ARIZONA STATE TRANSPORTATION BOARD MULTIMODAL PLANNING DIVISION REPORT December 20, 2019 Multimodal Planning Division Director: Greg Byres, P.E.
Transcript
Page 1: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

ARIZONA STATE TRANSPORTATION BOARD

MULTIMODAL PLANNING DIVISION REPORT December 20 2019

Multimodal Planning Division Director

Greg Byres PE

Current Planning Activities

bull Evaluation for prioritization of projects from P2P bull Preparation of Tentative 2021-2025 Five Year Program bull Planning of Major Projects (Tier 1 DCR) bull Grant funding and application information

Evaluation of Priority Projects

bull Projects provided by COGrsquos MPOrsquos Cityrsquos Countyrsquos Planning studyrsquos Districts Technical Groups and others

bull Evaluation criteria includes Technical Policy Safety and District weighted scoring

bull Total number of projects submitted was 1371

bull The prioritized project lists for Preservation (Pavement and Bridge) Modernization and Expansion will be provided to the State Transportation Board the beginning of January

bull Planning Level Scoping (PLS) has commenced on the highest rated preservation and modernization projects several of which are updates to projects previously evaluated through PLS

Preparation of Tentative 2021-2025

Five Year Program

bull Finalize annual budget for each year of the program bull Adjust projects to accommodate project schedules as

necessary bull Add prioritized projects in appropriate program years bull Set sub-programs at appropriate budget levels and add

proposed projects to the program where applicable

I-11 Corridor Highlights Draft Tier 1 Environmental Impact

Statement and Preliminary Section 4(f) Evaluation

Timeline

6

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 2: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Current Planning Activities

bull Evaluation for prioritization of projects from P2P bull Preparation of Tentative 2021-2025 Five Year Program bull Planning of Major Projects (Tier 1 DCR) bull Grant funding and application information

Evaluation of Priority Projects

bull Projects provided by COGrsquos MPOrsquos Cityrsquos Countyrsquos Planning studyrsquos Districts Technical Groups and others

bull Evaluation criteria includes Technical Policy Safety and District weighted scoring

bull Total number of projects submitted was 1371

bull The prioritized project lists for Preservation (Pavement and Bridge) Modernization and Expansion will be provided to the State Transportation Board the beginning of January

bull Planning Level Scoping (PLS) has commenced on the highest rated preservation and modernization projects several of which are updates to projects previously evaluated through PLS

Preparation of Tentative 2021-2025

Five Year Program

bull Finalize annual budget for each year of the program bull Adjust projects to accommodate project schedules as

necessary bull Add prioritized projects in appropriate program years bull Set sub-programs at appropriate budget levels and add

proposed projects to the program where applicable

I-11 Corridor Highlights Draft Tier 1 Environmental Impact

Statement and Preliminary Section 4(f) Evaluation

Timeline

6

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 3: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Evaluation of Priority Projects

bull Projects provided by COGrsquos MPOrsquos Cityrsquos Countyrsquos Planning studyrsquos Districts Technical Groups and others

bull Evaluation criteria includes Technical Policy Safety and District weighted scoring

bull Total number of projects submitted was 1371

bull The prioritized project lists for Preservation (Pavement and Bridge) Modernization and Expansion will be provided to the State Transportation Board the beginning of January

bull Planning Level Scoping (PLS) has commenced on the highest rated preservation and modernization projects several of which are updates to projects previously evaluated through PLS

Preparation of Tentative 2021-2025

Five Year Program

bull Finalize annual budget for each year of the program bull Adjust projects to accommodate project schedules as

necessary bull Add prioritized projects in appropriate program years bull Set sub-programs at appropriate budget levels and add

proposed projects to the program where applicable

I-11 Corridor Highlights Draft Tier 1 Environmental Impact

Statement and Preliminary Section 4(f) Evaluation

Timeline

6

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 4: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Preparation of Tentative 2021-2025

Five Year Program

bull Finalize annual budget for each year of the program bull Adjust projects to accommodate project schedules as

necessary bull Add prioritized projects in appropriate program years bull Set sub-programs at appropriate budget levels and add

proposed projects to the program where applicable

I-11 Corridor Highlights Draft Tier 1 Environmental Impact

Statement and Preliminary Section 4(f) Evaluation

Timeline

6

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 5: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

I-11 Corridor Highlights Draft Tier 1 Environmental Impact

Statement and Preliminary Section 4(f) Evaluation

Timeline

6

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 6: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Timeline

6

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 7: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

The Build Corridor Alternatives

7

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 8: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Primarily Purple and Green

Best meets Purpose and Need while reducing the potential for adverse impacts

Recommended Corridor Alternative

8

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 9: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Comment Summary

9

Comment Period Ended July 8 2019 Comment Summary Snapshot April 5 to August 20

2019 Total Number of Submissions 12339 How the submissions were transmitted

Webform 2608 Hand Written 43 Oral (Public Hearing) 248 Email 414 Email campaign 8652 Mail 94 Phone Line 252 Other 28

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 10: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Sonoran Corridor Study Three Build Corridors and No-Build Alternative under evaluation

Alternative 1 ndash San Xavier District to Rita Road

Alternative 7 ndash El Toro South to Rita Road

Alternative 8A ndash El Toro South to Houghton Road

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 11: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Schedule

bull Draft Tier 1 Environmental Study ndash Spring 2020 bull Public Hearings ndash Spring 2020 bull Final Tier 1 Environmental Study ndash Summer 2020

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 12: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

12232019 12 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NORTH-SOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

Study Update

Project No 999 PN 000 H7454 Federal Aid No 999-A(365)X

December 2019

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 13: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

12232019 13 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY OVERVIEW

The Study Area is approximately 50 miles long between Apache Junction and Eloy and traverses central Pinal County

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 14: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

12232019 14 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

STUDY PROCESS The publication of the Draft Tier 1 Environmental Impact Statement (EIS) is the culmination of bull Extensive public outreach bull Technical analysis bull Consultation with federal state and

local governments tribal governments planning organizations and utility companies

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 15: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

12232019 15 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

DEVELOPMENT OF CORRIDOR ALTERNATIVES

The range of corridor options to meet the purpose and need for the NorthndashSouth Corridor are based on bull Public input bull Local regional state and federal

agencies and tribal coordination bull Findings from previous studies bull Avoidance or minimization of

environmental impacts

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 16: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

12232019 16 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

PREFERRED CORRIDOR ALTERNATIVE RATIONALE

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 17: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

12232019 17 NORTHndashSOUTH CORRIDOR STUDY Draft Tier 1 Environmental Impact Statement

NEXT STEPS Public Review The public review and comment period for the Draft Tier 1 Environmental Impact Statement (EIS) was September 6 2019 through October 29 2019

bull Approximately 400 public and agency comments received

Final Tier 1 EIS amp Record of Decision A Final Tier 1 EIS is expected to be prepared in combination with a Record of Decision (ROD) in 2020

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 18: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report

Project No 010 PM 260 H7825 01L Federal Project No 010-E(210)S

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 19: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Study Milestones 2011-2015 ndash Phase I 2015 Feasibility Study amp Environmental Overview Identification of system alternatives

2016-2020 ndash Phase II Draft EA and Initial DCR published for public review Identification of recommended alternative

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 20: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Study Area State Route 210 (SR 210) (Barraza-Aviation Parkway) from Golf Links Road to a future connection with I-10 along Alvernon Way Interstate 10 (I-10) from I-10Interstate 19 (I-19) interchange to Kolb Road

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 21: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

System Alternative I - Recommended Alternative Designate Alvernon Way as SR210 from Golf Links Road to I-10 and provide four (4) travel lanes in each direction

Add a new system interchange to provide access from SR210 to I-10

Add up to two (2) lanes in each direction on I-10 from the I-10I-19 interchange to Alvernon Way

Add up to four (4) lanes in each direction on I-10 from Alvernon Way to Kolb Road

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 22: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Tentative Implementation Plan Proposed plan developed as part of the DCR Recommends 18 projects over 15 to 20 years Timing dependent on availability of funding and coordination with PAG Design of Kino Pkwy and Country Club Rd TIs included in Five Year Plan

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
Page 23: ARIZONA STATE TRANSPORTATION BOARDaztransportationboard.gov/downloads/Presentations/2019-122019-MPD-Update.pdf2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $60,000,000 $54,000,000

Grant Funding for Projects Fiscal Year

Grantor Agency

Name of Grant

Application Title Grant Requested

Grant Awarded

Fees

2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $24500000 $0 $551662014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 $562142014 USDOT-FHWA TIGER I-11 and Intermountain West

Corridor Study Environmental $26250000 $0 $25815

2015 USDOT-FHWA TIGER SR-347 Grade Separation $10330000 $10330000 $75344

2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 $50165

2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor

$60000000 $54000000 $49360

2017 USDOT-FHWA TIGER SR-189 Flyover $25000000 $25000000 $89487

2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point

$120000000 $0 $85136

2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project

$8603000 $0 $41002

2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $14230000 $10365000 $41002

2019 USDOT-FHWA INFRA I-17 Flexible Demand $95500000 $90000000 $29883

2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand

$25000000 $0 $42560

2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $25000000 $0 $60288

2019 USDOT-FMCSA

HP-ITD Arizona High Priority ITD Grant Application 2019

$1148560 $1148560 $0

2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation

$12539480 $0 $55177

2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity

$25000000 $0 $49967

Number of Grant applications in the past 5 years -16 Number of Grant awards in the past 5 years ndash 6 Success Rate over past 5 years ndash 38 Total Grant funding awarded over past 5 years - $190843560 Total cost of Grant application preparation - $806565

Sheet1

amp-Boldamp14 2014 to 2019 Grant Tracking Sheet

Sheet2

Sheet3

  • ARIZONA STATE TRANSPORTATION BOARDMULTIMODAL PLANNING DIVISION REPORTDecember 20 2019
  • Current Planning Activities
  • Evaluation of Priority Projects
  • Preparation of Tentative 2021-2025 Five Year Program
  • Slide Number 5
  • Timeline
  • The Build Corridor Alternatives
  • Recommended Corridor Alternative
  • Comment Summary
  • Slide Number 10
  • Slide Number 11
  • North-South Corridor Study
  • Study Overview
  • Study Process
  • Development of corridor alternatives
  • Preferred Corridor Alternative Rationale
  • Next Steps
  • Interstate 10 and State Route 210 Phase II Draft Environmental Assessment and Initial Design Concept Report
  • Study Milestones
  • Study Area
  • System Alternative I - Recommended Alternative
  • Tentative Implementation Plan
  • Grant Funding for Projects
Fiscal Year Grantor Agency Name of Grant Application Title Project Cost Grant Requested Total Match State Regional County City Bond Tribal Grant Awarded Submitted By Lead Agency Major Partner(s) Submission Portal Date Submitted Award Status Award Date ADOT PM Remarks Grant Consultant Fees
2014 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $35000000 $24500000 $10500000 $10500000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis Jacobs amp HDR $55166
2014 USDOT-FHWA TIGER I-10 Ehrenberg POE $0 GRANTSGOV Not awarded Jacobs amp HDR $56214
2014 USDOT-FHWA TIGER I-11 and Intermountain West Corridor Study Environmental Impact Statement $35000000 $26250000 $8750000 $8750000 $0 ADOT ADOT GRANTSGOV April 28 2014 Not awarded September 12 2014 Data from eCivis HDR $25815
2015 USDOT-FHWA TIGER SR-347 Grade Separation $15980000 $10330000 $5650000 $5650000 $10330000 ADOT ADOT GRANTSGOV NA Awarded September xx 2015 Data from TIGER website Jacobs amp HDR $75344
2016 USDOT-FHWA TIGER I-15 Virgin River Bridge 1 $0 ADOT ADOT GRANTSGOV NA Not awarded September 12 2016 Jacobs amp HDR $50165
2016 USDOT-FHWA FASTLANE I-10 Phoenix to Tucson Corridor $146800000 $60000000 $86800000 $86800000 $54000000 ADOT ADOT MAG PAG GRANTSGOV April 14 2016 Awarded September 12 2016 PMG Includes other federal funds $55200000 HDR $49360
2017 USDOT-FHWA TIGER SR-189 Flyover $134000000 $25000000 $109000000 $82334000 $13333000 $13333000 $25000000 ADOT ADOT City of Nogales Santa Cruz County GRANTSGOV October 16 2017 Awarded March 9 2018 PMG Includes NHPP $44000000 Jacobs $89487
2017 USDOT-FHWA INFRA Widening I-17 Anthem to Sunset Point $300000000 $120000000 $180000000 $130000000 $50000000 $0 ADOT ADOT MAG GRANTSGOV November 2 2017 Not awarded June 13 2018 PMG Includes HDDP $120000000 and MAG $50000000 Jacobs amp HDR $85136
2018 USDOT-FHWA CHBP Flagstaff Area Bridge Bundling Project $14531000 $8603000 $5928000 $828000 $5100000 $0 ADOT ADOT City of Flagstaff GRANTSGOV December 4 2018 Not awarded August 29 2019 PMG IGA with CoF executed HDR $41002
2018 USDOT-FHWA CHBP US 191 Bridge Bundling Project $15090000 $14230000 $860000 $860000 $10365000 ADOT ADOT NA GRANTSGOV December 4 2018 Awarded August 29 2019 PMG Secretary Chao announced $10365000 award HDR $41002
2019 USDOT-FHWA INFRA I-17 Flexible Demand $192300000 $95500000 $96800000 $46800000 $50000000 $90000000 ADOT ADOT MAG GRANTSGOV March 4 2019 Awarded July 25 2019 Major Projects Secretary Chao announced $90000000 award HDR $29883
2018 USDOT-FHWA BUILD I-17 Flexing to BUILD for Directional Demand $193310000 $25000000 $168310000 $2500000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 18 2018 PMG Multiple match sources HDR $42560
2018 USDOT-FHWA BUILD I-15 Virgin River Bridge No 1 $58300000 $25000000 $33300000 $33300000 $0 ADOT ADOT NA GRANTSGOV July 18 2018 Not awarded December 19 2018 PMG NHPP match Jacobs $60288
2019 USDOT-FMCSA HP-ITD Arizona High Priority ITD Grant Application 2019 $1351280 $1148560 $202720 $202720 $1148560 ADOT ADOT NA GRANTSGOV April 24 2019 Awarded September 24 2019 ECD Contact Steve KalinaTim Lane In-house $0
2019 USDOT-FHWA BUILD US-191 Chinle to Many Farms Navajo Nation $12539480 $12539480 $0 $0 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG No financial support from Navajo HDR (final amount NA) $55177
2019 USDOT-FHWA BUILD US-95 Avenue 9E to Welton Mohawk Canal Vicinity $53000000 $25000000 $28000000 $28000000 $0 ADOT ADOT NA GRANTSGOV July 12 2019 Not awarded November 12 2019 PMG BCR = 039 but submitted per DirectorSEO direction AECOM (final amount NA) $49967
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0

Recommended