13
Arun LNG Receiving Hub & Regasification Terminal - The First Conversion of LNG Plant Become LNG Regasification Terminal Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina
Transcript
Page 1: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Arun LNG Receiving Hub & Regasification

Terminal - The First Conversion of LNG Plant

Become LNG Regasification Terminal

Nuranti W.Gunawan

Sr. Engineer Process Tech. Opt

PT Pertamina

Page 2: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Arun LNG Plant Overview

• 6 LNG Trains, Total Capacity 12.5 MTPA

• LPG Extraction, Capacity 1.4 MTPA

• Condensate Treating, Max. Capacity 120,000 barrel/day

• 11 Power Generators, output capacity 220 MW

• 5 LNG Tank, total capacity 636,000 m³

• 4 LPG Tank, total capacity 302,000 m³

• 4 Condensate tank, total capacity 2.12 million barrel

• 2 LNG Jetty @80,000 DWT

• 1 LPG Jetty @65,000 DWT

Operated by PT ARUN NGL, since 1977 Location : Lhokseumawe, Aceh Last Cargo : October 15th, 2014

Page 3: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Project Background

• Existing gas resources was

declined without potential gas reserves.

• LNG Sales contract ended in 2014;

plant operator should be terminated.

• Lead to decommissioned of

industries in Aceh area. 0

50

100

150

200

250

197

8

198

0

198

2

198

4

198

6

198

8

199

0

199

2

199

4

199

6

199

8

200

0

200

2

200

4

200

6

200

8

201

0

201

2

201

4

Y-2014:12 TO

TA

L C

AR

GO

Arun LNG Production

Converted

LNG Production Plant • Export terminal

• Liquefaction plant

• LNG Production

LNG Receiving Hub &

Regasification Terminal • Import/Export Terminal

• Regasification plant

• LNG trading

Page 4: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Historical Timeline

Page 5: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Pra-Project Assessment

1. FEED (Front End Engineering Designed)

Study

2. Remaining Life Assessment (RLA)

3. Risk Assessment to the existing facility

4. LNG Tank Assessment

Equipment Modification

• LNG Loading Dock Berth-

3

• Unloading/loading arm

overhaul

• Fenders repair

• Motor capstan repair

• Bypass installation ( loading

mode and unloading mode)

• 2 LNG Boil-off Gas

Compressors

• Control system retrofit

• Dry Gas Seal installation

• 1 LNG Booster

Compressor

• Compressor Re-wheeling

• Gear box replacement

• Dry Gas Seal installation

• 4 LNG Storage Tanks Bottom filling modifications

• LNG Circulation Lines LNG Regas and LNG Hub

Segregation

Page 6: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Main Equipment List :

Existing Equipments :

• 1 set of LNG loading Berth jetty #3

• 4 ea LNG Storage Tanks

• 5 ea LNG Circulation Pumps

• 4 ea BOG Compressor

• BOG Booster Compressor

• 6 ea LNG Loading Pump

• Utilities (Nitrogen, Plant Air, Seawater facilities, water treatment, and fire water station)

Additional Equipments

• HP LNG Transfer Pump

• LNG Open Rack Vaporizer

• LNG Back-Up Vaporizer

• LNG Back-Up Pump

• Fuel Gas Electric Heater

• LNG Vapor Return Blower

• Piping & control system modification

Page 7: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Receiving & Regasification Terminal Flow Diagram

Page 8: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Regasification Facilities Open Rack Vaporizer E-2302 (A/B/C)

Capacity : 3x135 MMSCFD (LNG)

Page 9: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

LNG Filling Truck

• LNG ISO Tank filling for 20ft and 40ft

• Since November 2015

Page 10: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Project Lesson Learn

• Identify existing equipment condition (including equipment obsolescence)

• Identify and evaluate existing equipment efficiency refer to new proven technology

• Assess existing equipment condition

• Ensure existing equipment are well maintained after assessment until project execution

• Identify all LNG ship specification when design vapour return blower

• Provide scenarios for difference project execution regarding existing plant condition

• Review sea water quality

• Provide good FEED

Page 11: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

What Next ?

LNG HUB Facility

Breakbulk to Small Vessel LNG

LNG Bunkering Business

Cooldown Business

Page 12: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total

Conclusion

• There was possibility to re-use the 37 years old of longstanding equipment in the LNG Terminal with several assessments.

• The key point to prolong the life time of equipment was based on maintenance & reliability program during the previous operation. Good maintenance program would result a good condition and could last longer.

• Several assessments need to be performed such inspections and reconditions/overhaul, etc.

• Every LNG Producing Plant in the end would facing the declining of the feed gas and the conversion of the LNG producing plant to become LNG receiving and regasification terminal would be the option to get the added value and maintain the gas supply to the customers.

Page 13: Arun LNG Receiving Hub & Regasification Terminal - The ...€¦ · Nuranti W.Gunawan Sr. Engineer Process Tech. Opt PT Pertamina . Arun LNG Plant Overview • 6 LNG Trains, Total