Architecture, Strategy, and Design: Overview and Opportunities
Office of Information and TechnologyOffice of Architecture, Strategy, and
Design(ASD)1
6/9/2014 v4 2
Architecture, Strategy, and DesignEnterprise Architecture and Strategy: Leads and evolves the VA Enterprise Architecture as an authoritative reference for information used to make informed decisions. Leads OIT Strategic Planning. Facilitates and supports VA Enterprise transformation efforts.
• VA transformation initiatives / VA core process improvement
• VA/OIT Planning: IRM Strategic Plan/ VA Enterprise Roadmap
• OneVA EA Development, Maintenance, Evolution
Business Office: manages essential day-to-day administrative and logistics activities of ASD. Acts as a liaison to OIT for workforce management, finance, acquisition management, facilities and IT assets.
Office of Technology Strategies: defines the “To Be” enterprise technology vision for the VA Office of Information and Technology (OIT).
• Enterprise Design Patterns • TRM• Technology Roadmap
Process and Knowledge Management: develops, and oversees the OIT process framework. Promotes efficient and effective information sharing both internally and externally to ASD.
• Lockdown Facilitation• SharePoint & Web Environments• ProPathRRTF : Tasked with exploring cost savings / avoidance measures and presenting recommendations based on verified analysis • Systems Divestiture • Infrastructure Optimization
Product and Platform Management: provides solution architecture and integration services to guide the engineering of IT systems in the VA
• VistA Evolution
• Enterprise Shared Service Product Management
• Solution Architectures
• Interagency Interoperability
• Life Cycle Product Management • Product Cost Analysis & LCCE
• Program Operating Plan (POP) Development
Acquisitions and Contractual Authority
Acquisitions and contractual commitments can only be made by Government officials having expressed authority to enter into such agreements on behalf of the United States Government. The ONLY Government officials with such authority are Warranted Contracting Officials. Any discussions of contractual requirements do not constitute contractual direction or authorization of any kind. Future contractual directions, If ANY, shall ONLY come from the cognizant Department of Veterans Affairs Warranted Contracting Officer.
3
How Can You Help Us?Challenges: - Building an acquisition strategy that enables the retention of experienced incumbent Veteran Owned Small Businesses (VOSBs) and Woman Owned Veteran Owned Small Businesses (WOVOSBs)-Requirement to re-compete when the performance of VOSBs is outstanding and cost is within expectations- Required re-compete of contracts being performed by the VOSBs results in the turnover and productivity losses
Past Procurements Capabilities:Process Engineering, Program Management Support, Strategy, Test and Evaluation, Enterprise Architecture and Planning Support, Technical Consulting, Strategic Communications Support, Training
Relevant Needs:• Program integration at all levels• System design and system engineering• Enterprise data management• Information interoperability Services• Process modeling• Program management support
Above services can be provided by small business
Small Business Utilization:7DeltaAVOW Consulting PartnersSBG Technology Solutions
Product and Platform Management(PPM)
5
• Serves as the IT application design and portfolio management organization for enhancing capabilities across the VA Enterprise
• Leads all activities associated with strategic planning, requirements and design analysis, prioritization of product capabilities, and the architecture of VA application solutions
• Oversees the planning and requirements analysis elements of VistA Evolution and Electronic Health Record Interoperability
PPM Opportunities Forecast 2015-2016
6
VistA Evolution Program Executive Office SupportProvides the Program Executive Office and Projects with technical, clinical, financial and acquisition support- Executive Support Services- Health IT Portfolio- ONC EHR Certification- Ancillary Services- Special Projects
Total Value of Contracts: $5.5M – 7.5M
Process and Knowledge Management and Communications Service (PKMCS)
17 Nov 2014 7
Consists of 4 divisions: • Process Management - Process Standardization in OI&T• Knowledge Management - Develops solutions & methods to
acquire & retain knowledge assets and facilitate information sharing
• Records Management - Manages, protects, and retains ASD records in accordance with NARA and VA regulations
• Communications – Promotes a greater awareness and understanding of ASD plans, endeavors, products, and accomplishments
• Tools– ProPath – OIT Process Asset Library– ASD Web and SharePoint Sites– Meta-Knowledge Repository (MKR)
• OI&T Standard Process Development & Implementation
• Internal Communication Improvements
• Knowledge Capture
• ASD Web & SharePoint Development & Content Management
• Training to include:‒ ProPath (including CRISP)
‒ Meta-Knowledge Repository (MKR)
‒ SharePoint
‒ Knowledge Management
PKMCS Opportunities Forecast 2015-2016
Total Value of Contracts: $2-5M
Office of Technology Strategies (TS)
Office of Technology Strategies: defines the VA “To Be” enterprise technology vision
– Develops Enterprise Design Patterns to support VA solutions for the “To-Be” enterprise architecture to ensure they are fully interoperable and aligned to the OneVA Enterprise Architecture and Enterprise Technology Strategic Plan
– Provides OneVA Enterprise Technology Strategic Plan and Budget guidance
– Provide assessments of IT industry trends and analysis and their potential (positive and negative) impacts to VA enterprise architecture
– Provide Governance Enforcement Assessment and Compliance activities for Architecture, Strategy, and Design (ASD) through the Architecture Engineering Review Board and the VA Technical Reference Model
Total Value of Contracts: $4-7M
TS Opportunities Forecast 2015-2016
• Support for CRISP efforts
- Project Management support
- Analysis of unauthorized software
• Development of Enterprise Design Patterns
• Technical analysis of emerging industry technologies
Opportunities Forecast 2015-2016
11
Opportunity Description Anticipated parameters (e.g., use of particular contracting vehicles)
Anticipated date needed
Range of Budget
ASD VE PEO Support
Technical, clinical, financial & acquisition support
Transformation Twenty-One Total Technology Program (T4)
March 2015 $5.5-7.5M
PKMCS Support
Process Standardization & Implementation
Transformation Twenty-One Total Technology Program (T4)
June 2015 $2-5M
Technology Strategies Support
Project management & analysis; design patterns; analysis of emerging technologies
Transformation Twenty-One Total Technology Program (T4)
January 2015 $4-7M
Additional Information
• For more information, contact Renee Kenan [email protected]
• http://www.asd.oit.va.gov/
12
•Questions?