12
Ares I Stage 1 Mike Kahn Vice President, Space Launch Systems February 26, 2008
Transcript
Page 1: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

Ares I Stage 1

Mike Kahn

Vice President, Space Launch Systems

February 26, 2008

Page 2: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

2

Transition to Exploration

STS

Today

Ares I

Ares V

Tomorrow Future

Page 3: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

3

Frustum/Separation System

Deceleration System

Fwd Skirt/Electrical System

Aft Skirt/TVC

Five Segment Motor

Ares I – First Stage Elements

> 3.5Mlbf max thrust

Page 4: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

4

ETM-3 Five Segment Static Test –

Demonstrated Margins and Future Capability

October 23, 2003

Five Segment Motor Changes From RSRM

12 vs. 11 Fwd FinsGrain Design

ExistingIgniter

Aft Dome IncreaseInsulation/Liner

Burn RateAdjustment

Propellant

Throat Dia.Some ExistingNozzle

ExistingCase Hardware

New/ModifiedSame as 4 SegmentComponent

Changes from RSRM Baseline

Fwd segment

12 vs. 11 fins

Add center segment

Larger nozzle

throat

Page 5: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

5

• Completed two single parachute tests

• First parachute cluster (3) test in April 2008

Ares I First Stage Project Recent Progress HighlightsDeceleration Subsystem

Main Parachute Drop Test #2

Page 6: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

6

Ares I First Stage Project Recent Progress Highlights RSRMV - Forward Core Fabrication

Page 7: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

7

RSRMV Nozzle Process Simulation Article #1

Ares I First Stage Project Recent Progress HighlightsRSRMV – Nozzle Process Simulation Article 1

Page 8: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

8

Ares I First Stage Nozzle Team

Record accomplishment 36 months to 22 months

Page 9: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

9

Aft Exit Cone Mandrels

Page 10: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

10

Launch Abort Motor SST-1 Static Fire Test

ATK SST-1 Static Fire Test

Promontory, Utah

26 June 2007

video

Page 11: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

11

STS to Ares – Transitioning to Lower Costs

STS Ares

• Reduce requirements

• Streamline ops

• Tailored specs

• Drive efficiency

• Simpler integration

Page 12: Ares I Stage 1 - NASA · 12 Looking Ahead ¥Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008 ¥Ares I Preliminary Design Review (PDR) June 2008 ¥Ares

12

Looking Ahead

• Ares I Main Parachute Cluster Drop Test #1 (CDT-1) scheduled for 15 April 2008

• Ares I Preliminary Design Review (PDR) June 2008

• Ares I-X hardware deliveries to KSC beginning summer 2008

• Ares 1-X Test Flight April 2009

• Ares I First Stage DM-1 Ground Test April 2009


Recommended