+ All Categories
Home > Documents > As on 30 th August 2012

As on 30 th August 2012

Date post: 10-Jan-2016
Category:
Upload: sorena
View: 22 times
Download: 0 times
Share this document with a friend
Description:
As on 30 th August 2012. Front side view. Front view. Back side view. Entrance. Basement. Ground Floor. 1 st Floor. 2 nd Floor. Construction work on 3rd Floor. - PowerPoint PPT Presentation
Popular Tags:
10
As on 30 th August 2012
Transcript
Page 1: As on 30 th  August 2012

As on 30th August 2012

Page 2: As on 30 th  August 2012

Front side view

Page 3: As on 30 th  August 2012

Front view

Page 4: As on 30 th  August 2012

Back side view

Page 5: As on 30 th  August 2012

Entrance

Page 6: As on 30 th  August 2012

Basement

Page 7: As on 30 th  August 2012

Ground Floor

Page 8: As on 30 th  August 2012

1st Floor

Page 9: As on 30 th  August 2012

2nd Floor

Page 10: As on 30 th  August 2012

Construction work on 3rd Floor


Recommended