-programmable).

5.1.3.- COMM: Communication parameters Program here the parameters of the built-in RS-232 serial output. When selecting this

option the present parameters are shown on display:

COM

9600 NO 8 1

Baud Parity Bits Stop bits - Pressing [ENTER]: values on display are directly validated.

- To modify: (rotary input).

- Select with keys [4] or [3] the position to modify.

Page 15: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 15

- Though keys [6], [5] the value of the selected position is increased or decreased.

- [ENTER] to validate the total value or [ESC] to exit with no modification.

5.1.4.- CLOCK: Internal clock Use this section to set the analyzer internal clock in time: date / time and displaying

format. When this option is selected, presently programmed values are shown by display:

CLOCK TYPE DD /MM/YY HH :MM:SS

CLOCK TYPE MM/DD/YY HH :MM:SS

After validating the date format, the present date and time will be displayed according

to the selected arrangement:

CLOCK 00 /00 /00 00 :00 : 00

Proceed similarly than for the former section.

5.1.5.- PASSWORD: Safety setting. Set here the analyser password configuration. This password will be required to

access the SETUP menu. Thus, the manipulation of the analyser by not-authorized people can be avoided.

The password can be also required for turning the analyser off. The default password is:

PASSWORD [3] [SET] [5] [SET]

Change of SETUP access password: Firstly enter the old password:

OLD PASSWORD * * * *

Then enter the new password:

NEW PASSWORD* * * *

Finally, confirm the new password:

CHECK PASSWORD * * * *

Page 16: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 16

During this password modification process, the following error messages can be shown in screen during 5 s:

Incorrect Old password

Wrong password

Incorrect Check password

The confirmation of the new password has failed

5.1.6.- RECALL: Read configuration You can here recall a standard configuration.

Set Standard.. sure? <yes > <no>

- A confirmation is requested: “Recall Setup sure <yes> or <no>“. With keys

[4] & [3] select yes or no, and then press [ENTER].

A “Standard” operation program for the AR5/AR5-L is available to be user-recalled. Its features are:

- C.T. Ratio (SET + A) : 5 - V.T. Ratio (SET + V) : 1 / 1 - Circuit type : Three phase (III - Phase) - File name (FILE Name) : CK_METER - FILE type : .ACM - Communication parameters : 9600,No,8,1

Page 17: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 17

5.2.- DISPLAY menu

DISPLAY � CONTRAST

ANGLE

Contrast Show cosϕ or power factor (PF)

You can at this point, define the options about the parameters to be visualized on

display, the graphic mode performance, ...

5.2.1.- CONTRAST: Screen contrast The user can here vary the contrast of the AR5/AR5-L display:

- With the [4] you can intensify the display contrast and with the key [3] this can be lowered:

CONTRAST

DEC INC %

5.2.2.- POWER FACTOR The user can chose cosϕ or power factor (PF) to be shown,

φ

- With the [3] and [4] keys, it’s possible change the value.

Angle PF

Page 18: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 18

5.3.- FILES Menu Non-volatile AR5/AR5-L internal memory is storing data up to its maximum capacity.

Once full, no new data will not be saved in, nor stored data will be lost (provided no incorrect operation is done).

When memory is full, the display will show: "MEMORY FULL".

FILES FILES MENU � DIR

DELETE FORMAT

5.3.1.- DIR: Directory This option shows on display a directory of all files saved in memory.

AR5-L - DIR STD-PROG. STD xxxxx bytes File name / File size dd / mm / yy hh : mm : ss Day / Time TEST1. STD xxxxx bytes dd / mm / yy hh : mm : ss STD-PROG. STD xxxxx bytes dd / mm / yy hh : mm : ss ...... / ............. Free bytes: xxxxxxxxxx Number of free bytes in memory

- Keys [6] or [5] allows reading more files in case that all files stored by

the AR5/AR5-L cannot be shown in only one screen.

- Keys [ENTER] or [ESC] to exit.

5.3.2.- DELETE: Deleting a file You can here delete any file from the internal memory.

DELETE STD-PROG. STD xxxxx bytes File name / File size TEST1. STD xxxxx bytes STD-PROG. STD xxxxx bytes ...... ............

- With keys [6] & [5] select the file to be deleted.

- [ENTER] to confirm selected file erasing. Once press, a confirmation is required.

Page 19: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 19

5.3.3.- FORMAT: Formatting the AR5/AR5-L internal memory This option lets the user to format the internal memory.

FORMAT Once the format action over the internal memory is confirmed, a confirmation is

required. Take into account that this action will mean all stored data to be deleted.

Note: Do not turn the AR5/AR5-L off during the memory format process, otherwise the display will show an error message and the process should be redone.

5.4.- Menu OFF: Enable / Disable Password. In order to avoid an accidental manipulation of the analyser, the AR5/AR5-L can be

set to request for a password when the user wants to turn it off.

Password? <Yes> <No>

- With the key [4],[3] you can select: - YES: A password is requested to turn the AR5/AR5-L off. - NO: No password is required to turn the AR5/AR5-L off.

- [ENTER] to validate the choice or [ESC] to exit with no modification. The procedure to follow when this password is enabled is: 1) Press the key [OFF] during 5 seconds. 2) You will see in display:

PASSWORD

3) Enter the correct Password. 4) Press [OFF] again The analyser will turn off if the entered password is the correct one.

5.5.- Menu LANGUAGE It allows selecting the language in which the menus will be presented.

Language

English

- With keys [6] & [5] select the language.

- [ENTER] to confirm selected language

Press key [ESC] to exit with no modification. NOTE: This configuration is commune for all the programs.

Page 20: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 20

5.6.- Setup for energy meter check

AR5 CHECK-METER

User Name

1/1V 5/5A

? kWh? TURNS/IMP

? nTURNS?

? kWh START? kWh END

RECORD

? Wh METER? Wh AR5L

- -.- %

(1) User's data

(2) P.T. and C.T. ratios

(3) Check of energy meters

(5) Check start and end energy test

(6) Saving check results

(7) Check result

(8) % Error

(4) Check of number turns or pulses

3

• Use the keys [6] & [5] to select the option to be modified. • Press the key [SET], to modify the selected option. • Press the key [ENTER] to start the energy meter checking process. • Press the key [ESC] to switch to the screen of instantaneous values.

According the position within the verification screen, by pressing [SET] you can define: 1. Type the name of the user, no. of contract and a brief commentary about the performed

checking action. 2. Measurement conditions setting: • Primary and secondary of the P.T. used. • Primary of the C.T or Clamps. 3. Features of the meter to be checked and type of connection: • Energy meter type: - kWh -> Checking of active energy meters. - kvarh -> Checking of reactive energy meters. • kWh / no. of turns or pulses ratio of the energy meter • Circuit type: select the connection type used for the energy meter check:, three-phase

(III-Phase) or single-phase (II-Phase). 4. Set the number of turns for the mechanic energy meter checking. When checking an

electronic energy meter, will appear the number of impulses well-read by the optical reader.

5. Electronic energy meter check: set the value of the energy meter when starting the check and also when this is finished.

6. RECORD: To save in memory the record of the performed check. 7. This section will show the real value measured by the AR5/AR5-L and also the value that

the CHECK-METER should have measured according to the user-programmed values (points: 3, 4 & 5).

8. Error: You can here read the % of error for the energy meter check in relation with the measurement performed by the AR5/AR5-L.

9. To save the check results (6) by pressing [SET].

Page 21: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 21

6.- Operation mode When checking energy meters it is advisable to: • For any type of energy meter: To perform the energy meter check when the

installation is at full operation conditions. The higher the consumption is, the higher the check reliability will be.

• For active energy meters: Whether power factor correction units are installed in

the power system, check that those are in operation. The higher the power factor is, the higher the check reliability will be.. It is advisable to perform the checking process with a power factor >0,71.

• For reactive energy meters: Whether power factor correction units are installed

in the power system, check that those are disconnected. in operation. The lower the power factor is, the lower the check reliability will be.. It is advisable to perform the checking process with a power factor <0,71.

When the check process is finished, following messages could be shown on screen: - Overflow Energy: The checking process has been too long. The AR5’s inner

energy counter cannot count up to such a high energy level. The check process duration can last a maximum of 20 hour at full-load conditions.

- 999%: The error of the checked energy meter in comparison with the value

measured by the CHECK-METER is very big.

Check of active energy meters: Connect all power factor correction systems

Check of reactive energy meters:

Disconnect all power factor correction systems

The check process is advisable to be performed at full-load conditions

Page 22: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 22

7.- Checking energy meters

7.1.- Checking mechanic energy meters

AR5 CHECK-METER

User Name

1/1V 5/5A

? kWh? TURNS/IMP

? nTURNS?

? kWh START? kWh END

RECORD

? Wh METER? Wh AR5L

- -.- %

(1) User's data

(2) P.T. and C.T. ratios

(3) Check of energy meters

(6) Saving check results

(7) Check result

(8) % Error

(4) Check of number turns or pulses

3

• Use the keys [6] & [5] to select the option to be modified. • Press the key [SET], to modify the selected option. 1.- Enter user’s attribute (Name, no. of contract). (1) 2.- Set transforming ratio of P.T. and C.T. (clamps/shunts) used for the checking

action. (2) 3.- Type of energy meter: active or reactive energy meter. (3) (ENERGY: kWh (Active) or kvarh (reactive). 4.- Set the ratio of the mechanic energy meter: Energy x no. of turns. (3) 5.- Type of energy meter to be checked: single-phase/three-phase. (3) 6.- Press [ENTER] to start the energy meter checking process. After a confirmation

inquiry, you will see at the bottom of the screen:

START

When pressing then [ENTER] the energy meter checking process will start.

Page 23: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 23

7.- During some moments of data recording: 8.- You will see again at the bottom of the screen: 9.- The energy meter checking process will be stopped when pressing again

[ENTER]. 10.- Enter the number of turns occurred during the checking process. (4) 11.- The % of error for the energy meter check in relation with the measurement

performed by the AR5 will be shown at the bottom of the screen.(8) 12.- Save check results. (6) by pressing [SET]

STOP

Page 24: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 24

7.2.- Checking electronic energy meters

AR5 CHECK-METER

User Name

1/1V 5/5A

? kWh? TURNS/IMP

? nTURNS?

? kWh START? kWh END

RECORD

? Wh METER? Wh AR5L

- -.- %

(1) User's data

(2) P.T. and C.T. ratios

(3) Check of energy meters

(5) Check start and end energy test

(6) Saving check results

(7) Check result

(8) % Error

3

• Use the keys [6] & [5] to select the option to be modified. • Press the key [SET], to modify the selected option. 1.- Enter user’s attribute (Name, no. of contract). (1) 2.- Set transforming ratio of P.T. and C.T. (clamps/shunts) used for the checking

action. (2) 3.- Type of energy meter: active or reactive energy meter. (3) (ENERGY: kWh (Active) or kvarh (reactive). 4.- Press [ESC] and disregard inquiries about the mechanic meter ratio. (3) 5.- Type of energy meter to be checked: single-phase/three-phase. (3) 6.- Press [ENTER] to start the energy meter checking process. After a confirmation

inquiry, you will see at the bottom of the screen:

When pressing then [ENTER] the energy meter checking process will start.

START

Page 25: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 25

7.- During some moments of data recording 8.- You will see again at the bottom of the screen: 9.- The energy meter checking process will be stopped when pressing again

[ENTER]. 10.- Enter the initial and ending energy readouts of the energy meter to be

checked. (5) 11.- The % of error for the energy meter check in relation with the measurement

performed by the AR5 will be shown at the bottom of the screen.(8) 12.- Save check results. (6)

STOP

Page 26: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 26

7.3.- Checking electronic energy meters using the optical reader. It is possible to connect an optical reader (ref XXXXXXX) for those meters that have

a LED.

Connect the optical reader into AUX plugin

The communications must be set to: 9600 / NO / 8 / 1

AR5 CHECK-METER

User Name

1/1V 5/5A

? kWh? TURNS/IMP

? nTURNS?

? kWh START? kWh END

RECORD

? Wh METER? Wh AR5L

- -.- %

(1) User's data

(2) P.T. and C.T. ratios

(3) Check of energy meters

(6) Saving check results

(7) Check result

(8) % Error

(4) Check of number turns or pulses

3

• Use the keys [6] & [5] to select the option to be modified. • Press the key [SET], to modify the selected option. 1.- Enter user’s attribute (Name, no. of contract). (1) 2.- Set transforming ratio of P.T. and C.T. (clamps/shunts) used for the checking

action. (2) 3.- Type of energy meter: active or reactive energy meter. (3) (ENERGY: kWh (Active) or kvarh (reactive). 4.- Set the ratio of the electronic energy meter: Energy x no. of pulses. (3) 5.- Type of energy meter to be checked: single-phase/three-phase. (3)

Page 27: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 27

6.- Connect the optical reader, if it is not connected yet , to the AR5/AR5-L and align

optical head with the LED of the meter.

AUX

7.- Press [ENTER] to start the energy meter checking process. After requesting a confirmation the relation of transformation of INTENSITY of the TRANSFORMER is due to introduce where it goes connected the meter

PRIM. METER

100

ENTER

SEC. METER

5

ENTER 8.- When pressing the optical reader button the energy meter checking process will

start . When pressing then [ENTER] the energy meter

checking process will start.

START

Page 28: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 28

9.- During some moments of data recording 10.- You will see again at the bottom of the screen: 11.- The energy meter checking process will be stopped when pressing again the

optical reader button. 12.- The % of error for the energy meter check in relation with the measurement

performed by the AR5/AR5-L will be shown at the bottom of the screen.(8), 13.- The number of impulses that has been read, will shown at no turns/imp (4) 14.- Save check results. (6)

If you want check more energy meters with optical reader, keep it connected. If you need to do

another check, disconnect the optical reader. 8.- AR5/AR5-L COMMUNICATIONS

To connection to PC of the AR5/AR5-L must be done through the power supplier set, which will be necessary connected to the main. Perform the connection using the two wires factory-delivered with the AR5/AR5-L.

One cable will link the AR5/AR5-L to the power supplier set, and another cable is a standard RS232 connector.

When starting communication tasks take into account:

• Communication parameters of the AR5/AR5-L and the PC must fully coincide.

• The power supplier set must be plugged into.

• The AR5/AR5-L cannot be into the setup menu. CIRCUTOR has a software package that permits the user to retrieve stored data in

the AR5/AR5-L to PC for a further complete analysis. The download archive is in text format, that allow to be opened and edited.

STOP

Page 29: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 29

9.- TECHNICAL SPECIFICATIONS

Supply voltage: Through an external power supplier set 230 V a.c. (+10% / -15%) Frequency : 50...60 Hz Burden : 8 VA Operation temperature : 0 / 50 ºC Measuring circuit : SINGLE-PHASE, THREE-PHASE, ARON Voltage measurement: Measuring range : 20 to 866 V a.c. (between phases) 20 to 500 V a.c. (phase-neutral) Automatic scale adjustment Other voltages : through suitable voltage transformers Frequency : 45 to 65 Hz Current measurement: Measuring range: according to current clamps Current transducer ratio : user-programmable Measurement units : automatic scale adjustment Constructive characteristics of the cartridge Case : Anti-chock plastic Dimensions : 64 x 19 x 40 mm Connection terminals : 1 input/output terminal Accuracy class: Current ..................................... 0.5 % of readout ± 2 digits Voltage ..................................... 0.5 % of readout ± 2 digits Active power ............................. 1.0 % of readout ± 2 digits Reactive power.......................... 1.0 % of readout ± 2 digits

Measuring conditions to assure accuracy class: Errors due to external voltage and current transformer not included Temperature range : 5 ºC to 45 ºC Power factor : 0.5 to 1. Measuring range : between 5 % and 100 %. ACCESSORIES − AR5/AR5-L Programs - HARMONIC ........................CODE. M 80221 - FLICKER ............................CODE. M 80223 - DISTORTIONS ...................CODE. M 80224 - CHECK-METER .................CODE. M 80225 - FAST CHECK ....................CODE. M 80226 - Software CirEnergy …........Visit our web site − Current measurement: a) Through Current clamps (3 Clamps KIT): ¨ CP-2000-200 ..…………….......................…...... CODE M 81045 ¨ CPR-1000 ......………………….......................... CODE M 81044 ¨ CPR-500 ..........………………........................... CODE M 81043 ¨ CP-100 (M1-U) ................................................. CODE M 81042 ¨ CPR-100 (For Neutral current measurement)....CODE M 81036 ¨ CP-5 ........................... ....…………………........ CODE M 81041 b) Through flexible Current clamps (3 Clamps KIT):

Page 30: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 30

¨ C-FLEX 200/2000/ 20000 – Length 45 cm.................. CODE M 81141 ¨ C-FLEX 200/2000/ 20000 – Length 80 cm.................. CODE M 81142 ¨ C-FLEX 200/2000/ 20000 – Length 120 cm................ CODE M 81143 c) ATS-5 shunt (5 A / 2 V a.c.) + current transformers (../5 A) ....CODE M 89925 − Carrying case - Carrying case for AR5/AR5-L current clamps.................. CODE M 89921 - Carrying case for AR5/AR5-L................................................. CODE M 89901 - 1000 case (with protection rubber CPR-1000) ................ CODE M 89923 - 2000 case (with protection rubber CPR-2000) ................. CODE M 89921

Page 31: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 31

10.- SAFETY WARNINGS

The user should take into account all installation instructions referred in sections INSTALLATION AND STARTUP, CONNECTION INSTRUCTIONS and TECHNICAL SPECIFICATIONS of the analyser.

Note that with the instrument powered on, the terminals could be dangerous to touching, and cover opening or elements removal actions may allow accessing dangerous parts. The analyser has been designed and tested to meet IEC 348 standard and is factory-shipped in proper conditions.

11.- MAINTENANCE

The AR5/AR5-L does not require any special maintenance. No adjustment, maintenance or repairing actions should be done over the instrument open and, should those are essential, high-qualified operators must perform them.

Before any adjustment, replacement, maintenance or repairing operation is carried out, the instrument must be disconnected from any power supply source.

When any protection failure is suspected to exist, the instrument must be immediately put out of service.

The own instrument design permits a quick replacement in case of damage.

12.- TECHNICAL SERVICE

For any inquiry about the instrument operation mode or in case of malfunction, you can contact CIRCUTOR’s technical service.

CIRCUTOR S.A. - Aftersales Service Vial Sant Jordi, s/n 08232 – Viladecavalls (SPAIN) Tel: (+34) 93 745 29 00 Fax: (+34) 93 745 29 14 E-mail: [email protected]

Page 32: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 32

A. CABLE ARRANGEMENT Different cables used with the AR5/AR5-L have following arrangements:

• Communication cable RS232: PC - Power supplier set

PC POWER SUPPLIER SET

2 3 3 2 5 5 7 8 8 7

• Power supply/Communication: Power supplier set - AR5/AR5-L.

POWER SUPPLIER

SET

AR5/AR5-L

1 1 7 2 6 3 5 4 2 5 4 6

1

2

3 4

5

6

7

3 7

Page 33: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 33

B. QUICK GUIDE Menu Description Options Standard

Circuit Choice type of measuring circuit. Three-phase Single-phase

Three-phase

Rel. V Voltage transformers ratio. Primary=1 Secondary=1

Measure

Tr. Rel

Rel. A Current transformers ratio. Primary=5

Setup

Comm Communication parameters setting 9600,n,8,1

Clock Analyzer’s date and time setting

Password Set here the analyzer password configuration

Recall Recalling standard configuration Standard

Contrast. SET de contrast Display Angle Choose between cosϕ or P.F visualization. Dir Directory of stored files. Delete Deleting a file.

Files

Format Clearing all memory content. OFF set to request for a password when the user wants to turn it off.

Language Set the user language. English Spanish

C. QUICK GUIDE FOR AR5 - CHECK-METER.

AR5 CHECK-METER

User Name

1/1V 5/5A

? kWh? TURNS/IMP

? nTURNS?

? kWh START? kWh END

RECORD

? Wh METER? Wh AR5L

- -.- %

(1) User's data

(2) P.T. and C.T. ratios

(3) Check of energy meters

(6) Saving check results

(7) Check result

(8) % Error

(4) Check of number turns or pulses

3

Check of active energy meters: Connect all power factor correction systems

Check of reactive energy meters: Disconnect all power factor correction systems

The check process is advisable to be performed at full-load conditions

Page 34: AR5 & AR5-L seriesdocs.circutor.com/docs/M98110301-03.pdf · ----- SUPPLY NETWORK ANALYZER AR5-L ----- Page nº 4 1.- BASIC INSTRUCTIONS This manual is aimed to familiarize the user

-------------- SUPPLY NETWORK ANALYZER AR5-L ----------- Page nº 34

D. EXAMPLE OF TRANSFORMATION RELATIONS Clamps connected in the secondary one

5A clamps

L1

L1

L2

L2

L3

L3

METER

27000 V500 A

110 V 5 A

CHECK-METERUSER

27000/110V 500/5

Clamps connected in the primary one

L1

L1

L2

L2

L3

L3

METER

27000 V500 A

110 V 5 A1000 A clamps

CHECK-METERUSER

27000/110V 1000/5


Recommended