Home > Documents > arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and...

arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and...

Date post: 21-Apr-2020
Category:
Upload: others
View: 6 times
Download: 0 times
Share this document with a friend
12
Transcript
Page 1: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection
Page 2: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

arches

Norridgewock Bridge, Norridgewock, ME

Construction analysis for erection of the new arch

structure, erection plans & procedures

as well as development & design of temporary arch shoring.

Page 3: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

McNary Bergeron & Associates has now been serving the complex Bridge market for 10 years! We have enjoyed working with the premiere Owners, Contractors and Engineers in the world helping build some amazing bridges. Here are 10 highlighted projects that show how we have assisted our clients over the years.

colorado565 Burbank Street, Suite ABroomfield, CO 80020tel 303 450 6900

coNNecticut220 Old Boston Post RoadOld Saybrook, CT 06475tel 860 388 2267

www.mcnarybergeron.com

lowry (Cover) Minneapolis, MN

3D Time-Dependentconstruction analysis, phased geometry control and erection

procedures, design of falsework and temporary works for backspans, mainspan

and arch erection.

steel

PawtucketPawtucket, RI

McNary Bergeron & Associates developed and designed the erection

plans, procedures, temporary works and heavy lifts for erection of the arches, as well as the upper structural steel

works and precast deck panels. We also developed and designed the arch “roll-in”

scheme.

Page 4: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

cables

Hoover dam ByPassBoulder City, NV

McNary Bergeron & Associates provided construction

engineering services for the arch construction. This includes

the structural design for the temporary stay cable system

(anchorages, towers and cable connections at the arch ribs) as well as arch rib shop drawings and an independent review of

the formtraveler design.

Page 5: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

equipment

Port maNNVancouver, BC Canada

Provided an independent check of the launching gantry designed

by DEAL for use in erection of the balanced cantilever and span-by-span approaches.

Page 6: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

segmental

Nalley valley WA

McNary Bergeron & Associates assisted the contractor in procuring the contract by

redesigning two expensive steel bridges to be more economical

concrete structures. McNary Bergeron redesigned the bridge

from a steel tub-girder bridge to a precast segmental box

girder bridge, a change that also suited the owner because of the

extended design life and reduced maintenance. Construction

engineering services were also provided for the redesigned

structure through the casting and erection processes.

Page 7: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

DRB/ExpERt

maiN street BridgeColumbus, OH

Scott McNary, of McNary Bergeron & Associates is a

member of the Dispute Review Board (DRB)

Page 8: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

SubStructure

route 36Washington

McNary Bergeron & Associates provided construction engineering

services including the design of precast cofferdams and support system for footing construction,

integrated shop drawings for precast column and superstructure

segments, construction analysis, step-by-step erection procedures,

development and design of falsework, cantilever stability

system, lifting assemblies and rigging, and misc temporary works, and geometry control

system, including casting software for column and superstructure

segments.

Heavy Lift

Page 9: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

Heavy Lift

lowryMinneapolis, MN

McNary Bergeron & Associates provided construction engineering

services to Lunda Construction for this unique basket-handle arch bridge. Our services included 3D time-dependent

construction analysis, phased geometry control and erection procedures,

design of falsework and temporary works for backspans, mainspan and arch

erection,design of lifting beams & equipment for

precast edge beam erection and arch rib lifting, and 2D and 3D integrated

shop drawings and working drawings for footings, piers, and superstructure

backspans and mainspan.

Page 10: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

AccelerAted Bridge construction

cHesaPeakeAnnapolos, MD

McNary Bergeron & Associates provided construction engineering

services including, construction analysis for the replacement

of the suspension span deck through truss deck, erection

plans & procedures, geometry control systems, integrated shop

drawings for the precast deck units, development and design of lifting and handling systems

and the design of marine access system and trestle.

Bridges toProsPerity

Page 11: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

Bridges toProsPerity

el BosQue El Salvador

Two communities are served by this bridge when traveling from their homes to the main road in

order to get anywhere, including town, city, markets, and doctors.

The third community is set on the road side of the river but the school is on the other side. This

bridge allowed the children of this community the opportunity

to get safely to their school all year around.

Page 12: arcHes...and arch erection. STEEL Pawtucket Pawtucket, RI McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection

colorado565 Burbank Street, Suite ABroomfield, CO 80020tel 303 450 6900

coNNecticut220 Old Boston Post RoadOld Saybrook, CT 06475tel 860 388 2267

www.mcnarybergeron.com


Recommended