ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS This document is based on AIA DOCUMENT G710 The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. PROJECT: ARCHITECT’S SUPPLEMENTAL INSTRUCTION NO. CONTRACTOR: ARCHITECT: COLAB Architecture + Urban Design llc 421 SW 6th Ave, Suite 1250 Portland, OR 97204 503.827.5339 OWNER: DATE OF ISSUANCE: CONTRACT FOR: DESCRIPTION: (Provide all material and labor to perform the following) ATTACHMENTS: ISSUED BY: ARCHITECT: COLAB Architecture + Urban Design llc Item: Pages: Date: ARCHITECT’S PROJECT NO.: CONTRACT DATED: OWNER ARCHITECT CONSULTANT CONTRACTOR FIELD OTHER ✔ ✔ ✔ ✔ ✔ View Point Terrace Apartments 3939 SW View Point Terrace Portland, OR 97239 12 VPT llc 12/18/2014 Pavilion Construction 4700 SW Macadam Ave Portland, OR 97239 General Construction 1309 09/30/2014 Revised portions of sheets S2.12, S2.13 which include revisions to glu-lam depths and one eliminated glu-lam Revised holdown schedule Holdown details HSS posts to conc. and shear wall details Structural drawings 8 12/18/2014 Jessica Molinar
Transcript
ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS
This document is based on AIA DOCUMENT G710
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sumor Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum orContract Time.
PROJECT: ARCHITECT’S SUPPLEMENTAL INSTRUCTION NO.
CONTRACTOR: ARCHITECT: COLAB Architecture + Urban Design llc421 SW 6th Ave, Suite 1250Portland, OR 97204503.827.5339
OWNER: DATE OF ISSUANCE:
CONTRACT FOR:
DESCRIPTION: (Provide all material and labor to perform the following)
View Point Terrace Apartments 3939 SW View Point Terrace Portland, OR 97239
12
VPT llc 12/18/2014
Pavilion Construction 4700 SW Macadam Ave Portland, OR 97239
General Construction 1309
09/30/2014
Revised portions of sheets S2.12, S2.13 which include revisions to glu-lam depths and one eliminated glu-lam Revised holdown schedule Holdown details HSS posts to conc. and shear wall details
Structural drawings 8 12/18/2014
Jessica Molinar
1 of 8
RussellD
Snapshot
RussellD
Text Box
FLOOR FRAMINGS AND HOLDOWN CHANGES, SHEET S2.13
RussellD
Callout
BEAM SIZE CHANGED
RussellD
Callout
HOLDOWN CONFIGURATION CHANGED, REF DETAILS D1 and D2 FOR INSTALLATION
RussellD
Callout
HOLDOWN CONFIGURATION CHANGED, REF DETAILS D1 and D2 FOR INSTALLATION
RussellD
Callout
BEAM SIZE CHANGED
RussellD
Callout
SHEAR WALL SEGMENT ADDED
RussellD
Text Box
VIEWPOINT
RussellD
Text Box
PORTLAND, OR
RussellD
Text Box
COLAB
RussellD
Text Box
RED
RussellD
Text Box
12/18/14
RussellD
Text Box
13096
RussellD
Rectangle
RussellD
Jerome Oregon Signature
2 of 8
RussellD
Snapshot
RussellD
Text Box
BEAM REMOVED AT GRID D BETWEEN 2 AND 3, SHEET S2.13
RussellD
Callout
BEAM AT THIS LOCATION REMOVED
RussellD
Text Box
VIEWPOINT
RussellD
Text Box
PORTLAND, OR
RussellD
Text Box
COLAB
RussellD
Text Box
RED
RussellD
Text Box
12/18/14
RussellD
Text Box
13096
RussellD
Line
RussellD
Ellipse
RussellD
Text Box
3
RussellD
Jerome Oregon Signature
3 of 8
RussellD
Snapshot
RussellD
Text Box
LATERAL SYSTEM CHANGES AROUND ELEVATOR, SHEET S2.13
RussellD
Callout
HOLDOWNS REMOVED, ANCHOR WALL TO HSS, SEE DETAIL D4
RussellD
Callout
HOLDOWNS REMOVED, ANCHOR WALL TO HSS, SEE DETAIL D4
RussellD
Text Box
VIEWPOINT
RussellD
Text Box
PORTLAND, OR
RussellD
Text Box
COLAB
RussellD
Text Box
RED
RussellD
Text Box
12/18/14
RussellD
Text Box
13096
RussellD
Ellipse
RussellD
Text Box
C
RussellD
Text Box
NOTE: ELEVATOR OCCURS BETWEEN GRIDS 4 and 5
RussellD
Jerome Oregon Signature
4 of 8
RussellD
Snapshot
RussellD
Text Box
LATERAL SYSTEM CHANGES AROUND ELEVATOR, SHEET S2.12
RussellD
Callout
HOLDOWNS REMOVED AT HSS, SEE D3 and D4 FOR HSS BASE PLATE AND WALL ANCHORAGE TO HSS
RussellD
Ellipse
RussellD
Text Box
C
RussellD
Text Box
VIEWPOINT
RussellD
Text Box
PORTLAND, OR
RussellD
Text Box
COLAB
RussellD
Text Box
RED
RussellD
Text Box
12/18/14
RussellD
Text Box
13096
RussellD
Text Box
NOTE: ELEVATOR OCCURS BETWEEN GRIDS 4 and 5
RussellD
Jerome Oregon Signature
5 of 8
RussellD
Snapshot
RussellD
Text Box
DETAIL CALLOUT AND HOLDOWNS CLARIFIED, SHEET S2.13
RussellD
Ellipse
RussellD
Text Box
A
RussellD
Text Box
VIEWPOINT
RussellD
Text Box
PORTLAND, OR
RussellD
Text Box
COLAB
RussellD
Text Box
RED
RussellD
Text Box
12/18/14
RussellD
Text Box
13096
RussellD
Jerome Oregon Signature
6 of 8
RussellD
Snapshot
RussellD
Text Box
CHANGES TO HOLDOWN SCHEDULE, SHEET S0.02
RussellD
Callout
HDU11 (TYPE 4) NO LONGER USED, TYPE 5 ADDED TO CORRESPOND TO PLAN