+ All Categories
Home > Documents > As of 5:00 PM on September 9, 2014...2014/09/24  · Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B...

As of 5:00 PM on September 9, 2014...2014/09/24  · Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B...

Date post: 10-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B Unit: mSv/h 2.0 0.28 0.70 0.05 5 0.35 0.32 Transfer pipe 1.5(Surface) 1.0(Atmosph ere ) Transfer pipe 1.2(Surface) 0.80(Atmosp here ) Transfer pipe 0.10(Surface) 0.060(Atmosp here ) Transfer pipe 80(Surface) 10(Atmosphe re ) Transfer pipe 0.18(Surface) 0.18(Atmosph ere ) Transfer pipe 0.35(Surface) 0.065(Atmosph ere ) 0.15 0.10 July, 2011 70100 Unit 1& 2 SGTS pipe >10,000 October, 2012 0.26 0.30 0.060 0.21 0.10 0.90 0.65 0.17 0.25 0.38 0.17 0.20 0.05 0 0.25 0.30 0.20 June, 2012 July, 2012 0.25 0.4 1.3 0.50 0.20 0.50 Rooftop1.0 0.20 0.30 0.05 0.43 0.24 1.3 0.50 0.60 0.21 0.10 0.20 0.20 0.60 1.0 0.7 0.20 November, 2012 December, 2012 March, 2013 0.019 0.050 0.018 0.085 0.011 0.026 0.18 0.050 0.040 0.15 0.15 0.3 0.8 0.3 1.3 0.20 0.27 Upper part of concrete-filed vertical shaft 0.25(after gravel installation0.14 0.10 0.10 0.040 0.090 0.050 0.20 0.90 1.0 1.0 0.40 0.092 0.060 0.47 0.085 0.090 0.25 0.55 0.026 0.12 0.068 0.20 2.5 0.080 0.20 0.11 June, 2013 0.35 July, 2013 0.20 2.0 2.5 4.0 Atmosphere 1.8 Ground surface 8.5 1.5 Atmosphere 1.7 Ground surface 8.5 1.0 September, 2013 November, 2013 0.4 In front of the door of carry-in entrance 3.5 2.7 0.045 0.35 0.050 0.045 0.085 0.055 0.080 0.050 April, 2014 0.030 0.050 0.050 0.026 0.025 0.050 0.040 0.050 0.080 0.20 July, 2014 June, 2014 0.11 September, 2014 Fukushima Daiichi NPS Survey Map As of 5:00 PM on September 9, 2014Bottom of side ditch 30Surface1.3 Atmosphere)
Transcript
Page 1: As of 5:00 PM on September 9, 2014...2014/09/24  · Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B Unit: mSv/h 2.0 0.28 0.70 0.05 5 0.35 0.32 Transfer pipe 1.5(Surface) 1.0(Atmosph ere

Unit 1R/B Unit 2

R/BUnit 3

R/BUnit 4

R/B

Unit: mSv/h

2.0

0.28

0.70

0.055

0.35

0.32

Transfer pipe

1.5(Surface)1.0(Atmosph

ere )

Transfer pipe

1.2(Surface)0.80(Atmosp

here )Transfer pipe0.10(Surface)0.060(Atmosp

here )Transfer pipe80(Surface)

10(Atmosphere )

Transfer pipe0.18(Surface)0.18(Atmosph

ere )

Transfer pipe0.35(Surface)

0.065(Atmosphere )

0.15

0.10

July, 2011

70~100

Unit 1& 2 SGTS pipe

>10,000

October, 2012

0.26

0.30

0.060

0.21

0.10

0.90

0.65

0.170.25

0.38

0.17

0.20

0.050

0.25 0.30 0.20

June, 2012

July, 2012

0.25

0.4

1.3

0.50

0.20

0.50(Rooftop)

1.0

0.20

0.300.05 0.43

0.24

1.3

0.500.60

0.21

0.10

0.20 0.20

0.60

1.0 0.7 0.20

November, 2012

December, 2012

March, 2013

0.019

0.050 0.018

0.085

0.0110.026

0.18

0.050

0.040

0.15

0.150.3

0.80.3

1.30.200.27

Upper part of concrete-filed vertical shaft

0.25(after gravel installation)

0.14

0.10

0.10

0.040

0.0900.050

0.20

0.90

1.0

1.0

0.40

0.092

0.0600.470.085

0.090

0.25

0.55

0.026

0.12

0.068

0.20

2.5

0.0800.20

0.11

June, 2013

0.35

July, 2013

0.20

2.02.5

4.0

Atmosphere 1.8Ground surface 8.5

1.5

Atmosphere 1.7Ground surface 8.5

1.0

September, 2013November, 2013

0.4

In front of the door of carry-in entrance

3.5

2.7

0.0450.35

0.050

0.045

0.085

0.0550.080

0.050

April, 2014

0.030

0.050

0.050

0.026

0.0250.050

0.040

0.050 0.080 0.20

July, 2014June, 2014

0.11

September, 2014

Fukushima Daiichi NPS Survey Map ( As of 5:00 PM on September 9, 2014)

Bottom of side ditch

30(Surface)1.3 (Atmosphere)

Recommended