ARANSAS PASS ISD SPORTS COMPLEX 450 South Avenue A Aransas Pass, TX 78336 Architect: LaMarr Womack & Associates LP Todd Brendalen 711 N. Carancahua, Suite 404 Corpus Christi, TX 78401 361-884-7442 [email protected] Contract Amount: $4,310,526 Final Contract Amount: $4,374,698 Start Date: October 17, 2017 Completion Date: September 26, 2019 Project Description: Construction of a new single story 18,340 SF gymnasium. Project consist of structural steel framing with unit masonry walls and insulated translucent wall panels. Interior finishes consist of wood gym flooring with specialized school graphics; telescoping bleachers; basketball goals; volleyball court graphics / lines and netting sleeves; locker rooms with showers, benches, and toilet compartments; center and wall hung scoreboards; sound absorbing acoustical wall panels, concessions area, ticket booth area; all associated MEP along with a sound system and fire alarm and sprinkler systems. Exterior amenities included cover walkway canopies; new parking lot; and exterior lighting. Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 Point of Contact: Cara Cooke 361-758-4200 [email protected] Construction Team: Project Manager: Fidel Mendoza Superintendent: Mike Decker / Joe Russell
Transcript
Page 1: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

ARANSAS PASS ISD SPORTS COMPLEX 450 South Avenue A Aransas Pass, TX 78336 Architect: LaMarr Womack & Associates LP Todd Brendalen 711 N. Carancahua, Suite 404 Corpus Christi, TX 78401 361-884-7442 [email protected] Contract Amount: $4,310,526 Final Contract Amount: $4,374,698 Start Date: October 17, 2017 Completion Date: September 26, 2019 Project Description: Construction of a new single story 18,340 SF gymnasium. Project consist of structural steel framing with unit masonry walls and insulated translucent wall panels. Interior finishes consist of wood gym flooring with specialized school graphics; telescoping bleachers; basketball goals; volleyball court graphics / lines and netting sleeves; locker rooms with showers, benches, and toilet compartments; center and wall hung scoreboards; sound absorbing acoustical wall panels, concessions area, ticket booth area; all associated MEP along with a sound system and fire alarm and sprinkler systems. Exterior amenities included cover walkway canopies; new parking lot; and exterior lighting. Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 Point of Contact: Cara Cooke 361-758-4200 [email protected] Construction Team: Project Manager: Fidel Mendoza Superintendent: Mike Decker / Joe Russell

Page 2: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

RECONSTRUCTION OF SEAGATE CONDOMINIUMS 132 Palmilla Beach Drive Port Aransas, TX 78373 Design Consultant: Open Studio Architecture Haley Serna 6122 DeZavala Rd. San Antonio, TX 78249 210-417-4307 [email protected] Contract Amount: $4,702,755 Start Date November 28, 2017 Completion Date: July 12, 2018 Project Description: Interior demolition and reconstruction of approximately 20 condominium units totaling approximately 36,600 SF due to hurricane damages. Project included: interior demolition; new drywall, paints and coatings; interior doors/frames and hardware; crown molding; cabinetry; flooring; appliances; light fixtures; associated MEP and lobby elevator repairs. Exterior painting and replacement of all exterior fire sprinkler heads as required per City inspection; complete reroofing with a galvalume standing seam roof; catwalk balcony waterproofing/ceramic tile installation. Owner / Customer: McCombs Enterprises 755 E. Mulberry Ave. Suite 600 San Antonio, TX 78212 Point of Contact: Gregory Carr 210-294-0702 [email protected] Construction Team: Project Manager: Michael Dodson Superintendent: Rudy Ruiz and Mark Espinoza

Page 3: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

TEXAS A&M UNIVERSITY KINGSVILLE ATHLETIC AND INTRAMURAL FIELDS 1725 W. Corral Ave. Kingsville, TX 78363 Architect: Trey Schneider PBK Sports 11 Geenway Plaza, 22nd Floor Houston, TX 77046 713-965-0608 [email protected] Start Date: June 13, 2016 Completion Date: April 17, 2017 Contract Amount: $5,725,200 Final Contract Amount: $5,800,026 Project Description: This 18 acre sports facility on the Texas A&M Kingsville University campus consists of 8 Court NCAA Regulation Tennis facility with a securely fenced perimeter on a post tensioned concrete with an acrylic playing surface coating. There are 6 NCAA Regulation Sand Volleyball Pit Courts also fenced in with a perimeter grass berm and synthetic surfaced perimeter concrete walkway. The facility has a bricked Restroom building serving the complex in a centrally located area. The restroom building also has drinking fountains and a towered multi-head shower. There are 2 fully fenced natural grassed Intramural Softball Fields, 2 Intramural Soccer Fields, and 1 Intramural Cricket Field with a synthetic turf covered concrete pitch. All fields and courts have a state-of-the-art sports lighting pole system that is remotely monitored with remote and/or programmer control capability. The facility has wide concrete walkways to all fields with main entry walkway landscaping while all fields and common grassed areas are irrigated with a multi zone remote controlled programmer. Owner / Customer: Texas A&M University – Kingsville 700 University Blvd., MCS 111 Kingsville, TX 78363 Point of Contact: Christopher Vera Director of Planning & Construction Services 361-593-2647 [email protected] Gerald Tyler AGCM, Construction Manager 361-960-6071 [email protected] Construction Team: Project Manager: Fidel Mendoza Superintendent: Jerry Lee

Page 4: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

TEXAS A&M INTERNATIONAL UNIVERSITY RECREATION CENTER EXPANSION 5201 University Blvd. Laredo, TX 78401 Architect: Rey Gonzalez Frank Architects, Inc. 901 Victoria St. Suite A Laredo, TX 78040 956-725-7418 [email protected] Start Date: October 5, 2015 Completion Date: November 18, 2016 Contract Amount: $3,597,746 Final Contract Amount: $3,534,363 Project Description: 14,000 sf 2-story addition / expansion to existing recreational sports building. Project included free weight and cardio training areas on the first floor and two (2) fitness rooms on the second floor. Overall work included demolition; site work; piers, concrete slab on grade; steel structure; masonry wall construction; steel stud partitions; aluminum storefront, windows, and doors; miscellaneous steel elements; clay tile roofing; TPO roof system; ceramic tile; wood flooring; resilient flooring; paint; millwork; mechanical and electrical systems; site utilities; fire alarm and sprinkler systems. Owner / Customer: SSC Service Solutions Texas A&M International University 5201 University Blvd. Laredo, TX 78041 Point of Contact: Robert Garza 956-326-2266 [email protected] Construction Team: Project Manager: Michael Dodson Superintendent: Pete Gutierrez

Page 5: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

ALICE MULTI-USE COMPLEX Construction Manager at Risk 723 FM 1554 Alice, TX 78332 Architect / Engineer: Lewis Shrier, P.E. Hanson/Naismith Engineering 4501 Gollihar Corpus Christi, TX 78411 (361) 814-9900 [email protected] Construction Start Date: July 15, 2013 Completion Date: August 31, 2015 Contract Amount: $15,389,241 Final Contract Amount: $15,135,314 Project Description: A 38,000 SF Natatorium/Aquatics facility with an adjacent 2 acre outdoor water park and picnic area. The indoor section includes a 600,000 gallon indoor competition swimming pool and diving center with a 10,000 SF air conditioned administration wing including coach’s offices, concessions, and locker rooms. The building is a structural steel frame with CMU walls and a prefinished standing seam roof surrounding four large skylights over the pool area with single ply roofing system over the administration and mechanical wings. Decorative colored roof tile covers the Admin. and pool area ventilation clerestory towers. The exterior walls are a combination of stucco, split face CMU, and windstorm rated aluminum/glass storefront systems. The outdoor water park includes a 400,00 gallon water jet lazy river and shallow entry pool, an aquatics play unit, and three 28ft high water slides and plunge pools. A 350 space asphalt parking lot surrounds the facility that includes two paved access roads from the adjacent highways. Owner / Customer: City of Alice PO Box 3229 Alice, TX 78333 Point of Contact: John Michael Hanson/Naismith Engineering (361) 814-9900 [email protected] Construction Team: Project Manager: Fidel Mendoza Job Superintendent: Bob Schey Assistant Superintendent: Danny Ochoa

Page 6: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

GEORGE WEST ISD NEW HIGH SCHOOL 1013 Houston Street George West, TX 78022 Architect: Rob Garcia LaMarr Womack & Associates, LP 711 N. Carancahua, Suite 404 Corpus Christi, TX 78401 (361) 884-7442 [email protected] Construction Start Date: April 17, 2012 Completion Date: August 25, 2013 Contract Amount: $7,405,614 Final Contract Amount: $7,242,755 Project Description: Construction of a new 38,000sf high school and remodeling of a 14,000sf existing science building that abuts to the new high school and a separate 4,800sf existing classroom building. Structural steel frame with CMU at exterior and interior walls. Porcelain tile corridor walls with ceramic tiled restrooms, vinyl composition tiled corridors and classrooms with carpeted administration offices and library. Roof construction included built up bituminous and metal clad mansards. Face brick clad exterior walls with precast stone accents at new exterior canopy columns and wall caps. Provided new asphalt parking lot and concrete ramps and sidewalks. Owner / Customer: George West Independent School District 913 Houston Street George West, TX 78022 Point of Contact: Ty Sparks Superintendent (361) 449-1914 [email protected] Construction Team: Project Manager: Fidel Mendoza Job Superintendent: Mike Decker

Page 7: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

CONSOLIDATED CLUB FACILITY DESIGN-BUILD NAVMWR-10-C-0006 11803 Ocean Drive NAS Corpus Christi, TX 78419 Architect: Erasmo Nava Solka, Nava, Torno Architects 6262 Weber Rd., Suite 310 Corpus Christi, TX 78413 (361) 854-1471 [email protected] Design Start Date: June 27, 2011 Construction Start Date: November 7, 2011 Completion Date: February 14, 2013 Contract Amount: $4,153,000 Final Contract Amount: $4,419,315 Project Description: 15,000sf single story modern naval consolidated club facility with surface parking for 155 vehicles and a one-way drive to building for a drop-off point. Building was constructed of a load bearing Insulated Concrete Form (ICF) system, exterior wall finishes are a combination of cementious ICF wall coating system and thin brick veneer. Roofing consisted of a hipped red standing seam metal panel system along with a single ply system on a flat sloped area in the rear of the facility. An air cooled chiller with multiple scroll compressors will service the building along with Direct Digital Controls (DDC) System for each HVAC equipment. Interior finishes consist of ceramic tile flooring, wood look vinyl planks and carpeting. A full commercial kitchen directly serves the lounge/bar, while a back of the house pathway to the meeting rooms was provided. The kitchen provides zones for storage, preparation, cooking and cleaning. Other amenities include a walk-in cooler and freezer and employee lockers. Owner / Customer: MWR Deputy Director NAS Corpus Christi Bldg. 39, D Street Corpus Christi, TX 78419 Point of Contact: Kass Varner (361) 961-2240 [email protected] Construction Team: General Contractor: Marshall Company Project Manager: Fidel Mendoza Job Superintendent: Lee Barnes Quality Control Mgr: Brandon Rice

Page 8: ARANSAS PASS ISD SPORTS COMPLEX _Projects_Narrativ… · Owner / Customer: Aransas Pass ISD 2300 McMullen Lane Suite 600 Aransas Pass, TX 78336 . Point of Contact: Cara Cooke 361-758-4200

T-45 FLIGHTLINE RE-CAPITALIZATION DESIGN-BUILD NAS Kingsville, TX N62467-04-D-0078 Task 0002 Owner / Customer: NAVFAC South Texas Area, NAS Kingsville 201 Nimitz Ave., Bldg. 4711 Kingsville, TX 78363 Point of Contact: Jack Kopatz ROICC (361) 516-6044 [email protected] Start Date: September 2, 2008 Completion Date: February 15, 2011 Original Contract Amount: $12,562,000 Final Contract Amount: $13,337,417 Project Description: Design, renovation and repair of three buildings. Buildings 2713, 760 and 3786. This project renovated 79,964 square feet of existing building space, demolished 5,875 square feet of substandard space and constructed 9,400 square feet of new warehouse/shop space. Building 2713 – The renovation of this hangar included modifications to the structural steel allowing the restoration of the existing hangar doors, interior and exterior painting, repairs to the electrical, power and lighting, repairs to the existing fire suppression system and the addition of AFFF, and an Interior Fire Alarm and Mass Notification System and roof repairs. Building 760 – This is a historic hanger renovated by modification to the structural steel and building skin allowing restoration of the existing hanger doors, repairs to the existing fire suppression system and the addition of AFFF, addition of an Interior Fire Alarm and Mass Notification System, repairs to the existing electrical, power and lighting system, interior and exterior painting, and repairs to the existing plumbing and restrooms. This project also includes the demolition of 5,875 square feet of inadequate warehouse space to be replaced with 9,400 square feet new pre-engineered metal building for warehouse/shops space on the west side of the hanger. Building 3786 – The renovation of this storage building included repairs to the existing metal roof, electrical, power and lighting systems, repair to the building exterior finish, the addition of overhead doors and interior and exterior painting, and addition of an Interior Fire Alarm and Mass Notification System. Construction Team: Project Manager: Fidel Mendoza Superintendent: Bob Bickle Construction QC: Gary Morgan Architect: Ted Fery

VOA Associates, Inc. 4798 New Broad St., Suite 100 Orlando, Florida 32814 (407) 541-0203