ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Summary
Commissioning Blank Transmissions Ground Segment Chaining Groundstations Ham TV school contacts Discussion
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Commissioning
Commissioning objectives ASI Radio Telescope Geodesy Center in Matera TLE & First Checkup diagram installation operations at Matera commissioning #1 commissioning #2 B. USOC report Small ground station role
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningCommissioning objectives
check the correct operation of the HAMTV transmitter: by measuring the RF power level received (C/No, MER) by measuring the bit-error rate (BER) of the QPSK signal
check the four transmitting frequencies (2 nominal, 2 backup) check the two modulation bitrates (1.3 and 2.0 MS/s) verify the performance of ARISS antennas (#41 and #43) check the ground stations performance
To be sure to receive even a weak signal in the case of reduced output power of the HAMTV transmitter, due for example to excessive loss in the antenna cables or in the ARISS antennas, it was decided to focus on a very high-gain receiving antenna: the ASI VLBI radiotelescope in Matera: a 20 meter reflector with a gain of 50 dB in S-band with near full tracking capabilities.
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningASI VLBI Radio Telescope Antenna Geodesy Center in Matera
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningTLE & First Checkup
Our first check before starting the commissioning was to verify the following items:
a) how accurate are the TLE data in tracking with such high-precision equipment.
b) the capability of the VLBI antenna, designed to point fixed stars in the sky to track fast moving objects such a satellites in low earth orbits (LEO).
a) how to interface our receiving system (S-band downconverter, DVB-S receivers) with the VLBI RF equipment.
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningTLE & First Checkup
To check the accuracy of the TLE data, we tracked the ISS with an optical telescope, which is part of the Matera center for Geodesy. Next, we checked the ability of the antenna tracking systems to follow fast moving objects such as satellites in LEO. The results have been very good (less than 0.05 deg of pointing biases applied to the telescope to center the image in the FOV).
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningTLE & First Checkup
To install the S-band downconverter (Kuhne KU 25 LNC), we have taken the signal between the S-LNA (inside the Dewar) and the D/C2 (see block diagram in the next slide) with a 10 dB directional coupler. We used the X-band cable exiting from D/C1 (IF1) to send the IF signal to the receivers in the control room. IF2 remained in place for monitoring purposes. Work was done in the core of the VLBI antenna, in a chamber just below the feed assembly.
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningVLBI RF chain block diagram
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningMatera VLBI Control Room
All signals were routed in the control room. In this panoramic image, all the workstations are clearly seen. From left to right: antenna control, signal monitoring, remote ground station monitoring, set-top box (interfaced to a portable computer for streaming), one receiving computer equipped with Tutioune (the DVB-S software developed by Jean Pierre F6DZP) and the TT-3200 card, another computer equipped with the TT-1600 card.
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
400 600 800 1000 1200 1400 1600 1800 2000 2200 24000
5
10
15
20
25
30
35
40
45
50
55
60
Range [km]
C/N
[dB
]
400 600 800 1000 1200 1400 1600 1800 2000 2200 2400-360
-240
-120
0
120
240
360
Tim
e [s
]
Our model prediction: commissioning step 2, 12:44:20 UTC, Matera station. C/N =44.5 dB at 2.0 MSymb/s, Off-Nadir 9°, range 625 km, G/T=25.7 dB(1/K).
Measured RF performances during commissioning
G/T of Matera RX was measured the day before using Cassiopeia A as a calibrated noise source
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Commissioning #1Live TV reception with the TT-3200 (Matera #1)
Frequency: 2369 MHz, symbol rate: 1.3 MS/s, MER: 25 dB
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Commissioning #1Signal monitoring with the FSV Spectrum Analyzer
Frequency: 2369 MHz (M1), symbol rate: 1.3 MS/s, C/N> 30 dB
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Commissioning #2Live TV reception with the TT-3200 (Matera #1)
Frequency: 2395 MHz, symbol rate: 2 MS/s, MER: 31 dB
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Commissioning #2Signal monitoring with the FSV Spectrum Analyzer
Frequency: 2395 MHz (M2), symbol rate: 2 MS/s, C/N> 42 dB
ARISS meeting ESTEC 2014ARISS Europe - Regional Scheduling Procedures
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
CommissioningAll 3 receivers worked as expected in Matera (Italy), plus two ground stations at
Casale Monferrato (Italy), and Poitiers (France)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
B.USOC report
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Blank Transmissions
Objectives and Plan Confirmation reports ARISS Report F6DZP Forum
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Blank TransmissionsObjectives and plan as of March 28, 2014
Date Configuration Frequency Duration
March 6 1 2422 MHz 1 week
March 16 3 2395 MHz 2 weeks
March 30 7 2437 MHz 1 week
April 6 5 2369 MHz 1 week
April 13 4 2395 MHz 2.0MS/s
+/- 2 weeks
+/- April 25 nihil nihil nihil
All Blank Transmissions performed with antenna 43
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Blank TransmissionsConfirmation from
• ARISS website reception reports (FSTV)• HAMTV Facebook page• VIVADATV forum
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ground SegmentHAM TV standard
The typical Ground Station (GS) is depicted in figure 1; it mainly consists of an offset dish antenna with 1 meter diameter size, a Left Hand Circular Polarization (LHCP) feed with downconverter/preamplifier (LNB) and a Set-Top Box Receiver. All equipments are Components Off The Shelf.
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ground SegmentHAM TV standard
Each Ground Station will operate as a receive-only (R/O) terminal i.e. the station can receive, demodulate and record data transmitted in the S-band (2360 - 2450 MHz). The antenna used for data reception consists of an offset focus system with azimuth and elevation mount; it is capable of program controlled operation, however manual
capability as backup solution is foreseen as well.
Antenna 1.2 m Offset Dish
Feed LHCP Helix
Preamplifier/Down Converter Kuhne KU LNC-25
RF Coax Cable LMR-400
Set Top Box / PC Card Megasat HD 800
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ground SegmentHAM TV standard
KU LNC 25 TM (HAMTV baseline configuration)Frequency range : 2350 – 2550 MHz, IF : 1433.5 – 1633.5 MHz
Amplification : 40 dBhttp://www.kuhne-electronic.de
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ground SegmentSun noise measurement software
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Chaining Groundstations
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3010
15
20
25
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 6010
15
20
25
Vid
eo
co
nta
ct d
ura
tion
[min
ute
s]
60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9010
15
20
25
Time starting from 1 SEP 2010 00:00:00 [days]
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Video contact duration for a 90 days period starting September 1st, 2010.
Chained stations (and antenna diameters):
Blue: (case A) Lisboa (1 m), Milano (1 m), Bucaresti (1 m), Moskva (1 m)
Green: (case B) Tenerife (1m), Lisboa (1m), Milano (1m), Bucaresti (1m), Moskva (1m)
Red: (case C) Lisboa (2.5m), Milano (1m), Bucaresti (1m), Moskva (2.5m)
Cyan: (case D) Tenerife (2.5m), Lisboa (1m), Milano (1m), Bucaresti (1m), Moskva (2.5m)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Chaining GroundstationsHand-over example (case A, C)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Chaining GroundstationsHand-over example (case B, D)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Chaining GroundstationsChaining Groundstationslocation of present ground stations in Europe (range 700 Km)location of present ground stations in Europe (range 700 Km)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Chaining GroundstationsChaining Groundstations
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
TelebridgeTelebridge GroundstationsGroundstations0° elevation mask - ISS range = 2400Km (only voice link)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
TelebridgeTelebridge GroundstationsGroundstations21° elevation mask - ISS range = 1000Km (HAMTV link)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
TelebridgeTelebridge Groundstations + ESA/ESACGroundstations + ESA/ESAC+ Warsaw + IZ7RTN (pending application)+ Warsaw + IZ7RTN (pending application)
21° elevation mask - ISS range = 1000Km (HAMTV link)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
TelebridgeTelebridge Groundstations + ESA/ESACGroundstations + ESA/ESAC+ Warsaw + IZ7RTN (pending application)+ Warsaw + IZ7RTN (pending application)
21° elevation mask - ISS range = 1000Km (HAMTV link)
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ham TV school contacts
Traditional, voice-only, bidirectional, half-duplex school contact
VHF band audio
School
Webcast
HAM Radio station aboard
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ham TV school contacts
VHF band audio
School
Webcast
HAM Radio station aboard
NOTE:1) VHF audio down-link acts as a backup for the school and allows ham stations within the ISS visibility footprint to receive ISS voice with a simple hardware. Hams will receive ISS voice during the whole pass.
S band audio & video
NOTE:2) Lip synchronization is guaranteed when the school listen to the “S band voice”3) Any ham station, equipped with a DVB-S receiver similar to the one used in the school and within the ISS visibility circle, can catch the video down-link
approx. 10 minutes audio in VHF bandapprox. 5 minutes video in S band
ARISS meeting ESTEC 2014HAM Video
ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC
Ham TV school contacts
Internet Network
School
Webcast
HAM TV +Telebridge
Ground station
School Ground station
PhoneTeleconference
HAM TVGround station
approx. 10 minutes audio in VHF bandapprox. 10 minutes video in S band using chained ground stations linked per phone teleconference and per