HIGH SIERRA FORESTRY RODD RUMMEL 775-762-5611 [email protected] ArrowCreek Plateau Application 2016 Project description / objective Plateau application project is in ArrowCreek sub-division of Reno, Nevada. The objective of this project is to apply the selective herbicide Plateau to select areas in the community (47.6 acres of priority #1, as well as 38.5 acres of priority #2). Plateau will be used to reduce the germination of cheatgrass seeds present in the soil. Herbicide Application STORAGE AND HANDLING. The Contractor shall explicitly follow the Manufacturer’s instructions and handle, and store all products or equipment in accordance with manufacturers written directions as stated on the EPA registered label (Attachment B). EQUIPMENT CALIBRATION. Prior to initiation of herbicide application, the Contractor shall conduct a demonstration with clean water to verify that the application equipment has been properly and accurately calibrated for the required application rate. PRODUCTS. Pre-emergent herbicide manufactured by BASF under the trade name Plateau’ will be applied at a rate of eight (8) ounces per acre, mixed with water as per the EPA registered label and Supplemental Labeling that addresses directions for use on invasive species. EXECUTION i) Herbicide application shall only be performed by a State of Nevada Department of Agriculture certified applicator under the supervision of a licensed commercial applicator. ii) Application shall strictly follow ALL recommendations, restrictions, conditions, procedures and precautionary measures as stated on the EPA registered label (Attachment B) and the Supplemental Labeling that address directions for use on invasive species. iii) Applicators and handlers must were protective clothing as stated on the herbicide label. iv) In the cheatgrass control areas, the Plateau application period will be carefully scheduled in the fall/ winter within two to three (2-3) weeks of normal predicted precipitation. . v) The application will be carefully conducted during early morning hours under sustained winds less than one mile per hour. Extreme care will be taken to avoid drift to adjacent property. vi) Mixing and Sprayer Cleanup before and following application will strictly follow the EPA registered label. i) Contractor shall be responsible for prohibiting access to any and all areas being treated with herbicide for the Restricted Entry Interval (REI) period indicated on the herbicide label.
Transcript
Page 1: ArrowCreek Plateau Application 2016 SIERRA FORESTRY RODD RUMMEL 775-762-5611 rodd@highsierraforestry.com ArrowCreek Plateau Application 2016 Project description / objective Plateau

HIGH SIERRA FORESTRY RODD RUMMEL

775-762-5611

[email protected]

ArrowCreek Plateau Application 2016

Project description / objective

Plateau application project is in ArrowCreek sub-division of Reno, Nevada. The objective of

this project is to apply the selective herbicide Plateau to select areas in the community (47.6 acres of priority #1, as well as 38.5 acres of priority #2). Plateau will be used to reduce the

germination of cheatgrass seeds present in the soil.

Herbicide Application

STORAGE AND HANDLING. The Contractor shall explicitly follow the Manufacturer’s

instructions and handle, and store all products or equipment in accordance with manufacturers

written directions as stated on the EPA registered label (Attachment B).

EQUIPMENT CALIBRATION. Prior to initiation of herbicide application, the Contractor

shall conduct a demonstration with clean water to verify that the application equipment has

been properly and accurately calibrated for the required application rate.

PRODUCTS. Pre-emergent herbicide manufactured by BASF under the trade name

‘Plateau’ will be applied at a rate of eight (8) ounces per acre, mixed with water as per the

EPA registered label and Supplemental Labeling that addresses directions for use on

invasive species.

EXECUTION

i) Herbicide application shall only be performed by a State of Nevada Department of

Agriculture certified applicator under the supervision of a licensed commercial applicator.

ii) Application shall strictly follow ALL recommendations, restrictions, conditions,

procedures and precautionary measures as stated on the EPA registered label (Attachment

B) and the Supplemental Labeling that address directions for use on invasive species.

iii) Applicators and handlers must were protective clothing as stated on the herbicide label.

iv) In the cheatgrass control areas, the Plateau application period will be carefully scheduled in

the fall/ winter within two to three (2-3) weeks of normal predicted precipitation. .

v) The application will be carefully conducted during early morning hours under sustained

winds less than one mile per hour. Extreme care will be taken to avoid drift to adjacent

property.

vi) Mixing and Sprayer Cleanup before and following application will strictly follow the EPA

registered label.

i) Contractor shall be responsible for prohibiting access to any and all areas being treated

with herbicide for the Restricted Entry Interval (REI) period indicated on the herbicide

label.

Page 2: ArrowCreek Plateau Application 2016 SIERRA FORESTRY RODD RUMMEL 775-762-5611 rodd@highsierraforestry.com ArrowCreek Plateau Application 2016 Project description / objective Plateau

Special conditions

The work hours will be limited to Monday through Friday 7:00 am to 5:00 pm daily.

All equipment will be required to be thoroughly cleaned prior to entering the staging and work

areas to prevent introduction of noxious weeds. Equipment assigned to the project will not be

used at other locations without being thoroughly washed before re-entering the staging and

work areas.

ArrowCreek HOA will be the organization deciding on which contractor to hire and handling

all the contracting involved.

Bid Deadline

Please bid each Priority area individually.

Sealed Bids are due no later than 5pm September 16, 2016.

Please include availability of a start date and time needed to complete the job.

Selected vendor will need to provide a certificate of liability insurance listing the HOA as

additional insured; proof of worker’s comp insurance and a completed W-9 Form.

Contact Information

ArrowCreek HOA

C/O Jeanne Tarantino

Associa Sierra North

10509 Professional Circle #200

Reno, NV 89521

775-334-7403

[email protected]

Attachments

A – maps of the herbicide application area

Page 3: ArrowCreek Plateau Application 2016 SIERRA FORESTRY RODD RUMMEL 775-762-5611 rodd@highsierraforestry.com ArrowCreek Plateau Application 2016 Project description / objective Plateau

µ ArrowCreek HOAMaintenance for 2015

State Fire Assistance Grant0 0.1 0.2Miles

LegendPriority #1 Areas - 47.6 ac.Priority #2 Areas - 38.5 ac.

FS 49

2

HIGH

VIST

A

MASTERS

WINDING RIDGE

COPP

ER C

LOUD

GRANITE PO

INTE

HARBOTT

LE

ARROW CREEK

OLD C

OACH

WHITE MOUNTAIN

INDIGO RUN

SALT BRUSH

PAINTED VISTA

COUR SAINT MICHELLE

TEMPE

FEATHERSTONE

SANDOVAL

RIVER BIRCH

OCTATE

MULES EAR

STONEBRIDGESHALE CREEK

SIERRA MESA DR

RABB

IT R

IDGE

LA PAZ

RUE D

`AZU

R

ZOELLER

VIA FIORI

ARCTIC WILLOW

RENE

GADE

OAK GRASS

EAGLE ROCK

MUIRFIELD


Recommended