    PROPOSEDINWARD GATE ENTRY

    ON LINE TRACKING OF RGP / NRGPP.O.RELEASE STRATEGY

    E-MAIL PO TO VENDOR (LESS PAPERS)

    DISCONTINUTION GRN PRINT (INTRO. QA/QC)

    NEW SERIES ALLOCATION (PO & PR PLANT WISE)INDUCTION OF WIP FOR PROD. CONSUMABLES

    RESTRICTIONS (ON BACK DT. PO / TOLERANCE)

    NO PO WITHOUT PR

    RTP SYSTEM (FOR EMPTY CYLINDERS)PHYS. INVENTORY (SYSTEM V/S PHYSICAL)

    GENERAL REPORT MODIFICATIONS.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    4/63

    PRESENT PROCESS : One step GRN is followed & no gate

    Entry in SAP.DEV/MODIFICATION : Two Step procedure (103 mvt / 105

    mvt) to be implemented.

    BENEFITS : Tracking for material entered at Gate

    but not reached at stores is possible.And delay in Goods receipt can be

    controlled.

    MM INWARD GATE ENTRY

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    5/63

    PRESENT PROCESS : Dummy code is used for RGP / NRGP

    tracking.

    DEV/MODIFICATION : PR no. linkage & reconciliation w.r.t.

    material doc.New material code for

    each RGP item.

    BENEFITS : 1. Detailed Tracking in terms of qty.lying at party end.

    2. Tracking of individual items

    movement (repair) history.

    3. Partial qty recd can be traced out.

    MM ONLINE RGP NRGP TRACKING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    6/63

    PRESENT PROCESS : No PO released through system,

    manual approval is in practice.

    DEV/MODIFICATION : Two Step release procedure (01 at

    HOD purchase & 02 at Commercial

    HEAD)

    BENEFITS : 1. Less papers work.2. By this frequent Changes in PO can

    be controlled by releasing Authorities.

    3.Version Management to be activated

    to trace changes made in PO.

    MM PO RELEASE STRATEGY

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    7/63

    PRESENT PROCESS : Hard copy of PO is being sent to

    vendor.

    DEV/MODIFICATION : PO will be sent through E-mail.

    BENEFITS : 1.Less papers work.

    2.Faster communication with vendor.

    MM E-MAIL PO TO VENDOR

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    8/63

    PRESENT PROCESS : GRN print is taken & approved by

    user / QA/QC dept.

    DEV/MODIFICATION : No GRN will be printed out, QA/QC

    dept will only release it from Quality

    to unrestricted stock through system.

    BENEFITS : 1.Less papers work.

    2.If material get rejected, can be sent

    back to vendor in time frame.

    MM DISCONTINUTION GRN PRINT

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    9/63

    PRESENT PROCESS : There is single series of PR /

    PO for all plants.

    DEV/MODIFICATION : Plant wise / Process wise separate PR /

    PO series will be created.

    BENEFITS : 1.Easy tracking of Plant wise PR / PO.

    2.Excise related problems can beminimized (EWPO).

    MM NEW NO. SERIES for PR / PO

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    10/63

    PRESENT PROCESS : Stores is directly booking the

    consumptions on demand.

    DEV/MODIFICATION : Stores will transfer the BOM items to

    WIP location & PP dept will book the

    actual consumption.

    BENEFITS : 1.Actual consumption details will be

    available against mtrl. transferred.

    2.Wrong booking of Consumables can

    be controlled.

    MM INDUCTION OF WIP FOR PROD.CONSUMABLES

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    11/63

    PRESENT PROCESS : 1.No restriction on back dated PO

    creation,

    2.No restriction on Tolerance changes

    in PO at the Time of goods receipt.

    DEV/MODIFICATION : Back dated PO will be restricted. Andchanging tolerance in PO will be

    restricted.

    BENEFITS : 1.Audit point requirement.

    2.We can restrict excess good receipt.3.Amendments for Qty. can be traced

    out.

    MM RESTRICTIONS ON BACK DATED POAND TOLERANCE CHANGES.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    12/63

    PRESENT PROCESS : Currently PO can be created without

    PR.

    DEV/MODIFICATION : Restriction will be set in system not to

    allow PO without PR.

    BENEFITS : 1. There will be PR for each PO.Tracking of PO's with reference to PR

    Possible.

    2. user dept will be traced out easily

    through PR.

    MM NO PO WITHOUT PR

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    13/63

    PRESENT PROCESS : Empty cylinders are monitored by

    manual register.

    DEV/MODIFICATION : New material logic / Process for RTP

    will be used.

    BENEFITS : 1.We can get supplier wise emptycylinder stock lying .

    2. Manual register maintaining can be

    avoided.

    MM RTP SYSTEM

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    14/63

    PRESENT PROCESS : Stock is taken from system (Bin wise) &is matched with physical count by eitherposting GI (201,261 or reversing

    GI(202,262)in system.

    DEV/MODIFICATION : Standard SAP process for Physical

    Inventory can be started

    BENEFITS :1.Proper records available in systemwith Inventory Adjustment Movementtypes.

    2.Last Physical Inventory Documents willbe available in system with all relateddata.3.Differentiation between actualconsumption and inventory adjustment

    will be available.

    MM PHYSICAL INVENTORY

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    15/63

    LakshyaSAP REVIEW

    Module :

    PRODUCTION PLANNING ANDCONTROL

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    16/63

    PROPOSEDINDUCTION OF NEW MTRL CODE LOGIC (BASED ONITEM DESCRIPTION FOR FGCOATING PLANT)

    SCRAP ACCOUNTING

    ONLINE PIPE SAMPLE LABTEST REPORT (PRESENTLYUNDER LEGACY)

    INDUCTION OF RAW MTRL. LABTEST REPORT

    YARD MANAGEMENT (BARE PIPE AVAILABILITY)

    INDUCTION OF WIP (TRACKING OF PLATES & PIPES)

    ON LINE RECONCILIATION OF PROD. ORDER

    CHECK ON PLATE CONSUMPTION (HEAT NO. WISE

    AVAILABLE IN CLEAR STOCK)SUB-CONTRACTING (TAB CUTTING)

    NEW PROCESS FOR PROD. TOOL ACCOUNTING.

    INDUCTION OF PROCESS CHART. (LESS PAPER)

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    17/63

    INDUCTION OF NEW MTRL CODE LOGIC(COATING)

    PRESENT LOGIC : 1. Material code is of 7 digits.

    2. First digit is alphabet; Represent the plant

    i.e. S= for Spiral plant, L = Longi Plant.

    3.Second digit will be numeric and it represents the

    material type I.e.3=Coated piped.

    4.Remaining digits is numeric serial no.

    DEV/MODIFICATION : 1. Material code will be of 9 digits.

    2. Only difference is in Third and fourth digit

    represents coated type. i.e. 01- 3 Lpe. 02-

    Internal.3.Remaining digits will same as above logic.

    e.g.L30100001.

    BENEFITS : To have correct identification of material

    from code.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    18/63

    SCRAP ACCOUNTING

    PRESENT PROCESS : Planned scrap is not maintained in the bill

    of material.

    DEV/MODIFICATION : Planned scrap qty is to be maintained inthe bill of material and the process for thescrap to be modified.

    BENEFITS : System v/s Actual Analysis.Better controlon system.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    19/63

    ONLINE PIPE SAMPLE LAB TEST REPORT

    PRESENT PROCESS : Quality parameter recording is confirmedfor operation but online sample testing is

    not incorporated in SAP.

    DEV/MODIFICATION : Master data of inspection parameter is tobe maintained for testing operation and

    report to be developed.

    BENEFITS : Legacy will replace by SAP system.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    20/63

    INDUCTION OF RAW MTRL. LABTEST REPORT

    PRESENT PROCESS : Quality checks is not maintained for raw

    material inspection.

    DEV/MODIFICATION : Quality checks in material master andreport to be developed.

    BENEFITS : Quality parameter per sample heat is tobe possible.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    21/63

    YARD MANAGEMENT

    PRESENT PROCESS : Pipe transfer from L-Saw to coating

    directly instead of transferring directlyLSAW to yard.

    DEV/MODIFICATION : Modification in production order is to bemade accordingly.

    BENEFITS : Stock availability information of yardstock.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    22/63

    INDUCTION OF WIP

    PRESENT PROCESS : Plate is consumed at first operation and nowip report for pipe and plate.

    DEV/MODIFICATION : Plate consumption program is to bemodified.

    BENEFITS : Pipe up to forming will consider as Wip ofplate.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    23/63

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    24/63

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    25/63

    SUB-CONTRACTING

    PRESENT PROCESS : Plate or pipe is consumed directly onproduction order.

    DEV/MODIFICATION : Subcontracting cycle to be developed for

    Tab cutting.

    BENEFITS : It will help to get the report of scrapgeneration at subcontractor.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    26/63

    NEW PROCESS FOR PROD. TOOL ACCOUNTING.

    PRESENT PROCESS : PRT consumption of PRT is not showingcorrect value and stock in the system.

    DEV/MODIFICATION : Whole process to reviewed with all

    perspective.

    BENEFITS : Correct stock and value will display in thesystem.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    27/63

    CHECK ON PLATE CONSUMPTION

    PRESENT PROCESS : Plate is consumed with any heat sstock.

    DEV/MODIFICATION : Plate issue program is to be modified forheat and plate.Plate is issued to forming.

    BENEFITS : Heat plate tracking in the production.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    28/63

    INDUCTION OF PROCESS CHART

    PRESENT PROCESS : Hard copies of Process chart aredistributed.

    DEV/MODIFICATION : Process chart will be incorporated in

    SAP.

    BENEFITS : Less paper office Lakshya will beachieved.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    29/63

    LakshyaSAP REVIEW

    Module :

    FINANCE AND CONTROLLING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    30/63

    List of Topics

    FI GL ACCOUNTING

    FI ACCOUNTS RECEIVABLE

    FI

    ACCOUNTS PAYABLE

    FI ASSET ACCOUNTING

    PSM FUND MANAGEMENT

    EC PROFIT CENTER ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    31/63

    TOPIC : SALARY BDC

    PURPOSE : Entry of Salary & Loans ofEmployees

    PRESENT PROCESS : Entries are done manually nearly

    more than 200 Line items for

    Salary and Loans & Advances

    DEV/MODIFICATION : BDC program to be developed for

    automatic entry through file upload.

    BENEFITS : Saves the time of entries for users,just need to prepare a file with data

    as per given format and upload into

    SAP by single execution.

    FI GL ACCOUNTING

    FI GL ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    32/63

    TOPIC : Cash Journal Implementation

    PURPOSE : To ease the Cash entries such as

    Cash Payment & Cash Receipt.PRESENT PROCESS : Presently entries are making through Transaction

    Code: F-02 by giving all parameters such as Posting

    Key, Account Number apart from document Header

    line by line.

    DEV/MODIFICATION : Cash Journal sub Module has to be implemented for

    Cash Transactions.

    BENEFITS : You can pass entries of Payment/Receipt with

    Business Transaction and no need to give all

    parameters like Headers details like Co code, periodcurrency, doc date, posting date and line items like

    posting key, G/L account. Instead of G/L Business

    transaction will be used hence no need to search for

    particular G/L, more over you will have the option of

    Cash Balance on the screen

    FI GL ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    33/63

    TOPIC : Accounting Document Printing

    PURPOSE : To Print the Accounting Documents

    in mass with Continuous stationary

    PRESENT PROCESS : Presently Accounts people printing

    single document at a time as per the SAP

    standard delivered facility, mass printing

    is also carried out but it is having lengthyformat, hence it is not used.

    DEV/MODIFICATION : Print form is to be created new form

    for printing of the same in mass through

    F.62 Transactions.

    BENEFITS : You can have option of printing multiple

    Accounting Documents at a time in the

    required format, so that it will save time

    as well as paper.

    FI GL ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    34/63

    FI ACCOUNTS RECEIVABLE

    TOPIC : Customer Outstanding Ageing Report

    PURPOSE : Evaluation/Analysis of Customer

    Outstanding for payment recovery.

    PRESENT PROCESS : Presently one standard report is available

    but it is with multiple line items and

    master data details, which allows to work

    in excel sheet to get into one line.

    DEV/MODIFICATION : New report is to be developed for it with

    the format provided by Finance people in

    one line item with flexibility of difference

    days ageing.

    BENEFITS : You will get the report as an when you

    required with required days format for

    analysis and banking purpose with one

    execution.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    35/63

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    36/63

    FI ACCOUNTS PAYABLE

    TOPIC : Vendor Outstanding Ageing Report

    PURPOSE : Evaluation/Analysis of VendorOutstanding for payment.

    PRESENT PROCESS : Presently one standard report is available

    but it is with multiple line items and

    master data details, which allows to work

    in excel sheet to get into one line.

    DEV/MODIFICATION : New report is to be developed for it with

    the format provided by Finance people in

    one line item with flexibility of difference

    days ageing.

    BENEFITS : You will get the report as an when you

    required with required days format for

    analysis and banking purpose with one

    execution.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    37/63

    TOPIC : Payment Advice Printing

    PURPOSE : To issue Payment details to Vendors

    PRESENT PROCESS : Presently one ZFI04 Transaction is

    available for Payment Advice, but does

    not showing the Invoice against which

    the payment has made and also

    deductions made in the payment.

    DEV/MODIFICATION : New payment form is to be developed

    with the above required fields in printing.

    BENEFITS : While printing of Payment advice all the

    required details can be availed which will

    give transparency between us and vendor.

    FI ACCOUNTS PAYABLE

    FI ASSET ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    38/63

    FI ASSET ACCOUNTING

    TOPIC : Purchase Register for Assets

    PURPOSE : Asset details are required in PurchaseRegister ZMM100

    PRESENT PROCESS : Asset Main Number, Sub-Asset number

    and description fields are not available in

    Purchase Register.

    DEV/MODIFICATION : Modification is required for adding the

    above fields in Purchase Register.

    BENEFITS : You will get the Asset details such as

    which asset is purchased against whichPO and what are the purchase cost and

    other costs.

    FI ASSET ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    39/63

    TOPIC : Asset Register

    PURPOSE : Required for Finance Department with all

    required details such as nature of Asset,

    Asset Class, acquisition costs, other costs

    and other information.

    PRESENT PROCESS : Presently there is no such report exists for

    Management, other summarized reports

    are available in Standard SAP.

    DEV/MODIFICATION : New report is to be developed with the

    provided format by Finance Department.

    BENEFITS : It gives you all the information related to

    a particular assets with costs and duties.

    FI ASSET ACCOUNTING

    PSM FUND MANAGEMENT

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    40/63

    PSM FUND MANAGEMENT

    TOPIC : Plan Budget Report

    PURPOSE : Analysis of Allotted Budget & Released

    Budget.

    PRESENT PROCESS : Presently one report is there for Budget in

    Standard SAP but it is not showing Cost

    Center, Order and Budget Text.

    DEV/MODIFICATION : New reports has to be developed for the

    above requirements.

    BENEFITS : It will have a better control through this

    report for Budget and analysis.

    PSM FUND MANAGEMENT

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    41/63

    TOPIC : LSMW

    PURPOSE : Budget Assignment, Release,Enhancement of Budget.

    PRESENT PROCESS : Presently Manually entering the Budget

    Fund, Fund Center and Commitment item

    wise every month.

    DEV/MODIFICATION : New 4 LSMW (Legacy System

    Migration Workbench) are to be

    developed for Original Budget

    assignment, Original Budget release,Enhancement of Budget and Release of

    Budget.

    BENEFITS : It saves the time and will avoid mistakes

    while Budget entry.

    PSM FUND MANAGEMENT

    EC PROFIT CENTER ACCOUNTING

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    42/63

    EC PROFIT CENTER ACCOUNTING

    TOPIC : Profit Center wise Profitability

    PURPOSE : Profitability analysis of Division/Profit

    Center for Management.

    PRESENT PROCESS : At present No such report is available in

    SAP but Data is available.

    DEV/MODIFICATION : New reports has to be developed for the

    above requirements.

    BENEFITS : It will give you Division wise/Profit

    Center wise Sales, Costs and margin forManagement Information purpose.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    43/63

    LakshyaSAP REVIEW

    Module :

    SALES & DISTRIBUTION

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    44/63

    PROPOSEDINQUIRY & QUOTATIONS THROUGH SAP

    VARIOUS PAYMENT TERMS & INCOTERMSEXPORT, ARE 1 THROUGH SAP

    PRINTING QTY IN 3 DIGITS (EXCISE INVOICE)

    NET/GROSS WEIGHT MANDATORY

    PROFIT CENTRE MANDATORYREGISTER THROUGH SAP (UTILIZATION, ER4)

    REPORTS (NEW MIS, PENDING SO STATUS)

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    45/63

    SALES ACTIVITYInquiry & Quotation

    CURRENT PROCESS : Done manually

    DEV/MODIFICATION : Can be started through SAP

    BENEFITS : Tracking of the system from the

    initial stage of the Order

    SALES ACTIVITY

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    46/63

    SALES ACTIVITY

    Orders

    CURRENT PROCESS :Domestic/Deemed Export1.Availibility of various PaymentTerms , Inco Terms

    2.SO should give complete statusof Production, Dispatch & Billed

    DEV/MODIFICATION : Payment Terms & Inco terms areconfigured as per customerrequirement. New requirement can

    also be incorporated

    BENEFITS : Reports are available

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    47/63

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    48/63

    MASTER DATA REVIEWMaterial Master

    CURRENT PROCESS :Create, Change is done byPPC Dept. & other viewmaintained by all Dept.

    DEV/MODIFICATION : 1.Net Weight / Gross Weightto be made mandatory.

    2.Profit Centre to mademandatory.

    BENEFITS :1.Packing List Accuracy.

    2.Timely dispatch and get the dataplant wise (Division)

    G S

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    49/63

    REGISTERUtilization

    CURRENT PROCESS : Manually carried

    out on Monthly Basis

    DEV/MODIFICATION : Configured in SAP

    BENEFITS : Easy availability of Excise data

    Saves time & manpower.

    REGISTER

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    50/63

    REGISTERER4

    CURRENT PROCESS :Manually carried out on

    Yearly Basis

    DEV/MODIFICATION :Configured in SAP

    BENEFITS :RT-12 Data can be taken fromSAP.

    REGISTER

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    51/63

    REGISTERExcise Return

    CURRENT PROCESS : Manually carried out on

    Monthly Basis

    DEV/MODIFICATION : Configured in SAP

    BENEFITS : RT-12 Data can be taken from

    SAP.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    52/63

    REPORTS

    CURRENTLY : 1.Sales Register

    2. Daily Dispatch Report

    DEV/MODIFICATION :1.New MIS Report fordevelopment received.

    2.New Report -Pending SOPosition received for development

    BENEFITS :Timely availability of data for all.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    53/63

    LakshyaSAP REVIEW

    Module :

    PLANT MAINTENANCE

    PROPOSED

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    54/63

    PROPOSEDCatalogue Profile.

    Service PR Through Maintenance Order.Master Data Updating.

    Equipment BOM.

    Equipment Classification.

    Compulsory fields in Notification.Power Plant Schedule in SAP.

    Cost of Floor Spares.

    History card & Log book.

    Power Plant Report.

    PM CATALOGUE PROFILE

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    55/63

    PRESENT PROCESS : No Proper Catalogue Profile

    maintained & used in case of

    breakdowns.

    DEV/MODIFICATION : Need to maintain Proper catalogue

    profile & use them effectively.

    BENEFITS : Able to get Breakdown analysis withcause,damage & down time.

    PM CATALOGUE PROFILE

    PM SERVICE PR THROUGH MAINT.ORD

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    56/63

    PRESENT PROCESS : Not followed presently.

    DEV/MODIFICATION : No changes required, Need to startusing.

    BENEFITS : Able to capture repair cost Equipment

    wise.

    PM SERVICE PR THROUGH MAINT.ORD

    PM MASTER DATA UPDATION

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    57/63

    PRESENT PROCESS : No Proper Master data maintained.

    DEV/MODIFICATION : Need to maintain Proper Master datafor Equipments & Functional

    Locations.

    BENEFITS : Master Data gets copied to

    Notification & MaintenanceOrder,which reduces data entry time.

    PM MASTER DATA UPDATION

    PM EQUIPMENT BOM

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    58/63

    PRESENT PROCESS : Not using presently.

    DEV/MODIFICATION : Need to create Equipment BOM.

    BENEFITS : Able to get components in

    Maintenance order, hence reduces

    component selection & attachment

    time & also wrong selection ofcomponents.

    QU O

    PM EQUIPMENT CLASSIFICATION.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    59/63

    PRESENT PROCESS : Not Maintained.

    DEV/MODIFICATION : Need to maintain Characteristic &classification in Master data.

    BENEFITS : Able to get Equipment Specifications

    in the system.

    Q

    PM COMPULSORY FIELDS

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    60/63

    PRESENT PROCESS : Fields are not mandatory.

    DEV/MODIFICATION : Customization required.BENEFITS : Able to get complete data filled,

    to have proper Breakdown

    analysis with cause,damage & down

    time.

    PM POWER PLANT SCHEDULE

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    61/63

    PRESENT PROCESS : Not Maintained in the system.

    DEV/MODIFICATION : Need to maintain Proper catalogueprofile & use them effectively.

    BENEFITS : Able to track Preventive

    Maintenance,Breakdown details &

    maintenance in the system.

    PM HISTORY CARD & LOG BOOK.

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    62/63

    PRESENT PROCESS : Maintained in the Register.

    DEV/MODIFICATION : Not suggested in SAP,as it takes muchtime for data entry with less

    management informative.Can use

    SHARE folder to maintain data in

    EXCEL file with proper sharing, &

    update in SAP for selected ones.

    BENEFITS : Able to track spares lying on the shop

    floor which are tobe

    tested,modification etc.

    PM POWER PLANT REPORT

  • 8/11/2019 AS IS -TO BE LAKSHYA r

    63/63

    PRESENT PROCESS : Not Available.

    DEV/MODIFICATION : Need to create Measuring point &

    update regularly.ABAP required to

    develop report.

    BENEFITS : Able to track cost per unit of fuel