Date post: | 13-Jan-2016 |
Category: |
Documents |
Upload: | gregory-butler |
View: | 222 times |
Download: | 0 times |
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Argos-3: Argos-3:
Update and Update and
Test ProgramTest Program
Argos-3 Test program DBCP Workshop La Jolla - October 2006
400 bits per second
4 processing units
-128 dBm
20 kHz receiver bandwidth
400 bits per second
8 processing units
-131 dBm
80 kHz receiver bandwidth
400 & 4800 bits per second
12 processing units
-137 dBm
110 kHz receiver bandwidth
2- way communication
SYSTEM GENERATIONSSYSTEM GENERATIONS
ARGOS 1
ARGOS 2
ARGOS 3
Argos-3 Test program DBCP Workshop La Jolla - October 2006
The ARGOS-3 SystemThe ARGOS-3 System
UPLINK : 3 transmission protocols @ 401 MHz
– Standard : 400 bps, basic Argos ServiceSTD Argos-1, 2 and 3
– High Sensitivity : 400 bps, very low powerNG additional 5 dB margin
– High Data Rate : 4.8 kbps, 5 WattHD up to 50 kbits per pass
Argos-3 Test program DBCP Workshop La Jolla - October 2006
The ARGOS-3 Receiving Spectrum
80 kHz30 kHz
24 kHz
401.610 MHz 401.690 MHz401.580 MHz
401.638 MHz
401.662 MHz
Argos-3 Test program DBCP Workshop La Jolla - October 2006
ServiceService, Argos Downlink to, Argos Downlink to
Send messages to your platforms
And
Manage transmissions spare power & sat rendez-vous with
• Sat. pass predictions
Send more Data with
• Interactive data Collection
Argos-3 Test program DBCP Workshop La Jolla - October 2006
CASE STUDY - ARGO
Argos-3 Test program DBCP Workshop La Jolla - October 2006
FIRST GENERATION PMTFIRST GENERATION PMT
““MODULAR” - 80 MODULAR” - 80 SEIMAC units availableSEIMAC units available
SECOND GENERATION PMTSECOND GENERATION PMT
““SINGLE BOARD” SINGLE BOARD”
Kenwood & EltaKenwood & Elta : prototypes in March 07: prototypes in March 07
Production end 2007Production end 2007
CLS PMTCLS PMT Project: 2 GenerationsProject: 2 Generations
Argos-3 Test program DBCP Workshop La Jolla - October 2006
ARGOS-3 Test ProgramARGOS-3 Test ProgramPurposePurpose: Test the new functions, define : Test the new functions, define useful commands, make available ready-to- useful commands, make available ready-to- deploy platforms by end 2007deploy platforms by end 2007
Set-up Test program TeamsSet-up Test program Teams
CLS Support providedCLS Support provided
Partnership / TeamworkPartnership / Teamwork
Expected ResultsExpected Results
CalendarCalendar
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Argos-3 Test Program TeamsArgos-3 Test Program Teams
Communication
One or moreManufacturers
CLS technicians
CLS coordinator
One or more Users
Argos-3 Test program DBCP Workshop La Jolla - October 2006
CLS Program Support (1/2)CLS Program Support (1/2)
CLS will give all participants in the test program a wide range of resources :
1G PMT, manufactured by Seimac, Ltd., including antenna
A user’s manual
Free two-way communication air-time while you test-drive the system’s capabilities
Argos-3 Test program DBCP Workshop La Jolla - October 2006
CLS Program Support (2/2)CLS Program Support (2/2)
ArgosWeb: a single web to: Send commands to your
platforms view your messages & data see how data is processed
with the new system
Manufacturer web pages including documents, FAQ, news, guidelines etc.
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Partnership/TeamworkPartnership/TeamworkTo help you during the integration process, we propose to:
Provide a personal contact to help discover Argos-3
Team meetings with CLS representatives to present and discuss the new functions – i.e. PMTs, commands definition, ArgosWeb
Give support by phone or by email over the course of the integration process
Communicate the results of test programs via the Argos website to the user community
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Expected ResultsExpected Results
Define useful commands for User platforms
Gain feed-back on Argos-3
Share results through a seminar in mid-2007
Inform User community about test progress
Argos-3 ready-to-deploy platforms for your applications by end-2007
© JAMSTEC
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Results-sharing seminarResults-sharing seminar
In mid-2007, we will organize a results-sharing seminar. We will listen to feedback on the Argos-3 system and respond to your requests. We will work together to satisfy user needs!
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Program CalendarProgram CalendarOctober-November 2006: Program participants will fill
out test program protocols and fax them back to CLS.
December 2006: Participants will receive their 1G PMT.
February 2007-June 2007: Participants will test the Argos-3 system with their 1G PMT
Summer 2007: Participants will share their test results during a results-sharing seminar
End-2007: The second generation PMT will be ready for integration
Argos-3 Test program DBCP Workshop La Jolla - October 2006
Contact us before end October Contact us before end October to join the Teamsto join the Teams
Thank you for your attention