Ok i eOra v2e2-'2S631te 10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office 170 South 500 East Vernal, Utah 84078 RE: Application for Permit to Drill-Dominion Exploration & Production, Inc. HCU 14-27F Surface : 1,569' FSL & 1,937' FWL, NE/4 SW/4 Target' 550' FSL & 2,000' FWL, SE/4 SW/4 Section 27, Tl0S, R20E, SLB&M, Uintah County, Utah Dear Fluid Minerals Group: On behalf of Dominion Exploration & Production, Inc. (Dominion), Buys & Associates, Inc. respectfully sub- mits the enclosed original and two copies of the Application for Permit to Drill (APD) for the above referenced tribal surface / federal mineral well. Included with the APD is the following supplemental information: Exhibit "A" - Survey plats, layouts and photos of the proposed well site; Exhibit "B" - Proposed location maps with access and utility corridors; Exhibit "C" - Production site layout; Exhibit "D" - Drilling Plan; Exhibit "E" - Surface Use Plan; Exhibit "F" - Typical BOP and Choke Manifold diagram. Please accept this letter as Dominion's, written request for confidential treatment of all information contained in and pertaining to this application. Thank you very much for your timely consideration of this application. Please feel free to contact myself or Carla Christian of Dominion at 405-749-5263 if you have any questions or need additional information. Don Hamilton 2005 Agent for Dominion ec: Diana Whitney, Division of Oil, Gas and Mining Amanda Mart, Bureau of Indian Affairs Carla Christian, Dominion FI LECOPY Ok i eOra v2e2-'2S631te 10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office 170 South 500 East Vernal, Utah 84078 RE: Application for Permit to Drill-Dominion Exploration & Production, Inc. HCU 14-27F Surface : 1,569' FSL & 1,937' FWL, NE/4 SW/4 Target' 550' FSL & 2,000' FWL, SE/4 SW/4 Section 27, Tl0S, R20E, SLB&M, Uintah County, Utah Dear Fluid Minerals Group: On behalf of Dominion Exploration & Production, Inc. (Dominion), Buys & Associates, Inc. respectfully sub- mits the enclosed original and two copies of the Application for Permit to Drill (APD) for the above referenced tribal surface / federal mineral well. Included with the APD is the following supplemental information: Exhibit "A" - Survey plats, layouts and photos of the proposed well site; Exhibit "B" - Proposed location maps with access and utility corridors; Exhibit "C" - Production site layout; Exhibit "D" - Drilling Plan; Exhibit "E" - Surface Use Plan; Exhibit "F" - Typical BOP and Choke Manifold diagram. Please accept this letter as Dominion's, written request for confidential treatment of all information contained in and pertaining to this application. Thank you very much for your timely consideration of this application. Please feel free to contact myself or Carla Christian of Dominion at 405-749-5263 if you have any questions or need additional information. Don Hamilton 2005 Agent for Dominion ec: Diana Whitney, Division of Oil, Gas and Mining Amanda Mart, Bureau of Indian Affairs Carla Christian, Dominion FI LECOPY
Transcript
Page 1: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Ok i eOra v2e2-'2S631te10

Env i ronment a l Consult a nts303/781-8211 303/781-1167 Fax

July 15, 2005

Fluid Minerals GroupBureau of Land ManagementVernal Field Office170 South 500 EastVernal, Utah 84078

RE: Application for Permit to Drill-Dominion Exploration & Production, Inc.HCU 14-27F

Surface : 1,569' FSL & 1,937' FWL, NE/4 SW/4Target' 550' FSL & 2,000' FWL, SE/4 SW/4

Section 27, Tl0S, R20E, SLB&M, Uintah County, Utah

Dear Fluid Minerals Group:

On behalf of Dominion Exploration & Production, Inc. (Dominion), Buys & Associates, Inc. respectfully sub-mits the enclosed original and two copies of the Application forPermit to Drill (APD) for the above referencedtribal surface / federal mineral well. Included with the APD is the following supplemental information:

Exhibit "A" - Survey plats, layouts and photos of the proposed well site;

Exhibit "B" - Proposed location maps with access and utility corridors;

Exhibit "C" - Production site layout;

Exhibit "D" - Drilling Plan;

Exhibit "E" - Surface Use Plan;

Exhibit "F" - Typical BOP and Choke Manifold diagram.

Please accept this letter as Dominion's, written request for confidential treatment of all information contained inand pertaining to this application.

Thank you very much for your timely consideration of this application. Please feel free to contact myself orCarla Christian of Dominion at 405-749-5263 if you have any questions or need additional information.

Don Hamilton 2005Agent for Dominion

ec: Diana Whitney, Division of Oil, Gas and MiningAmanda Mart, Bureau of Indian AffairsCarla Christian, Dominion FILECOPY

Ok i eOra v2e2-'2S631te10

Env i ronment a l Consult a nts303/781-8211 303/781-1167 Fax

July 15, 2005

Fluid Minerals GroupBureau of Land ManagementVernal Field Office170 South 500 EastVernal, Utah 84078

RE: Application for Permit to Drill-Dominion Exploration & Production, Inc.HCU 14-27F

Surface : 1,569' FSL & 1,937' FWL, NE/4 SW/4Target' 550' FSL & 2,000' FWL, SE/4 SW/4

Section 27, Tl0S, R20E, SLB&M, Uintah County, Utah

Dear Fluid Minerals Group:

On behalf of Dominion Exploration & Production, Inc. (Dominion), Buys & Associates, Inc. respectfully sub-mits the enclosed original and two copies of the Application forPermit to Drill (APD) for the above referencedtribal surface / federal mineral well. Included with the APD is the following supplemental information:

Exhibit "A" - Survey plats, layouts and photos of the proposed well site;

Exhibit "B" - Proposed location maps with access and utility corridors;

Exhibit "C" - Production site layout;

Exhibit "D" - Drilling Plan;

Exhibit "E" - Surface Use Plan;

Exhibit "F" - Typical BOP and Choke Manifold diagram.

Please accept this letter as Dominion's, written request for confidential treatment of all information contained inand pertaining to this application.

Thank you very much for your timely consideration of this application. Please feel free to contact myself orCarla Christian of Dominion at 405-749-5263 if you have any questions or need additional information.

Don Hamilton 2005Agent for Dominion

ec: Diana Whitney, Division of Oil, Gas and MiningAmanda Mart, Bureau of Indian AffairsCarla Christian, Dominion FILECOPY

Page 2: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Forra 3160-3 SUBMIT IN TR CATE* Form approved.(December 1990) (otherinstructions o Budget Bureau No. 1004-0136

UN D STATES teverse side) Expires: December 31, 1991

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.

BUREAU OF LAND MANAGEMENT U-29784APPLICATION FOR PERMIT TO DRILL OR DEEPEN 6.lPMDIAN,ALLOTTEEORTRIBENAME

la TYPE OF WORK Ute Indian Tribe

O 7 UNITAGREEMENTNAMEDRILL DEEPEN

b. TYPE OF WL Hill Creek UnitOIL GAS SINGLE MULTIPLE 8 FARM OR LEASE NAME,WELL NO.WELL OTHER ZONE ZONE O HCU 14-27F2.NAMEOFOPERATDorninion

Exploration & Production, Inc. O ÑÌ $ (,gy 2.3. ADDRESS AND TELEPHONE NO 10 FIELD AND POOL, OR WILDCAT

14000 QuailSprings Parkway, Suite 600, Oklahoma City, OK 73I34, 405-749-5263 Natural Buttes4. LOCATION OF WELL (Report location clearlyand inaccordancewithanyStaterequirements.*) 11 SEC..T.,R,M., OR BLK

1,569'FSL & 1,937' FWL, NE/4 SW/4 un a Section 27,At pmposed pod. me / 7 Ê7 Û

5,50'FSL & 2,000'FWL,SE/4 SW/4 Tl0S, R20E, SLB&M14..DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 12 COUNTY OR PARISH f3, STATE

12.02 miles south of Ourav, Utah Uintah | Utah15 DISTANCE FROM PROPOSED* 16 NO. OF ACRES IN LEASE 17 NO OF ACRES ASSIGNED

LOCATION TO NEAREST TO THIS WELLPROPERTY OR LEASE LINE, FT.(Also to neare t drig unit line, if any) 2S' 640 40 acres

18. DISTANCE FROM PROPOSED 19 PROPOSED DEPTH 20 ROTARY OR CABLE TOOLSLOCATION TO NEAREST WELL,DRILLING,COMPLETED, ORAPPLIED FOR, ON TH[S LEASE.FT, 686' 7.900' Rotary

21. ELEVATIONS (Show whetimr DF,RT.GR,etc.) 22. APPROK DATE WORK WR.L START*

5.171' GR October 1.2005a PROPOSED CASING AND CEMENTING PROGRAM

SIZE OF HOLE GRADE, SIZE OF CASING WEIGHT PER POOT SETTING DEPTH QUANTITY OF CBMENT

17-1/2" 13-3/8" H40 ST&C 48# 500' 4$0 sks "C" Cement with additives (see DriffingPlan)12-1/4" 9-5/8" J-55 LT&C 36# 2.800' 300 sacks Lead and 390 sacks Tail (see Drilling Plan)

7-7/8" 5-1/2" Mav-80 LT&C 17# 7,900' 90 sacks Lead and 600 sacks Tail (see Drilling Plan)

Bond Information:Bond coverage is provided by Travelers Casualty and Surety Company of America, Bond #76S 63050 0330

Other Information: ( $ 72 2 / 0 i 95 2.530Drilling Plan and Surface Use Plan are attached.Dominion requests that this complete application for permit to drill be held confidential.A request for exception to spacing (R649-3-11) is hereby requested based on topography mino the well is located

within 460' of the drilling unit boundary. Dominion Exploration & Production, Inc. is the only owner andoperator within 460' of the proposed well and all points along the intended well bore path.

Surface Ownership - Ute Indian Tribe under the management of the Bureau of Indian Affairs - Uintah and OurayAgency, P.O. Box 130, 988 South 7500 East, Ft. Duchesne, Utah 84026

RECEiVED‡ederalAPP"'* CONiiDENTIALAcyonis Necessary

IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen, give data present pr pr byzone. If proposal is to drill or deepen directionally, givepertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer progrant if any.

24

SIGNED Don Hamilton Agent for Dominion egy, July 15,2005(This space for Federal or State office use)

PERMIT NO APPROVAL DATE

Application approval does not warrant o the applicant holds legal or equitable title to thoserights in thesubject lease which would entitle the applicant to conduct operations thereon.CAPPOWODNB

TITLE DATE ....·

*See Instructions On Reverse SideTitle 18 U.S.C. Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency or

Forra 3160-3 SUBMIT IN TR CATE* Form approved.(December 1990) (otherinstructions o Budget Bureau No. 1004-0136

UN D STATES teverse side) Expires: December 31, 1991

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.

BUREAU OF LAND MANAGEMENT U-29784APPLICATION FOR PERMIT TO DRILL OR DEEPEN 6.lPMDIAN,ALLOTTEEORTRIBENAME

la TYPE OF WORK Ute Indian Tribe

O 7 UNITAGREEMENTNAMEDRILL DEEPEN

b. TYPE OF WL Hill Creek UnitOIL GAS SINGLE MULTIPLE 8 FARM OR LEASE NAME,WELL NO.WELL OTHER ZONE ZONE O HCU 14-27F2.NAMEOFOPERATDorninion

Exploration & Production, Inc. O ÑÌ $ (,gy 2.3. ADDRESS AND TELEPHONE NO 10 FIELD AND POOL, OR WILDCAT

14000 QuailSprings Parkway, Suite 600, Oklahoma City, OK 73I34, 405-749-5263 Natural Buttes4. LOCATION OF WELL (Report location clearlyand inaccordancewithanyStaterequirements.*) 11 SEC..T.,R,M., OR BLK

1,569'FSL & 1,937' FWL, NE/4 SW/4 un a Section 27,At pmposed pod. me / 7 Ê7 Û

5,50'FSL & 2,000'FWL,SE/4 SW/4 Tl0S, R20E, SLB&M14..DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 12 COUNTY OR PARISH f3, STATE

12.02 miles south of Ourav, Utah Uintah | Utah15 DISTANCE FROM PROPOSED* 16 NO. OF ACRES IN LEASE 17 NO OF ACRES ASSIGNED

LOCATION TO NEAREST TO THIS WELLPROPERTY OR LEASE LINE, FT.(Also to neare t drig unit line, if any) 2S' 640 40 acres

18. DISTANCE FROM PROPOSED 19 PROPOSED DEPTH 20 ROTARY OR CABLE TOOLSLOCATION TO NEAREST WELL,DRILLING,COMPLETED, ORAPPLIED FOR, ON TH[S LEASE.FT, 686' 7.900' Rotary

21. ELEVATIONS (Show whetimr DF,RT.GR,etc.) 22. APPROK DATE WORK WR.L START*

5.171' GR October 1.2005a PROPOSED CASING AND CEMENTING PROGRAM

SIZE OF HOLE GRADE, SIZE OF CASING WEIGHT PER POOT SETTING DEPTH QUANTITY OF CBMENT

17-1/2" 13-3/8" H40 ST&C 48# 500' 4$0 sks "C" Cement with additives (see DriffingPlan)12-1/4" 9-5/8" J-55 LT&C 36# 2.800' 300 sacks Lead and 390 sacks Tail (see Drilling Plan)

7-7/8" 5-1/2" Mav-80 LT&C 17# 7,900' 90 sacks Lead and 600 sacks Tail (see Drilling Plan)

Bond Information:Bond coverage is provided by Travelers Casualty and Surety Company of America, Bond #76S 63050 0330

Other Information: ( $ 72 2 / 0 i 95 2.530Drilling Plan and Surface Use Plan are attached.Dominion requests that this complete application for permit to drill be held confidential.A request for exception to spacing (R649-3-11) is hereby requested based on topography mino the well is located

within 460' of the drilling unit boundary. Dominion Exploration & Production, Inc. is the only owner andoperator within 460' of the proposed well and all points along the intended well bore path.

Surface Ownership - Ute Indian Tribe under the management of the Bureau of Indian Affairs - Uintah and OurayAgency, P.O. Box 130, 988 South 7500 East, Ft. Duchesne, Utah 84026

RECEiVED‡ederalAPP"'* CONiiDENTIALAcyonis Necessary

IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen, give data present pr pr byzone. If proposal is to drill or deepen directionally, givepertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer progrant if any.

24

SIGNED Don Hamilton Agent for Dominion egy, July 15,2005(This space for Federal or State office use)

PERMIT NO APPROVAL DATE

Application approval does not warrant o the applicant holds legal or equitable title to thoserights in thesubject lease which would entitle the applicant to conduct operations thereon.CAPPOWODNB

TITLE DATE ....·

*See Instructions On Reverse SideTitle 18 U.S.C. Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency or

Page 3: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

TiOS R20 E, S. L.B. &M. DOMINION EXPLR. & PROD., INC.' Well location, HCU #14-27F, located as shown

in the NE 1/4 SW 1/4 of Section 27, T10S,WEST - 79.83 (c.L.o.) R20E, S.L.B.&M. Uintah County Utah.

BASIS OF ELEVATIONSPOT ELEVATIONAT THE SOUTHWEST CORNER OFSECT10N 20, T10S, R20E, S.LB.&M. TAKEN FROMTHE BIG PACK MTN. NW QUADRANGLE,UTAH, UINTAHCOUNTY, 7.5 MINUTE QUAD. (TOPOGRAPHIC MAP)PUBL1SHEDBY THE UNITED STATES DEPARTMENTOF THE INTER10R, GEOLOGICALSURVEY. SAID

---- ELEVATIONIS MARKED AS BEING 5251 FEET.

NOTE:THEPROPOSEDBOTTOMHOLEFOR TNISWELt.IS LOCATEDIN THE SE 1/4 SW 1/4 OF SECTION27, T10S, R20E, S.LB.&M. AT A DISTANCEOF550' FSL 2000' FWL. IT BEARS 504 31'48"E1072.02' FROM THE PROPOSEDWELLHEAD.

NTrue Positionn 271928 Brass Cap .

0.5' High, Pi/eof Stones o o - o

HCU /14- 27E1937' Elev. Graded Ground =

5171. SC A LE

CERTIFICATETHIS IS TO CERTIFYTHAT THEABOVE PI, PREPAREDFROMF1ELDNO7ES OF ACTUAL SURVEYS DERMYSUPERVISIONAND THAT THE SAME CT TO T

to BEST OF MY KNOWLEDGEAND~ Bottorn Hole

1.0' Hgh, Ple PRe of Stones, f.RECISTRATI . 161319of Stones N-S Fancelme TATSOF .•

1928 Ðross Cap NB957'08"W 262288' (Meas.) SB95f20"W 2624.07' (Meas.)o.e'High, Pae UnrfAH ENGINEERING NGorston•• BASIS OF BEARINGS

85 SOUTH 200 ßAST - VERNAL UTAH 84078BASIS OF BEARINGSIS A G.P.S. OBSERVATION.

(435) 789--1017(NAD 83)LEGEND SCALE DATESURVEYED: DATE DRAWN:· LATITUDE= 39°54'55.62 (39.915450) 1" = 1000' 2-28-05 3-8-05

=90° SYMBOL LONGITUDE= 109°39°12.57" (109.653492) PARTY REFERENCES

(NAD 27) B.B. J.M. K.G- G.L.O. PLAT= PROPOSED WELL HEAD· LATiTUDE= 39°54'55.75" (39.915486) WEATHER FILEA = SECTIONCORNERSLOCATED. LONGITUDE= 109°39'10.08" (109.652800) COOL DOMINIONEXPLR.& PROD.,

TiOS R20 E, S. L.B. &M. DOMINION EXPLR. & PROD., INC.' Well location, HCU #14-27F, located as shown

in the NE 1/4 SW 1/4 of Section 27, T10S,WEST - 79.83 (c.L.o.) R20E, S.L.B.&M. Uintah County Utah.

BASIS OF ELEVATIONSPOT ELEVATIONAT THE SOUTHWEST CORNER OFSECT10N 20, T10S, R20E, S.LB.&M. TAKEN FROMTHE BIG PACK MTN. NW QUADRANGLE,UTAH, UINTAHCOUNTY, 7.5 MINUTE QUAD. (TOPOGRAPHIC MAP)PUBL1SHEDBY THE UNITED STATES DEPARTMENTOF THE INTER10R, GEOLOGICALSURVEY. SAID

---- ELEVATIONIS MARKED AS BEING 5251 FEET.

NOTE:THEPROPOSEDBOTTOMHOLEFOR TNISWELt.IS LOCATEDIN THE SE 1/4 SW 1/4 OF SECTION27, T10S, R20E, S.LB.&M. AT A DISTANCEOF550' FSL 2000' FWL. IT BEARS 504 31'48"E1072.02' FROM THE PROPOSEDWELLHEAD.

NTrue Positionn 271928 Brass Cap .

0.5' High, Pi/eof Stones o o - o

HCU /14- 27E1937' Elev. Graded Ground =

5171. SC A LE

CERTIFICATETHIS IS TO CERTIFYTHAT THEABOVE PI, PREPAREDFROMF1ELDNO7ES OF ACTUAL SURVEYS DERMYSUPERVISIONAND THAT THE SAME CT TO T

to BEST OF MY KNOWLEDGEAND~ Bottorn Hole

1.0' Hgh, Ple PRe of Stones, f.RECISTRATI . 161319of Stones N-S Fancelme TATSOF .•

1928 Ðross Cap NB957'08"W 262288' (Meas.) SB95f20"W 2624.07' (Meas.)o.e'High, Pae UnrfAH ENGINEERING NGorston•• BASIS OF BEARINGS

85 SOUTH 200 ßAST - VERNAL UTAH 84078BASIS OF BEARINGSIS A G.P.S. OBSERVATION.

(435) 789--1017(NAD 83)LEGEND SCALE DATESURVEYED: DATE DRAWN:· LATITUDE= 39°54'55.62 (39.915450) 1" = 1000' 2-28-05 3-8-05

=90° SYMBOL LONGITUDE= 109°39°12.57" (109.653492) PARTY REFERENCES

(NAD 27) B.B. J.M. K.G- G.L.O. PLAT= PROPOSED WELL HEAD· LATiTUDE= 39°54'55.75" (39.915486) WEATHER FILEA = SECTIONCORNERSLOCATED. LONGITUDE= 109°39'10.08" (109.652800) COOL DOMINIONEXPLR.& PROD.,

Page 4: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

0 ODRILLING PLAN

APPROVAL OF OPERATIONS

Attachment for Permit to Drill

Name of Operator: Dominion Exploration & ProductionAddress: 14000 QuailSprings Parkway, Suite 600

Oklahoma City, OK 73134Well Location: HCU 14-27F

SHL: 1569' FSL & 193T FWL Section 27-10S-20E

BHL: 550' FSL & 2000' FWL Section 27-10S-20E

Uintah County, UT

1. GEOLOGIC SURFACE FORMATION Uintah

2. ESTIMATED DEPTHSOF IMPORTANT GEOLOGIC MARKERS

Formation Depth

Wasatch Tongue 3,785'Uteland Limestone 4,120'Wasatch 4,265'Chapita Wells 5,160'Uteland Buttes 6.290'Mesaverde 7,050'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER. OIL, GAS OR MINERALS

Formation Depth Tyge

Wasatch Tongue 3,785' OilUteland Limestone 4,120' OilWasatch 4,265' GasChapita Wells 5,160' GasUteland Buttes 6,290' GasMesaverde 7,050' Gas

4. PROPOSED CASING PROGRAM

All casing used to drill this well will be new casing.

Typ_e & Weight Grade Conn. Tog Bottom Hi

Surface 13-3/8" 48.0 ppf H-40 STC 0¯500' 17-½"

Intermediate 9-5/8" 36.0 ppf J-55 LTC 0' 2,800' 12-1/4"Production 5-1/2" 17.0 ppf MAV-80 LTC 0' 7,900' 7-7/8"

5. OPERATOR'S MINIMUM SPECIFICATIONS FOR PRESSURE CONTROLSurface hole: No BOPE will be utilized.Intermediate hole: To be drilled using a diverter stack with rotating head to divert flow from rig floor.Production hole: Prior to drilling out the intermediate casing shoe, 3,000 psi or greater BOP equipment will be installed.The pipe rams will be operated at least once per day from intermediate casing to total depth. The blind rams will be testedonce per day from intermediate casing to total depth if operations permit.

0 ODRILLING PLAN

APPROVAL OF OPERATIONS

Attachment for Permit to Drill

Name of Operator: Dominion Exploration & ProductionAddress: 14000 QuailSprings Parkway, Suite 600

Oklahoma City, OK 73134Well Location: HCU 14-27F

SHL: 1569' FSL & 193T FWL Section 27-10S-20E

BHL: 550' FSL & 2000' FWL Section 27-10S-20E

Uintah County, UT

1. GEOLOGIC SURFACE FORMATION Uintah

2. ESTIMATED DEPTHSOF IMPORTANT GEOLOGIC MARKERS

Formation Depth

Wasatch Tongue 3,785'Uteland Limestone 4,120'Wasatch 4,265'Chapita Wells 5,160'Uteland Buttes 6.290'Mesaverde 7,050'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER. OIL, GAS OR MINERALS

Formation Depth Tyge

Wasatch Tongue 3,785' OilUteland Limestone 4,120' OilWasatch 4,265' GasChapita Wells 5,160' GasUteland Buttes 6,290' GasMesaverde 7,050' Gas

4. PROPOSED CASING PROGRAM

All casing used to drill this well will be new casing.

Typ_e & Weight Grade Conn. Tog Bottom Hi

Surface 13-3/8" 48.0 ppf H-40 STC 0¯500' 17-½"

Intermediate 9-5/8" 36.0 ppf J-55 LTC 0' 2,800' 12-1/4"

Production 5-1/2" 17.0 ppf MAV-80 LTC 0' 7,900' 7-7/8"

5. OPERATOR'S MINIMUM SPECIFICATIONS FOR PRESSURE CONTROLSurface hole: No BOPE will be utilized.Intermediate hole: To be drilled using a diverter stack with rotating head to divert flow from rig floor.Production hole: Prior to drilling out the intermediate casing shoe, 3,000 psi or greater BOP equipment will be installed.The pipe rams will be operated at least once per day from intermediate casing to total depth. The blind rams will be testedonce per day from intermediate casing to total depth if operations permit.

Page 5: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O ODRILLING PLAN

APPROVAL OF OPERATIONS

A diagram of the planned BOP equipment for normal drilling operations in this area is attached. As denoted there will betwo valves and one check valve on the kill line, two valves on the choke line, and two adjustable chokes on the manifoldsystem. The BOP "stack" will consist of two BOP rams (1 pipe, 1 blind) and one annular type preventer, all rated to aminimum of 3,000 psi working pressure.

The BOP equipment will be pressure tested prior to drilling below the intermediate casing shoe. All test pressures will bemaintained for fifteen (15) minutes without any significant pressure decrease. Clear water will be circulated into the BOPstack and lines prior to pressure testing. The following test pressures will be used as a minimum for various equipmentitems.

1. Annular BOP 1,500 psi2. Ram type BOP 3,000 psi3. Kill line valves 3,000 psi4. Choke line valves and choke manifold valves 3,000 psiS. Chokes 3,000 psi6. Casing, casinghead & weld 1,500 psi7. Upper kelly cock and safety valve 3,000 psi8. Dart valve 3,000 psi

6. MUD SYSTEMS• An air or an air/mist system may be used to drill to drill the surface hole until water influx becomes too great.• KCL mud system will be used to drill well.

Depths Mud Weight (ppg) Mud System0' - 500' 8.4 Air foam mist, no pressure control

500' - 2,800' 8.6 Fresh water, rotating head and diverter2,800'-7,900' 8.6 Fresh water/2%KCL/KCL mud system

7. BLOOIE LINE• An automatic igniter will not be installed on blooie line. The blooie will have a contant ignition source.• A "target tee" connection will be installed on blooie line for 90° change of directions for abrasion resistance.• "Target tee" connections will be a minimum of 50' from wellhead.• The blooie line discharge will be a minimum of 100' from the wellhead.

8. AUXILIARY EQUIPMENT TO BE USEDa. Kelly cock.b. Full opening valve with drill pipe connection will be kept on floor. Valve will be used when the kelly is not in string.

9. TESTING.LOGGING, AND CORING PROGRAMS TO ßE FOLLOWED• A drillstem test in the Wasatch Tongue is possible.• One electric line wire-log will be run from total depth to intermediate casing.• The gamma ray will be left on to record from total depth to intermediate casing.• Other log curves (resistivities, porosity, and caliper) will record from total depth to intermediate casing.• A dipmeter, percussion cores, or rotary cores may be run over selected intervals.

10. ANTICIPATED ABNORMAL PRESSURES OR TEMPERATURES EXPECTED• Expected BHP 1,500-2,000 psi (lower than normal pressure gradient).• No abnormal temperature or pressures are anticipated.• The formations to be penetrated do not contain known H2S gas,

l l. WATER SUPPLY• No water pipelines will be laid for this well.• No water well will be drilled for this well.• Drilling water for this will be hauled on the road(s) shown in Attachment No. 3.• Water will be hauled from: Water Permit # 43-10447 Section 9, Township 8 South, Range 20 East

O ODRILLING PLAN

APPROVAL OF OPERATIONS

A diagram of the planned BOP equipment for normal drilling operations in this area is attached. As denoted there will betwo valves and one check valve on the kill line, two valves on the choke line, and two adjustable chokes on the manifoldsystem. The BOP "stack" will consist of two BOP rams (1 pipe, 1 blind) and one annular type preventer, all rated to aminimum of 3,000 psi working pressure.

The BOP equipment will be pressure tested prior to drilling below the intermediate casing shoe. All test pressures will bemaintained for fifteen (15) minutes without any significant pressure decrease. Clear water will be circulated into the BOPstack and lines prior to pressure testing. The following test pressures will be used as a minimum for various equipmentitems.

1. Annular BOP 1,500 psi2. Ram type BOP 3,000 psi3. Kill line valves 3,000 psi4. Choke line valves and choke manifold valves 3,000 psiS. Chokes 3,000 psi6. Casing, casinghead & weld 1,500 psi7. Upper kelly cock and safety valve 3,000 psi8. Dart valve 3,000 psi

6. MUD SYSTEMS• An air or an air/mist system may be used to drill to drill the surface hole until water influx becomes too great.• KCL mud system will be used to drill well.

Depths Mud Weight (ppg) Mud System0' - 500' 8.4 Air foam mist, no pressure control

500' - 2,800' 8.6 Fresh water, rotating head and diverter2,800'-7,900' 8.6 Fresh water/2%KCL/KCL mud system

7. BLOOIE LINE• An automatic igniter will not be installed on blooie line. The blooie will have a contant ignition source.• A "target tee" connection will be installed on blooie line for 90° change of directions for abrasion resistance.• "Target tee" connections will be a minimum of 50' from wellhead.• The blooie line discharge will be a minimum of 100' from the wellhead.

8. AUXILIARY EQUIPMENT TO BE USEDa. Kelly cock.b. Full opening valve with drill pipe connection will be kept on floor. Valve will be used when the kelly is not in string.

9. TESTING.LOGGING, AND CORING PROGRAMS TO ßE FOLLOWED• A drillstem test in the Wasatch Tongue is possible.• One electric line wire-log will be run from total depth to intermediate casing.• The gamma ray will be left on to record from total depth to intermediate casing.• Other log curves (resistivities, porosity, and caliper) will record from total depth to intermediate casing.• A dipmeter, percussion cores, or rotary cores may be run over selected intervals.

10. ANTICIPATED ABNORMAL PRESSURES OR TEMPERATURES EXPECTED• Expected BHP 1,500-2,000 psi (lower than normal pressure gradient).• No abnormal temperature or pressures are anticipated.• The formations to be penetrated do not contain known H2S gas,

l l. WATER SUPPLY• No water pipelines will be laid for this well.• No water well will be drilled for this well.• Drilling water for this will be hauled on the road(s) shown in Attachment No. 3.• Water will be hauled from: Water Permit # 43-10447 Section 9, Township 8 South, Range 20 East

Page 6: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

0 0DRILLING PLAN

APPROVAL OF OPERATIONS

12. CEMENT SYSTEMS

a. Surface Cement:Drill 17-½" hole to 500' and cement 13-3/8" to surface with 450 sks class "C" cement with 2% CaCl2 and1/4 #/sk. Poly-E-Flakes (volume includes 40% excess). Top out if necessary with Top Out cement listed below.

b. Intermediate Casing Cement:• Drill 12-1/4" hole to 2,800'+, run and cement 9-5/8" to surface.• Pump 20 bbls lightly weighted water spacer followed by 5 bbls fresh water. Displace with any available water.• Casing to be run with: a) guide shoe b) insert float c) three (3) eentralizers, one on each of first 3 jointsd) stop ring

for plug two jointsoff bottom e) bottom three joints thread locked f) pump job with bottom plug only.• Cement to surface not required due to surface casing set deeper than normal.

F[ole CementIyge M Interval Density Y_ieLd Volume Volume ExcessLead 300 0'-2,000' 11.0 ppg 3.82 CFS 658 CF 1,152 CF 75%Tail 390 2,000'-2,800' 15.6 ppg 1.20 CFS 268 CF 469 CF 75%

Lead Mix: Halliburton Prem Plus V blend. Blend includes Class "C" cement, gel, salt, gilsonite, EX-1 and HR-7.Slurry yield: 3.82 cf/sack Slurry weight: l 1.00 #/gal.Water requirement: 22.95 gal/sackCompressives @130°F: 157 psi after 24 hours

Tail Mix: Class "G" Cement, 1/4 Ib/sk Cellophane Flakes + 2% bwoc Calcium Chloride + 44.3% fresh water.Pump Time: 1 hr. 5 min. 90 °F.

Compressives @95 °F: 24 Hour is 4,700 psi

c. Production Casing Cement:• Drill 7-7/8" hole to 7,900'±, run and cement 5 1/2".• Cement interface is at 3,700', which is typically 500'-1,000' above shallowest pay.• Pump 20 bbl Mud Clean II unweighted spacer, followed by 20 Bbls fresh H20 spacer.• Displace with 3% KCL.

II_ole CementÎygg Sacks Interval Density Yjeld Volume Volume ExcessLead 90 3,700'4,500' 11.5 ppg 3.12 CFS 139 CF 277 CF 100%Tail . 600 4,500'-7,900' 13.0 ppg 1.75 CFS 525 CF 1050 CF 100%

Note: Caliper will be run to determine exact cement volume.

Lead Mix: Halliburton Prem Plus V blend. Blend includes Class "C" cement, gel, salt, gilsonite, EX-l and HR-7.Slurry yield: 3.12 ef/sack Slurry weight: 11.60 #/gal.Water requirement: 17.71 gal/sackCompressives @130°F: 157 psi after 24 hours

Tail Mix: Halliburton HLC blend (Prem Plus VIJB flyash). Blend includes Class "G" cement, KCl, EX-1, Halad 322,& HR-5.Slurry yield: 1.75 ef/sack Sturry weight: 13.00#/gal.Water requirement: 9.09 gallsackCompressives 165°F: 905 psi after 24 hours

13. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONSStarting Date: October l, 2005Duration: 14 Days

0 0DRILLING PLAN

APPROVAL OF OPERATIONS

12. CEMENT SYSTEMS

a. Surface Cement:Drill 17-½" hole to 500' and cement 13-3/8" to surface with 450 sks class "C" cement with 2% CaCl2 and1/4 #/sk. Poly-E-Flakes (volume includes 40% excess). Top out if necessary with Top Out cement listed below.

b. Intermediate Casing Cement:• Drill 12-1/4" hole to 2,800'+, run and cement 9-5/8" to surface.• Pump 20 bbls lightly weighted water spacer followed by 5 bbls fresh water. Displace with any available water.• Casing to be run with: a) guide shoe b) insert float c) three (3) eentralizers, one on each of first 3 jointsd) stop ring

for plug two jointsoff bottom e) bottom three joints thread locked f) pump job with bottom plug only.• Cement to surface not required due to surface casing set deeper than normal.

F[ole CementIyge M Interval Density Y_ieLd Volume Volume ExcessLead 300 0'-2,000' 11.0 ppg 3.82 CFS 658 CF 1,152 CF 75%Tail 390 2,000'-2,800' 15.6 ppg 1.20 CFS 268 CF 469 CF 75%

Lead Mix: Halliburton Prem Plus V blend. Blend includes Class "C" cement, gel, salt, gilsonite, EX-1 and HR-7.Slurry yield: 3.82 cf/sack Slurry weight: l 1.00 #/gal.Water requirement: 22.95 gal/sackCompressives @130°F: 157 psi after 24 hours

Tail Mix: Class "G" Cement, 1/4 Ib/sk Cellophane Flakes + 2% bwoc Calcium Chloride + 44.3% fresh water.Pump Time: 1 hr. 5 min. 90 °F.

Compressives @95 °F: 24 Hour is 4,700 psi

c. Production Casing Cement:• Drill 7-7/8" hole to 7,900'±, run and cement 5 1/2".• Cement interface is at 3,700', which is typically 500'-1,000' above shallowest pay.• Pump 20 bbl Mud Clean II unweighted spacer, followed by 20 Bbls fresh H20 spacer.• Displace with 3% KCL.

II_ole CementÎygg Sacks Interval Density Yjeld Volume Volume ExcessLead 90 3,700'4,500' 11.5 ppg 3.12 CFS 139 CF 277 CF 100%Tail . 600 4,500'-7,900' 13.0 ppg 1.75 CFS 525 CF 1050 CF 100%

Note: Caliper will be run to determine exact cement volume.

Lead Mix: Halliburton Prem Plus V blend. Blend includes Class "C" cement, gel, salt, gilsonite, EX-l and HR-7.Slurry yield: 3.12 ef/sack Slurry weight: 11.60 #/gal.Water requirement: 17.71 gal/sackCompressives @130°F: 157 psi after 24 hours

Tail Mix: Halliburton HLC blend (Prem Plus VIJB flyash). Blend includes Class "G" cement, KCl, EX-1, Halad 322,& HR-5.Slurry yield: 1.75 ef/sack Sturry weight: 13.00#/gal.Water requirement: 9.09 gallsackCompressives 165°F: 905 psi after 24 hours

13. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONSStarting Date: October l, 2005Duration: 14 Days

Page 7: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

$ Ryan an 41ODominion E & P

Well: HCU 14-27FField: Hill Creek UnitUintah Co. UtahSec. 27, T10S, R20E

Surface Location:o n• n MD Omrt Hniti 0 9 FS 93 ' FWL

13 3/8"

$50 O' 550 MDstartBuild 3.50

1000 1094 3 19' 1104 MD $tart Hold

Sec.27, TIUS; R20E550' FSL 20011'FWL

3000 -IZOO-

, , ,

-400 0 400 800West(-)/East(+) [400ftlin]

..3504 __ _____942 ____ 19° 3659 MDStatt Drop -2.50

SECTION DETAILS

Sec MD lue Azi TVD +N/-S +E/-W DLeg TFace VSec TargetWasetch Tongue

1 0 00 0.00 175.47 0.00 0.00 0.00 0.00 0.00 0.00Uteland I.iniest me 2 550 00 0.00 175.47 550.00 0.00 0.00 0.00 175.47 0.00

3 li0444 19.41 175,47 1093.90 -92.71 7.35 3.50 175.47 93.004000 4 365921 19,41 175.47 3503.54 -938.88 74.39 0.00 0.00 941.82Wasatch 5 4435.43 0.00 175.47 4265.00 -1068.67 84.67 2.50 180.00 1072.02

4265 1072 . . . 6 8070.43 0.00 175.47 7900.00 -1068.67 84.67 0.00 17$,47 1072.02- - - - - - - - - - - 0° 443 MD start Hold

WELL DETAILS

Namc +N/-S +El-W Nonking Eusting Latitude Longitude $lotI HCU 14-27F 0.00 0.00 7143286.58 2158293.12 39"$4'55.620N 109 39'12.570W N/A

.ioon

Chapita Wells¥ORMATION TOP DETAILS WELLPATH DETAILS

No. TVDPath MDPath Fomiarion OriginalHole

2hl

c Ref Da est-KB @519& 0.0Dit3 4265.00 4435 43 Wasarch

MICO 6 7050.00 7220.43 Mcsuverde175 47° 0.00 0.00 0.00

T

REFERENCE INFORMATIONMCo-onlimic (N/E) Reference: Sïtc Centre HCU 14-27F, TrueNorth Azimuths to True North

Vertical (TVD) Referenec: est.KB @ 519& 0.00 Magnetic North: 11.88Section (VS) Referenec: SiteCentre(0.00N,0 00E)

7000 Mensun d Depsh Reference: est.KB @5190 0.00 Magnetic FicidCalculation Method: Minimum Culvature Strength: 52903nT

Dip Angle: 65-92°Date: 7/12/2005Model: igrf2005

7900 1072 VIELD DETAILS SITE DETAILS---- --------- O'8070MDTD

8000 Natural Buttes Ficid HCU 14-27FUintah County,Utah Hill Cicck Uni;

USA See.27. TIOS, R20E

OcodeticSystem: US State Plane Coordinate System 1983 Site Centre Latitude: 39 54SS.620NEllipsoid: GRS 1980 Longitude: 109 39 12.570W

Zone: Utah, Central ZoneMagnetic Model: igrf2005

Positiona ruert OSystem Datum: Mean Sea Level Convergeacc: 1.18

Local North: True North I0 1000 2000Vertical Section at 176.47° [1000R/in]

$ Ryan an 41ODominion E & P

Well: HCU 14-27FField: Hill Creek UnitUintah Co. UtahSec. 27, T10S, R20E

Surface Location:o n• n MD Omrt Hniti 0 9 FS 93 ' FWL

13 3/8"

$50 O' 550 MDstartBuild 3.50

1000 1094 3 19' 1104 MD $tart Hold

Sec.27, TIUS; R20E550' FSL 20011'FWL

3000 -IZOO-

, , ,

-400 0 400 800West(-)/East(+) [400ftlin]

..3504 __ _____942 ____ 19° 3659 MDStatt Drop -2.50

SECTION DETAILS

Sec MD lue Azi TVD +N/-S +E/-W DLeg TFace VSec TargetWasetch Tongue

1 0 00 0.00 175.47 0.00 0.00 0.00 0.00 0.00 0.00Uteland I.iniest me 2 550 00 0.00 175.47 550.00 0.00 0.00 0.00 175.47 0.00

3 li0444 19.41 175,47 1093.90 -92.71 7.35 3.50 175.47 93.004000 4 365921 19,41 175.47 3503.54 -938.88 74.39 0.00 0.00 941.82Wasatch 5 4435.43 0.00 175.47 4265.00 -1068.67 84.67 2.50 180.00 1072.02

4265 1072 . . . 6 8070.43 0.00 175.47 7900.00 -1068.67 84.67 0.00 17$,47 1072.02- - - - - - - - - - - 0° 443 MD start Hold

WELL DETAILS

Namc +N/-S +El-W Nonking Eusting Latitude Longitude $lotI HCU 14-27F 0.00 0.00 7143286.58 2158293.12 39"$4'55.620N 109 39'12.570W N/A

.ioon

Chapita Wells¥ORMATION TOP DETAILS WELLPATH DETAILS

No. TVDPath MDPath Fomiarion OriginalHole

2hl

c Ref Da est-KB @519& 0.0Dit3 4265.00 4435 43 Wasarch

MICO 6 7050.00 7220.43 Mcsuverde175 47° 0.00 0.00 0.00

T

REFERENCE INFORMATIONMCo-onlimic (N/E) Reference: Sïtc Centre HCU 14-27F, TrueNorth Azimuths to True North

Vertical (TVD) Referenec: est.KB @ 519& 0.00 Magnetic North: 11.88Section (VS) Referenec: SiteCentre(0.00N,0 00E)

7000 Mensun d Depsh Reference: est.KB @5190 0.00 Magnetic FicidCalculation Method: Minimum Culvature Strength: 52903nT

Dip Angle: 65-92°Date: 7/12/2005Model: igrf2005

7900 1072 VIELD DETAILS SITE DETAILS---- --------- O'8070MDTD

8000 Natural Buttes Ficid HCU 14-27FUintah County,Utah Hill Cicck Uni;

USA See.27. TIOS, R20E

OcodeticSystem: US State Plane Coordinate System 1983 Site Centre Latitude: 39 54SS.620NEllipsoid: GRS 1980 Longitude: 109 39 12.570W

Zone: Utah, Central ZoneMagnetic Model: igrf2005

Positiona ruert OSystem Datum: Mean Sea Level Convergeacc: 1.18

Local North: True North I0 1000 2000Vertical Section at 176.47° [1000R/in]

Page 8: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Dominion-yan EnerL'YTReecim010gÎgygg

Company: DominionE & P Date: 7/12/2005 Time: 16:04:31 Page: 1Field: Natural Buttes Field Co-ordinate(NE) Referendiite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E.175.47Azi)Welipath: OriginalHole Plan: Plan #1

Field: Natural Buttes FieldUintah County, UtahUSA

Map SystenOS State Plane Coordinate Systern 1983 Map Zone: Utah, Central ZoneGeo DatumGRS1980 Coordinate System: Site CentreSys Datum:Mean Sea Level Geomagnetic Model: igrf2005

Site: HCU 14-27FHRICreek UnitSec. 27. T108, R20E

Site Position: Northing: 7143286.58 ft Latitude: 39 54 55.620 NFrom: Geographic Easting: 2158293.12 ft Longitude: 109 39 12.570 WPosition Uncertainty: 0.00 ft North Reference: TrueGround Level: 5171.00 ft Grid Convergence: 1.18 deg

We1I: NCU 14-27F Slot Name:

Surface Position: +N/-S 0.00 ft Northing: 7143286.58 ft Latitude: 39 54 55.620 N+El-W 0.00 ft Easting : 2158293.12 ft Longitude: 109 39 12.570 W

Position Uncertainty: 0.00 ftReference Point: +N/-S 0.00 ft Northing: 7143286,58 ft Latitude: 39 54 55.620 N

+E/-W 0.00 ft Easting : 2158293.12 ft Longitude: 109 39 12.570 WMeasured Depth: 0.00 ft laclination: 0.00 degVertical Depth: 0.00 ft Azimuth : 0.00 deg

Welipath: OriginalHole Drilled From: Well Ref. PointTie.on Depth: 0.00 ft

Current Datum: est.KB @5190' Height 0.00 ft Above System Datum: Mean Sea LevelMaguetic Data: 7/12/2005 Declination: 11.88 degField Strength: 52903 uT Mag Dip Angle: 65.92 degVertical Section: Depth From (TVD) +N/-S +E/-W Direction

ft ft it deg0.00 0.00 0.00 175.47

Plan: Plan #1 Date Composed: 7/12/2005Version: 1

Principal: Yes Tied-to: From Well Ref. Point

Plan Section Information

MD Inci Azim TVD +N/-S +E/-W DLS Build Turn TFO Targetft deg deg ft ft ft deg/100ftdeg/100ftdeg/100ft deg

0.00 0.00 175.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00550.00 0.00 175.47 550.00 0.00 0.00 0.00 0.00 0.00 175.47

1104.44 19.41 175.47 1093.90 -92.71 7.35 3.50 3.50 0.00 175.473659.21 19.41 175.47 3503.54 -938.88 74.39 0.00 0.00 0.00 0.004435.43 0.00 175.47 4265.00 -1068.67 84.67 2.50 -2.50 0.00 180.008070.43 0.00 175.47 7900.00 -1068.67 84.67 0.00 0.00 0.00 175.47

Section 1 : Start HoldMD Incl Azim TVD +NAS +El-W VS DLS Build Turn TFDft deg deg ft it ft ft deg/100ft deg/100ft deg/100ft deg0.00 0.00 175.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

100.00 0.00 175.47 100.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47200.00 0,00 175.47 200.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47300.00 0.00 175.47 300.00 0.00 0.00 0.00 0.00 0.00 0.00 176.47400.00 0.00 175.47 400.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47500.00 0.00 175.47 500.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47550.00 0.00 175.47 550.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47

Section 2 : Start Build3.50MD Incl Azim TVD +N/-S +ENW VS DLS Build Turn TIiOft deg deg it ft ft ft deg/100ftdeg/100ftdeg/100ft deg

600.00 1.75 175.47 599.99 -0.76 0.06 0.76 3.50 3.50 0.00 0.00700.00 5.25 175.47 699.79 -6.85 0.54 6.87 3.50 3.50 0.00 0.00

Dominion-yan EnerL'YTReecim010gÎgygg

Company: DominionE & P Date: 7/12/2005 Time: 16:04:31 Page: 1Field: Natural Buttes Field Co-ordinate(NE) Referendiite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E.175.47Azi)Welipath: OriginalHole Plan: Plan #1

Field: Natural Buttes FieldUintah County, UtahUSA

Map SystenOS State Plane Coordinate Systern 1983 Map Zone: Utah, Central ZoneGeo DatumGRS1980 Coordinate System: Site CentreSys Datum:Mean Sea Level Geomagnetic Model: igrf2005

Site: HCU 14-27FHRICreek UnitSec. 27. T108, R20E

Site Position: Northing: 7143286.58 ft Latitude: 39 54 55.620 NFrom: Geographic Easting: 2158293.12 ft Longitude: 109 39 12.570 WPosition Uncertainty: 0.00 ft North Reference: TrueGround Level: 5171.00 ft Grid Convergence: 1.18 deg

We1I: NCU 14-27F Slot Name:

Surface Position: +N/-S 0.00 ft Northing: 7143286.58 ft Latitude: 39 54 55.620 N+El-W 0.00 ft Easting : 2158293.12 ft Longitude: 109 39 12.570 W

Position Uncertainty: 0.00 ftReference Point: +N/-S 0.00 ft Northing: 7143286,58 ft Latitude: 39 54 55.620 N

+E/-W 0.00 ft Easting : 2158293.12 ft Longitude: 109 39 12.570 WMeasured Depth: 0.00 ft laclination: 0.00 degVertical Depth: 0.00 ft Azimuth : 0.00 deg

Welipath: OriginalHole Drilled From: Well Ref. PointTie.on Depth: 0.00 ft

Current Datum: est.KB @5190' Height 0.00 ft Above System Datum: Mean Sea LevelMaguetic Data: 7/12/2005 Declination: 11.88 degField Strength: 52903 uT Mag Dip Angle: 65.92 degVertical Section: Depth From (TVD) +N/-S +E/-W Direction

ft ft it deg

0.00 0.00 0.00 175.47

Plan: Plan #1 Date Composed: 7/12/2005Version: 1

Principal: Yes Tied-to: From Well Ref. Point

Plan Section Information

MD Inci Azim TVD +N/-S +E/-W DLS Build Turn TFO Targetft deg deg ft ft ft deg/100ftdeg/100ftdeg/100ft deg

0.00 0.00 175.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00550.00 0.00 175.47 550.00 0.00 0.00 0.00 0.00 0.00 175.47

1104.44 19.41 175.47 1093.90 -92.71 7.35 3.50 3.50 0.00 175.473659.21 19.41 175.47 3503.54 -938.88 74.39 0.00 0.00 0.00 0.004435.43 0.00 175.47 4265.00 -1068.67 84.67 2.50 -2.50 0.00 180.008070.43 0.00 175.47 7900.00 -1068.67 84.67 0.00 0.00 0.00 175.47

Section 1 : Start HoldMD Incl Azim TVD +NAS +El-W VS DLS Build Turn TFDft deg deg ft it ft ft deg/100ft deg/100ft deg/100ft deg0.00 0.00 175.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

100.00 0.00 175.47 100.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47200.00 0,00 175.47 200.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47300.00 0.00 175.47 300.00 0.00 0.00 0.00 0.00 0.00 0.00 176.47400.00 0.00 175.47 400.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47500.00 0.00 175.47 500.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47550.00 0.00 175.47 550.00 0.00 0.00 0.00 0.00 0.00 0.00 175.47

Section 2 : Start Build3.50MD Incl Azim TVD +N/-S +ENW VS DLS Build Turn TIiOft deg deg it ft ft ft deg/100ftdeg/100ftdeg/100ft deg

600.00 1.75 175.47 599.99 -0.76 0.06 0.76 3.50 3.50 0.00 0.00700.00 5.25 175.47 699.79 -6.85 0.54 6.87 3.50 3.50 0.00 0.00

Page 9: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

yan Enern Tecplmologie gyggCompany: DominionE & P Date: T/12/2005 Time: 16:04:31 Page: 2Field: Natural Buttes Field Co-ordinate(NE) Referendlite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0We!I: HCU 14-27F Section (VS) Reference: Site (0,00N,0.00E,175.47Azi)Wellpath: OriginalHole Plan: Plan #1

Section 2 : Start Build 3.50

MD Inci Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft deg

800.00 8.75 175.47 799.03 -18.99 1.50 19.05 3.50 3.50 0.00 0.00900.00 12.25 175.47 897.34 -37.16 2.94 37.27 3.50 3.50 0.00 0.00

1000.00 15.75 175.47 994.35 -61.27 4.85 61.46 3.50 3.50 0.00 0.001104.44 19.41 175.47 1093.90 -92.71 7.35 93.00 3.50 3.50 0.00 0.00

Section 3 : Start HoldMD lacl Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

1200.00 19.41 175.47 1184.03 -124.36 9.85 124.75 0.00 0.00 0.00 0.001300.00 19.41 175.47 1278.35 -157.48 12,48 157.97 0.00 0.00 0.00 0.001400.00 19.41 175.47 1372.67 -190.60 15.10 191.20 0.00 0.00 0.00 0.001500.00 19.41 175.47 1466.99 -223.72 17.73 224.42 0.00 0.00 0.00 0.001600.00 19.41 175.47 1561,31 -266.84 20.35 257.65 0.00 0.00 0.00 0.001700.00 19.41 175.47 1655.63 -289.96 22.97 290.87 0.00 0.00 0.00 0.001800.00 19.41 175.47 1749.95 -323.09 25.60 324.10 0.00 0.00 0.00 0.001900.00 19.41 175.47 1844.27 -356.21 28.22 357.32 0.00 0.00 0.00 0.002000.00 19.41 175.47 1938.58 -389.33 30.85 390.55 0.00 0.00 0.00 0.002100.00 19.41 175.47 2032.90 -422.45 33.47 423.77 0.00 0.00 0.00 0.002200.00 19.41 175.47 2127.22 -455.57 36.09 457.00 0.00 0.00 0.00 0.002300.00 19,41 175.47 2221.54 -488.69 38.72 490.22 0.00 0.00 0.00 0.002400.00 19.41 175.47 2316.86 -521.81 41.34 523.45 0.00 0.00 0.00 0,002500.00 19.41 175.47 2410.18 -554.93 43.97 556.67 0.00 0.00 0.00 0.002600.00 19.41 175.47 2504.50 -588.06 46.59 589.90 0.00 0.00 0.00 0.002700.00 19.41 175.47 2598.82 -621.18 49.22 623.12 0.00 0.00 0.00 0.002800.00 19.41 175.47 2693.14 -654.30 51.84 656.35 0.00 0.00 0.00 0.002900.00 19.41 175.47 2787.46 -687.42 54.46 689.57 0.00 0.00 0.00 0.003000.00 19.41 175.47 2881.78 -720.54 57.09 722.80 0.00 0.00 0.00 0.003100.00 19.41 175.47 2976.09 .753.66 59.71 756.02 0.00 0.00 0.00 0.003200.00 19.41 175.47 3070.41 -786.78 62.34 789.25 0.00 0.00 0.00 0.003300,00 19.41 175.47 3164.73 -819.90 64.96 822.47 0.00 0.00 0.00 0.003400.00 19.41 175.47 3259.05 -853.03 67.58 855.70 0.00 0.00 0.00 0.003500.00 19.41 175.47 3353.37 -886.15 70.21 888.92 0.00 0.00 0.00 0.003600.00 19.41 175.47 3447.69 -919.27 72.83 922.15 0.00 0.00 0.00 0.003659.21 19.41 175.47 3503.54 -938.88 74.39 941.82 0.00 0.00 0.00 0.00

Section 4 : Start Drop -2.50

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Tura TFO- ft deg - deg ft ft ft ft deg/100ftdeg/100ft deg/100ft deg

3700.00 18.39 175.47 3542.13 -952.05 75.43 955.03 2.50 -2.50 0.00 180.003800.00 15.89 175.47 3637.68 -981.42 77.76 984.49 2.50 -2.50 0.00 180.003900.00 13.39 175.47 3734.43 -1006.60 79.75 1009.76 2.50 -2.50 0.00 180.003951.85 12.09 175.47 3785.00 -1018.00 80.66 1021.19 2.50 -2.50 0.00 180.004000.00 10.89 175.47 3832.19 -1027.56 81.41 1030.78 2.50 -2.50 0.00 180.004100.00 8.39 175.47 3930.77 -1044.24 82.73 1047.52 2.50 -2.50 0.00 180.004200.00 5.89 175.47 4029.99 -1056.63 83.72 1059.94 2.50 -2.50 0.00 180.004290.33 3.63 175.47 4120.00 -1064.09 84.31 1067.43 2.50 -2.50 0.00 180.004300.00 3.39 175.47 4129.65 -1064.68 84.35 1068.02 2.50 -2.50 0.00 -180.00

4400.00 0.89 175.47 4229.57 -1068.40 84.65 1071.75 2.50 -2.50 0.00 180.004435.43 0.00 175.47 4265.00 -1068.67 84.67 1072.02 2.50 -2.50 0.00 -180.00

Section 5 : Start HoldMD lael Azim TVD +N/-S +E/-W VS DLS Build Tura TFOft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft deg

4500.00 0.00 175.47 4329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.474600.00 0.00 175.47 4429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175,474700.00 0.00 175.47 4529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.474800.00 0.00 175.47 4629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.474900.00 0.00 175.47 4729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475000.00 0.00 175.47 4829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475100.00 0.00 175.47 4929.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475200.00 0.00 175.47 5029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.47

yan Enern Tecplmologie gyggCompany: DominionE & P Date: T/12/2005 Time: 16:04:31 Page: 2Field: Natural Buttes Field Co-ordinate(NE) Referendlite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0We!I: HCU 14-27F Section (VS) Reference: Site (0,00N,0.00E,175.47Azi)Wellpath: OriginalHole Plan: Plan #1

Section 2 : Start Build 3.50

MD Inci Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft deg

800.00 8.75 175.47 799.03 -18.99 1.50 19.05 3.50 3.50 0.00 0.00900.00 12.25 175.47 897.34 -37.16 2.94 37.27 3.50 3.50 0.00 0.00

1000.00 15.75 175.47 994.35 -61.27 4.85 61.46 3.50 3.50 0.00 0.001104.44 19.41 175.47 1093.90 -92.71 7.35 93.00 3.50 3.50 0.00 0.00

Section 3 : Start HoldMD lacl Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

1200.00 19.41 175.47 1184.03 -124.36 9.85 124.75 0.00 0.00 0.00 0.001300.00 19.41 175.47 1278.35 -157.48 12,48 157.97 0.00 0.00 0.00 0.001400.00 19.41 175.47 1372.67 -190.60 15.10 191.20 0.00 0.00 0.00 0.001500.00 19.41 175.47 1466.99 -223.72 17.73 224.42 0.00 0.00 0.00 0.001600.00 19.41 175.47 1561,31 -266.84 20.35 257.65 0.00 0.00 0.00 0.001700.00 19.41 175.47 1655.63 -289.96 22.97 290.87 0.00 0.00 0.00 0.001800.00 19.41 175.47 1749.95 -323.09 25.60 324.10 0.00 0.00 0.00 0.001900.00 19.41 175.47 1844.27 -356.21 28.22 357.32 0.00 0.00 0.00 0.002000.00 19.41 175.47 1938.58 -389.33 30.85 390.55 0.00 0.00 0.00 0.002100.00 19.41 175.47 2032.90 -422.45 33.47 423.77 0.00 0.00 0.00 0.002200.00 19.41 175.47 2127.22 -455.57 36.09 457.00 0.00 0.00 0.00 0.002300.00 19,41 175.47 2221.54 -488.69 38.72 490.22 0.00 0.00 0.00 0.002400.00 19.41 175.47 2316.86 -521.81 41.34 523.45 0.00 0.00 0.00 0,002500.00 19.41 175.47 2410.18 -554.93 43.97 556.67 0.00 0.00 0.00 0.002600.00 19.41 175.47 2504.50 -588.06 46.59 589.90 0.00 0.00 0.00 0.002700.00 19.41 175.47 2598.82 -621.18 49.22 623.12 0.00 0.00 0.00 0.002800.00 19.41 175.47 2693.14 -654.30 51.84 656.35 0.00 0.00 0.00 0.002900.00 19.41 175.47 2787.46 -687.42 54.46 689.57 0.00 0.00 0.00 0.003000.00 19.41 175.47 2881.78 -720.54 57.09 722.80 0.00 0.00 0.00 0.003100.00 19.41 175.47 2976.09 .753.66 59.71 756.02 0.00 0.00 0.00 0.003200.00 19.41 175.47 3070.41 -786.78 62.34 789.25 0.00 0.00 0.00 0.003300,00 19.41 175.47 3164.73 -819.90 64.96 822.47 0.00 0.00 0.00 0.003400.00 19.41 175.47 3259.05 -853.03 67.58 855.70 0.00 0.00 0.00 0.003500.00 19.41 175.47 3353.37 -886.15 70.21 888.92 0.00 0.00 0.00 0.003600.00 19.41 175.47 3447.69 -919.27 72.83 922.15 0.00 0.00 0.00 0.003659.21 19.41 175.47 3503.54 -938.88 74.39 941.82 0.00 0.00 0.00 0.00

Section 4 : Start Drop -2.50

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Tura TFO- ft deg - deg ft ft ft ft deg/100ftdeg/100ft deg/100ft deg

3700.00 18.39 175.47 3542.13 -952.05 75.43 955.03 2.50 -2.50 0.00 180.003800.00 15.89 175.47 3637.68 -981.42 77.76 984.49 2.50 -2.50 0.00 180.003900.00 13.39 175.47 3734.43 -1006.60 79.75 1009.76 2.50 -2.50 0.00 180.003951.85 12.09 175.47 3785.00 -1018.00 80.66 1021.19 2.50 -2.50 0.00 180.004000.00 10.89 175.47 3832.19 -1027.56 81.41 1030.78 2.50 -2.50 0.00 180.004100.00 8.39 175.47 3930.77 -1044.24 82.73 1047.52 2.50 -2.50 0.00 180.004200.00 5.89 175.47 4029.99 -1056.63 83.72 1059.94 2.50 -2.50 0.00 180.004290.33 3.63 175.47 4120.00 -1064.09 84.31 1067.43 2.50 -2.50 0.00 180.004300.00 3.39 175.47 4129.65 -1064.68 84.35 1068.02 2.50 -2.50 0.00 -180.00

4400.00 0.89 175.47 4229.57 -1068.40 84.65 1071.75 2.50 -2.50 0.00 180.004435.43 0.00 175.47 4265.00 -1068.67 84.67 1072.02 2.50 -2.50 0.00 -180.00

Section 5 : Start HoldMD lael Azim TVD +N/-S +E/-W VS DLS Build Tura TFOft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft deg

4500.00 0.00 175.47 4329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.474600.00 0.00 175.47 4429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175,474700.00 0.00 175.47 4529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.474800.00 0.00 175.47 4629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.474900.00 0.00 175.47 4729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475000.00 0.00 175.47 4829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475100.00 0.00 175.47 4929.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475200.00 0.00 175.47 5029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.47

Page 10: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

yan Energy TechnologieÑgyggDomi Planning Report

Company: DominionE &P Date: 7/12/2005 Time: 16:04:31 Page: 3Field: Natural Buttes Field Co-ordinate(NE) Referendiite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst,KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E,175.47Azi)Welipath: Original Hole Plan: Plan #1

Section 5 : Start HoldMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft deg

5300.00 0.00 175.47 5129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475330.43 0.00 175.47 5160.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475400.00 0.00 175.47 5229.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475500.00 0.00 175.47 5329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475600.00 0.00 175.47 5429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475700.00 0.00 175.47 5529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475800.00 0.00 175.47 5629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475900.00 0.00 175.47 5729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476000.00 0.00 175.47 5829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476100.00 0.00 175.47 5929.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476200.00 0.00 175.47 6029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476300.00 0.00 175.47 6129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476400.00 0.00 175.47 6229.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476460.43 0.00 175.47 6290.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476500.00 0.00 175.47 6329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476600.00 0.00 175.47 6429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476700.00 0.00 175.47 6529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476800.00 0.00 175.47 6629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476900.00 0.00 175.47 6729.57 -1068.6T 84.67 1072,02 0.00 0.00 0.00 175.477000.00 0.00 175.47 8829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477100.00 0.00 175,47 6929.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477200.00 0.00 175.47 7029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477220.43 0.00 175.47 7050.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477300.00 0.00 175.47 7129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477400.00 0.00 175.47 7229.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477500.00 0.00 175.47 7329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477600.00 0.00 175.47 7429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477700.00 0.00 175.47 7529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477800.00 0.00 175.47 7629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477900.00 0.00 175.47 7729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.478000.00 0.00 175.47 7829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.478070.43 0.00 175.47 7900.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.47

Survey

MD inel Azim TVD +N/-S +E/-W VS DLS Build Tura Tool/Commentft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft

0.00 0.00 176.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 175.47 100.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 175.47 200.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 175.47 300.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 175.47 400.00 0.00 0.00 0.00 0.00 0.00 0.00

500.00 0.00 175.47 500.00 0.00 0.00 0.00 0.00 0.00 0.00650.00 0.00 175.47 550.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP600.00 1.75 175.47 599.99 -0.76 0.06 0.76 3.50 3.50 0.00700.00 5.25 175.47 699.79 -6.85 0.54 6.87 3.50 3.50 0.00800.00 8.75 175.47 799.03 -18.99 1.50 19.05 3.50 3.50 0.00

900.00 12.25 175.47 897.34 -37.16 2.94 37.27 3.50 3.50 0.001000.00 15.75 475.47 994.35 -61.27 4.85 61.46 3.50 3.50 0.001104.44 19.41 175.47 1093.90 -92.71 7.35 93.00 3.50 3.50 0.001200.00 19.41 175.47 1184.03 -124.36 9.85 124.75 0.00 0.00 0.001300.00 19.41 175.47 1278.35 -157.48 12.48 157.97 0.00 0.00 0.00

1400.00 19.41 175.47 1372.67 -190.60 15.10 191.20 0.00 0.00 0.001500.00 19.41 175.47 1466.99 -223.72 17.73 224.42 0.00 0.00 0.001600.00 19.41 175.47 1561.31 -256.84 20.35 257.65 0.00 0.00 0.001700.00 19.41 175.47 1655.63 -289.96 22.97 290.87 0.00 0.00 0.001800.00 19.41 175.47 1749.95 -323.09 25.60 324.10 0.00 0.00 0.00

1900.00 19.41 175.47 1844.27 -356.21 28.22 357.32 0.00 0.00 0.002000.00 19.41 175.47 1938.58 -389.33 30.85 390.55 0.00 0.00 0.002100.00 19.41 175.47 2032.90 -422.45 33.47 423.77 0.00 0.00 0.00

yan Energy TechnologieÑgyggDomi Planning Report

Company: DominionE &P Date: 7/12/2005 Time: 16:04:31 Page: 3Field: Natural Buttes Field Co-ordinate(NE) Referendiite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst,KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E,175.47Azi)Welipath: Original Hole Plan: Plan #1

Section 5 : Start HoldMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft deg

5300.00 0.00 175.47 5129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475330.43 0.00 175.47 5160.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475400.00 0.00 175.47 5229.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475500.00 0.00 175.47 5329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475600.00 0.00 175.47 5429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475700.00 0.00 175.47 5529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475800.00 0.00 175.47 5629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.475900.00 0.00 175.47 5729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476000.00 0.00 175.47 5829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476100.00 0.00 175.47 5929.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476200.00 0.00 175.47 6029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476300.00 0.00 175.47 6129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476400.00 0.00 175.47 6229.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476460.43 0.00 175.47 6290.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476500.00 0.00 175.47 6329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476600.00 0.00 175.47 6429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476700.00 0.00 175.47 6529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476800.00 0.00 175.47 6629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.476900.00 0.00 175.47 6729.57 -1068.6T 84.67 1072,02 0.00 0.00 0.00 175.477000.00 0.00 175.47 8829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477100.00 0.00 175,47 6929.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477200.00 0.00 175.47 7029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477220.43 0.00 175.47 7050.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477300.00 0.00 175.47 7129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477400.00 0.00 175.47 7229.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477500.00 0.00 175.47 7329.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477600.00 0.00 175.47 7429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477700.00 0.00 175.47 7529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477800.00 0.00 175.47 7629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.477900.00 0.00 175.47 7729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.478000.00 0.00 175.47 7829.57 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.478070.43 0.00 175.47 7900.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 175.47

Survey

MD inel Azim TVD +N/-S +E/-W VS DLS Build Tura Tool/Commentft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft

0.00 0.00 176.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 175.47 100.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 175.47 200.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 175.47 300.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 175.47 400.00 0.00 0.00 0.00 0.00 0.00 0.00

500.00 0.00 175.47 500.00 0.00 0.00 0.00 0.00 0.00 0.00650.00 0.00 175.47 550.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP600.00 1.75 175.47 599.99 -0.76 0.06 0.76 3.50 3.50 0.00700.00 5.25 175.47 699.79 -6.85 0.54 6.87 3.50 3.50 0.00800.00 8.75 175.47 799.03 -18.99 1.50 19.05 3.50 3.50 0.00

900.00 12.25 175.47 897.34 -37.16 2.94 37.27 3.50 3.50 0.001000.00 15.75 475.47 994.35 -61.27 4.85 61.46 3.50 3.50 0.001104.44 19.41 175.47 1093.90 -92.71 7.35 93.00 3.50 3.50 0.001200.00 19.41 175.47 1184.03 -124.36 9.85 124.75 0.00 0.00 0.001300.00 19.41 175.47 1278.35 -157.48 12.48 157.97 0.00 0.00 0.00

1400.00 19.41 175.47 1372.67 -190.60 15.10 191.20 0.00 0.00 0.001500.00 19.41 175.47 1466.99 -223.72 17.73 224.42 0.00 0.00 0.001600.00 19.41 175.47 1561.31 -256.84 20.35 257.65 0.00 0.00 0.001700.00 19.41 175.47 1655.63 -289.96 22.97 290.87 0.00 0.00 0.001800.00 19.41 175.47 1749.95 -323.09 25.60 324.10 0.00 0.00 0.00

1900.00 19.41 175.47 1844.27 -356.21 28.22 357.32 0.00 0.00 0.002000.00 19.41 175.47 1938.58 -389.33 30.85 390.55 0.00 0.00 0.002100.00 19.41 175.47 2032.90 -422.45 33.47 423.77 0.00 0.00 0.00

Page 11: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

yan Ener TRecphnologie ÑyOD

Company: DominionE & P Date: 7/12/2005 Time: 16:04:31 Page: 4Field: Natural Buttes Field Co-ordinate(NE) Referendiite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E,175.47Azi)Well path: OriginalHole P Ian: Plan #1

SurveyMD Inci Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft

2200.00 19.41 175.47 2127.22 -455.57 36.09 457.00 0.00 0.00 0.002300.00 19.41 175.47 2221.54 -488.69 38.72 490.22 0.00 0.00 0.00

2400.00 19.41 175.47 2315.86 -521.81 41.34 523.45 0.00 0.00 0.002500.00 19.41 175.47 2410.18 -554.93 43.97 556.67 0.00 0.00 0.002600.00 19.41 175.47 2504.50 -588.06 46.59 589.90 0.00 0.00 0.002700.00 19.41 175.47 2598.82 -621.18 49.22 623.12 0.00 0.00 0.002800.00 19.41 175.47 2693.14 -654.30 51.84 656.35 0.00 0.00 0.00

2900.00 19.41 175.47 2787.46 -687.42 54.46 689.57 0.00 0.00 0.003000.00 19.41 175.47 2881.78 -720.54 57.09 722.80 0.00 0.00 0.003100.00 19.41 175.47 2976.09 -753.66 59.71 756.02 0.00 0.00 0.003200.00 19.41 176.47 3070.41 -786.78 62.34 789.25 0.00 0.00 0.003300.00 19.41 175.47 3164.73 -819.90 64.96 822.47 0.00 0.00 0.00

3400.00 19.41 175.47 3259.05 -853.03 67.58 855.70 0.00 0.00 0.003500.00 19.41 175.47 3353.37 -886.15 70.21 888.92 0.00 0.00 0.003600.00 19.41 175.47 3447.69 -919.27 72.83 922.15 0.00 0.00 0.003659.21 19.41 175.47 3503.54 -938.88 74.39 941.82 0.00 0.00 0.003700.00 18.39 175.47 3542.13 -952.05 75.43 955.03 2.50 -2.50 0.00

3800.00 15.89 175.47 3637.68 -981.42 77,76 984.49 2.50 -2.50 0.003900.00 13.39 175.47 3734.43 -1006.60 79.75 1009.76 2.50 -2.50 0.003951.85 12.09 175.47 3785.00 -1018.00 80.66 1021.19 2.50 -2.50 0.00 Wasatch Tongue4000.00 10.89 175.47 3832.19 -102T.56 81.41 1030.78 2.50 -2.50 0.004100.00 8.39 175.47 3930.77 -1044.24 82.73 1047.52 2.50 -2.50 0.00

4200.00 5.89 175.47 4029.99 -1056.63 83.72 1059.94 2.50 -2.50 0.004290.33 3.63 175.47 4120.00 -1064.09 84.31 1067.43 2,50 -2.50 0.00 Uteland Limestone4300.00 3.39 175.47 4129.65 -1064.68 84.35 1068.02 2.50 -2.50 0.004400.00 0.89 175.47 4229.57 -1068,40 84.65 1071.75 2.50 -2.50 0.004435.43 0.00 175.47 4265.00 -1068.67 84.67 1072.02 2.50 -2.50 0.00 Wasatch

4500.00 0.00 175.47 4329.57 -1068.67 84.67 1072.02 0.00 0.00 0.004600.00 0.00 175.47 4429.57 -1068.67 84.67 1072.02 0.00 0.00 0.004700.00 0.00 175.47 4529.57 -1068.67 84.67 1072.02 0.00 0.00 0.004800.00 0.00 175.47 4629.57 -1068.67 84.87 1072.02 0.00 0.00 0.004900.00 0.00 175.47 4729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

5000.00 0.00 175.47 4829.57 -1068.67 84.67 1072.02 0.00 0.00 0.005100.00 0.00 175.47 4929.57 -1068.67 84.67 1072.02 0.00 0.00 0.005200.00 0.00 175.47 5029.57 -1068.87 84.67 1072.02 0.00 0.00 0.005300.00 0.00 175.47 5129.57 -1068.67 84.67 1072.02 0.00 0.00 0.005330.43 0.00 175.47 5160.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 Chapita Wells

5400.00 0.00 175.47 5229.57 -1068.67 84.67 1072.02 0.00 0.00 0.005500.00 0.00 175.47 5329.57 -1068.67 84.67 1072.02 0.00 0.00 0.005600.00 0.00 175,47 5429.57 -1068.67 84,67 1072.02 0.00 0.00 0.005700.00 0.00 175.47 5529.57 -1068.67 84.67 1072.02 0.00 0.00 0.005800.00 0.00 175.47 5629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

5900.00 0.00 175.47 6729.57 -1068.67 84.67 1072.02 0.00 0.00 0.006000.00 0.00 175.47 5829.57 -1068.67 84.67 1072.02 0.00 0.00 0.006100.00 0.00 175.47 5929.57 -1068.67 84.67 1072.02 0.00 0.00 0.006200.00 0.00 175.47 6029.57 -1068.67 84.67 1072.02 0.00 0.00 0.006300.00 0.00 175.47 6129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

6400.00 0.00 175.47 6229.57 -1068.67 84.67 1072.02 0.00 0.00 0.006460.43 0.00 175.47 6290.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 Uteland Buttes6500.00 0.00 175.47 6329.57 -1068.67 84.67 1072.02 0.00 0.00 0.006600.00 0.00 175.47 6429.57 -1068.67 84.67 1072.02 0.00 0.00 0.006700.00 0.00 175.47 6529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

6800.00 0.00 175.47 6629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

yan Ener TRecphnologie ÑyOD

Company: DominionE & P Date: 7/12/2005 Time: 16:04:31 Page: 4Field: Natural Buttes Field Co-ordinate(NE) Referendiite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E,175.47Azi)Well path: OriginalHole P Ian: Plan #1

SurveyMD Inci Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft

2200.00 19.41 175.47 2127.22 -455.57 36.09 457.00 0.00 0.00 0.002300.00 19.41 175.47 2221.54 -488.69 38.72 490.22 0.00 0.00 0.00

2400.00 19.41 175.47 2315.86 -521.81 41.34 523.45 0.00 0.00 0.002500.00 19.41 175.47 2410.18 -554.93 43.97 556.67 0.00 0.00 0.002600.00 19.41 175.47 2504.50 -588.06 46.59 589.90 0.00 0.00 0.002700.00 19.41 175.47 2598.82 -621.18 49.22 623.12 0.00 0.00 0.002800.00 19.41 175.47 2693.14 -654.30 51.84 656.35 0.00 0.00 0.00

2900.00 19.41 175.47 2787.46 -687.42 54.46 689.57 0.00 0.00 0.003000.00 19.41 175.47 2881.78 -720.54 57.09 722.80 0.00 0.00 0.003100.00 19.41 175.47 2976.09 -753.66 59.71 756.02 0.00 0.00 0.003200.00 19.41 176.47 3070.41 -786.78 62.34 789.25 0.00 0.00 0.003300.00 19.41 175.47 3164.73 -819.90 64.96 822.47 0.00 0.00 0.00

3400.00 19.41 175.47 3259.05 -853.03 67.58 855.70 0.00 0.00 0.003500.00 19.41 175.47 3353.37 -886.15 70.21 888.92 0.00 0.00 0.003600.00 19.41 175.47 3447.69 -919.27 72.83 922.15 0.00 0.00 0.003659.21 19.41 175.47 3503.54 -938.88 74.39 941.82 0.00 0.00 0.003700.00 18.39 175.47 3542.13 -952.05 75.43 955.03 2.50 -2.50 0.00

3800.00 15.89 175.47 3637.68 -981.42 77,76 984.49 2.50 -2.50 0.003900.00 13.39 175.47 3734.43 -1006.60 79.75 1009.76 2.50 -2.50 0.003951.85 12.09 175.47 3785.00 -1018.00 80.66 1021.19 2.50 -2.50 0.00 Wasatch Tongue4000.00 10.89 175.47 3832.19 -102T.56 81.41 1030.78 2.50 -2.50 0.004100.00 8.39 175.47 3930.77 -1044.24 82.73 1047.52 2.50 -2.50 0.00

4200.00 5.89 175.47 4029.99 -1056.63 83.72 1059.94 2.50 -2.50 0.004290.33 3.63 175.47 4120.00 -1064.09 84.31 1067.43 2,50 -2.50 0.00 Uteland Limestone4300.00 3.39 175.47 4129.65 -1064.68 84.35 1068.02 2.50 -2.50 0.004400.00 0.89 175.47 4229.57 -1068,40 84.65 1071.75 2.50 -2.50 0.004435.43 0.00 175.47 4265.00 -1068.67 84.67 1072.02 2.50 -2.50 0.00 Wasatch

4500.00 0.00 175.47 4329.57 -1068.67 84.67 1072.02 0.00 0.00 0.004600.00 0.00 175.47 4429.57 -1068.67 84.67 1072.02 0.00 0.00 0.004700.00 0.00 175.47 4529.57 -1068.67 84.67 1072.02 0.00 0.00 0.004800.00 0.00 175.47 4629.57 -1068.67 84.87 1072.02 0.00 0.00 0.004900.00 0.00 175.47 4729.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

5000.00 0.00 175.47 4829.57 -1068.67 84.67 1072.02 0.00 0.00 0.005100.00 0.00 175.47 4929.57 -1068.67 84.67 1072.02 0.00 0.00 0.005200.00 0.00 175.47 5029.57 -1068.87 84.67 1072.02 0.00 0.00 0.005300.00 0.00 175.47 5129.57 -1068.67 84.67 1072.02 0.00 0.00 0.005330.43 0.00 175.47 5160.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 Chapita Wells

5400.00 0.00 175.47 5229.57 -1068.67 84.67 1072.02 0.00 0.00 0.005500.00 0.00 175.47 5329.57 -1068.67 84.67 1072.02 0.00 0.00 0.005600.00 0.00 175,47 5429.57 -1068.67 84,67 1072.02 0.00 0.00 0.005700.00 0.00 175.47 5529.57 -1068.67 84.67 1072.02 0.00 0.00 0.005800.00 0.00 175.47 5629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

5900.00 0.00 175.47 6729.57 -1068.67 84.67 1072.02 0.00 0.00 0.006000.00 0.00 175.47 5829.57 -1068.67 84.67 1072.02 0.00 0.00 0.006100.00 0.00 175.47 5929.57 -1068.67 84.67 1072.02 0.00 0.00 0.006200.00 0.00 175.47 6029.57 -1068.67 84.67 1072.02 0.00 0.00 0.006300.00 0.00 175.47 6129.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

6400.00 0.00 175.47 6229.57 -1068.67 84.67 1072.02 0.00 0.00 0.006460.43 0.00 175.47 6290.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 Uteland Buttes6500.00 0.00 175.47 6329.57 -1068.67 84.67 1072.02 0.00 0.00 0.006600.00 0.00 175.47 6429.57 -1068.67 84.67 1072.02 0.00 0.00 0.006700.00 0.00 175.47 6529.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

6800.00 0.00 175.47 6629.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

Page 12: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

yan Energy TechnologieÑgyggyDomimon^ Planning Report

Company: DominionE &P Date: 7/12/2005 Time: 16:04:31 Page: 5Field: Natural Buttes Field Co-ordinate(NE) Referendaite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E,175.47Azi)Welipath: OriginalHole Plan: Plan#1

SurveyMD IncI Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft

6900.00 0.00 175.47 6729.57 -1068.67 84.67 1072.02 0.00 0.00 0.007000.00 0.00 175.47 6829.57 -1068.67 84.67 1072.02 0.00 0.00 0.007100.00 0.00 175.47 6929.57 -1068.67 84.67 1072.02 0.00 0.00 0.007200.00 0.00 175.47 7029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

7220.43 0.00 175.47 7050.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 Mesaverde7300.00 0.00 175.47 7129.57 -1068.67 84.67 1072.02 0.00 0.00 0.007400.00 0.00 175.47 7229.57 -1068.67 84.67 1072.02 0.00 0.00 0.007500.00 0.00 175.47 7329.57 -1068.67 84.67 1072.02 0.00 0.00 0.007600.00 0.00 175.47 7429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

7700.00 0.00 175.47 7529.57 -1068.67 84.67 1072.02 0.00 0.00 0.007800.00 0.00 175.47 7629.57 -1068.67 84.67 1072.02 0.00 0.00 0.007900.00 0.00 175.47 7729.57 -1068.67 84.67 1072.02 0.00 0.00 0.008000.00 0.00 175.47 7829.57 -1068.67 84.67 1072.02 0.00 0.00 0.008070.43 0.00 175.47 7900.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 TD

Targets

Map Map <---- Latitude --><- Longitude 2--Name Description TVD +N/-S +El-W Northing . Easting Deg Min See Deg Min Sec

Dip, Dir. ft ft ft ft ftTD 7900.00 -1068.67 84.67 7142219.892158399.83 39 54 45.058 N 109 39 11.483 W

-Plan hit target

Formations

MD TVD Formations Lithology Dip Angle Dip Directionft ft deg deg

3951.85 3785.00 Wasatch Tongue 0.00 0.004290.33 4120.00 Uteland Limestone 0.00 0.004435.43 4265.00 Wasatch 0.00 0.005330.43 5160.00 Chapita Wells 0.00 0.006460.43 6290.00 Uteland Buttes 0.00 0.007220.43 7050.00 Mesaverde 0.00 0.00

Annotation

MD TVDft ft

550.00 550.00 KOP

yan Energy TechnologieÑgyggyDomimon^ Planning Report

Company: DominionE &P Date: 7/12/2005 Time: 16:04:31 Page: 5Field: Natural Buttes Field Co-ordinate(NE) Referendaite: HCU 14-27F, True NorthSite: HCU 14-27F Vertical (TVD) Referencesst.KB @5190'0.0Well: HCU 14-27F Section (VS) Reference: Site (0.00N,0.00E,175.47Azi)Welipath: OriginalHole Plan: Plan#1

SurveyMD IncI Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft ft ft deg/100ftdeg/100ftdeg/100ft

6900.00 0.00 175.47 6729.57 -1068.67 84.67 1072.02 0.00 0.00 0.007000.00 0.00 175.47 6829.57 -1068.67 84.67 1072.02 0.00 0.00 0.007100.00 0.00 175.47 6929.57 -1068.67 84.67 1072.02 0.00 0.00 0.007200.00 0.00 175.47 7029.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

7220.43 0.00 175.47 7050.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 Mesaverde7300.00 0.00 175.47 7129.57 -1068.67 84.67 1072.02 0.00 0.00 0.007400.00 0.00 175.47 7229.57 -1068.67 84.67 1072.02 0.00 0.00 0.007500.00 0.00 175.47 7329.57 -1068.67 84.67 1072.02 0.00 0.00 0.007600.00 0.00 175.47 7429.57 -1068.67 84.67 1072.02 0.00 0.00 0.00

7700.00 0.00 175.47 7529.57 -1068.67 84.67 1072.02 0.00 0.00 0.007800.00 0.00 175.47 7629.57 -1068.67 84.67 1072.02 0.00 0.00 0.007900.00 0.00 175.47 7729.57 -1068.67 84.67 1072.02 0.00 0.00 0.008000.00 0.00 175.47 7829.57 -1068.67 84.67 1072.02 0.00 0.00 0.008070.43 0.00 175.47 7900.00 -1068.67 84.67 1072.02 0.00 0.00 0.00 TD

Targets

Map Map <---- Latitude --><- Longitude 2--Name Description TVD +N/-S +El-W Northing . Easting Deg Min See Deg Min Sec

Dip, Dir. ft ft ft ft ftTD 7900.00 -1068.67 84.67 7142219.892158399.83 39 54 45.058 N 109 39 11.483 W

-Plan hit target

Formations

MD TVD Formations Lithology Dip Angle Dip Directionft ft deg deg

3951.85 3785.00 Wasatch Tongue 0.00 0.004290.33 4120.00 Uteland Limestone 0.00 0.004435.43 4265.00 Wasatch 0.00 0.005330.43 5160.00 Chapita Wells 0.00 0.006460.43 6290.00 Uteland Buttes 0.00 0.007220.43 7050.00 Mesaverde 0.00 0.00

Annotation

MD TVDft ft

550.00 550.00 KOP

Page 13: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

SURFACE USE PLAN

CONDITIONS OF APPROVAL

Attachment for Permit to Drill

Name of Operator: Dominion Exploration & ProductionAddress: 14000 QuailSprings Parkway, Suite 600

Oklahoma City, OK 73134Well Location: HCU 14-27F

SHL: 1569' FSL & 1937' FWL Section 27-10S-20E

BHL: 550' FSL & 2000' FWL Section 27-10$-20EUintah County, UT

The dirt contractor will be provided with an approved copy of the surface use plan of operationsbefore initiating construction.

The tribal onsite inspection for the referenced well was conducted on Wednesday, June 22, 2005 atapproximately 2:35 pm. In attendance at the onsite inspection were the following individuals:

Kermit Wopsock Technician Ute Indian Tribe-Energy & MineralsNicole Mortensen Environmental Protection Spec. Uintah & Ouray Agency - BIAKarl Wright Nat. Res. Prot. Spec. Bureau of Land Management - VernalKen Secrest Field Foreman Dominion E & P, Inc.Brandon Bowthorpe Surveyor Uintah Engineering and Land SurveyingJesse Merkley Surveyor Helper Uintah Engineering and Land SurveyingRnady Jackson Foreman Jackson ConstructionDon Hamilton Agent Buys & Associates, Inc.

1. Existing Roads:

a. The proposed well site is located approximately 12.02 miles south of Ouray, UT.

b. Directions to theproposed well site have been attached at the end of Exhibit B.

c. The use of roads under State and County Road Department maintenance are necessary toaccess the Hill Creek Unit. However, an encroachment permitisnot anticipated since noupgrades to the State or County Road system are proposed at this time.

d. All existing roads will be maintained and kept in good repair during all phases of operation.

e. Vehicle operators will obey posted speed restrictions and observe safespeeds commensuratewith road and weather conditions.

f. Since no improvements are anticipated to the State, County, Tribal or BLM access roads notopsoilstriping will occur.

g. An off-lease federal right-of-way is not anticipated for the access road or utility corridorsince both are located within the existing Hill Creek Unit boundary.

h. A tribal right-of-way has been submitted for the wellsite, access and pipeline disturbancesonUte Indian Tribe

SURFACE USE PLAN

CONDITIONS OF APPROVAL

Attachment for Permit to Drill

Name of Operator: Dominion Exploration & ProductionAddress: 14000 QuailSprings Parkway, Suite 600

Oklahoma City, OK 73134Well Location: HCU 14-27F

SHL: 1569' FSL & 1937' FWL Section 27-10S-20E

BHL: 550' FSL & 2000' FWL Section 27-10$-20EUintah County, UT

The dirt contractor will be provided with an approved copy of the surface use plan of operationsbefore initiating construction.

The tribal onsite inspection for the referenced well was conducted on Wednesday, June 22, 2005 atapproximately 2:35 pm. In attendance at the onsite inspection were the following individuals:

Kermit Wopsock Technician Ute Indian Tribe-Energy & MineralsNicole Mortensen Environmental Protection Spec. Uintah & Ouray Agency - BIAKarl Wright Nat. Res. Prot. Spec. Bureau of Land Management - VernalKen Secrest Field Foreman Dominion E & P, Inc.Brandon Bowthorpe Surveyor Uintah Engineering and Land SurveyingJesse Merkley Surveyor Helper Uintah Engineering and Land SurveyingRnady Jackson Foreman Jackson ConstructionDon Hamilton Agent Buys & Associates, Inc.

1. Existing Roads:

a. The proposed well site is located approximately 12.02 miles south of Ouray, UT.

b. Directions to theproposed well site have been attached at the end of Exhibit B.

c. The use of roads under State and County Road Department maintenance are necessary toaccess the Hill Creek Unit. However, an encroachment permitisnot anticipated since noupgrades to the State or County Road system are proposed at this time.

d. All existing roads will be maintained and kept in good repair during all phases of operation.

e. Vehicle operators will obey posted speed restrictions and observe safespeeds commensuratewith road and weather conditions.

f. Since no improvements are anticipated to the State, County, Tribal or BLM access roads notopsoilstriping will occur.

g. An off-lease federal right-of-way is not anticipated for the access road or utility corridorsince both are located within the existing Hill Creek Unit boundary.

h. A tribal right-of-way has been submitted for the wellsite, access and pipeline disturbancesonUte Indian Tribe

Page 14: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O O2. Planned Access Roads:

a. The proposed well makes use of existing access to the existing HCU l l-27F and HCU 13-27F.

3. Location of Existing Wells:

a. Exhibit B has a map reflecting these wells within a one mile radius of the proposed well.

4. Location of Production Facilities:

a. All permanent structures will be painted a flat, non-reflective Desert Brown to match thestandard environmental colors. All facilities will be painted within six months of installation.Facilities required to comply with the Occupational Safety and Health Act (OSHA) may beexcluded.

b. Site security guidelines identified in 43 CFR 3163.7-5 and Onshore Oil and Gas Order No. 3will be adhered to.

c. A gas meter run will be constructed and located on lease within 500 feet of the wellhead.Meter runs will be housed and/or fenced. All gas production and measurement shallcomplywith the provisions of43 CFR 3162. 7-3, Onshore Oil and Gas Order No. 5, and AmericanGas Association (AGA) Report No. 3.

d. A tank battery will be constructed on this lease, it will be surrounded by a dike of sufficientcapacity to contain the storage capacity of the largest tank. All loading lines and valves willbe placed inside the berm surrounding the tank battery. All liquid hydrocarbons productionand measurement shall conform to the provisions of43 CFR 3162.7-3 and Onshore Oil andGas Order No. 4 and Onshore Oil and Gas Order No. 5 for natural gas production andmeasurement.

e. Any necessary pits will be properly fenced to prevent any wildlife and livestock entry.

f. All access roads will be maintained as necessary to prevent erosion and accommodate year-round traffic. The road will be maintained in a safe useable condition,

g. The site will require periodic maintenance to ensure thatdrainages are kept open and free ofdebris, ice, and snow, and that surfaces are properly treated to reduce erosion, fugitive dust,and impacts to adjacent areas.

h. No new pipeline or pipeline upgrade is proposed with this application.

5. Location and Type of Water Supply:

a. The location and type of water supply has been addressed as number 11 within the previousdrilling plan information.

6. Source of Construction Material:

a. The use of materials will conform to 43 CFR

O O2. Planned Access Roads:

a. The proposed well makes use of existing access to the existing HCU l l-27F and HCU 13-27F.

3. Location of Existing Wells:

a. Exhibit B has a map reflecting these wells within a one mile radius of the proposed well.

4. Location of Production Facilities:

a. All permanent structures will be painted a flat, non-reflective Desert Brown to match thestandard environmental colors. All facilities will be painted within six months of installation.Facilities required to comply with the Occupational Safety and Health Act (OSHA) may beexcluded.

b. Site security guidelines identified in 43 CFR 3163.7-5 and Onshore Oil and Gas Order No. 3will be adhered to.

c. A gas meter run will be constructed and located on lease within 500 feet of the wellhead.Meter runs will be housed and/or fenced. All gas production and measurement shallcomplywith the provisions of43 CFR 3162. 7-3, Onshore Oil and Gas Order No. 5, and AmericanGas Association (AGA) Report No. 3.

d. A tank battery will be constructed on this lease, it will be surrounded by a dike of sufficientcapacity to contain the storage capacity of the largest tank. All loading lines and valves willbe placed inside the berm surrounding the tank battery. All liquid hydrocarbons productionand measurement shall conform to the provisions of43 CFR 3162.7-3 and Onshore Oil andGas Order No. 4 and Onshore Oil and Gas Order No. 5 for natural gas production andmeasurement.

e. Any necessary pits will be properly fenced to prevent any wildlife and livestock entry.

f. All access roads will be maintained as necessary to prevent erosion and accommodate year-round traffic. The road will be maintained in a safe useable condition,

g. The site will require periodic maintenance to ensure thatdrainages are kept open and free ofdebris, ice, and snow, and that surfaces are properly treated to reduce erosion, fugitive dust,and impacts to adjacent areas.

h. No new pipeline or pipeline upgrade is proposed with this application.

5. Location and Type of Water Supply:

a. The location and type of water supply has been addressed as number 11 within the previousdrilling plan information.

6. Source of Construction Material:

a. The use of materials will conform to 43 CFR

Page 15: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Ob. No construction materialswill be removed from Ute Tribal or BLM lands,

c. If any gravel is used, it will be obtained from a state approved gravel pit.

7. Methods of Handling Waste Disposal:

a. All wastes associated with this application will be contained and disposed of utilizingapproved facilities.

b. Drill cuttings will be contained and buriedon site.

c. The reserve pit will be located outboard of the location and along the southwest side of thepad.

d. The reserve pit will be constructed so as not to leak, break, or allow any discharge.

e. The reserve pit will be lined with 12 mil minimum thicknessplastic nylon reinforced linermaterial. The liner will overlay a felt liner pad only if rock is encountered duringexcavation.The pit liner will overlap the pit walls and be covered with dirt and/or rocks to hold it inplace. No trash, scrap pipe, etc., that could puncture the liner will be disposed of in the pit.Pit walls will be sloped no greater than 2:1. A minimum2-foot freeboard will be maintainedin the pit at all times during the drilling and completion operation,

f. The reserve pit has been locatedin cut material. Three sides of the reserve pit will be fencedbefore drilling starts. The fourth side will be fenced as soon as drilling is completed, andshall remain until the pit is dry. After the reserve pit has dried, all areas not needed forproduction will be rehabilitated.

g. No chemicals subject to reporting under SARA Title III (hazardous materials) in an amountgreater than 10,000 pounds will be used, produced, stored, transported, or disposed ofannually in association with the drilling, testing, or completion of the well. Furthermore, noextremely hazardous substances, as defined in 40 CFR 355, in threshold planning quantities,will be used, produced, stored, transported, or disposed of in association with the drilling,testing, or completion of the well.

h. Trash will be contained in a trash cage and hauled away to an approved disposal site asnecessary but no later than at the completion of drilling operations. The contents of the trashcontainer will be hauled off periodically to the approved Uintah CountyLandfillnear Vernal,Utah.

i. Produced fluids from the well other than water will be produced into a test tank until suchtime as construction of production facilities is completed. Any spills of oil, gas, salt waterorother produced fluids will be cleaned up and removed.

j. After initial clean-up, a 400 bbl tank will be installed to contain produced waste water. Thiswater will betransported from the tank to an approved Dominion disposal well fordisposal.

k. Produced water from the production well will be disposed of at the RBU 13-11F orRBU 16-19F disposal wells in accordance with Onshore Order #7.

1. Any salts and/or chemicals, which are an integral part ofthe drilling system, will be disposedof in the same manner as the drilling fluid.

m. Sanitary facilities will be on site at all timesduring operations. Sewage will be placed in aportable chemical toilet and the toilet replaced periodically utilizing a licensed contractor

Ob. No construction materialswill be removed from Ute Tribal or BLM lands,

c. If any gravel is used, it will be obtained from a state approved gravel pit.

7. Methods of Handling Waste Disposal:

a. All wastes associated with this application will be contained and disposed of utilizingapproved facilities.

b. Drill cuttings will be contained and buriedon site.

c. The reserve pit will be located outboard of the location and along the southwest side of thepad.

d. The reserve pit will be constructed so as not to leak, break, or allow any discharge.

e. The reserve pit will be lined with 12 mil minimum thicknessplastic nylon reinforced linermaterial. The liner will overlay a felt liner pad only if rock is encountered duringexcavation.The pit liner will overlap the pit walls and be covered with dirt and/or rocks to hold it inplace. No trash, scrap pipe, etc., that could puncture the liner will be disposed of in the pit.Pit walls will be sloped no greater than 2:1. A minimum2-foot freeboard will be maintainedin the pit at all times during the drilling and completion operation,

f. The reserve pit has been locatedin cut material. Three sides of the reserve pit will be fencedbefore drilling starts. The fourth side will be fenced as soon as drilling is completed, andshall remain until the pit is dry. After the reserve pit has dried, all areas not needed forproduction will be rehabilitated.

g. No chemicals subject to reporting under SARA Title III (hazardous materials) in an amountgreater than 10,000 pounds will be used, produced, stored, transported, or disposed ofannually in association with the drilling, testing, or completion of the well. Furthermore, noextremely hazardous substances, as defined in 40 CFR 355, in threshold planning quantities,will be used, produced, stored, transported, or disposed of in association with the drilling,testing, or completion of the well.

h. Trash will be contained in a trash cage and hauled away to an approved disposal site asnecessary but no later than at the completion of drilling operations. The contents of the trashcontainer will be hauled off periodically to the approved Uintah CountyLandfillnear Vernal,Utah.

i. Produced fluids from the well other than water will be produced into a test tank until suchtime as construction of production facilities is completed. Any spills of oil, gas, salt waterorother produced fluids will be cleaned up and removed.

j. After initial clean-up, a 400 bbl tank will be installed to contain produced waste water. Thiswater will betransported from the tank to an approved Dominion disposal well fordisposal.

k. Produced water from the production well will be disposed of at the RBU 13-11F orRBU 16-19F disposal wells in accordance with Onshore Order #7.

1. Any salts and/or chemicals, which are an integral part ofthe drilling system, will be disposedof in the same manner as the drilling fluid.

m. Sanitary facilities will be on site at all timesduring operations. Sewage will be placed in aportable chemical toilet and the toilet replaced periodically utilizing a licensed contractor

Page 16: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

0 0transport by truck the portable chemical toilet so that its contents can be delivered to theVernal Wastewater Treatment Facility in accordance with state and county regulations.

8. Ancillary Facilities:

a. Garbage Containers and Portable Toilets are the only ancillary facilities proposed in thisapplication.

9. Well Site Lavout: (See Exhibit B)

a. The well will be properly identified in accordance with 43 CFR 3162.6.

b. Access to the well pad will be from the southeast.

c. The pad and road designs are consistent with BLM specification

d. A pre-construction meeting with responsible company representative, contractors, and theUte Tribe will be conducted at the projectsite prior to commencement of surface-disturbingactivities, The pad and road will be construction-staked prior to this meeting.

e. The pad has been staked at its maximum size of 355' X 200'; however it will be constructedsmaller if possible, depending upon rig availability. Should the layout change, thisapplication will be amended and approved utilizing a sundrynotice.

f All surface disturbing activities, will be supervised by a qualified, responsible companyrepresentative who isaware of theterms and conditions ofthe APD and specifications intheapproved plans.

g. All cut and fill slopes will be such that stability can bemaintainedfor the life of the activity.

h. Diversion ditches will be constructed as shown around thewellsite toprevent surfacewatersform entering the well site area,

i. The site surface will be graded to drain away from the pit to avoid pit spillage during largestorm events.

j. The stockpiled topsoil (first 6 inches or maximum available) will be stored ina windrow onthe uphill side of the location to prevent any possible contamination. All topsoil will bestockpiled for reclamation in such a way as to prevent soil loss and contamination.

k. Pits will remain fenced until site cleanup.

1. The blooieline will be located at least 100 feet from the well head,

m. Water injection may be implementedifnecessary to minimize the amount of fugitivedust.

10. Plans for Restoration of the Surface:

a. Site reclamation for a producing well will be accomplished for portions of the site notrequired for the continued operation of the well.

b. The Operator will control noxious weeds along access road use authorizations, pipelinerouteauthorizations, well sites, or other applicable facilitiesby sprayingor mechanicalremoval.

0 0transport by truck the portable chemical toilet so that its contents can be delivered to theVernal Wastewater Treatment Facility in accordance with state and county regulations.

8. Ancillary Facilities:

a. Garbage Containers and Portable Toilets are the only ancillary facilities proposed in thisapplication.

9. Well Site Lavout: (See Exhibit B)

a. The well will be properly identified in accordance with 43 CFR 3162.6.

b. Access to the well pad will be from the southeast.

c. The pad and road designs are consistent with BLM specification

d. A pre-construction meeting with responsible company representative, contractors, and theUte Tribe will be conducted at the projectsite prior to commencement of surface-disturbingactivities, The pad and road will be construction-staked prior to this meeting.

e. The pad has been staked at its maximum size of 355' X 200'; however it will be constructedsmaller if possible, depending upon rig availability. Should the layout change, thisapplication will be amended and approved utilizing a sundrynotice.

f All surface disturbing activities, will be supervised by a qualified, responsible companyrepresentative who isaware of theterms and conditions ofthe APD and specifications intheapproved plans.

g. All cut and fill slopes will be such that stability can bemaintainedfor the life of the activity.

h. Diversion ditches will be constructed as shown around thewellsite toprevent surfacewatersform entering the well site area,

i. The site surface will be graded to drain away from the pit to avoid pit spillage during largestorm events.

j. The stockpiled topsoil (first 6 inches or maximum available) will be stored ina windrow onthe uphill side of the location to prevent any possible contamination. All topsoil will bestockpiled for reclamation in such a way as to prevent soil loss and contamination.

k. Pits will remain fenced until site cleanup.

1. The blooieline will be located at least 100 feet from the well head,

m. Water injection may be implementedifnecessary to minimize the amount of fugitivedust.

10. Plans for Restoration of the Surface:

a. Site reclamation for a producing well will be accomplished for portions of the site notrequired for the continued operation of the well.

b. The Operator will control noxious weeds along access road use authorizations, pipelinerouteauthorizations, well sites, or other applicable facilitiesby sprayingor mechanicalremoval.

Page 17: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Olist of noxious weeds may be obtained from the BLM or the appropriate CountyExtensionOffice. On Tribal administered land,it isrequired that a PesticideUse Proposal besubmittedand approved prior to the application of herbicides, pesticides or possibly hazardouschemicals.

c. Upon well completion, any hydrocarbons in the pit shall be removed in accordance with 43CFR 3162.7-1.Once the reserve pit is dry, the plastic nylon reinforced liner shall be torn andperforated before backfilling of the reserve pit. The reserve pit and that portion of thelocation not needed for production facilities/operations will be recontoured to theapproximate natural contours.

d. The cut and fill slopes and all other disturbed areas not needed for theproduction operationwill be top soiled and re-vegetated. The stockpiled topsoil will be evenly distributedover thedisturbedarea,

e. Prior to reseeding thesite, all disturbed areas, including the access road, willbe scarifiedandleft with a rough surface. The site will then be seeded and/or planted as prescribed by theUte Indian Tribe. The Ute Indian Tribe recommended seed mix will be detailed within theirapproval documents.

11. Surface and Mineral Ownership:

a. Surfàce Ownership - Ute Indian Tribe under the management of the Bureau of Indian Affairs -

Uintah and Ouray Agency, P.O. Box 130, 988 South 7500 East, Ft. Duchesne, Utah 84026

b. Mineral Ownership - Federal under the management of the Bureau ofLand Management - VernalField Office, 170 South 500 East, Vernal, Utah 84078; 435-781-4400.

12. Other Information:

a. AIA Archaeological has conducted a Class III archeological survey. A copy of the report hasbeen submitted under separate cover to the appropriate agencies by AIA Archaeological,

b. Alden Hamblin will conduct a paleontological survey. A copy of the report will be submittedunder separate cover to the appropriate agencies by Alden Hamblin.

c. Our understanding ofthe results of the onsite inspection are:

a. No Threatened and Endangered flora and fauna species were found during the onsiteinspection.

b. No drainage crossings that require additional State or Federal approval are being

Olist of noxious weeds may be obtained from the BLM or the appropriate CountyExtensionOffice. On Tribal administered land,it isrequired that a PesticideUse Proposal besubmittedand approved prior to the application of herbicides, pesticides or possibly hazardouschemicals.

c. Upon well completion, any hydrocarbons in the pit shall be removed in accordance with 43CFR 3162.7-1.Once the reserve pit is dry, the plastic nylon reinforced liner shall be torn andperforated before backfilling of the reserve pit. The reserve pit and that portion of thelocation not needed for production facilities/operations will be recontoured to theapproximate natural contours.

d. The cut and fill slopes and all other disturbed areas not needed for theproduction operationwill be top soiled and re-vegetated. The stockpiled topsoil will be evenly distributedover thedisturbedarea,

e. Prior to reseeding thesite, all disturbed areas, including the access road, willbe scarifiedandleft with a rough surface. The site will then be seeded and/or planted as prescribed by theUte Indian Tribe. The Ute Indian Tribe recommended seed mix will be detailed within theirapproval documents.

11. Surface and Mineral Ownership:

a. Surfàce Ownership - Ute Indian Tribe under the management of the Bureau of Indian Affairs -

Uintah and Ouray Agency, P.O. Box 130, 988 South 7500 East, Ft. Duchesne, Utah 84026

b. Mineral Ownership - Federal under the management of the Bureau ofLand Management - VernalField Office, 170 South 500 East, Vernal, Utah 84078; 435-781-4400.

12. Other Information:

a. AIA Archaeological has conducted a Class III archeological survey. A copy of the report hasbeen submitted under separate cover to the appropriate agencies by AIA Archaeological,

b. Alden Hamblin will conduct a paleontological survey. A copy of the report will be submittedunder separate cover to the appropriate agencies by Alden Hamblin.

c. Our understanding ofthe results of the onsite inspection are:

a. No Threatened and Endangered flora and fauna species were found during the onsiteinspection.

b. No drainage crossings that require additional State or Federal approval are being

Page 18: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O

13. Operator's Representative and Certification

Title Name Office PhoneCompany Representative (Roosevelt) Ken Secrest 1-435-722-4521Company Representative (Oklahoma) Carla Christian 1-405-749-5263Agent for Dominion Don Hamilton 1-435-637-4075

Certification:

I hereby certify that I, or persons under my direct supervision, have inspected the proposeddrill site and access route; that I am familiar with the conditions which currently exists; thatthe statementsmade in this APD package are, to the best of my knowledge, true and correct;and that the work associated with the operations proposed herein will be performed byDominion Exploration & Production, Inc. and its contractors and subcontractors inconformity with this APD package and the terms and conditions under which it is approved. Ialso certify responsibility for the operationsconducted on that portion of the leased landsassociated with this application, with bond coverage being provided under Dominion's BLMbond. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a falsestatement.

Signature: San /1 & .Date:

O

13. Operator's Representative and Certification

Title Name Office PhoneCompany Representative (Roosevelt) Ken Secrest 1-435-722-4521Company Representative (Oklahoma) Carla Christian 1-405-749-5263Agent for Dominion Don Hamilton 1-435-637-4075

Certification:

I hereby certify that I, or persons under my direct supervision, have inspected the proposeddrill site and access route; that I am familiar with the conditions which currently exists; thatthe statementsmade in this APD package are, to the best of my knowledge, true and correct;and that the work associated with the operations proposed herein will be performed byDominion Exploration & Production, Inc. and its contractors and subcontractors inconformity with this APD package and the terms and conditions under which it is approved. Ialso certify responsibility for the operationsconducted on that portion of the leased landsassociated with this application, with bond coverage being provided under Dominion's BLMbond. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a falsestatement.

Signature: San /1 & .Date:

Page 19: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O

DOMINION EXPLR. & PROD., INC.HCU#14-27F

SECTION 27, T10S, R20E, S.L.B.&M.

PROCEED IN A WESTERLY DIRECTION FROM VERNAL, UTAH ALONG U.S.HIGHWAY 40 APPROXIMATELY 14.0 MILES TO THE JUNCTION OF STATEHIGHWAY 88; EXIT LEFT AND PROCEED IN A SOUTHERLY DIRECTIONAPPROXIMATELY 17.0 MILES TO OURAY, UTAH; PROCEED IN ASOUTHERLY, THEN SOUTHEASTERLY DIRECTION APPROXIMATELY 13.4MILES ON THE SEEP RIDGE ROAD TO THE JUNCTION OF THIS ROAD AND ANEXISTING ROAD TO THE SOUTHWEST; TURN RIGHT AND PROCEED IN ASOUTHWESTERLY, THEN NORTHWESTERLY DIRECTION APPROXIMATELY3.2 MILES TO THE JUNCTION OF THIS ROAD AND AN EXISTING ROAD TOTHE SOUTHWEST; TURN LEFT AND PROCEED IN A SOUTHWESTERLY, THENNORTHWESTERLY DIRECTION APPROXIMATELY 0.2 MILES TO THEPROPOSED LOCATION.

TOTAL DISTANCE FROM VERNAL, UTAH TO THE PROPOSED WELLLOCATION IS APPROXIMATELY 47.8

O

DOMINION EXPLR. & PROD., INC.HCU#14-27F

SECTION 27, T10S, R20E, S.L.B.&M.

PROCEED IN A WESTERLY DIRECTION FROM VERNAL, UTAH ALONG U.S.HIGHWAY 40 APPROXIMATELY 14.0 MILES TO THE JUNCTION OF STATEHIGHWAY 88; EXIT LEFT AND PROCEED IN A SOUTHERLY DIRECTIONAPPROXIMATELY 17.0 MILES TO OURAY, UTAH; PROCEED IN ASOUTHERLY, THEN SOUTHEASTERLY DIRECTION APPROXIMATELY 13.4MILES ON THE SEEP RIDGE ROAD TO THE JUNCTION OF THIS ROAD AND ANEXISTING ROAD TO THE SOUTHWEST; TURN RIGHT AND PROCEED IN ASOUTHWESTERLY, THEN NORTHWESTERLY DIRECTION APPROXIMATELY3.2 MILES TO THE JUNCTION OF THIS ROAD AND AN EXISTING ROAD TOTHE SOUTHWEST; TURN LEFT AND PROCEED IN A SOUTHWESTERLY, THENNORTHWESTERLY DIRECTION APPROXIMATELY 0.2 MILES TO THEPROPOSED LOCATION.

TOTAL DISTANCE FROM VERNAL, UTAH TO THE PROPOSED WELLLOCATION IS APPROXIMATELY 47.8

Page 20: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

I INION EXPLR. & PROD., .

LOCA YOUT FOR

H #14-27F

SECTION27 T10S, R20E, S.L.B.&M.1569 ÈSL 1937' FWL

0&d/ding 8

es' Sta. J+SSSCALE: 1" - 50'DATE: 3-8-05Drawn By K.G. xisting P IU* TANK

Approx.Toe ofBonn Fill Slope

Anchor

NO1EF/are P/t Is to be /ocateda min. of 100' from theWe// Head. ' W

PE RACKS

E/. 74.4 20' WIDE BENCH305

3 135' Sta. 1+80

Tofd P/t Capac/ty- Wyf of Freaboarri -

--.. - 10, 750 BNs. ± -

Totei P/t Volume . t- 3,120 Gr. Yak PUM#

TORETMUD SHED

- .... EH

POWER so- s:

RESERVE P/TS ¯¯¯ TOOLS(s' omep) ¯¯¯ T Meter

20 WIDE BENCH C-6.5' STORAGEE/. 77.1' TANKExisting

Topsol/ Stockpile \

APP - E pso¡/

StockpildSta.,0+00

Top of - C--9.0 Existing Access C-0. JCut Slope E/. 79.6' Road Ei. 70.9'

, UINTAH ENGINEERING & LAND SURVEYINGE/ev. Graded Ground at /14-27E Locat/on Stoke =5170.6 es s.. 2oo 2...• v,,..t. ve.» avore · («ss;

I INION EXPLR. & PROD., .

LOCA YOUT FOR

H #14-27F

SECTION27 T10S, R20E, S.L.B.&M.1569 ÈSL 1937' FWL

0&d/ding 8

es' Sta. J+SSSCALE: 1" - 50'DATE: 3-8-05Drawn By K.G. xisting P IU* TANK

Approx.Toe ofBonn Fill Slope

Anchor

NO1EF/are P/t Is to be /ocateda min. of 100' from theWe// Head. ' W

PE RACKS

E/. 74.4 20' WIDE BENCH305

3 135' Sta. 1+80

Tofd P/t Capac/ty- Wyf of Freaboarri -

--.. - 10, 750 BNs. ± -

Totei P/t Volume . t- 3,120 Gr. Yak PUM#

TORETMUD SHED

- .... EH

POWER so- s:

RESERVE P/TS ¯¯¯ TOOLS(s' omep) ¯¯¯ T Meter

20 WIDE BENCH C-6.5' STORAGEE/. 77.1' TANKExisting

Topsol/ Stockpile \

APP - E pso¡/

StockpildSta.,0+00

Top of - C--9.0 Existing Access C-0. JCut Slope E/. 79.6' Road Ei. 70.9'

, UINTAH ENGINEERING & LAND SURVEYINGE/ev. Graded Ground at /14-27E Locat/on Stoke =5170.6 es s.. 2oo 2...• v,,..t. ve.» avore · («ss;

Page 21: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

INION EXPLR. & PROD., g..

O TYPICAL CROSS SECTIONSFORX-Section ifScale HCU #14-27F ND se,

'¯ SECTION 27, T10S, R20E, S.L.B.&M.1" = 50'

1569' FSL 1937' FWLDATE: 3-8-05Drawn By K.G.

65' 135'

S/ope- 1 1/2: 1yp) \ Finished Grade

\ FILL /LL

SM. J+55

145' 135'

-LOCA770N STAKE

STA. 1+80

10 100' 35' 135'

Preconstruction35 135'

Grade

CUT CUT.¯¯ ¶¾WifwW&WiiiWnWWWWPJWa

s rA. osoo* NOTE·

APPROXIMATEYARDAGES F/LL QUAN71TY/NCLUDES5% EOR COMPACT/ON

CUT(12") Topsoil Stripping = 1,250 Cu. Yds.

EXCESS MATERIAL = 8,020 Cu. Yds.

(New Consturction Only) Topsoil & Pit Bockfill = 2,810 Cu. Yds.Remaining Location = 6,700 Cu. Yds. (1/2 Pit Vol.)

EXCESS UNBALANCE = 5,210 Cu. Yds.TOTAL CUT = 9,950 CU.YDS. (After Rehabilitation)

FILL = 1,9JO CU.YDS- UINTAH ENGINEERING & LAND Ñ7RVEYING85 So. 200 Eas¢ * Vernal, Utah 84078 * (436)

INION EXPLR. & PROD., g..

O TYPICAL CROSS SECTIONSFORX-Section ifScale HCU #14-27F ND se,

'¯ SECTION 27, T10S, R20E, S.L.B.&M.1" = 50'

1569' FSL 1937' FWLDATE: 3-8-05Drawn By K.G.

65' 135'

S/ope- 1 1/2: 1yp) \ Finished Grade

\ FILL /LL

SM. J+55

145' 135'

-LOCA770N STAKE

STA. 1+80

10 100' 35' 135'

Preconstruction35 135'

Grade

CUT CUT.¯¯ ¶¾WifwW&WiiiWnWWWWPJWa

s rA. osoo* NOTE·

APPROXIMATEYARDAGES F/LL QUAN71TY/NCLUDES5% EOR COMPACT/ON

CUT(12") Topsoil Stripping = 1,250 Cu. Yds.

EXCESS MATERIAL = 8,020 Cu. Yds.

(New Consturction Only) Topsoil & Pit Bockfill = 2,810 Cu. Yds.Remaining Location = 6,700 Cu. Yds. (1/2 Pit Vol.)

EXCESS UNBALANCE = 5,210 Cu. Yds.TOTAL CUT = 9,950 CU.YDS. (After Rehabilitation)

FILL = 1,9JO CU.YDS- UINTAH ENGINEERING & LAND Ñ7RVEYING85 So. 200 Eas¢ * Vernal, Utah 84078 * (436)

Page 22: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O ODOMINION EXPLR. & PROD., INC.

HCU#14-27FLOCATED IN UINTAH COUNTY, UTAH

SECTION 27, T10S, R20E, S.L.B.&M.

#13-27F| -

PHOTO: VIEW OF LOCATION STAKES CAMERA ANGLE: SOUTHEASTERLY

PHOTO: VIEW OF EXISTING ACCESS CAMERA ANGLE: NORTHWESTERLY

Uintah Engineering & Land Surveying I OCATION PHOTos 05 0 1 03 PHOTO85 South 200 East Vernal, Utah 84078 ONT DAY YEAR

-Smet 1964. 435-789-1017 [email protected] TAKENBY:B.B. DRAWNBY:J.L.G.

Page 23: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

OURAY 42I *

-- -- - - - -- -

T S

6

T 8 S

T 9 S

6

6

T9ST10 S

I as Fie '"' s

PROPOSED LOCATION:HCU #14-27F

R ISE TOPO

19 20 .

E E e .

LEGEND: DOMINION EXPLR. & PROD., INC.PROPOSED LOCATION N HCU #14-27F

SECTION 27, T10S, R20E, S.L.B.&M.1569' FSL 1937' FWL

Uintah Engineering & Land Surveying TOPOGR A PH I c 05 0 1 0385 South 200 East Vernal, Utah 84078 M A P ONTH DAY YEAR(435) 789-1017 * FAX (435) 189-1813

SCALE:1:100,000DRAWNBY:J.L.G

OURAY 42I *

-- -- - - - -- -

T S

6

T 8 S

T 9 S

6

6

T9ST10 S

I as Fie '"' s

PROPOSED LOCATION:HCU #14-27F

R ISE TOPO

19 20 .

E E e .

LEGEND: DOMINION EXPLR. & PROD., INC.PROPOSED LOCATION N HCU #14-27F

SECTION 27, T10S, R20E, S.L.B.&M.1569' FSL 1937' FWL

Uintah Engineering & Land Surveying TOPOGR A PH I c 05 0 1 0385 South 200 East Vernal, Utah 84078 M A P ONTH DAY YEAR(435) 789-1017 * FAX (435) 189-1813

SCALE:1:100,000DRAWNBY:J.L.G

Page 24: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

R

00

PROPOSED LOC :HCU #14-27F S o

0.2 MI. +/-

22200

0

ITS

LEGEND: DOMINION EXPLR. & PROD., INC.EXISTING ROAD N HCU #14-27F

----------- PROPOSEDACCESSROAD SECTION 27, T10S, R20E, S.L.B.&M.1569' FSL 1937'

R

00

PROPOSED LOC :

HCU #14-27F S o

0.2 MI. +/-

22200

0

ITS

LEGEND: DOMINION EXPLR. & PROD., INC.EXISTING ROAD N HCU #14-27F

----------- PROPOSEDACCESSROAD SECTION 27, T10S, R20E, S.L.B.&M.1569' FSL 1937'

Page 25: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

o

0-27 #8- 7F

H.

PROPOSED LOCATION:H-27F .

IICU #14-27F

gH23 F

FF

U

# 3F

0

LEGEND: DOMINION EXPLR. & PROD., INC.ff DISPOSAL WELLS WATER WELLS N HCU #14-27Fe PRODUCING WELLS ABANDONED WELLS SECTION 27, T10S, R20E, S.L.B.&M.

SHUT IN WELLS - - TEMPORARILY ABANDONED 1569' FSL 1937' FWL

- Uintah Engineering & Land Surveying TOPOGR A PH I C 05 0 1 0385 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR

(435) 789-1017 * FAX (435) 789-1813SCALE:1" = 2000' DRAWNBY:J.L.G REVISED:03-O3.05C.E

o

0-27 #8- 7F

H.

PROPOSED LOCATION:H-27F .

IICU #14-27F

gH23 F

FF

U

# 3F

0

LEGEND: DOMINION EXPLR. & PROD., INC.ff DISPOSAL WELLS WATER WELLS N HCU #14-27Fe PRODUCING WELLS ABANDONED WELLS SECTION 27, T10S, R20E, S.L.B.&M.

SHUT IN WELLS - - TEMPORARILY ABANDONED 1569' FSL 1937' FWL

- Uintah Engineering & Land Surveying TOPOGR A PH I C 05 0 1 0385 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR

(435) 789-1017 * FAX (435) 789-1813SCALE:1" = 2000' DRAWNBY:J.L.G REVISED:03-O3.05C.E

Page 26: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

LEGEND

D = Dit LineG = Gos LineV = Voter LineR = Relief Line (Pressure)C = Condensole L.neV = Vent L;neD = Droin L;neM = Gos Meter °

P = PumpBP = Bock Pressure VoiveSVS = Seoleci Yhen ShippingSUS = Seoled Unless ShippingT = Heot Troced Line

VELLHEAD <typ> e H = Heoterc 2 BL = Buried Line

= Volve= Check Volve

SC = Sealed Closed VolveNC = Nornolly ClosedBD = Blowdown Line

BD. BL

[T+100· Relief

)' pX 30'

SEPW. BL 300 bbt Tonk

(conciensote)BL, C

SCSUS

GLYCOL &REBOILER - The site security plan is on file

va in DEPJas district office located at

CONTACT 1400 N. State St., Roosevelt, UTah.

TOWER It can be inspected duripg officehours, from 6:30 AM thru 3:30 FM,Monday thru Friday..

Y

DOMINIONEXPLORATION& PRODUCTION,lNC.

not to

I TYPICAL FLOW DIAGRAM

LEGEND

D = Dit LineG = Gos LineV = Voter LineR = Relief Line (Pressure)C = Condensole L.neV = Vent L;neD = Droin L;neM = Gos Meter °

P = PumpBP = Bock Pressure VoiveSVS = Seoleci Yhen ShippingSUS = Seoled Unless ShippingT = Heot Troced Line

VELLHEAD <typ> e H = Heoterc 2 BL = Buried Line

= Volve= Check Volve

SC = Sealed Closed VolveNC = Nornolly ClosedBD = Blowdown Line

BD. BL

[T+100· Relief

)' pX 30'

SEPW. BL 300 bbt Tonk

(conciensote)BL, C

SCSUS

GLYCOL &REBOILER - The site security plan is on file

va in DEPJas district office located at

CONTACT 1400 N. State St., Roosevelt, UTah.

TOWER It can be inspected duripg officehours, from 6:30 AM thru 3:30 FM,Monday thru Friday..

Y

DOMINIONEXPLORATION& PRODUCTION,lNC.

not to

I TYPICAL FLOW DIAGRAM

Page 27: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O O

BOP STACK

RILLING NIPPLE

-FLOW LINE

FILLUP LINE

.. HYORIL

I I

PIPE. RAMS

BLINO RAMS

DRILLING

SPOOL

KILL LINE CHOKE LINE

HEAD

CHOKE MANIF¯OLD

ADJusTABLE CHOKETO MUD TANK

VALVECHOKE LINE > TO

O O

BOP STACK

RILLING NIPPLE

-FLOW LINE

FILLUP LINE

.. HYORIL

I I

PIPE. RAMS

BLINO RAMS

DRILLING

SPOOL

KILL LINE CHOKE LINE

HEAD

CHOKE MANIF¯OLD

ADJusTABLE CHOKETO MUD TANK

VALVECHOKE LINE > TO

Page 28: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 07/21/2005 API NO. ASSIGNED: 43-047-36852

WELL NAME: HCU 14-27F

OPERATOR: DOMINION EXPL & PROD ( N1095 )

CONTACT: DON HAMILTON PHONE NUMBER: 435-650-1886

PROPOSED LOCATION:

NESW 27 100s 200E INSPECT LOCATN BY: / /

SURFACE: 1569 FSL 1937 FWL Tech Review Initials DateSfÁ BOTTOM: 0550 FSL 2000 FWL

UINTAH Engineering

NATURAL BUTTES ( 630 ) Geology

LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: U-29784

SURFACE OWNER: 2 - IndianLATITUDE: 39.91545

PROPOSED FORMATION: MVRD

COALBED METHANE WELL? NO LONGITUDE: -109.6528

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit HILL CREEK

(No. 76$630500330 )Potash (Y/N) R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 siting:460 From otr/Qtr & 920'Between wells

Water Permit R649-3-3. Exception(No.43-10447 )

Drilling UnitRDCC Review (Y/N)

Board Cause No: Q-Í(Date: )

Eff Date: g-in-ZOQQFee Surf Agreement (Y/N) Siting: LA{f ¡yd bowcLMIntent to Commingle (Y/N) g/ R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS: - M vg

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 07/21/2005 API NO. ASSIGNED: 43-047-36852

WELL NAME: HCU 14-27F

OPERATOR: DOMINION EXPL & PROD ( N1095 )

CONTACT: DON HAMILTON PHONE NUMBER: 435-650-1886

PROPOSED LOCATION:

NESW 27 100s 200E INSPECT LOCATN BY: / /

SURFACE: 1569 FSL 1937 FWL Tech Review Initials DateSfÁ BOTTOM: 0550 FSL 2000 FWL

UINTAH Engineering

NATURAL BUTTES ( 630 ) Geology

LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: U-29784

SURFACE OWNER: 2 - IndianLATITUDE: 39.91545

PROPOSED FORMATION: MVRD

COALBED METHANE WELL? NO LONGITUDE: -109.6528

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit HILL CREEK

(No. 76$630500330 )Potash (Y/N) R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 siting:460 From otr/Qtr & 920'Between wells

Water Permit R649-3-3. Exception(No.43-10447 )

Drilling UnitRDCC Review (Y/N)

Board Cause No: Q-Í(Date: )

Eff Date: g-in-ZOQQFee Surf Agreement (Y/N) Siting: LA{f ¡yd bowcLM

Intent to Commingle (Y/N) g/ R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS: - M vg

Page 29: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

.9. 9.. e.

. .. ... y m- +=-.a-h

h -hh d-

BMI E Les iba-

emi amis

e i m **

NANRAL SU

+2p bL(P_ -- CMME Mani imi

- oci.har = in

.=IM wru um i - us

--

_pr

HLLCxtEK UMT

NATURALBUTTE

e" - - na u

o YOR DONDFIGN ExFI. ? 00 N1095b

ser- Er& 25 1.100 L 20E

,= a ..- .urm ...

otorry, umr=

CADEk WF-13; &tNiin

Utah OffGas and Mining. raassu-amm. Earnix- a-Aa-t--i

-m txal-DM N

THMMi- B ABANDOt-DTeocerma t.no NNimi esspinomucmnd-- NM stomaca

M•4xa l TERMon15-iprr·- osa -

-

755&. Ilma1RIOttiD. ggruggg P UK

WATERS@K3Mbu UKWB451. Watamamens Tuposaisis rmara-Dth Diam mostrurr« wat- piltOsa AIT

.9. 9.. e.

. .. ... y m- +=-.a-h

h -hh d-

BMI E Les iba-

emi amis

e i m **

NANRAL SU

+2p bL(P_ -- CMME Mani imi

- oci.har = in

.=IM wru um i - us

--

_pr

HLLCxtEK UMT

NATURALBUTTE

e" - - na u

o YOR DONDFIGN ExFI. ? 00 N1095b

ser- Er& 25 1.100 L 20E

,= a ..- .urm ...

otorry, umr=

CADEk WF-13; &tNiin

Utah OffGas and Mining. raassu-amm. Earnix- a-Aa-t--i

-m txal-DM N

THMMi- B ABANDOt-DTeocerma t.no NNimi esspinomucmnd-- NM stomaca

M•4xa l TERMon15-iprr·- osa -

-

755&. Ilma1RIOttiD. ggruggg P UK

WATERS@K3Mbu UKWB451. Watamamens Tuposaisis rmara-Dth Diam mostrurr« wat- piltOsa AIT

Page 30: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

0 0United States Department of the Interior

BUREAU OF LANDMANAGEMENTUtah State office

P.O. Box 45155Salt Lake City, Utda 84145-0155

IN REPLY REMER TO:3160(UT-922)

July 21, 2005

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2005 Plan of Development Hill Creek UnitUintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following wells are planned for calendar year2005 within the Hill Creek Unit, Uintah County, Utah.

APl# \NELLNAME LOCATION

(Proposed PZ MesaVerde)

43-047-36852 HCU 14-27F Sec 27 T10S R20E 1569 FSL 1937 FWLBHL Sec 27 T10S R20E 0550 FSL 2000 FWL

43-047-36853 HCU 16-29F Sec 29 T10S R20E 0811 FSL 0830 FEL

This office has no objection to permitting the wells at thistime.

/s/ Michael L. Coulthard

bec: File - Hill Creek UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

0 0United States Department of the Interior

BUREAU OF LANDMANAGEMENTUtah State office

P.O. Box 45155Salt Lake City, Utda 84145-0155

IN REPLY REMER TO:3160(UT-922)

July 21, 2005

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2005 Plan of Development Hill Creek UnitUintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following wells are planned for calendar year2005 within the Hill Creek Unit, Uintah County, Utah.

APl# \NELLNAME LOCATION

(Proposed PZ MesaVerde)

43-047-36852 HCU 14-27F Sec 27 T10S R20E 1569 FSL 1937 FWLBHL Sec 27 T10S R20E 0550 FSL 2000 FWL

43-047-36853 HCU 16-29F Sec 29 T10S R20E 0811 FSL 0830 FEL

This office has no objection to permitting the wells at thistime.

/s/ Michael L. Coulthard

bec: File - Hill Creek UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

Page 31: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O OJON M. HUNTSMAN,JR.

Governor

GARY R. HERBERTLieutenant Governor

State of Utah July 26, 2005

Department ofNatural Resources

MICHAEL R. STYLERExecutive Director Dominion Exploration& Production, Inc.

Division of 14000 QuailSprings Parkway, Suite 600Oklahoma City, OK 73134Oil, Gas & Mining

JOHN R. BAZAoivmanDirector Re: Hill Creek Unit 14-27F Well, Surface Location 1569' FSL, 1937' FWL, NE SW,

Sec. 27, T. 10 South, R. 20 East, Bottom Location 550'FSL, 2000' FWL,SE SW, Sec. 27, T. 10 South, R. 20 East, UintahCounty, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 et seq.,Utah Administrative Code R649-3-1 et seq., and the attached Conditions of Approval,approval to drill the referenced well is granted.

This approval shall expire one year from the above dateunless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to thiswell is 43-047-36852.

Sincerely,

Gil HuntActingAssociate Director

pabEnclosurescc: Uintah County Assessor

Bureau of Land Management, VernalDistrict Office

1594 West North Temple,Suite 1210, PO Box 145801,Sah Lake City, UT

O OJON M. HUNTSMAN,JR.

Governor

GARY R. HERBERTLieutenant Governor

State of Utah July 26, 2005

Department ofNatural Resources

MICHAEL R. STYLERExecutive Director Dominion Exploration& Production, Inc.

Division of 14000 QuailSprings Parkway, Suite 600Oklahoma City, OK 73134Oil, Gas & Mining

JOHN R. BAZAoivmanDirector Re: Hill Creek Unit 14-27F Well, Surface Location 1569' FSL, 1937' FWL, NE SW,

Sec. 27, T. 10 South, R. 20 East, Bottom Location 550'FSL, 2000' FWL,SE SW, Sec. 27, T. 10 South, R. 20 East, UintahCounty, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 et seq.,Utah Administrative Code R649-3-1 et seq., and the attached Conditions of Approval,approval to drill the referenced well is granted.

This approval shall expire one year from the above dateunless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to thiswell is 43-047-36852.

Sincerely,

Gil HuntActingAssociate Director

pabEnclosurescc: Uintah County Assessor

Bureau of Land Management, VernalDistrict Office

1594 West North Temple,Suite 1210, PO Box 145801,Sah Lake City, UT

Page 32: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

O OOperator: Dominion Exploration & Production, Inc.Well Name & Number Hill Creek Unit 14-27F

API Number: 43-047-36852Lease: U-29784

Surface Location: NE SW Sec. 27 T. 10 South R. 20 EastBottom Location: SE SW Sec. 27 T. 10 South R. 20 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338

3. Reporting RequirementsAll required reports, forrns and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directionalsurvey report to the Division within 30 daysfollowing completion of the well.

6 In accordance with Order in Cause No. 190-5(b) dated October 28, 1982, the Operator shallcomply with requirements of Rules R649-3-31 and R649-3-27 pertaining to DesignatedOil Shale Areas. Additionally, the operator shall ensure that the surface and/orproduction casing is properly cemented over the entire oil shale interval as defined byRule R649-3-31. The Operator shall report the actual depth the oil shale is encounteredto the

O OOperator: Dominion Exploration & Production, Inc.Well Name & Number Hill Creek Unit 14-27F

API Number: 43-047-36852Lease: U-29784

Surface Location: NE SW Sec. 27 T. 10 South R. 20 EastBottom Location: SE SW Sec. 27 T. 10 South R. 20 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338

3. Reporting RequirementsAll required reports, forrns and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directionalsurvey report to the Division within 30 daysfollowing completion of the well.

6 In accordance with Order in Cause No. 190-5(b) dated October 28, 1982, the Operator shallcomply with requirements of Rules R649-3-31 and R649-3-27 pertaining to DesignatedOil Shale Areas. Additionally, the operator shall ensure that the surface and/orproduction casing is properly cemented over the entire oil shale interval as defined byRule R649-3-31. The Operator shall report the actual depth the oil shale is encounteredto the

Page 33: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Form 3160-5

UNIT TATES FORM APPROVEDDEPARTMENTwF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease Serial No.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/orNo.

1. Type of Well Hill Creek Unitil Well Gas Well ther 8. Well Name and No.

2. Name of Operator HCU 14-27F9. API Well No.

DOMINIONEXPLORATION& PRODUCTION, INC.3a. Address Suite 600 3b Phone No (include area code) 43-047-36852

14000 QUAIL SPGS PKWY, OKLACITY,OK 73134 405-749-1300 10. Field and Pool, or ExploratoryArea

4. Location of Well (Footage, Sec., T., R., M., or Survey Description)

Natural Buttesl1. County or Parish, State

1569' FSL & 1937' FWL, (NE SW) Sec. 27-105-20EUintah

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NoticeofIntent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon APD Extension

O Final Abandonment Notice Convertto injection Plug Back Water Disposal

13 Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof.If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work willbe performed or provide the Bond No. on file wäh BLM/BIA. Required subsequent reports shall be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed oncetesting has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

The state APD for thiswell expires July 26, 2006. Dominion is hereby requesting a one year extension.

14. I hereby certifythat the foregoing is true and correctN ame (Printed/Typed)

Carla Christian Title Sr. Regulatory Specialist

signatureA Date 6/19/2006

Approvedby BRADLEY G. HILL Dat

Conditions of approval, i tached. Approval of this notice does not warrant or ENvlHONMENÌALMANAGkHcertify that the applican Id I or equitable titleto those rights in the subject lease Officewhich would entitle the applidan nduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowingly and willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction RECElVED

JUN2 7 2006

DMOF0\LGAS&

Form 3160-5

UNIT TATES FORM APPROVEDDEPARTMENTwF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease Serial No.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/orNo.

1. Type of Well Hill Creek Unitil Well Gas Well ther 8. Well Name and No.

2. Name of Operator HCU 14-27F9. API Well No.

DOMINIONEXPLORATION& PRODUCTION, INC.3a. Address Suite 600 3b Phone No (include area code) 43-047-36852

14000 QUAIL SPGS PKWY, OKLACITY,OK 73134 405-749-1300 10. Field and Pool, or ExploratoryArea

4. Location of Well (Footage, Sec., T., R., M., or Survey Description)

Natural Buttesl1. County or Parish, State

1569' FSL & 1937' FWL, (NE SW) Sec. 27-105-20EUintah

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NoticeofIntent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon APD Extension

O Final Abandonment Notice Convertto injection Plug Back Water Disposal

13 Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof.If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond under which the work willbe performed or provide the Bond No. on file wäh BLM/BIA. Required subsequent reports shall be filed within 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed oncetesting has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection.)

The state APD for thiswell expires July 26, 2006. Dominion is hereby requesting a one year extension.

14. I hereby certifythat the foregoing is true and correctN ame (Printed/Typed)

Carla Christian Title Sr. Regulatory Specialist

signatureA Date 6/19/2006

Approvedby BRADLEY G. HILL Dat

Conditions of approval, i tached. Approval of this notice does not warrant or ENvlHONMENÌALMANAGkHcertify that the applican Id I or equitable titleto those rights in the subject lease Officewhich would entitle the applidan nduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowingly and willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction RECElVED

JUN2 7 2006

DMOF0\LGAS&

Page 34: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

0 6

Application for Permit to DrillRequest for Permit Extension

Validation(this form shouldaccompany the Sundry Notice requesting pennit extension)

API: RWell Name: HCU 14-27F

Location: Section 27-10$-20E, 1569' FSL & 1937' FWLCompany Permit Issued to: Dominion Exploration & Production, Inc.

Date Original Permit Issued: 7/26/2005

The undersigned as ownerwith legal rights to drillon the property as permittedabove, hereby verifies thatthe information as submitted in the previouslyapproved applicationto drill, remains valid and does not require revision.

Following is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownershipchanged, ifso, has the surfaceagreement been updated? YesO NoO

Have any wells been drilled in the vicinityof the proposed well which would affectthe spacing or siting requirements for thislocation? YesO Nom

Has there been any unit or other agreements put in place that could affect thepermitting or operation of this proposed well? YesO No21

Have there been any changes to the access route including ownership, or right-of-way, which could affect the proposed location? YesO No21

Has the approved source ofwater for drillingchanged? YesO NoO

Have therebeen any physical changes tothe surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? YesO No2

Is bonding still in place, which covers this proposed well? YeslZJNoO

6/20/2006

Signature Date

Title: Sr. Regulatory Specialist

Representing: Dominion Exploration & Production, Inc.

RECEIVEDJUN2 72006

Oli OFO!L,GASI

0 6

Application for Permit to DrillRequest for Permit Extension

Validation(this form shouldaccompany the Sundry Notice requesting pennit extension)

API: RWell Name: HCU 14-27F

Location: Section 27-10$-20E, 1569' FSL & 1937' FWLCompany Permit Issued to: Dominion Exploration & Production, Inc.

Date Original Permit Issued: 7/26/2005

The undersigned as ownerwith legal rights to drillon the property as permittedabove, hereby verifies thatthe information as submitted in the previouslyapproved applicationto drill, remains valid and does not require revision.

Following is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownershipchanged, ifso, has the surfaceagreement been updated? YesO NoO

Have any wells been drilled in the vicinityof the proposed well which would affectthe spacing or siting requirements for thislocation? YesO Nom

Has there been any unit or other agreements put in place that could affect thepermitting or operation of this proposed well? YesO No21

Have there been any changes to the access route including ownership, or right-of-way, which could affect the proposed location? YesO No21

Has the approved source ofwater for drillingchanged? YesO NoO

Have therebeen any physical changes tothe surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? YesO No2

Is bonding still in place, which covers this proposed well? YeslZJNoO

6/20/2006

Signature Date

Title: Sr. Regulatory Specialist

Representing: Dominion Exploration & Production, Inc.

RECEIVEDJUN2 72006

Oli OFO!L,GASI

Page 35: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Form 3160-5

(August, 1999) UNITED STATES FORM APPROVED= DEPARTMENT OF THE INTERIO OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT = w Expires: November 30, 2000

SUNDRY NOTICES AND REPORTS ON WELL§EP2 9 2006 u"_2No4

Do not use this form for proposals to drill or to re-enter an 6. Iflndian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/or No.

l. Type of Well HillCreek Unitil Well Gas Well her 8. Well Name and No.

2. Name of Operator HCU 14-27F9. API Well No.

DOMINIONEXPLORATION& PRODUCTION, INC.3a. Address Suite 600 3b. Phone No (include area code) 43-047-36852

14000 QUAILSPGS PKWY, OKLACITY,OK 73134 405-749-1300 10. Field and Pool, or ExploratoryArea

4. Location of Well (Footage, Sec., T., R., M., or SurveyDescription)

Natural Buttesl 1. County or Parish, State

1569' FSL & 1937' FWL, (NE SW) Sec. 27-10S-20EUintah

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well Integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon APD Extension

O Final Abandonment Notice Convert to injection Plug Back Water Disposal

13 Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof.If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond underwhich the work willbe performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filedwithin 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 316¾ shall be filed oncetesting has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection]

The federal APD for this well expires October 13, 2006. Dominion is hereby requesting a one year extension.

RECEIVEDOCT23 2006

DIV.0FOIL,GAS&MINING

CONDITIONSOFAPPROVALATTACHED

14. I hereby certify that the foregoing is true and correctName (Prinie&Typed)

Carla Christian Title Sr. Regulatory Specialist

Signature Date 9/26/2006

Approvedby ' ÑOÍrOleUrn Engineer Date

Conditions of approval, if any, are attached. Approval of this notice does not warrant orcertify that the applicant holds legal or equitable titleto those rights in the subject lease Officewhich would entitle the applicant to conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowingly and willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its

Form 3160-5

(August, 1999) UNITED STATES FORM APPROVED= DEPARTMENT OF THE INTERIO OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT = w Expires: November 30, 2000

SUNDRY NOTICES AND REPORTS ON WELL§EP2 9 2006 u"_2No4

Do not use this form for proposals to drill or to re-enter an 6. Iflndian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/or No.

l. Type of Well HillCreek Unitil Well Gas Well her 8. Well Name and No.

2. Name of Operator HCU 14-27F9. API Well No.

DOMINIONEXPLORATION& PRODUCTION, INC.3a. Address Suite 600 3b. Phone No (include area code) 43-047-36852

14000 QUAILSPGS PKWY, OKLACITY,OK 73134 405-749-1300 10. Field and Pool, or ExploratoryArea

4. Location of Well (Footage, Sec., T., R., M., or SurveyDescription)

Natural Buttesl 1. County or Parish, State

1569' FSL & 1937' FWL, (NE SW) Sec. 27-10S-20EUintah

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well Integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon APD Extension

O Final Abandonment Notice Convert to injection Plug Back Water Disposal

13 Describe Proposed or Completed Operation (clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof.If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of all pertinent markers and zones.Attach the Bond underwhich the work willbe performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filedwithin 30 daysfollowing completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 316¾ shall be filed oncetesting has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed and the operator hasdetermined that the site is ready for final inspection]

The federal APD for this well expires October 13, 2006. Dominion is hereby requesting a one year extension.

RECEIVEDOCT23 2006

DIV.0FOIL,GAS&MINING

CONDITIONSOFAPPROVALATTACHED

14. I hereby certify that the foregoing is true and correctName (Prinie&Typed)

Carla Christian Title Sr. Regulatory Specialist

Signature Date 9/26/2006

Approvedby ' ÑOÍrOleUrn Engineer Date

Conditions of approval, if any, are attached. Approval of this notice does not warrant orcertify that the applicant holds legal or equitable titleto those rights in the subject lease Officewhich would entitle the applicant to conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowingly and willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its

Page 36: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

CONDITIONS OF APPROVAL

Dominion Exploration & Production

Notice of IntentAPD Extension

Lease: UTU-29784WeH: HCU 14-27FLocation: NESW Sec 27-T10S-R20E

An extension for the referenced APD is granted with the following conditions:

1. The extension and APD shall expire on 10/13/07

2. No other extension shall be granted.

If you have any other questions concerning this matter, please contact Matt Baker of this office at(435)

CONDITIONS OF APPROVAL

Dominion Exploration & Production

Notice of IntentAPD Extension

Lease: UTU-29784WeH: HCU 14-27FLocation: NESW Sec 27-T10S-R20E

An extension for the referenced APD is granted with the following conditions:

1. The extension and APD shall expire on 10/13/07

2. No other extension shall be granted.

If you have any other questions concerning this matter, please contact Matt Baker of this office at(435)

Page 37: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Form 3160-5

UNITED STATES FORM APPROVEDDEPARTMENT OF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease Serial No.

SUNDRY NOTICES AND REPORTS ON WEËLW U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/or No.

I. Type of Well Hill Creek Unitil Well Gas Well ther 8. Well Name and No.

2. Nameof Operator HCU 14-27F9. API Well No.

Dominion Exploration & Production, Inc.3a. Address 3b. Phone No. (include area code) 43-047-3685214000 Quail Springs Pkwy, Ste 600, OKC, OK 73134 (405) 749-5237 10. Field and Pool, or Exploratory Area

4. Location of Well (Footage, Sec., T., R., M., or Survey Description) Natural Buttes1569' FSL & 1937' FWL, NE SW, Sec. 27-10S-20E 11. County or Parish, State

Uintah, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well Integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon APD Extension

O Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13 Describe Proposed or Comoleted Ooeration (clearlv state all certinent details, includina estimated startina date of anv Drocosed work and anoroximate duration thereof.If the DroDosal is to deeoen dimctionallv or recomolete horizontallv. aive subsurface locations and measured and true vertical deaths of all certinent markers and zones.Attach the Bond underwhich the work willbe Derformed or Drovide the Bond No. on filewith BLM/BIA. Reauired subseauent reoorts shall be filedwithin 30 davsfollowing completion of the involved ooerations. Ifthe operation results in a multiolecomoletion or recomoletion in a new interval, a Form 3160-4 shall be filed oncetesting has been comoleted. Final Abandonment Notices shall be filed onlv after all reauirements, including reclamation, have been completed and the oDerator hasdetermined that the site is readv for final insoection.)

The State APD for this well expires July 26, 2007. o gy requests a one year extension.

Utah Division ofOil, Gas and Mining

Name (Printed/Typed)

arbara Lester Title Regulatory Specialist

Signature Date 5/24/2007

Approved by Title Date

Conditions of aooroval, if anv. are attached. Acoroval of this notice does not warrant orcertify that the acolicant holds legal or eauitable titleto those rights in the subiect lease Officewhich would entitle the acolicant to conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowingly and willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

RECEDI

MAYb 2007

D

Form 3160-5

UNITED STATES FORM APPROVEDDEPARTMENT OF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease Serial No.

SUNDRY NOTICES AND REPORTS ON WEËLW U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/or No.

I. Type of Well Hill Creek Unitil Well Gas Well ther 8. Well Name and No.

2. Nameof Operator HCU 14-27F9. API Well No.

Dominion Exploration & Production, Inc.3a. Address 3b. Phone No. (include area code) 43-047-3685214000 Quail Springs Pkwy, Ste 600, OKC, OK 73134 (405) 749-5237 10. Field and Pool, or Exploratory Area

4. Location of Well (Footage, Sec., T., R., M., or Survey Description) Natural Buttes1569' FSL & 1937' FWL, NE SW, Sec. 27-10S-20E 11. County or Parish, State

Uintah, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well Integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon APD Extension

O Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13 Describe Proposed or Comoleted Ooeration (clearlv state all certinent details, includina estimated startina date of anv Drocosed work and anoroximate duration thereof.If the DroDosal is to deeoen dimctionallv or recomolete horizontallv. aive subsurface locations and measured and true vertical deaths of all certinent markers and zones.Attach the Bond underwhich the work willbe Derformed or Drovide the Bond No. on filewith BLM/BIA. Reauired subseauent reoorts shall be filedwithin 30 davsfollowing completion of the involved ooerations. Ifthe operation results in a multiolecomoletion or recomoletion in a new interval, a Form 3160-4 shall be filed oncetesting has been comoleted. Final Abandonment Notices shall be filed onlv after all reauirements, including reclamation, have been completed and the oDerator hasdetermined that the site is readv for final insoection.)

The State APD for this well expires July 26, 2007. o gy requests a one year extension.

Utah Division ofOil, Gas and Mining

Name (Printed/Typed)

arbara Lester Title Regulatory Specialist

Signature Date 5/24/2007

Approved by Title Date

Conditions of aooroval, if anv. are attached. Acoroval of this notice does not warrant orcertify that the acolicant holds legal or eauitable titleto those rights in the subiect lease Officewhich would entitle the acolicant to conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowingly and willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

RECEDI

MAYb 2007

D

Page 38: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Application for Permit to DrillRequest for Permit Extension

Validation(this form should accompany the Sundry Notice requesting permit extension)

API: 43-047-36852

Well Name: HCU 14-27F

Location: 1569' FSL & 1937' FWL, Sec. 27-10S-20E

Company Permit Issued to: Dominion Exploration & Production, Inc.Date Original Permit Issued: 7/26/20tW

The undersigned as owner with legal rights to drill on the property as permittedabove, hereby verifies that the information as submitted in the previouslyapproved application to drill, remains valid and does not require revision.

Followinq is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownership changed, if so, has the surfaceagreement been updated? YesONoO

Have any wells been drilled in the vicinity of the proposed well which would affectthe spacing or siting requirements for this location? YesO Nom

Has there been any unit or other agreements put in place that could affect thepermitting oroperation of this proposed well? YesONoO

Have there been any changes to the access route including ownership, or right-of-way, which could affect the proposed location? YesO No El

Has the approved source of water for drilling changed? YesO NoO

Have there been any physical changes to the surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? YesO NoO

Is bonding still in place, which covers this proposed well? YesŒNoO

Signature Date

Title: Regulatory Specialist

Representing. RECEDominionExploration & Production, Inc.

DV.0FOL

Application for Permit to DrillRequest for Permit Extension

Validation(this form should accompany the Sundry Notice requesting permit extension)

API: 43-047-36852

Well Name: HCU 14-27F

Location: 1569' FSL & 1937' FWL, Sec. 27-10S-20E

Company Permit Issued to: Dominion Exploration & Production, Inc.Date Original Permit Issued: 7/26/20tW

The undersigned as owner with legal rights to drill on the property as permittedabove, hereby verifies that the information as submitted in the previouslyapproved application to drill, remains valid and does not require revision.

Followinq is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownership changed, if so, has the surfaceagreement been updated? YesONoO

Have any wells been drilled in the vicinity of the proposed well which would affectthe spacing or siting requirements for this location? YesO Nom

Has there been any unit or other agreements put in place that could affect thepermitting oroperation of this proposed well? YesONoO

Have there been any changes to the access route including ownership, or right-of-way, which could affect the proposed location? YesO No El

Has the approved source of water for drilling changed? YesO NoO

Have there been any physical changes to the surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? YesO NoO

Is bonding still in place, which covers this proposed well? YesŒNoO

Signature Date

Title: Regulatory Specialist

Representing. RECEDominionExploration & Production, Inc.

DV.0FOL

Page 39: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

DIVISION OF OIL, GAS AND MINING

SPUDDING INFORMATION

Name of Company: Dominion Exploration & Production

Well Name: HCU 14-27F

API No: 43-047-36852 Lease Type: Federal/Indian

Section 27 Township 10S Range County Uintah

Drilling Contractor Bill Jr's Rig # 6

SPUDDED:Date 6-20-07

Time 6:00 PM

How Dry

Drilling will Commence:

Reported by Pat Wisener

Telephone # 435-828-1455

Date 6-20-07 Signed

DIVISION OF OIL, GAS AND MINING

SPUDDING INFORMATION

Name of Company: Dominion Exploration & Production

Well Name: HCU 14-27F

API No: 43-047-36852 Lease Type: Federal/Indian

Section 27 Township 10S Range County Uintah

Drilling Contractor Bill Jr's Rig # 6

SPUDDED:Date 6-20-07

Time 6:00 PM

How Dry

Drilling will Commence:

Reported by Pat Wisener

Telephone # 435-828-1455

Date 6-20-07 Signed

Page 40: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

DEPIWell Operations Chronology Report ) Mi i t

Wel: NCUtaTIF API: 430673505200 Rpt Na: 1 DOL: 1 DFS: 0 Asport Date: Gl21120&T

Operator DOMINION EXPLORATION & PRODUCTION INC UWl: 1569'FSL, 1937'FWL, SEC 27-108-20E NE/SW

Rig Name: BILL JRS S Final Sulface Location:

Event: DRILL Start Date: 9/29/2005 Spud DL:0/20/2007 Type: Drill & equipa 8000 TVD Wasatch/Mesaverde well

Supervisor PAT WISENER En0ineer RICHARD HOWELL AFE No 0702803 Authorized Days:

Active Datum: GL @5,171.0!!(GRADED Gmund Elev 5,171 00 WI: Authorized MD/TVD:GROUND LEVEL)

CURRENT DEPTH HOLE SIžE MUDWEIGHT LAST CASINGMD(II) TVD(ft) 24 Hr Progress SIZE MD TVD LOT(EMW)

550 00 550.00 550 0(!!) 17-1/2 (ft) (tt) (ppg)

FORMATIONITARGETNAME MDTOP (ft) TVDTOP (It) NEXTCASINGMESAVERDE SIZE MD TVD

WASATCH 13-3/8() 520.0(!!) 520.0(!!)

Daily Detall: MIRU DRILL550' OF 17.5" HOLE ggg gggggRUN & SET 12 JT'S OF 13.375", H-40, 48#, CSGN @520'IGL.CEMENT W/ 500 SKS. DRIL COMP WELL

DAILY 114,536.00 0 00 114,536.00

CUM 114,536.00 0 00 114,536.00

AFE 957,948.00 822 759 00

DEPIWell Operations Chronology Report ) Mi i t

Wel: NCUtaTIF API: 430673505200 Rpt Na: 1 DOL: 1 DFS: 0 Asport Date: Gl21120&T

Operator DOMINION EXPLORATION & PRODUCTION INC UWl: 1569'FSL, 1937'FWL, SEC 27-108-20E NE/SW

Rig Name: BILL JRS S Final Sulface Location:

Event: DRILL Start Date: 9/29/2005 Spud DL:0/20/2007 Type: Drill & equipa 8000 TVD Wasatch/Mesaverde well

Supervisor PAT WISENER En0ineer RICHARD HOWELL AFE No 0702803 Authorized Days:

Active Datum: GL @5,171.0!!(GRADED Gmund Elev 5,171 00 WI: Authorized MD/TVD:GROUND LEVEL)

CURRENT DEPTH HOLE SIžE MUDWEIGHT LAST CASINGMD(II) TVD(ft) 24 Hr Progress SIZE MD TVD LOT(EMW)

550 00 550.00 550 0(!!) 17-1/2 (ft) (tt) (ppg)

FORMATIONITARGETNAME MDTOP (ft) TVDTOP (It) NEXTCASINGMESAVERDE SIZE MD TVD

WASATCH 13-3/8() 520.0(!!) 520.0(!!)

Daily Detall: MIRU DRILL550' OF 17.5" HOLE ggg gggggRUN & SET 12 JT'S OF 13.375", H-40, 48#, CSGN @520'IGL.CEMENT W/ 500 SKS. DRIL COMP WELL

DAILY 114,536.00 0 00 114,536.00

CUM 114,536.00 0 00 114,536.00

AFE 957,948.00 822 759 00

Page 41: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Form 3160-5^= l"¾ UNITED STATES FORM APPROVED' ' DEPARTMENT OF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease SerialNo.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned weH. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/or No.

1. Type of Well Hill Creek Unitil Well Gas Well ther 8. Well Name and No.

2. Name of Operator HCU 14-27F9. API Well No.

Dominion Exploration & Production, Inc.3a. Address 3b. Phone No. (include area code) 43-047-3685214000 QuailSprings Pkwy, Ste 600, OKC, OK 73134 (405) 749-5237 to. Field and Pool, or Exploratory Area4. Location of Well (Footage, Sec., T., R., M., or Survey Description) Natural Buttes1569' FSL & 1937' FWL, NE SW, Sec. 27-10S-20E I 1. County or Parish, State

Uintah, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well Integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon

O Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13 Describe Procosed or Completed ODeration (clearlv state all certinent details, including estimated stading date of anv proposed work and aporoximate duration thereof.If the orooosal is to deepen directionallvor recomolete horizontallv. give subsurface locations and measured and true vertical deoths of all certinent markers and zones.Attach the Bond underwhich the work willbe performed ororovide the Bond No. on filewith BLM/BIA. Reauired subsequent reoorts shall be filedwithin 30 davsfollowing comoletion of the involved ooerations. If the operation results in a multiolecompletion or recomoletion in a new interval, a Form 3160-4 shall be filedoncetesting has been completed. Final Abandonment Notices shall be filed oniv after all reguirements, including reclamation, have been completed and the oDerator hasdetermined that the site is readv for final insoection3

Dominion requests permission to change the drilling plan for the HCU 14-27F slightly. The intermediate depth willnow beset at 3,675' per the attached new drilling plan.

Accepted weeUtah DMalon& RECEIVEDoil,Gas and Mining

FORRECORDONLY JUN2 1 2007DIV.0F0lL,GAS&MINING

14. l hereby certify that the foregoing is true and correctName (Printedffyped)

Barbara Lester Title Regulatory Specialist

Signature Date 6/15/2007

Approved by Title Date

Conditions of aporoval, if anv. are attached. Acoroval of this notice does not warrant orcertifv that the acolicant holds legal or eauitable titleto those rights in the subiect lease Officewhich would entitle the acolicant to conduct ooerations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowinglyand willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its

Form 3160-5^= l"¾ UNITED STATES FORM APPROVED' ' DEPARTMENT OF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease SerialNo.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned weH. Use Form 3160-3 (APD) for such proposals.7. If Unit or CA/Agreement, Name and/or No.

1. Type of Well Hill Creek Unitil Well Gas Well ther 8. Well Name and No.

2. Name of Operator HCU 14-27F9. API Well No.

Dominion Exploration & Production, Inc.3a. Address 3b. Phone No. (include area code) 43-047-3685214000 QuailSprings Pkwy, Ste 600, OKC, OK 73134 (405) 749-5237 to. Field and Pool, or Exploratory Area4. Location of Well (Footage, Sec., T., R., M., or Survey Description) Natural Buttes1569' FSL & 1937' FWL, NE SW, Sec. 27-10S-20E I 1. County or Parish, State

Uintah, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

Altering Casing Fracture Treat Reclamation Well Integrity

O Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon

O Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13 Describe Procosed or Completed ODeration (clearlv state all certinent details, including estimated stading date of anv proposed work and aporoximate duration thereof.If the orooosal is to deepen directionallvor recomolete horizontallv. give subsurface locations and measured and true vertical deoths of all certinent markers and zones.Attach the Bond underwhich the work willbe performed ororovide the Bond No. on filewith BLM/BIA. Reauired subsequent reoorts shall be filedwithin 30 davsfollowing comoletion of the involved ooerations. If the operation results in a multiolecompletion or recomoletion in a new interval, a Form 3160-4 shall be filedoncetesting has been completed. Final Abandonment Notices shall be filed oniv after all reguirements, including reclamation, have been completed and the oDerator hasdetermined that the site is readv for final insoection3

Dominion requests permission to change the drilling plan for the HCU 14-27F slightly. The intermediate depth willnow beset at 3,675' per the attached new drilling plan.

Accepted weeUtah DMalon& RECEIVEDoil,Gas and Mining

FORRECORDONLY JUN2 1 2007DIV.0F0lL,GAS&MINING

14. l hereby certify that the foregoing is true and correctName (Printedffyped)

Barbara Lester Title Regulatory Specialist

Signature Date 6/15/2007

Approved by Title Date

Conditions of aporoval, if anv. are attached. Acoroval of this notice does not warrant orcertifv that the acolicant holds legal or eauitable titleto those rights in the subiect lease Officewhich would entitle the acolicant to conduct ooerations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowinglyand willfully to make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its

Page 42: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

DRILLING PLAN

APPROVAL OF OPERATIONS

Attachment for Permit to Drill

Name of Operator: Dominion Exploration & ProductionAddress: 14000 QuailSprings Parkway, Suite 600

Oklahoma City, OK 73134Well Location: HCU 14-27F

1569' FSL & 1937' FWLSection 27-10S-20E

Uintah County, UT

1. GEOLOGIC SURFACE FORMATION Uintah

2. ESTIMATED DEPTHS OF IMPORTANT GEOLOGlC MARKERS

Formation DepthWasatch Tongue 4,785'Uteland Limestone 4,120'Wasatch 4,265'Chapita Wells 5,160'Uteland Buttes 6,530'Mesaverde 7,290'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER. OIL, GAS OR MINERALS

Formation Depth _Typ_eWasatch Tongue 4,785' OilUteland Limestone 4,120' OilWasatch 4,265' GasChapita Wells 5,160' GasUteland Buttes 6,530' GasMesaverde 7,290' Gas

4. PROPOSED CASING PROGRAM

All casing used to drill this well will be new casing.

T_yp_e Size Weight Grade Conn. Top Bottom Hole

Surface 8-5/8" 32.0 ppf J-55 STC O' 2,000' 12-1/4"

Production 5-1/2" 17.0 ppf MAV-80 LTC O' 7,900' 7-7/8"

Note: The drilled depth of the surface hole and the setting depth of the surface casing may vary from 1,700' to 2,000'.Should a lost circulation zone be encountered while drilling, casing will be set approximately 300' below the lostcirculation zone. If no lost circulation zone is encountered, casing to be set at 2,000'±.

5. OPERATOR'S MINIMUM SPECIFICATIONS FOR PRESSURE CONTROLSurface hole: No BOPE will be utilized. Air foam mist, rotating head and diverter system will be utilized.Production hole: Prior to drilling out the surface casing shoe, 3,000 psi or greater BOP equipment will be installed. Thepipe rams will be operated at least once per day from surface to total depth. The blind rams will be tested once per dayfrom surface to total depth if operations

DRILLING PLAN

APPROVAL OF OPERATIONS

Attachment for Permit to Drill

Name of Operator: Dominion Exploration & ProductionAddress: 14000 QuailSprings Parkway, Suite 600

Oklahoma City, OK 73134Well Location: HCU 14-27F

1569' FSL & 1937' FWLSection 27-10S-20E

Uintah County, UT

1. GEOLOGIC SURFACE FORMATION Uintah

2. ESTIMATED DEPTHS OF IMPORTANT GEOLOGlC MARKERS

Formation DepthWasatch Tongue 4,785'Uteland Limestone 4,120'Wasatch 4,265'Chapita Wells 5,160'Uteland Buttes 6,530'Mesaverde 7,290'

3. ESTIMATED DEPTHS OF ANTICIPATED WATER. OIL, GAS OR MINERALS

Formation Depth _Typ_eWasatch Tongue 4,785' OilUteland Limestone 4,120' OilWasatch 4,265' GasChapita Wells 5,160' GasUteland Buttes 6,530' GasMesaverde 7,290' Gas

4. PROPOSED CASING PROGRAM

All casing used to drill this well will be new casing.

T_yp_e Size Weight Grade Conn. Top Bottom Hole

Surface 8-5/8" 32.0 ppf J-55 STC O' 2,000' 12-1/4"

Production 5-1/2" 17.0 ppf MAV-80 LTC O' 7,900' 7-7/8"

Note: The drilled depth of the surface hole and the setting depth of the surface casing may vary from 1,700' to 2,000'.Should a lost circulation zone be encountered while drilling, casing will be set approximately 300' below the lostcirculation zone. If no lost circulation zone is encountered, casing to be set at 2,000'±.

5. OPERATOR'S MINIMUM SPECIFICATIONS FOR PRESSURE CONTROLSurface hole: No BOPE will be utilized. Air foam mist, rotating head and diverter system will be utilized.Production hole: Prior to drilling out the surface casing shoe, 3,000 psi or greater BOP equipment will be installed. Thepipe rams will be operated at least once per day from surface to total depth. The blind rams will be tested once per dayfrom surface to total depth if operations

Page 43: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

DRILLING PLAN

APPROVAL OF OPERATIONS

A diagram of the planned BOP equipment for normal drilling operations in this area is attached. As denoted there will betwo valves and one check valve on the kill line, two valves on the choke line, and two adjustable chokes on the manifoldsystem. The BOP "stack" will consist of two BOP rams (1 pipe, 1blind) and one annular type preventer, all rated to aminimum of 3,000 psi working pressure.

The BOP equipment will be pressure tested prior to drilling out surface casing shoe and anytime a new casing string is set.All test pressures will be maintained for fifteen (15) minutes without any significant pressure decrease. Clear water will becirculated into the BOP stack and lines prior to pressure testing. The following test pressures will be used as a minimumfor various equipment items.

I. Annular BOP 1,500 psi2. Ram type BOP 3,000 psi3. Kill line valves 3,000 psi4. Choke line valves and choke manifold valves 3,000 psi5. Chokes 3,000 psi6. Casing, casinghead & weld 1,500 psi7. Upper kelly cock and safety valve 3,000 psi8. Dart valve 3,000 psi

6. MUD SYSTEMS• An air or an air/mist system may be used to drill to drill the surface hole until water influx becomes too great.• KCL mud system will be used to drill well.• The mud system will be monitored manually/visually.

Depths Mud Weight (ppe) Mud SystemO' -2,000' 8.4 Air foam mist, rotating head and diverter

2,000' -7,900' 8.6 Fresh water/2% KCL/KCL mud system

7. BLOOIE LINE• An automatic igniter will not be installed on blooie line. The blooie will have a constant ignition source.• A "target tee" connection will be installed on blooie line for 90° change of directions for abrasion resistance.• "Target tee" connections will be a minimum of 50' from wellhead.• The blooie line discharge will be a minimum of 80' from the wellhead.

8. AUXILIARY EQUIPMENT TO BE USEDa. Kelly cock.b. Full opening valve with drill pipe connection will be kept on floor. Valve will be used when the kelly is not in string.

9. TESTING. LOGGING, AND CORING PROGRAMS TO BE FOLLOWED• A drillstem test in the Wasatch Tongue is possible.• One electric line wire-log will be run from total depth to surface casing.• The gamma ray will be left on to record from total depth to surface casing.• Other log curves (resistivities, porosity, and caliper) will record from total depth to surface casing.• A dipmeter, percussion cores, or rotary cores may be run over selected intervals.

10. ANTICIPATED ABNORMAL PRESSURES OR TEMPERATURES EXPECTED• Expected BHP 1,500-2,000 psi (lower than normal pressure gradient).• No abnonnal temperature or pressures are anticipated.• The formations to be penetrated do not contain known H2S gas.

l l. WATER SUPPLY• No water pipelines will be laid for this well.• No water well will be drilled for this well.• Drilling water for this will be hauled on the road(s) shown in Attachment No. 3.• Water will be hauled from: Water Permit # 43-10447 Section 9, Township 8 South, Range 20

DRILLING PLAN

APPROVAL OF OPERATIONS

A diagram of the planned BOP equipment for normal drilling operations in this area is attached. As denoted there will betwo valves and one check valve on the kill line, two valves on the choke line, and two adjustable chokes on the manifoldsystem. The BOP "stack" will consist of two BOP rams (1 pipe, 1blind) and one annular type preventer, all rated to aminimum of 3,000 psi working pressure.

The BOP equipment will be pressure tested prior to drilling out surface casing shoe and anytime a new casing string is set.All test pressures will be maintained for fifteen (15) minutes without any significant pressure decrease. Clear water will becirculated into the BOP stack and lines prior to pressure testing. The following test pressures will be used as a minimumfor various equipment items.

I. Annular BOP 1,500 psi2. Ram type BOP 3,000 psi3. Kill line valves 3,000 psi4. Choke line valves and choke manifold valves 3,000 psi5. Chokes 3,000 psi6. Casing, casinghead & weld 1,500 psi7. Upper kelly cock and safety valve 3,000 psi8. Dart valve 3,000 psi

6. MUD SYSTEMS• An air or an air/mist system may be used to drill to drill the surface hole until water influx becomes too great.• KCL mud system will be used to drill well.• The mud system will be monitored manually/visually.

Depths Mud Weight (ppe) Mud SystemO' -2,000' 8.4 Air foam mist, rotating head and diverter

2,000' -7,900' 8.6 Fresh water/2% KCL/KCL mud system

7. BLOOIE LINE• An automatic igniter will not be installed on blooie line. The blooie will have a constant ignition source.• A "target tee" connection will be installed on blooie line for 90° change of directions for abrasion resistance.• "Target tee" connections will be a minimum of 50' from wellhead.• The blooie line discharge will be a minimum of 80' from the wellhead.

8. AUXILIARY EQUIPMENT TO BE USEDa. Kelly cock.b. Full opening valve with drill pipe connection will be kept on floor. Valve will be used when the kelly is not in string.

9. TESTING. LOGGING, AND CORING PROGRAMS TO BE FOLLOWED• A drillstem test in the Wasatch Tongue is possible.• One electric line wire-log will be run from total depth to surface casing.• The gamma ray will be left on to record from total depth to surface casing.• Other log curves (resistivities, porosity, and caliper) will record from total depth to surface casing.• A dipmeter, percussion cores, or rotary cores may be run over selected intervals.

10. ANTICIPATED ABNORMAL PRESSURES OR TEMPERATURES EXPECTED• Expected BHP 1,500-2,000 psi (lower than normal pressure gradient).• No abnonnal temperature or pressures are anticipated.• The formations to be penetrated do not contain known H2S gas.

l l. WATER SUPPLY• No water pipelines will be laid for this well.• No water well will be drilled for this well.• Drilling water for this will be hauled on the road(s) shown in Attachment No. 3.• Water will be hauled from: Water Permit # 43-10447 Section 9, Township 8 South, Range 20

Page 44: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

DRILLING PLAN

APPROVAL OF OPERATIONS

12. CEMENT SYSTEMS

a. Surface Cement:• Drill 12-l/4" hole to 2,000'±, run and cement 8-5/8" to surface (depth to vary based on depth of lost circulation

zone).• Pump 20 bbis lightly weighted water spacer followed by 5 bbls fresh water. Displace with any available water.• Casing to be run with: a) guide shoe b) insert float c) three (3) centralizers, one on each of first 3 jointsd) stop ring

for plug one joint off bottom e) bottom three joints thread locked f) pump job with bottom plug only. Casing to becentralized with a total of 8 centralizers.

• Cement the casing annulus to surface. Top out jobs to be performed if needed. Depending to depth of top ofcement in the annulus, a 1" tubing string may or may not be utilized.

Hole CementTyp_e Sacks Interval Density Yield Volume VolumeLead 219 O'-1,500' 11.0 ppg 3.82 CFS 619 CF 836 CFTail 236 1,500'-2,000' 15.6 ppg 1.18 CFS 206 CF 279 CF

Top Out 100 0'-200' 15.6 ppg 1.18 CFS 87 CF l18 CF

Surface design volumes based on 35% excess of gauge hole.

Lead Mix: Halliburton Premium Plus V blend. Blend includes Class "G" cement, gel, salt, gilsonite.Slurry yield: 3.82 cf/sack Slurry weight: 11.00 #/gal.Water requirement: 22.95 gal/sack

Tail Mix: Class "G" Cement, l/4 lb/sk Cellophane Flakes + 2% bwoc Calcium Chloride + 44.3% fresh water.Slurry yield: I.18 ef/sack Slurry weight: 15.60 #/gal.Water requirement: 5.2 gal/sack

Top Out: Class "G" Cement, 1/4 lb/sk Cellophane Flakes + 2% bwoc Calcium Chloride + 44.3% fresh water.Slurry yield: 1.18 ef/sack Slurry weight: 15.60 #/gal.Water requirement: 5.2 gal/sack

c. Production Casing Cement:• Dril1 7-7/8" hole to 7,900'+, run and cement 5 1/2".• Pump 20 bbl Mud Clean Il unweighted spacer, followed by 20 Bbls fresh H20 spacer.• Displace with 2% KCL.• Production casing to be centralized with 30 centralizers.

Hole CementType & Interval Density Yield Volume VolumeLead 90 2,885'-3,675' 11.5 ppg 3.12 CFS 139 CF 277 CFTail 840 3,675'-7,900' 13.0 ppg 1.75 CFS 732 CF 1464 CF

Production design volumes are estimates based on 35% excess of gauge hole. Actual volumes will be calculated fromcaliper log to bring lead cement to 800' above top of Wasatch + 15% excess, and tail cement to top of Wasatch + 15%excess.

Lead Mix: Halliburton Prem Plus V blend. Blend includes Class "G" cement, gel, salt, gilsonite, EX-1 and HR-7.Slurry yield: 3.12 cf/sack Slurry weight: 11.60 #/gal.Water requirement: 17.71 gal/sackCompressives @130°F: 157 psi after 24 hours

Tail Mix: Halliburton HLC blend (Prem Plus V/JB flyash). Blend includes Class "G" cement, KCl, EX-1, Halad 322,& HR-5.Slurry yield: 1.75 cf/sack Slurry weight: 13.00 #/gal.Water requirement: 9.09 gal/sackCompressives @165°F: 905 psi after 24 hours

13. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONSStarting Date: September 25, 2007Duration: 14

DRILLING PLAN

APPROVAL OF OPERATIONS

12. CEMENT SYSTEMS

a. Surface Cement:• Drill 12-l/4" hole to 2,000'±, run and cement 8-5/8" to surface (depth to vary based on depth of lost circulation

zone).• Pump 20 bbis lightly weighted water spacer followed by 5 bbls fresh water. Displace with any available water.• Casing to be run with: a) guide shoe b) insert float c) three (3) centralizers, one on each of first 3 jointsd) stop ring

for plug one joint off bottom e) bottom three joints thread locked f) pump job with bottom plug only. Casing to becentralized with a total of 8 centralizers.

• Cement the casing annulus to surface. Top out jobs to be performed if needed. Depending to depth of top ofcement in the annulus, a 1" tubing string may or may not be utilized.

Hole CementTyp_e Sacks Interval Density Yield Volume VolumeLead 219 O'-1,500' 11.0 ppg 3.82 CFS 619 CF 836 CFTail 236 1,500'-2,000' 15.6 ppg 1.18 CFS 206 CF 279 CF

Top Out 100 0'-200' 15.6 ppg 1.18 CFS 87 CF l18 CF

Surface design volumes based on 35% excess of gauge hole.

Lead Mix: Halliburton Premium Plus V blend. Blend includes Class "G" cement, gel, salt, gilsonite.Slurry yield: 3.82 cf/sack Slurry weight: 11.00 #/gal.Water requirement: 22.95 gal/sack

Tail Mix: Class "G" Cement, l/4 lb/sk Cellophane Flakes + 2% bwoc Calcium Chloride + 44.3% fresh water.Slurry yield: I.18 ef/sack Slurry weight: 15.60 #/gal.Water requirement: 5.2 gal/sack

Top Out: Class "G" Cement, 1/4 lb/sk Cellophane Flakes + 2% bwoc Calcium Chloride + 44.3% fresh water.Slurry yield: 1.18 ef/sack Slurry weight: 15.60 #/gal.Water requirement: 5.2 gal/sack

c. Production Casing Cement:• Dril1 7-7/8" hole to 7,900'+, run and cement 5 1/2".• Pump 20 bbl Mud Clean Il unweighted spacer, followed by 20 Bbls fresh H20 spacer.• Displace with 2% KCL.• Production casing to be centralized with 30 centralizers.

Hole CementType & Interval Density Yield Volume VolumeLead 90 2,885'-3,675' 11.5 ppg 3.12 CFS 139 CF 277 CFTail 840 3,675'-7,900' 13.0 ppg 1.75 CFS 732 CF 1464 CF

Production design volumes are estimates based on 35% excess of gauge hole. Actual volumes will be calculated fromcaliper log to bring lead cement to 800' above top of Wasatch + 15% excess, and tail cement to top of Wasatch + 15%excess.

Lead Mix: Halliburton Prem Plus V blend. Blend includes Class "G" cement, gel, salt, gilsonite, EX-1 and HR-7.Slurry yield: 3.12 cf/sack Slurry weight: 11.60 #/gal.Water requirement: 17.71 gal/sackCompressives @130°F: 157 psi after 24 hours

Tail Mix: Halliburton HLC blend (Prem Plus V/JB flyash). Blend includes Class "G" cement, KCl, EX-1, Halad 322,& HR-5.Slurry yield: 1.75 cf/sack Slurry weight: 13.00 #/gal.Water requirement: 9.09 gal/sackCompressives @165°F: 905 psi after 24 hours

13. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONSStarting Date: September 25, 2007Duration: 14

Page 45: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Dominion Exploration & ProductionHCU'14-27F'Uintah County, Utah G

Section 27,T10S,R20E T M aniMagneticNorth: 1045°

Surface MagneticFieldStrength:52720cT

KOP, Build 3.00°/100' Dip Angle: 65.88°Date:6/14/2007

700- Model: igrf2005

West(-)/East(+) [400ft/in]

Hold 30.01°, 175.47° Azimuth -430 -200 0 200 400 600 8001400 200 Surface

KOP, Build 3.00°/100'

2100- g-Drop 3.00°/100'

Hold 30.01°, 175.47° Azimuth2800¯

-20 -'

End of Drop

3500 W5/8" Intemnediate-400-

Uteland Limestone

4200- Wasatch-600-

Drop 3.00°/100'

4900-Cliapita Wells -800

5600-1000 ,

End of Drop

Uteland Buttes PBHL6300¯-1200-

Mesaverde FORMATION TOP DETAILS7000-

No. TVDPath MDPath Formation

1 3785.00 4025.32 Wasatch Tongue770Œ- PBHL 2 4120.00 4360.32 Uteland Limestone

- a 3 4265.00 4505.32 Wasatch4 5160.00 5400.32 Chapita Wells5 6290.00 6530.32 Uteland Buttes

8400-- 6 7050.00 7290.32 Mesaverde

CASING DETAILS

3100 i i · · i i No. TVD MD Name Size-7)0 0 700 1400 2100 2800

verticalSectionat 175.47° [1400ft/in]1 3675.00 3915.32 9 5/8" Intermediate 9.625

TARGET DETAILS

Name TVD +N/-S +E/-W Northing Easting Latitude Longitude Shape

Surface 0.00 0.00 0.00 7143303.74 2158486.80 39°54'55.750N 109°39'10.080W PointPBHL 7900.00 -1068.70 84.70 7142235.04 2158571.50 39°54'45.l72N 109°39'09.276W Point

SECTION DETAILS

Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target

1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.003 1550.29 30.01 175.47 1505.18 -255.22 20.23 3.00 0.00 256.024 2670.03 30.01 175.47 2474.82 -813.48 64.47 0.00 0.00 816.035 3670.32 0.00 0.00 3430.00 -1068.70 84.70 3.00 180.00 1072.056 8140.32 0.00 0.00 7900.00 -1068.70 84.70 0.00 0.00 1072.05 PBHL

STRATA DueC

file: Dominion - HCU7RF

I 2..........- namseenhoisil

Dominion Exploration & ProductionHCU'14-27F'Uintah County, Utah G

Section 27,T10S,R20E T M ani

MagneticNorth: 1045°

Surface MagneticFieldStrength:52720cT

KOP, Build 3.00°/100' Dip Angle: 65.88°Date:6/14/2007

700- Model: igrf2005

West(-)/East(+) [400ft/in]

Hold 30.01°, 175.47° Azimuth -430 -200 0 200 400 600 8001400 200 Surface

KOP, Build 3.00°/100'

2100- g-Drop 3.00°/100'

Hold 30.01°, 175.47° Azimuth2800¯

-20 -'

End of Drop

3500 W5/8" Intemnediate-400-

Uteland Limestone

4200- Wasatch-600-

Drop 3.00°/100'

4900-Cliapita Wells -800

5600-1000 ,

End of Drop

Uteland Buttes PBHL6300¯-1200-

Mesaverde FORMATION TOP DETAILS7000-

No. TVDPath MDPath Formation

1 3785.00 4025.32 Wasatch Tongue770Œ- PBHL 2 4120.00 4360.32 Uteland Limestone

- a 3 4265.00 4505.32 Wasatch4 5160.00 5400.32 Chapita Wells5 6290.00 6530.32 Uteland Buttes

8400-- 6 7050.00 7290.32 Mesaverde

CASING DETAILS

3100 i i · · i i No. TVD MD Name Size-7)0 0 700 1400 2100 2800

verticalSectionat 175.47° [1400ft/in]1 3675.00 3915.32 9 5/8" Intermediate 9.625

TARGET DETAILS

Name TVD +N/-S +E/-W Northing Easting Latitude Longitude Shape

Surface 0.00 0.00 0.00 7143303.74 2158486.80 39°54'55.750N 109°39'10.080W PointPBHL 7900.00 -1068.70 84.70 7142235.04 2158571.50 39°54'45.l72N 109°39'09.276W Point

SECTION DETAILS

Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target

1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.003 1550.29 30.01 175.47 1505.18 -255.22 20.23 3.00 0.00 256.024 2670.03 30.01 175.47 2474.82 -813.48 64.47 0.00 0.00 816.035 3670.32 0.00 0.00 3430.00 -1068.70 84.70 3.00 180.00 1072.056 8140.32 0.00 0.00 7900.00 -1068.70 84.70 0.00 0.00 1072.05 PBHL

STRATA DueC

file: Dominion - HCU7RF

I 2..........- namseenhoisil

Page 46: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Strata Directional Technology, Inc.Planning Report

Company: DominionE&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 1Field: Uintah County, Utah Co-ordinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE0.0Well: #14-27H Section (VS) Reference: Well(0.00N,0.00E,175.47Azl)Wellpath: Proposal 1r0 Plan: Proposal 1r0

Field: Uintah County, Utah

Map System:US State Plane Coordinate System 1983 Map Zone: Utah, Central ZoneGeo Datum: GRS 1980 Coordinate System: Well CentreSys Datum: Mean Sea Level Geomagnetic Model: igrf2005

Site: HCU14-27F

Site Position: Northing: 7143303.74 ft Latitude: 39 54 55.750 NFrom: Geographic Easting: 2158486.80 ft Longitude: 109 39 10.080 WPosition Uncertainty: 0.00 ft North Reference: GridGround Level: 5171.00 ft Grid Convergence: 1.18 deg

Well: #14-27H Slot Name:

Well Position: +N/-S 0.00 ft Northing: 7143303.74 ft Latitude: 39 54 55.750 N+E/-W 0.00 ft Easting : 2158486.80 ft Longitude: 109 39 10.080 W

Position Uncertainty: 0.00 ft

Wellpath: Proposal 1r0 Drilled From: SurfaceTie-on Depth: 0.00 ft

Current Datum: SITE Height 0.00 ft Above System Datum: Mean Sea LevelMagnetic Data: 6/14/2007 Declination: 11.63 degField Strength: 52720 nT Mag Dip Angle: 65.88 degVertical Section: Depth From (TVD) +N/-S +E/-W Direction

ft ft ft deg0.00 0.00 0.00 175.47

Plan: Proposal ir0 Date Composed: 6/14/2007Version: 1

Principal: Yes Tied-to: User Defined

Plan Section Information

MD Inci Azim TVD +N/-S +E/-W DLS Buud Turn TFO Targetft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg

550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.001550.29 30.01 175.47 1505.18 -255.22 20.23 3.00 3.00 0.00 0.002670.03 30.01 175.47 2474.82 -813.48 64.47 0.00 0.00 0.00 0.003670.32 0.00 0.00 3430.00 -1068.70 84.70 3.00 -3.00 0.00 180.008140.32 0.00 0.00 7900.00 -1068.70 84.70 0.00 0.00 0.00 0.00 PBHL

Section 1 : Start Hold

MD Incl Azim TVD +N/-S +E/-W VS DLS Bund Turn TFOft deg deg ft ft it ft deg/100ft deg/100ft deg/100ft deg0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Section 2 : Start Build 3.00

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft ft it ft deg/100ft deg/100ft deg/100ft deg

600.00 1.50 175.47 599.99 -0.65 0.05 0.65 3.00 3.00 0.00 0.00700.00 4.50 175.47 699.85 -5.87 0.47 5.89 3.00 3.00 0.00 0.00800.00 7.50 175.47 799.29 -16.29 1.29 16.34 3.00 3.00 0.00 0.00900.00 10.50 175.47 898.04 -31.88 2.53 31.98 3.00 3.00 0.00 0.00

1000.00 13.50 175.47 995.85 -52.60 4.17 52.77 3.00 3.00 0.00 0.001100.00 16.50 175.47 1092.43 -78.40 6.21 78.65 3.00 3.00 0.00

Strata Directional Technology, Inc.Planning Report

Company: DominionE&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 1Field: Uintah County, Utah Co-ordinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE0.0Well: #14-27H Section (VS) Reference: Well(0.00N,0.00E,175.47Azl)Wellpath: Proposal 1r0 Plan: Proposal 1r0

Field: Uintah County, Utah

Map System:US State Plane Coordinate System 1983 Map Zone: Utah, Central ZoneGeo Datum: GRS 1980 Coordinate System: Well CentreSys Datum: Mean Sea Level Geomagnetic Model: igrf2005

Site: HCU14-27F

Site Position: Northing: 7143303.74 ft Latitude: 39 54 55.750 NFrom: Geographic Easting: 2158486.80 ft Longitude: 109 39 10.080 WPosition Uncertainty: 0.00 ft North Reference: GridGround Level: 5171.00 ft Grid Convergence: 1.18 deg

Well: #14-27H Slot Name:

Well Position: +N/-S 0.00 ft Northing: 7143303.74 ft Latitude: 39 54 55.750 N+E/-W 0.00 ft Easting : 2158486.80 ft Longitude: 109 39 10.080 W

Position Uncertainty: 0.00 ft

Wellpath: Proposal 1r0 Drilled From: SurfaceTie-on Depth: 0.00 ft

Current Datum: SITE Height 0.00 ft Above System Datum: Mean Sea LevelMagnetic Data: 6/14/2007 Declination: 11.63 degField Strength: 52720 nT Mag Dip Angle: 65.88 degVertical Section: Depth From (TVD) +N/-S +E/-W Direction

ft ft ft deg0.00 0.00 0.00 175.47

Plan: Proposal ir0 Date Composed: 6/14/2007Version: 1

Principal: Yes Tied-to: User Defined

Plan Section Information

MD Inci Azim TVD +N/-S +E/-W DLS Buud Turn TFO Targetft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg

550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.001550.29 30.01 175.47 1505.18 -255.22 20.23 3.00 3.00 0.00 0.002670.03 30.01 175.47 2474.82 -813.48 64.47 0.00 0.00 0.00 0.003670.32 0.00 0.00 3430.00 -1068.70 84.70 3.00 -3.00 0.00 180.008140.32 0.00 0.00 7900.00 -1068.70 84.70 0.00 0.00 0.00 0.00 PBHL

Section 1 : Start Hold

MD Incl Azim TVD +N/-S +E/-W VS DLS Bund Turn TFOft deg deg ft ft it ft deg/100ft deg/100ft deg/100ft deg0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Section 2 : Start Build 3.00

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft ft it ft deg/100ft deg/100ft deg/100ft deg

600.00 1.50 175.47 599.99 -0.65 0.05 0.65 3.00 3.00 0.00 0.00700.00 4.50 175.47 699.85 -5.87 0.47 5.89 3.00 3.00 0.00 0.00800.00 7.50 175.47 799.29 -16.29 1.29 16.34 3.00 3.00 0.00 0.00900.00 10.50 175.47 898.04 -31.88 2.53 31.98 3.00 3.00 0.00 0.00

1000.00 13.50 175.47 995.85 -52.60 4.17 52.77 3.00 3.00 0.00 0.001100.00 16.50 175.47 1092.43 -78.40 6.21 78.65 3.00 3.00 0.00

Page 47: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Strata Directional Technology, Inc.Planning Report

Company: Dominion E&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 2Field: UlntahCounty, Utah Co-ordinate(NE) Reference: Well: #14-27H,GridNorthSite: HCU 14-27F Vertical (TVD) Reference: SlTE 0.0Well: #14-27H Section (VS) Reference: Well (0.00N,0.00E,175.47Azi)WeUpath: Proposal 1r0 Plan: Proposal 1r0

Section 2 : Start Build 3.00MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft 11 ft ft deg/100ft deg/100ft deg/100ft deg

1200.00 19.50 175.47 1187.52 -109.20 8.66 109.55 3.00 3.00 0.00 0.001300.00 22.50 175.47 1280.87 -144.92 11.49 145.38 3.00 3.00 0.00 0.001400.00 25.50 175.47 1372.22 -185.47 14.70 186.05 3.00 3.00 0.00 0.001500.00 28.50 175.47 1461.31 -230.72 18.29 231.44 3.00 3.00 0.00 0.001550.29 30.01 175.47 1505.18 -255.22 20.23 256.02 3.00 3.00 0.00 0.00

Section 3 : Start HoldMD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

1600.00 30.01 175.47 1548.23 -280.00 22.19 280.88 0.00 0.00 0.00 180.001700.00 30.01 175.47 1634.82 -329.86 26.14 330.89 0.DO 0.00 0.00 180.001800.00 30.01 175.47 1721.42 -379.71 30.09 380.91 0.00 0.00 0.00 180.001900.00 30.01 175.47 1808.01 -429.57 34.05 430.92 0.00 0.00 0.00 180.002000.00 30.01 175.47 1894.61 -479.43 38.00 480.93 0.00 0.00 0.00 180.002100.00 30.01 175.47 1981.20 -529.28 41.95 530.94 0.00 0.00 0.00 180.002200.00 30.01 175.47 2067.80 -579.14 45.90 580.96 0.00 0.00 0.00 180.002300.00 30.01 175.47 2154.39 -629.00 49.85 630.97 0.00 0.00 0.00 180.002400.00 30.01 175.47 2240.99 -678.85 53.80 680.98 0.00 0.00 0.00 180.002500.00 30.01 175.47 2327.58 -728.71 57.75 731.00 0.00 0.00 0.00 180.002600.00 30.01 175.47 2414.18 -778.57 61.71 781.01 0.00 0.00 0.00 180.002670.03 30.01 175.47 2474.82 -813.48 64.47 816.03 0.00 0.00 0.00 180.00

Section 4 : Start Drop -3.00

MD IncI Azim TVD +N/-S +El-W VS DLS Build Turn TFOR deg deg ft A R R deg/100ft deg/100ft deg/100ft deg

2700.00 29.11 175.47 2500.89 -828.22 65.64 830.82 3.00 -3.00 0.00 180.002800.00 26.11 175.47 2589.49 -874.42 69.30 877.16 3.00 -3.00 0.00 180.002900.00 23.11 175.47 2680.40 -915.92 72.59 918.80 3.00 -3.00 0.00 180.003000.00 20.11 175.47 2773.36 -952.63 75.50 955.62 3.00 -3.00 0.00 180.003100.00 17.11 175.47 2868.12 -984.44 78.02 987.53 3.00 -3.00 0.00 180.003200.00 14.11 175.47 2964.42 -1011.26 80.15 1014.43 3.00 -3.00 0.00 180.003300.00 11.11 175.47 3062.00 -1033.02 81.87 1036.26 3.00 -3.00 0.00 180.003400.00 8.11 175.47 3160.58 -1049.66 83.19 1052.95 3.00 -3.00 0.00 180.003500.00 5.11 175.47 3259.91 -1061.13 84.10 1064.46 3.00 -3.00 0.00 180.003600.00 2.11 175.47 3359.70 -1067.41 84.60 1070.76 3.00 -3.00 0.00 180.003670.32 0.00 0.00 3430.00 -1068.70 84.70 1072.05 3.00 -3.00 0.00 -180.00

Section 5 : Start HoldMD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

3700.00 0.00 0.00 3459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.003800.00 0.00 0.00 3559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.003900.00 0.00 0.00 3659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.003915.32 0.00 0.00 3675.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004000.00 0.00 0.00 3759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004025.32 0.00 0.00 3785.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004100.00 0.00 0.00 3859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004200.00 0.00 0.00 3959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004300.00 0.00 0.00 4059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004360.32 0.00 0.00 4120.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004400.00 0.00 0.00 4159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004500.00 0.00 0.00 4259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004505.32 0.00 0.00 4265.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004600.00 0.00 0.00 4359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004700.00 0.00 0.00 4459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004800.00 0.00 0.00 4559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004900.00 0.00 0.00 4659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005000.00 0.00 0.00 4759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005100.00 0.00 0.00 4859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005200.00 0.00 0.00 4959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005300.00 0.00 0.00 5059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

Strata Directional Technology, Inc.Planning Report

Company: Dominion E&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 2Field: UlntahCounty, Utah Co-ordinate(NE) Reference: Well: #14-27H,GridNorthSite: HCU 14-27F Vertical (TVD) Reference: SlTE 0.0Well: #14-27H Section (VS) Reference: Well (0.00N,0.00E,175.47Azi)WeUpath: Proposal 1r0 Plan: Proposal 1r0

Section 2 : Start Build 3.00

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft 11 ft ft deg/100ft deg/100ft deg/100ft deg

1200.00 19.50 175.47 1187.52 -109.20 8.66 109.55 3.00 3.00 0.00 0.001300.00 22.50 175.47 1280.87 -144.92 11.49 145.38 3.00 3.00 0.00 0.001400.00 25.50 175.47 1372.22 -185.47 14.70 186.05 3.00 3.00 0.00 0.001500.00 28.50 175.47 1461.31 -230.72 18.29 231.44 3.00 3.00 0.00 0.001550.29 30.01 175.47 1505.18 -255.22 20.23 256.02 3.00 3.00 0.00 0.00

Section 3 : Start Hold

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

1600.00 30.01 175.47 1548.23 -280.00 22.19 280.88 0.00 0.00 0.00 180.001700.00 30.01 175.47 1634.82 -329.86 26.14 330.89 0.DO 0.00 0.00 180.001800.00 30.01 175.47 1721.42 -379.71 30.09 380.91 0.00 0.00 0.00 180.001900.00 30.01 175.47 1808.01 -429.57 34.05 430.92 0.00 0.00 0.00 180.002000.00 30.01 175.47 1894.61 -479.43 38.00 480.93 0.00 0.00 0.00 180.002100.00 30.01 175.47 1981.20 -529.28 41.95 530.94 0.00 0.00 0.00 180.002200.00 30.01 175.47 2067.80 -579.14 45.90 580.96 0.00 0.00 0.00 180.002300.00 30.01 175.47 2154.39 -629.00 49.85 630.97 0.00 0.00 0.00 180.002400.00 30.01 175.47 2240.99 -678.85 53.80 680.98 0.00 0.00 0.00 180.002500.00 30.01 175.47 2327.58 -728.71 57.75 731.00 0.00 0.00 0.00 180.002600.00 30.01 175.47 2414.18 -778.57 61.71 781.01 0.00 0.00 0.00 180.002670.03 30.01 175.47 2474.82 -813.48 64.47 816.03 0.00 0.00 0.00 180.00

Section 4 : Start Drop -3.00

MD IncI Azim TVD +N/-S +El-W VS DLS Build Turn TFOR deg deg ft A R R deg/100ft deg/100ft deg/100ft deg

2700.00 29.11 175.47 2500.89 -828.22 65.64 830.82 3.00 -3.00 0.00 180.002800.00 26.11 175.47 2589.49 -874.42 69.30 877.16 3.00 -3.00 0.00 180.002900.00 23.11 175.47 2680.40 -915.92 72.59 918.80 3.00 -3.00 0.00 180.003000.00 20.11 175.47 2773.36 -952.63 75.50 955.62 3.00 -3.00 0.00 180.003100.00 17.11 175.47 2868.12 -984.44 78.02 987.53 3.00 -3.00 0.00 180.003200.00 14.11 175.47 2964.42 -1011.26 80.15 1014.43 3.00 -3.00 0.00 180.003300.00 11.11 175.47 3062.00 -1033.02 81.87 1036.26 3.00 -3.00 0.00 180.003400.00 8.11 175.47 3160.58 -1049.66 83.19 1052.95 3.00 -3.00 0.00 180.003500.00 5.11 175.47 3259.91 -1061.13 84.10 1064.46 3.00 -3.00 0.00 180.003600.00 2.11 175.47 3359.70 -1067.41 84.60 1070.76 3.00 -3.00 0.00 180.003670.32 0.00 0.00 3430.00 -1068.70 84.70 1072.05 3.00 -3.00 0.00 -180.00

Section 5 : Start Hold

MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

3700.00 0.00 0.00 3459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.003800.00 0.00 0.00 3559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.003900.00 0.00 0.00 3659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.003915.32 0.00 0.00 3675.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004000.00 0.00 0.00 3759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004025.32 0.00 0.00 3785.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004100.00 0.00 0.00 3859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004200.00 0.00 0.00 3959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004300.00 0.00 0.00 4059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004360.32 0.00 0.00 4120.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004400.00 0.00 0.00 4159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004500.00 0.00 0.00 4259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004505.32 0.00 0.00 4265.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004600.00 0.00 0.00 4359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004700.00 0.00 0.00 4459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004800.00 0.00 0.00 4559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.004900.00 0.00 0.00 4659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005000.00 0.00 0.00 4759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005100.00 0.00 0.00 4859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005200.00 0.00 0.00 4959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005300.00 0.00 0.00 5059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

Page 48: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Strata Directional Technology, Inc.Planning Report

Company: Dominion E&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 3Field: UIntah County, Utah Co-ordinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE0.0Well: #14-27H Section (VS) Reference: Well (0.00N,0,00E,175.47Azi)Wellpath: Proposal ir0 Plan: Proposal ir0

Section 5 : Start HoldMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

5400.00 0.00 0.00 5159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005400.32 0.00 0.00 5160.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005500.00 0.00 0.00 5259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005600.00 0.00 0.00 5359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005700.00 0.00 0.00 5459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005800.00 0.00 0.00 5559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005900.00 0.00 0.00 5659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006000.00 0.00 0.00 5759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006100.00 0.00 0.00 5859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006200.00 0.00 0.00 5959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006300.00 0.00 0.00 6059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006400.00 0.00 0.00 6159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006500.00 0.00 0.00 6259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006530.32 0.00 0.00 6290.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006600.00 0.00 0.00 6359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006700.00 0.00 0.00 6459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006800.00 0.00 0.00 6559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006900.00 0.00 0.00 6659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007000.00 0.00 0.00 6759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007100.00 0.00 0.00 6859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007200.00 0.00 0.00 6959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007290.32 0.00 0.00 7050.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007300.00 0.00 0.00 7059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007400.00 0.00 0.00 7159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007500.00 0.00 0.00 7259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007600.00 0.00 0.00 7359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007700.00 0.00 0.00 7459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007800.00 0.00 0.00 7559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007900.00 0.00 0.00 7659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.008000.00 0.00 0.00 7759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.008100.00 0.00 0.00 7859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.008140.32 0.00 0.00 7900.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.00

SurveyMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft it ft deg/100ft deg/100ft deg/100ft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00

500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP, Build 3.00°/100'600.00 1.50 175.47 599.99 -0.65 0.05 0.65 3.00 3.00 0.00700.00 4.50 175.47 699.85 -5.87 0.47 5.89 3.00 3.00 0.00800.00 7.50 175.47 799.29 -16.29 1.29 16.34 3.00 3.00 0.00

900.00 10.50 175.47 898.04 -31.88 2.53 31.98 3.00 3.00 0.001000.00 13.50 175.47 995.85 -52.60 4.17 52.77 3.00 3.00 0.001100.00 16.50 175.47 1092.43 -78.40 6.21 78.65 3.00 3.00 0.001200.00 19.50 175.47 1187.52 -109.20 8.66 109.55 3.00 3.00 0.001300.00 22.50 175.47 1280.87 -144.92 11.49 145.38 3.00 3.00 0.00

1400.00 25.50 175.47 1372.22 -185.47 14.70 186.05 3.00 3.00 0.001500.00 28.50 175.47 1461.31 -230.72 18.29 231.44 3.00 3.00 0.001550.29 30.01 175.47 1505.18 -255.22 20.23 256.02 3.00 3.00 0.00 Hold 30.01°, 175.47° Azim1600.00 30.01 175.47 1548.23 -280.00 22.19 280.88 0.00 0.00 0.001700.00 30.01 175.47 1634.82 -329.86 26.14 330.89 0.00 0.00 0.00

1800.00 30.01 175.47 1721.42 -379.71 30.09 380.91 0.00 0.00 0.001900.00 30.01 175.47 1808.01 -429.57 34.05 430.92 0.00 0.00 0.002000.00 30.01 175.47 1894.61 -479.43 38.00 480.93 0.00 0.00

Strata Directional Technology, Inc.Planning Report

Company: Dominion E&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 3Field: UIntah County, Utah Co-ordinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE0.0Well: #14-27H Section (VS) Reference: Well (0.00N,0,00E,175.47Azi)Wellpath: Proposal ir0 Plan: Proposal ir0

Section 5 : Start Hold

MD Incl Azim TVD +N/-S +El-W VS DLS Build Turn TFOft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg

5400.00 0.00 0.00 5159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005400.32 0.00 0.00 5160.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005500.00 0.00 0.00 5259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005600.00 0.00 0.00 5359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005700.00 0.00 0.00 5459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005800.00 0.00 0.00 5559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.005900.00 0.00 0.00 5659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006000.00 0.00 0.00 5759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006100.00 0.00 0.00 5859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006200.00 0.00 0.00 5959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006300.00 0.00 0.00 6059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006400.00 0.00 0.00 6159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006500.00 0.00 0.00 6259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006530.32 0.00 0.00 6290.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006600.00 0.00 0.00 6359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006700.00 0.00 0.00 6459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006800.00 0.00 0.00 6559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.006900.00 0.00 0.00 6659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007000.00 0.00 0.00 6759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007100.00 0.00 0.00 6859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007200.00 0.00 0.00 6959.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007290.32 0.00 0.00 7050.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007300.00 0.00 0.00 7059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007400.00 0.00 0.00 7159.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007500.00 0.00 0.00 7259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007600.00 0.00 0.00 7359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007700.00 0.00 0.00 7459.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007800.00 0.00 0.00 7559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.007900.00 0.00 0.00 7659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.008000.00 0.00 0.00 7759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.008100.00 0.00 0.00 7859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.008140.32 0.00 0.00 7900.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 0.00

SurveyMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft it ft deg/100ft deg/100ft deg/100ft

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00

500.00 0.00 0.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00550.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP, Build 3.00°/100'600.00 1.50 175.47 599.99 -0.65 0.05 0.65 3.00 3.00 0.00700.00 4.50 175.47 699.85 -5.87 0.47 5.89 3.00 3.00 0.00800.00 7.50 175.47 799.29 -16.29 1.29 16.34 3.00 3.00 0.00

900.00 10.50 175.47 898.04 -31.88 2.53 31.98 3.00 3.00 0.001000.00 13.50 175.47 995.85 -52.60 4.17 52.77 3.00 3.00 0.001100.00 16.50 175.47 1092.43 -78.40 6.21 78.65 3.00 3.00 0.001200.00 19.50 175.47 1187.52 -109.20 8.66 109.55 3.00 3.00 0.001300.00 22.50 175.47 1280.87 -144.92 11.49 145.38 3.00 3.00 0.00

1400.00 25.50 175.47 1372.22 -185.47 14.70 186.05 3.00 3.00 0.001500.00 28.50 175.47 1461.31 -230.72 18.29 231.44 3.00 3.00 0.001550.29 30.01 175.47 1505.18 -255.22 20.23 256.02 3.00 3.00 0.00 Hold 30.01°, 175.47° Azim1600.00 30.01 175.47 1548.23 -280.00 22.19 280.88 0.00 0.00 0.001700.00 30.01 175.47 1634.82 -329.86 26.14 330.89 0.00 0.00 0.00

1800.00 30.01 175.47 1721.42 -379.71 30.09 380.91 0.00 0.00 0.001900.00 30.01 175.47 1808.01 -429.57 34.05 430.92 0.00 0.00 0.002000.00 30.01 175.47 1894.61 -479.43 38.00 480.93 0.00 0.00

Page 49: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

.. Strata Directional Technology, Inc.

Planning Report

Company: DominionE&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 4Field: UIntah County, Utah Co·erdinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE 0.0WeB: #14-27H Section (VS) Reference: Well(0.00N,0.00E,175.47Azl)Wellpath: Proposal 1r0 Plan: Proposal ir0

SurveyMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg it ft ft ft deg/100ft deg/100ft deg/100ft

2100.00 30.01 175.47 1981.20 -529.28 41.95 530.94 0.00 0.00 0.002200.00 30.01 175.47 2067.80 -579.14 45.90 580.96 0.00 0.00 0.00

2300.00 30.01 175.47 2154.39 -629.00 49.85 630.97 0.00 0.00 0.002400.00 30.01 175.47 2240.99 -678.85 53.80 680.98 0.00 0.00 0.002500.00 30.01 175.47 2327.58 -728.71 57.75 731.00 0.00 0.00 0.002600.00 30.01 175.47 2414.18 -778.57 61.71 781.01 0.00 0.00 0.002670.03 30.01 175.47 2474.82 -813.48 64.47 816.03 0.00 0.00 0.00 Drop 3.00°/100'

2700.00 29.11 175.47 2500.89 -828.22 65.64 830.82 3.00 -3.00 0.002800.00 26.11 175.47 2589.49 -874.42 69.30 877.16 3.00 -3.00 0.002900.00 23.11 175.47 2680.40 -915.92 72.59 918.80 3.00 -3.00 0.003000.00 20.11 175.47 2773.36 -952.63 75.50 955.62 3.00 -3.00 0.003100.00 17.11 175.47 2868.12 -984.44 78.02 987.53 3.00 -3.00 0.00

3200.00 14.11 175.47 2964.42 -1011.26 80.15 1014.43 3.00 -3.00 0.003300.00 11.11 175.47 3062.00 -1033.02 81.87 1036.26 3.00 -3.00 0.003400.00 8.11 175.47 3160.58 -1049.66 83.19 1052.95 3.00 -3.00 0.003500.00 5.11 175.47 3259.91 -1061.13 84.10 1064.46 3.00 -3.00 0.003600.00 2.11 175.47 3359.70 -1067.41 84.60 1070.76 3.00 -3.00 0.00

3670.32 0.00 0.00 3430.00 -1068.70 84.70 1072.05 3.00 -3.00 0.00 End of Drop3700.00 0.00 0.00 3459.68 -1068.70 84.70 1072.05 0.00 0.00 0.003800.00 0.00 0.00 3559.68 -1068.70 84.70 1072.05 0.00 0.00 0.003900.00 0.00 0.00 3659.68 -1068.70 84.70 1072.05 0.00 0.00 0.003915.32 0.00 0.00 3675.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 9 5/8" Intermediate

4000.00 0.00 0.00 3759.68 -1068.70 84.70 1072.05 0.00 0.00 0.004025.32 0.00 0.00 3785.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Wasatch Tongue4100.00 0.00 0.00 3859.68 -1068.70 84.70 1072.05 0.00 0.00 0.004200.00 0.00 0.00 3959.68 -1068.70 84.70 1072.05 0.00 0.00 0.004300.00 0.00 0.00 4059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

4360.32 0.00 0.00 4120.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Uteland Limestone4400.00 0.00 0.00 4159.68 -1068.70 84.70 1072.05 0.00 0.00 0.004500.00 0.00 0.00 4259.68 -1068.70 84.70 1072.05 0.00 0.00 0.004505.32 0.00 0.00 4265.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Wasatch4600.00 0.00 0.00 4359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

4700.00 0.00 0.00 4459.68 -1068.70 84.70 1072.05 0.00 0.00 0.004800.00 0.00 0.00 4559.68 -1068.70 84.70 1072.05 0.00 0.00 0.004900.00 0.00 0.00 4659.68 -1068.70 84.70 1072.05 0.00 0.00 0.005000.00 0.00 0.00 4759.68 -1068.70 84.70 1072.05 0.00 0.00 0.005100.00 0.00 0.00 4859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

5200.00 0.00 0.00 4959.68 -1068.70 84.70 1072.05 0.00 0.00 0.005300.00 0.00 0.00 5059.68 -1068.70 84.70 1072.05 0.00 0.00 0.005400.00 0.00 0.00 5159.68 -1068.70 84.70 1072.05 0.00 0.00 0.005400.32 0.00 0.00 5160.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Chapita Wells5500.00 0.00 0.00 5259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

5600.00 0.00 0.00 5359.68 -1068.70 84.70 1072.05 0.00 0.00 0.005700.00 0.00 0.00 5459.68 -1068.70 84.70 1072.05 0.00 0.00 0.005800.00 0.00 0.00 5559.68 -1068.70 84.70 1072.05 0.00 0.00 0.005900.00 0.00 0.00 5659.68 -1068.70 84.70 1072.05 0.00 0.00 0.006000.00 0.00 0.00 5759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

6100.00 0.00 0.00 5859.68 -1068.70 84.70 1072.05 0.00 0.00 0.006200.00 0.00 0.00 5959.68 -1068.70 84.70 1072.05 0.00 0.00 0.006300.00 0.00 0.00 6059.68 -1068.70 84.70 1072.05 0.00 0.00 0.006400.00 0.00 0.00 6159.68 -1068.70 84.70 1072.05 0.00 0.00 0.006500.00 0.00 0.00 6259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

6530.32 0.00 0.00 6290.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Uteland

.. Strata Directional Technology, Inc.

Planning Report

Company: DominionE&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 4Field: UIntah County, Utah Co·erdinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE 0.0WeB: #14-27H Section (VS) Reference: Well(0.00N,0.00E,175.47Azl)Wellpath: Proposal 1r0 Plan: Proposal ir0

SurveyMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg it ft ft ft deg/100ft deg/100ft deg/100ft

2100.00 30.01 175.47 1981.20 -529.28 41.95 530.94 0.00 0.00 0.002200.00 30.01 175.47 2067.80 -579.14 45.90 580.96 0.00 0.00 0.00

2300.00 30.01 175.47 2154.39 -629.00 49.85 630.97 0.00 0.00 0.002400.00 30.01 175.47 2240.99 -678.85 53.80 680.98 0.00 0.00 0.002500.00 30.01 175.47 2327.58 -728.71 57.75 731.00 0.00 0.00 0.002600.00 30.01 175.47 2414.18 -778.57 61.71 781.01 0.00 0.00 0.002670.03 30.01 175.47 2474.82 -813.48 64.47 816.03 0.00 0.00 0.00 Drop 3.00°/100'

2700.00 29.11 175.47 2500.89 -828.22 65.64 830.82 3.00 -3.00 0.002800.00 26.11 175.47 2589.49 -874.42 69.30 877.16 3.00 -3.00 0.002900.00 23.11 175.47 2680.40 -915.92 72.59 918.80 3.00 -3.00 0.003000.00 20.11 175.47 2773.36 -952.63 75.50 955.62 3.00 -3.00 0.003100.00 17.11 175.47 2868.12 -984.44 78.02 987.53 3.00 -3.00 0.00

3200.00 14.11 175.47 2964.42 -1011.26 80.15 1014.43 3.00 -3.00 0.003300.00 11.11 175.47 3062.00 -1033.02 81.87 1036.26 3.00 -3.00 0.003400.00 8.11 175.47 3160.58 -1049.66 83.19 1052.95 3.00 -3.00 0.003500.00 5.11 175.47 3259.91 -1061.13 84.10 1064.46 3.00 -3.00 0.003600.00 2.11 175.47 3359.70 -1067.41 84.60 1070.76 3.00 -3.00 0.00

3670.32 0.00 0.00 3430.00 -1068.70 84.70 1072.05 3.00 -3.00 0.00 End of Drop3700.00 0.00 0.00 3459.68 -1068.70 84.70 1072.05 0.00 0.00 0.003800.00 0.00 0.00 3559.68 -1068.70 84.70 1072.05 0.00 0.00 0.003900.00 0.00 0.00 3659.68 -1068.70 84.70 1072.05 0.00 0.00 0.003915.32 0.00 0.00 3675.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 9 5/8" Intermediate

4000.00 0.00 0.00 3759.68 -1068.70 84.70 1072.05 0.00 0.00 0.004025.32 0.00 0.00 3785.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Wasatch Tongue4100.00 0.00 0.00 3859.68 -1068.70 84.70 1072.05 0.00 0.00 0.004200.00 0.00 0.00 3959.68 -1068.70 84.70 1072.05 0.00 0.00 0.004300.00 0.00 0.00 4059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

4360.32 0.00 0.00 4120.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Uteland Limestone4400.00 0.00 0.00 4159.68 -1068.70 84.70 1072.05 0.00 0.00 0.004500.00 0.00 0.00 4259.68 -1068.70 84.70 1072.05 0.00 0.00 0.004505.32 0.00 0.00 4265.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Wasatch4600.00 0.00 0.00 4359.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

4700.00 0.00 0.00 4459.68 -1068.70 84.70 1072.05 0.00 0.00 0.004800.00 0.00 0.00 4559.68 -1068.70 84.70 1072.05 0.00 0.00 0.004900.00 0.00 0.00 4659.68 -1068.70 84.70 1072.05 0.00 0.00 0.005000.00 0.00 0.00 4759.68 -1068.70 84.70 1072.05 0.00 0.00 0.005100.00 0.00 0.00 4859.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

5200.00 0.00 0.00 4959.68 -1068.70 84.70 1072.05 0.00 0.00 0.005300.00 0.00 0.00 5059.68 -1068.70 84.70 1072.05 0.00 0.00 0.005400.00 0.00 0.00 5159.68 -1068.70 84.70 1072.05 0.00 0.00 0.005400.32 0.00 0.00 5160.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Chapita Wells5500.00 0.00 0.00 5259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

5600.00 0.00 0.00 5359.68 -1068.70 84.70 1072.05 0.00 0.00 0.005700.00 0.00 0.00 5459.68 -1068.70 84.70 1072.05 0.00 0.00 0.005800.00 0.00 0.00 5559.68 -1068.70 84.70 1072.05 0.00 0.00 0.005900.00 0.00 0.00 5659.68 -1068.70 84.70 1072.05 0.00 0.00 0.006000.00 0.00 0.00 5759.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

6100.00 0.00 0.00 5859.68 -1068.70 84.70 1072.05 0.00 0.00 0.006200.00 0.00 0.00 5959.68 -1068.70 84.70 1072.05 0.00 0.00 0.006300.00 0.00 0.00 6059.68 -1068.70 84.70 1072.05 0.00 0.00 0.006400.00 0.00 0.00 6159.68 -1068.70 84.70 1072.05 0.00 0.00 0.006500.00 0.00 0.00 6259.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

6530.32 0.00 0.00 6290.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Uteland

Page 50: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

..

Strata Directional Technology, Inc.Planning Report

Company: Dominion E&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 5Field: Ulntah County, Utah Co-ordinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE0.0Well: #14-27H Section (VS) Reference: Well(0.00N,0.00E,175.47Azl)Wellpath: Proposal 1r0 Plan: Proposal 1r0Survey

MD Incl Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft

6600.00 0.00 0.00 6359.68 -1068.70 84.70 1072.05 0.00 0.00 0.006700.00 0.00 0.00 6459.68 -1068.70 84.70 1072.05 0.00 0.00 0.006800.00 0.00 0.00 6559.68 -1068.70 84.70 1072.05 0.00 0.00 0.006900.00 0.00 0.00 6659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

7000.00 0.00 0.00 6759.68 -1068.70 84.70 1072.05 0.00 0.00 0.007100.00 0.00 0.00 6859.68 -1068.70 84.70 1072.05 0.00 0.00 0.007200.00 0.00 0.00 6959.68 -1068.70 84.70 1072.05 0.00 0.00 0.007290.32 0.00 0.00 7050.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Mesaverde7300.00 0.00 0.00 7059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

7400.00 0.00 0.00 7159.68 -1068.70 84.70 1072.05 0.00 0.00 0.007500.00 0.00 0.00 7259.68 -1068.70 84.70 1072.05 0.00 0.00 0.007600.00 0.00 0.00 7359.68 -1068.70 84.70 1072.05 0.00 0.00 0.007700.00 0.00 0.00 7459.68 -1068.70 84.70 1072.05 0.00 0.00 0.007800.00 0.00 0.00 7559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

7900.00 0.00 0.00 7659.68 -1068.70 84.70 1072.05 0.00 0.00 0.008000.00 0.00 0.00 7759.68 -1068.70 84.70 1072.05 0.00 0.00 0.008100.00 0.00 0.00 7859.68 -1068.70 84.70 1072.05 0.00 0.00 0.008140.32 0.00 0.00 7900.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 PBHL

TargetsMap Map <-- Latitude --> <- Longitude ->

Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min SecDip. Dir, ft ft ft it 11

Surface 0.00 0.00 0.00 7143303.742158486.80 39 54 55.750 N 109 39 10.080 W

PBHL 7900.00 -1068.70 84.70 7142235.042158571.50 39 54 45.172 N 109 39 9.276 W-Plan hit target

Casing PointsMD TVD Diameter Hole Size Nameft ft in in

3915.32 3675.00 9.625 12.250 9 5/8" Intermediate

Formations

MD TVD Formations Lithology Dip Angle Dip Directionft ft deg deg

4025.32 3785.00 Wasatch Tongue 0.00 0.004360.32 4120.00 Uteland Limestone 0.00 0.004505.32 4265.00 Wasatch 0.00 0.005400.32 5160.00 Chapita Wells 0.00 0.006530.32 6290.00 Uteland Buttes 0.00 0.007290.32 7050.00 Mesaverde 0.00 0.00

AnnotationMD TVDit ft

Surface550.00 550.00 KOP, Build 3.00°/100'

1550.29 1505.18 Hold 30.01°, 175.47° Azimuth2670.03 2474.82 Drop 3.00*/100'3670.32 3430.00 End of Drop8140.32 7900.00

..

Strata Directional Technology, Inc.Planning Report

Company: Dominion E&P, Inc. Date: 6/14/2007 Time: 13:09:19 Page: 5Field: Ulntah County, Utah Co-ordinate(NE) Reference: Well: #14-27H, Grid NorthSite: HCU14-27F Vertical (TVD) Reference: SITE0.0Well: #14-27H Section (VS) Reference: Well(0.00N,0.00E,175.47Azl)Wellpath: Proposal 1r0 Plan: Proposal 1r0

SurveyMD Incl Azim TVD +N/-S +El-W VS DLS Build Turn Tool/Commentft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft

6600.00 0.00 0.00 6359.68 -1068.70 84.70 1072.05 0.00 0.00 0.006700.00 0.00 0.00 6459.68 -1068.70 84.70 1072.05 0.00 0.00 0.006800.00 0.00 0.00 6559.68 -1068.70 84.70 1072.05 0.00 0.00 0.006900.00 0.00 0.00 6659.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

7000.00 0.00 0.00 6759.68 -1068.70 84.70 1072.05 0.00 0.00 0.007100.00 0.00 0.00 6859.68 -1068.70 84.70 1072.05 0.00 0.00 0.007200.00 0.00 0.00 6959.68 -1068.70 84.70 1072.05 0.00 0.00 0.007290.32 0.00 0.00 7050.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 Mesaverde7300.00 0.00 0.00 7059.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

7400.00 0.00 0.00 7159.68 -1068.70 84.70 1072.05 0.00 0.00 0.007500.00 0.00 0.00 7259.68 -1068.70 84.70 1072.05 0.00 0.00 0.007600.00 0.00 0.00 7359.68 -1068.70 84.70 1072.05 0.00 0.00 0.007700.00 0.00 0.00 7459.68 -1068.70 84.70 1072.05 0.00 0.00 0.007800.00 0.00 0.00 7559.68 -1068.70 84.70 1072.05 0.00 0.00 0.00

7900.00 0.00 0.00 7659.68 -1068.70 84.70 1072.05 0.00 0.00 0.008000.00 0.00 0.00 7759.68 -1068.70 84.70 1072.05 0.00 0.00 0.008100.00 0.00 0.00 7859.68 -1068.70 84.70 1072.05 0.00 0.00 0.008140.32 0.00 0.00 7900.00 -1068.70 84.70 1072.05 0.00 0.00 0.00 PBHL

TargetsMap Map <-- Latitude --> <- Longitude ->

Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min SecDip. Dir, ft ft ft it 11

Surface 0.00 0.00 0.00 7143303.742158486.80 39 54 55.750 N 109 39 10.080 W

PBHL 7900.00 -1068.70 84.70 7142235.042158571.50 39 54 45.172 N 109 39 9.276 W-Plan hit target

Casing PointsMD TVD Diameter Hole Size Nameft ft in in

3915.32 3675.00 9.625 12.250 9 5/8" Intermediate

Formations

MD TVD Formations Lithology Dip Angle Dip Directionft ft deg deg

4025.32 3785.00 Wasatch Tongue 0.00 0.004360.32 4120.00 Uteland Limestone 0.00 0.004505.32 4265.00 Wasatch 0.00 0.005400.32 5160.00 Chapita Wells 0.00 0.006530.32 6290.00 Uteland Buttes 0.00 0.007290.32 7050.00 Mesaverde 0.00 0.00

AnnotationMD TVDit ft

Surface550.00 550.00 KOP, Build 3.00°/100'

1550.29 1505.18 Hold 30.01°, 175.47° Azimuth2670.03 2474.82 Drop 3.00*/100'3670.32 3430.00 End of Drop8140.32 7900.00

Page 51: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

STATE OF UTAH FORM 6DEPARTMENT OF NATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING

ENTITYACTION FORM

Operator: Dominion Exploration & Production, Inc. Operator Account Number: N1095

Address: 14000 QuailSprings Parkwav, Suite 600

city Oklahoma City

state OK zip 73134 Phone Number: 405-749-5237

Well 1

API Number Well Name QQ Sec Twp Rng County

43-047-36852 HCU 14-27F NESW 27 10S 20E UintahAction Code Current Entity New Entity Spud Date Entity Assignment

Number Number Effective Date

A 6/20/2007Comments:

wAPI Numly N e 40 See Riig County

Action Code Current Entity NevyEntity Sppd Date Entity AssignmentNumber Number Effective Date

Comments:

PI NuÑibe WeÑName QÖ Sec Twp Rng County

Action Cocle Current Entity New Entity Spud Date Entity AssignmentNumber Number Effective Date

Comments:

ACTION CODES:A - Establish new entityfor new well (single wellonly) Barbara LesterB - Add new wellto existingentity (groupor unit well) N e PriC - Re-assign wellfrom one existingentitytoanother existing entityD - Re-assign well from one exlsting entitytoa new entity tureE - Other (Explain in 'comments' section) Regulatory Specialist 6/21/2007RECENED Title Date

JUN27 2W1

DN.0FO\L,GAS&

STATE OF UTAH FORM 6DEPARTMENT OF NATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING

ENTITYACTION FORM

Operator: Dominion Exploration & Production, Inc. Operator Account Number: N1095

Address: 14000 QuailSprings Parkwav, Suite 600

city Oklahoma City

state OK zip 73134 Phone Number: 405-749-5237

Well 1

API Number Well Name QQ Sec Twp Rng County

43-047-36852 HCU 14-27F NESW 27 10S 20E UintahAction Code Current Entity New Entity Spud Date Entity Assignment

Number Number Effective Date

A 6/20/2007Comments:

wAPI Numly N e 40 See Riig County

Action Code Current Entity NevyEntity Sppd Date Entity AssignmentNumber Number Effective Date

Comments:

PI NuÑibe WeÑName QÖ Sec Twp Rng County

Action Cocle Current Entity New Entity Spud Date Entity AssignmentNumber Number Effective Date

Comments:

ACTION CODES:A - Establish new entityfor new well (single wellonly) Barbara LesterB - Add new wellto existingentity (groupor unit well) N e PriC - Re-assign wellfrom one existingentitytoanother existing entityD - Re-assign well from one exlsting entitytoa new entity tureE - Other (Explain in 'comments' section) Regulatory Specialist 6/21/2007RECENED Title Date

JUN27 2W1

DN.0FO\L,GAS&

Page 52: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Form3160-5(August, 1999) LINITED STATES FORMAPPROVED

DEPARTMENT OF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease Serial No.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals. Ute Indian Tribe7. If Unit or CA/Agreement, Name and/or No.

l. Type of Well HillCreek Unitil Well Gas Well ther 8. Well Name and No.

2. Name of Operator HCU 14-27F9. APl Well No.

Dorninion Exploration & Production, Inc.3a. Address 3b. Phone No. (include area code) 43-047-3685214000 Quail Springs Pkwy, Ste 600, OKC, OK 73134 | (405) 749-5237 10.Field and Pool, or Exploratory Area

4. Location of Well (Footage, Sec., T., R., M., or Survey Description) Natural Buttes1569' FSL & 1937' FWL, NE SW, Sec. 27-10S-20E ll. County or Parish, State

Uintah, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

AlteringCasing Fracture Treat Reclamation Well Integrity

Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon Spud Well

O Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13 Describe Procosed or Comoleted Operation (clearlv state all certinent details, includina estimated startina date of any procosed work and acoroximate duration thereof.If the proposal is to deeoen directionallv or recomolete horizontallv. aive subsurface locations and measured and true vertical depths of all Dertinent markers and zones.Attach the Bond underwhich the worit will be Derformed or provide the Bond No. on file with BLMlBIA. Reguired subseauent recorts shall be filed within 30 davsfollowing comoletion of the involved ooerations. If the ooeration results in a multiolecomoletion or recomoletion in a new interval, a Form 3160-4 shall be filed oncetestina has been comoleted. Final Abandonment Notices shall be filed onlv after all reauirements, including reclamation. have been comoleted and the ooerator hasdetermined that the site is readv for final inspection.)

6/20/07 - Spud well. Ran 12 jts 13-3/8", 48#, H-40 csg set @520'. Cmt tailw/500 sks Class G, 15.8 ppg, 1.15 yld.

14. I hereby certify that the foregoing is true and correctName (Printed/Typed)

Barbara Lester Title Regulatory Specialist

signature Date 6/28/2007

Approved by Title Date

Conditions of accroval. if anv. are attached. Acoroval of this notice does not warrant orcertifv that the acolicant holds legal or equitable titleto those rights in the subiect lease Officewhich would entitle the aCDIicantto conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowinglyand willfullyto make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

RECEIVEDJULO2 2007

DN.0FOIL,GAS&

Form3160-5(August, 1999) LINITED STATES FORMAPPROVED

DEPARTMENT OF THE INTERIOR OMB No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: November 30, 20005. Lease Serial No.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784Do not use this form for proposals to drill or to re-enter an 6. If Indian, Allottee or Tribe Name

abandoned well. Use Form 3160-3 (APD) for such proposals. Ute Indian Tribe7. If Unit or CA/Agreement, Name and/or No.

l. Type of Well HillCreek Unitil Well Gas Well ther 8. Well Name and No.

2. Name of Operator HCU 14-27F9. APl Well No.

Dorninion Exploration & Production, Inc.3a. Address 3b. Phone No. (include area code) 43-047-36852

14000 Quail Springs Pkwy, Ste 600, OKC, OK 73134 | (405) 749-5237 10.Field and Pool, or Exploratory Area

4. Location of Well (Footage, Sec., T., R., M., or Survey Description) Natural Buttes1569' FSL & 1937' FWL, NE SW, Sec. 27-10S-20E ll. County or Parish, State

Uintah, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Production (Start/Resume) Water Shut-Off

AlteringCasing Fracture Treat Reclamation Well Integrity

Subsequent Report Casing Repair New Construction Recomplete Other

Change Plans Plug and Abandon Temporarily Abandon Spud Well

O Final Abandonment Notice Convert to Injection Plug Back Water Disposal

13 Describe Procosed or Comoleted Operation (clearlv state all certinent details, includina estimated startina date of any procosed work and acoroximate duration thereof.If the proposal is to deeoen directionallv or recomolete horizontallv. aive subsurface locations and measured and true vertical depths of all Dertinent markers and zones.Attach the Bond underwhich the worit will be Derformed or provide the Bond No. on file with BLMlBIA. Reguired subseauent recorts shall be filed within 30 davsfollowing comoletion of the involved ooerations. If the ooeration results in a multiolecomoletion or recomoletion in a new interval, a Form 3160-4 shall be filed oncetestina has been comoleted. Final Abandonment Notices shall be filed onlv after all reauirements, including reclamation. have been comoleted and the ooerator hasdetermined that the site is readv for final inspection.)

6/20/07 - Spud well. Ran 12 jts 13-3/8", 48#, H-40 csg set @520'. Cmt tailw/500 sks Class G, 15.8 ppg, 1.15 yld.

14. I hereby certify that the foregoing is true and correctName (Printed/Typed)

Barbara Lester Title Regulatory Specialist

signature Date 6/28/2007

Approved by Title Date

Conditions of accroval. if anv. are attached. Acoroval of this notice does not warrant orcertifv that the acolicant holds legal or equitable titleto those rights in the subiect lease Officewhich would entitle the aCDIicantto conduct operations thereon.

Title 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, makes it a crime for any person knowinglyand willfullyto make to any department or agency of theUnited States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

RECEIVEDJULO2 2007

DN.0FOIL,GAS&

Page 53: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

CONFlDEN11ALSTATE OF UTAH I FORM 9

DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL,GAS AND MINING 5 LEASE DESIGNATIONANDSERIALNUMBER:

U-29784

SUNDRY NOTICES AND REPORTS ON WELLS 6 F DANN, O EERBT BENAME:

7 UNIT of CA AGREEMENT NAME:Do not use thisform for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to

drillhorizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for such proposals.1. TYPE OF WELL 8 WELL NAMEand NUMBER:

OIL WELL GAS WELL OTHER HCU 14-27F2. NAMEOF OPERATOR: 9 API NUMBER:

XTO ENERGY INC. 43047368523. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDAND POOL, OR WILDCAT:2700 Farmington Ave. my Farmington STATE NM 7,87401 (505) 324-1090 NATURAL BUTTES

4. LOCATION OF WELL

FOOTAGESATSURFACE: 1569' FSL & 1937' FWL COUNTY: UINTAH

QTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: NESW 27 10S 20E STATE:UTAH

19. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONO NOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIRWELL

Approximate date workwillstart; CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

O CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

O CHANGETUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGEWELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(START/RESUM WATER SHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELL SITE OTHER SPUDO CONVERTWELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc

Dominion E&P spudded thiswell on 6/20/2007. XTO Energy Inc. assumed ownership of thiswell 8/1/2007. XTO drilled 550' of17 1/2" hole. Ran 12 joints 13 3/8", 48#, H40 casing to 520' and cemented with 512 s× Class G cement.

Drilled 12-1/4" hole to 3650'. Ran 86 joints9-5/8", 36#, J-55 intermediate casing & set @ 3644' with 830 sx Class G cement.

Drillingahead.

NAME(PLEASEPR O C., PE TITLE REGULATORY COMPLIANCE TECH

8/13/2007SIGNATURE DATE

(This space for State use only)

RECEIVED

AUS2 O2007(5/2000) (See instructions on Reverse Side)

DIV.0F0lL,GAS&

CONFlDEN11ALSTATE OF UTAH I FORM 9

DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL,GAS AND MINING 5 LEASE DESIGNATIONANDSERIALNUMBER:

U-29784

SUNDRY NOTICES AND REPORTS ON WELLS6 F DANN, O EERBT BENAME:

7 UNIT of CA AGREEMENT NAME:Do not use thisform for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to

drillhorizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for such proposals.1. TYPE OF WELL 8 WELL NAMEand NUMBER:

OIL WELL GAS WELL OTHER HCU 14-27F2. NAMEOF OPERATOR: 9 API NUMBER:

XTO ENERGY INC. 43047368523. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDAND POOL, OR WILDCAT:2700 Farmington Ave. my Farmington STATE NM 7,87401 (505) 324-1090 NATURAL BUTTES

4. LOCATION OF WELL

FOOTAGESATSURFACE: 1569' FSL & 1937' FWL COUNTY: UINTAH

QTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: NESW 27 10S 20E STATE:UTAH

19. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONO NOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIRWELL

Approximate date workwillstart; CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

O CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

O CHANGETUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGEWELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(START/RESUM WATER SHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELL SITE OTHER SPUDO CONVERTWELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc

Dominion E&P spudded thiswell on 6/20/2007. XTO Energy Inc. assumed ownership of thiswell 8/1/2007. XTO drilled 550' of17 1/2" hole. Ran 12 joints 13 3/8", 48#, H40 casing to 520' and cemented with 512 s× Class G cement.

Drilled 12-1/4" hole to 3650'. Ran 86 joints9-5/8", 36#, J-55 intermediate casing & set @ 3644' with 830 sx Class G cement.

Drillingahead.

NAME(PLEASEPR O C., PE TITLE REGULATORY COMPLIANCE TECH

8/13/2007SIGNATURE DATE

(This space for State use only)

RECEIVED

AUS2 O2007(5/2000) (See instructions on Reverse Side)

DIV.0F0lL,GAS&

Page 54: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

DEPIWell Operations Chronology Report

WER:HOU¾·W . MI:430&360SSIB AptNo.:t 001.:1 DFS:0 RepeñDate:GmdesF

Operator: DOMINION EXPLORATION & PRODUCTION INC UWI: 1569'FSL, 1937'FWL, SEC 27-108-20E NEISW

Rig Name: BILL JRS 6 Final Surface Location:

Event: DRILL Start Date: 9/29/2005 Spud Dt.: 6/20/2007 Type: Drill & equipa 8000' TVD Wasatch/Mesaverde well

Supervisor PAT WISENER Engineer RICHARD HOWELL AFE No 0702863 Authorized Days:

Active Datum: GL @5,171.0ft(GRADED Ground Elev 5,171.00 Wl: Authorized MD/TVD:GROUNDLEVEL)

CURRENT DEPTH HOLE SlžE MUDWEIGWT LAST CASINGMD(ft) TVD(ft) 24 Hr. Progress SIZE MD TVD LOT(EMW)

550.00 550.00 550 O(ñ) 17-1/2(") (•) (g) (R) (ppg)

FORMATIONifARGET NAME MDTOP TVDTOP g NEXTCASINGMESAVERDE SIZE MD TVD

WASATCH 13-3/8(") 520.0(!!) 520.0(It)

Daily Detail: MIRU. DRILL550' OF 17.5" HOLE WONCO$$$ gRUN & SET 12 JT'S OF 13.375", H-40, 48#, CSGN @520'lGL.DRIL coMP WELLCEMENT WI500 SKS

DAILY 114,536.00 0 00 114,536.00

CUM 114,536.00 0 00 114,536.00

AFE 957,948.00 822,759 00

DEPIWell Operations Chronology Report

WER:HOU¾·W . MI:430&360SSIB AptNo.:t 001.:1 DFS:0 RepeñDate:GmdesF

Operator: DOMINION EXPLORATION & PRODUCTION INC UWI: 1569'FSL, 1937'FWL, SEC 27-108-20E NEISW

Rig Name: BILL JRS 6 Final Surface Location:

Event: DRILL Start Date: 9/29/2005 Spud Dt.: 6/20/2007 Type: Drill & equipa 8000' TVD Wasatch/Mesaverde well

Supervisor PAT WISENER Engineer RICHARD HOWELL AFE No 0702863 Authorized Days:

Active Datum: GL @5,171.0ft(GRADED Ground Elev 5,171.00 Wl: Authorized MD/TVD:GROUNDLEVEL)

CURRENT DEPTH HOLE SlžE MUDWEIGWT LAST CASINGMD(ft) TVD(ft) 24 Hr. Progress SIZE MD TVD LOT(EMW)

550.00 550.00 550 O(ñ) 17-1/2(") (•) (g) (R) (ppg)

FORMATIONifARGET NAME MDTOP TVDTOP g NEXTCASINGMESAVERDE SIZE MD TVD

WASATCH 13-3/8(") 520.0(!!) 520.0(It)

Daily Detail: MIRU. DRILL550' OF 17.5" HOLE WONCO$$$ gRUN & SET 12 JT'S OF 13.375", H-40, 48#, CSGN @520'lGL.DRIL coMP WELLCEMENT WI500 SKS

DAILY 114,536.00 0 00 114,536.00

CUM 114,536.00 0 00 114,536.00

AFE 957,948.00 822,759 00

Page 55: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ

X - Change of Operator (Well Sold) Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 7/1/2007

FROM: (oldOperator): TO: ( New Operator):N1095-Dominion Exploration & Production, Inc N2615-XTO Energy Inc

14000 QuailSprings Parkway, Suite 600 810 Houston StOklahoma City, OK 73134 Fort Worth, TX 76102

Phone: 1 (405) 749-1300 Phone: 1 (817) 870-2800

CA No. Unit: HILL CREEKWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED LIST

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 8/6/20072. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 8/6/20073. The new company was checked on the Department of Commerce, Division of Corporations Database on: 8/6/20074a. Is the new operator registered in the State of Utah: Business Number: 5655506-0143

4b. If NO, the operator was contacted contacted on:5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok

6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,or operator change for all wells listed on Federal or Indian leases on: BLM BIA

7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on:

8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:

9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority toInject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:

DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 9/27/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 9/27/20073. Bond information entered in RBDMS on: 9/27/20074. Fee/State wells attached to bond in RBDMS on: 9/27/20075. Injection Projects to new operator in RBDMS on: 9/27/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: 9/27/2007BOND VERIFICATION:1. Federal well(s) covered by Bond Number: UTB0001382. Indian well(s) covered by Bond Number: n/a3a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 104312762

3b. The FORMER operator has requested a release of liability from their bond on: 1/23/2008The Division sent response by letter on:

LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on:COMMENTS:

XTO - HILLCREEK (DOMINION) FORM A.xis

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ

X - Change of Operator (Well Sold) Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 7/1/2007

FROM: (oldOperator): TO: ( New Operator):N1095-Dominion Exploration & Production, Inc N2615-XTO Energy Inc

14000 QuailSprings Parkway, Suite 600 810 Houston StOklahoma City, OK 73134 Fort Worth, TX 76102

Phone: 1 (405) 749-1300 Phone: 1 (817) 870-2800

CA No. Unit: HILL CREEKWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED LIST

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 8/6/20072. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 8/6/20073. The new company was checked on the Department of Commerce, Division of Corporations Database on: 8/6/20074a. Is the new operator registered in the State of Utah: Business Number: 5655506-0143

4b. If NO, the operator was contacted contacted on:5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok

6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,or operator change for all wells listed on Federal or Indian leases on: BLM BIA

7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on:

8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:

9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority toInject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:

DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 9/27/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 9/27/20073. Bond information entered in RBDMS on: 9/27/20074. Fee/State wells attached to bond in RBDMS on: 9/27/20075. Injection Projects to new operator in RBDMS on: 9/27/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: 9/27/2007

BOND VERIFICATION:1. Federal well(s) covered by Bond Number: UTB0001382. Indian well(s) covered by Bond Number: n/a3a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 104312762

3b. The FORMER operator has requested a release of liability from their bond on: 1/23/2008The Division sent response by letter on:

LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on:COMMENTS:

XTO - HILLCREEK (DOMINION) FORM A.xis

Page 56: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

STATE OF UTAH FORM 9DEPARTMENTOF NATURAL RESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER:

6. IF INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS7. UNITorCA AGREEMENT NAME:

Do notuse thisform for proposals to drill new wells, significantly deepen existingwells below current bottom-hole depth, reenter plugged wells, or todrillhorizontal laterals. Use APPLICATIONFOR PERMITTO DRILLform forsuch proposals.

1. TYPE OF WELL 8. WELLNAMEand NUMBER;OIL WELL GAS WELL / OTHER

SEE ATTACHED2. NAMEOFEne

qy nc.9. A UE

TACHED3. ADDRESS OF OPERATOR: 810 Houston Street PHONE NUMBER: 10. FIELDAND POOL, OR WILDCAT:

crry Fort Worth sixm TX w76102 (817) 870-2800 Natural Buttes4. LOCATIONOF WELL

FOOTAGESATSURFACE: SEE ATTACHED COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

ii. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ^CIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT

(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work willstart: CASINGREPAIR NEWCONSTRUCTION TEMPORARILYABANDON

CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGETUBING PLUGANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGEWELLNAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGEWELLSTATUS PRODUCTION(START/RESUME) WATERSHUT-OFFDate of work completion:

COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER:

CONVERTWELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective July 1, 2007, XTO Energy Inc. has purchased the wells listed on the attachment from:

Dominion Exploration & Production, Inc.14000 Quail Springs Parkway, Suite 600Oklahoma City, OK 73134

James D. AbercrombieSr. Vice President, General Manager - Western Business Unit

Please be advised that XTO Energy Inc. is considered to be the operator on the attached list and is responsibleunder the terms and conditions of the lease for the operations conducted upon the lease lands. Bond coverageis provided by Nationwide BLMBond #104312750 and Department of Natural Resources Bond #104312762.

NAME(PLEASEPRINT Win S. Ryan, Jr TITLE Sr. Vice President - Land Administration

SIGNATURE DATE 7/31/2007

(Thisspacefor

VED / /0¶RECEIVED

(5/2000) ÛÎVÎSton of Oil,GasandMining (See Instructions on Reverse Side) DN.0FOIL,GAS&MINING

EarleneRussell, Engineering

STATE OF UTAH FORM 9DEPARTMENTOF NATURAL RESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER:

6. IF INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS7. UNITorCA AGREEMENT NAME:

Do notuse thisform for proposals to drill new wells, significantly deepen existingwells below current bottom-hole depth, reenter plugged wells, or todrillhorizontal laterals. Use APPLICATIONFOR PERMITTO DRILLform forsuch proposals.

1. TYPE OF WELL 8. WELLNAMEand NUMBER;OIL WELL GAS WELL / OTHER

SEE ATTACHED2. NAMEOFEne

qy nc.9. A UE

TACHED3. ADDRESS OF OPERATOR: 810 Houston Street PHONE NUMBER: 10. FIELDAND POOL, OR WILDCAT:

crry Fort Worth sixm TX w76102 (817) 870-2800 Natural Buttes4. LOCATIONOF WELL

FOOTAGESATSURFACE: SEE ATTACHED COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

ii. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ^CIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT

(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work willstart: CASINGREPAIR NEWCONSTRUCTION TEMPORARILYABANDON

CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGETUBING PLUGANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGEWELLNAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGEWELLSTATUS PRODUCTION(START/RESUME) WATERSHUT-OFFDate of work completion:

COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER:

CONVERTWELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective July 1, 2007, XTO Energy Inc. has purchased the wells listed on the attachment from:

Dominion Exploration & Production, Inc.14000 Quail Springs Parkway, Suite 600Oklahoma City, OK 73134

James D. AbercrombieSr. Vice President, General Manager - Western Business Unit

Please be advised that XTO Energy Inc. is considered to be the operator on the attached list and is responsibleunder the terms and conditions of the lease for the operations conducted upon the lease lands. Bond coverageis provided by Nationwide BLMBond #104312750 and Department of Natural Resources Bond #104312762.

NAME(PLEASEPRINT Win S. Ryan, Jr TITLE Sr. Vice President - Land Administration

SIGNATURE DATE 7/31/2007

(Thisspacefor

VED / /0¶RECEIVED

(5/2000)ÛÎVÎSton of Oil,GasandMining (See Instructions on Reverse Side) DN.0FOIL,GAS&MINING

EarleneRussell, Engineering

Page 57: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

N1095 DOMINIONE and P, INC. to N2615 XTO ENERGY, INC.

api well name qtr _qtr sec. twp rng lease_num entity Lease well stat4304731522 FEDERAL 1-29 SWNW 29 100S 200E U-28203 12829 Federal GW P4304731601 HILLCREEK FED 1-30 NWSW 30 100S 200E U-30693 12829 Federal GW P4304731675 HILL CREEK FED 1-27 SENW 27 100S 200E U-29784 12829 Federal GW P4304733671 HCU 1-28F NENE 28 100S 200E 14-20-H62-4783 12829 Indian GW S4304733672 EK3D1-29F NENE 29 100S 200E U-28203 12829Federed GGV P4304733673 HCU 2-30F NWNE 30 100S 200E UTU-29784 12829 Federal GW P4304733688 HCU 3-28F NENW 28 100S 200E U-28203 12829 Federal GW P4304733689 HCU 3-29F NENW 29 100S 200E U-28203 12829 Federal GW P4304733713 HCU 3-30F NWNW 30 100S 200E UTU-30693 12829 Federal GW P4304733835 EKTU5-30F SVnSTV 30 100S 200E U-30693 12829 Federed GNV P4304733836 HCU6-30F SF149V 30 100S 200E U-30693 12829 Federed GBA'P4304733964 HCU 8-30F SENE 30 100S 200E UTU-29784 12829 Federal GW P4304733965 BKTUll-30F NESMT 30 100S 200E U-30693 12829 Federed GNV P4304733966 FROU13-30F STVSTV 30 100S 200E U-30693 12829 Federal GPA' P4304734045 HCU 5-28F SWNW 28 100S 200E U-28203 12829 Federal GW P4304734046 HCU 7-29F SWNE 29 100S 200E U-28203 12829 Federal GW P4304734223 HCU 9-29F NESE 29 100S 200E U-28203 12829 Federal GW P4304734298 HCU 3-31F NWNW 31 100S 200E UTU-30693 12829 Federal GW P4304734299 HCU 5-31F SWNW 31 100S 200E UTU-30693 12829 Federal GW P4304734300 HCU7-31F SF2497 31 100S 200E UTU-30693 12829 Federd (IRT P4304734316 HCU 2-27F NWNE 27 100S 200E UTU-79130 12829 Federal GW P4304734351 HCU 8-27F SENE 27 100S 200E UTU-79130 12829 Federal GW P4304734352 HCU l l-31F NWSW 31 100S 200E UTU-30693 12829 Federal GW P4304734353 HCU 13-31F SWSW 31 100S 200E UTU-30693 12829 Federal GW P4304734853 HCU 1-33F NENE 33 100S 200E 14-20-H62-4782 12829 Indian GW P4304734854 HCU3-34F NENTV 34 100S 200E 0-28203 12829 Federal Ciñ7 P4304734913 EKTU1-27F NENE 27 100S 200E U-79130 12829 Federal G1V P4304734914 HCU 3-27F NENW 27 100S 200E U-79130 12829 Federal GW P4304734915 HCU 7-27F SWNE 27 100S 200E U-79130 12829 Federal GW S4304734916 HCU 10-27F NWSE 27 100S 200E U-79130 12829 Federal GW P4304734917 ffCU 14-30F STVSTV 30 100S 200E U-30693 12829 Federal GNV P4304734918 EKID 15-30F STVSE 30 100S 200E U-29784 12829 Federal Ciñ7 P4304734919 HCU 2-31F NWNE 31 100S 200E U-30693 12829 Federal GW P4304734920 HCU 6-31F SWNW 31 100S 200E U-30693 12829 Federal GW P4304734921 HCU 4-31F NWNW 31 100S 200E U-30693 12829 Federal GW P4304735130 FLOUll-27F knBSTV 27 100S 200E U-29784 12829 Federd GPN P4304735131 HCU 2-29F NWNE 29 100S 200E U-28203 12829 Federal GW P4304735132 FLOU9-30F bnSSE 30 100S 200E U-29784 12829 Federd GAV P4304735133 HCU 10-30F NWSE 30 100S 200E U-29784 12829 Federal GW P4304735134 HCU 1-31F NENE 31 100S 200E U-36903 12829 Federal GW P4304735135 HCU 12-31F NWSW 31 100S 200E U-30693 12829 Federal GW P4304735137 HCU 2-33F NENE 33 100S 200E U-28203 12829 Federal GW P4304735139 HCU 5-34F NENW 34 100S 200E U-28203 12829 Federal GW P4304735154 FFCU13-27F NESTV 27 100S 200E U-29784 12829 Federal Ciwi P4304735230 HCU 8-33F SENE 33 100S 200E 14-20-H62-4782 12829 Indian GW P4304735307 FLOU6-29F SF249V 29 100S 200E U-28203 12829 Federal (197 P4304735470 FFOUll-29F FIESTV 29 100S 200E U-28203 12829 Federal CON P4304735471 HCU 10-29F NWSE 29 100S 200E U-28203 12829 Federal GW P

1

N1095 DOMINIONE and P, INC. to N2615 XTO ENERGY, INC.

api well name qtr _qtr sec. twp rng lease_num entity Lease well stat4304731522 FEDERAL 1-29 SWNW 29 100S 200E U-28203 12829 Federal GW P4304731601 HILLCREEK FED 1-30 NWSW 30 100S 200E U-30693 12829 Federal GW P4304731675 HILL CREEK FED 1-27 SENW 27 100S 200E U-29784 12829 Federal GW P4304733671 HCU 1-28F NENE 28 100S 200E 14-20-H62-4783 12829 Indian GW S4304733672 EK3D1-29F NENE 29 100S 200E U-28203 12829Federed GGV P4304733673 HCU 2-30F NWNE 30 100S 200E UTU-29784 12829 Federal GW P4304733688 HCU 3-28F NENW 28 100S 200E U-28203 12829 Federal GW P4304733689 HCU 3-29F NENW 29 100S 200E U-28203 12829 Federal GW P4304733713 HCU 3-30F NWNW 30 100S 200E UTU-30693 12829 Federal GW P4304733835 EKTU5-30F SVnSTV 30 100S 200E U-30693 12829 Federed GNV P4304733836 HCU6-30F SF149V 30 100S 200E U-30693 12829 Federed GBA'P4304733964 HCU 8-30F SENE 30 100S 200E UTU-29784 12829 Federal GW P4304733965 BKTUll-30F NESMT 30 100S 200E U-30693 12829 Federed GNV P4304733966 FROU13-30F STVSTV 30 100S 200E U-30693 12829 Federal GPA' P4304734045 HCU 5-28F SWNW 28 100S 200E U-28203 12829 Federal GW P4304734046 HCU 7-29F SWNE 29 100S 200E U-28203 12829 Federal GW P4304734223 HCU 9-29F NESE 29 100S 200E U-28203 12829 Federal GW P4304734298 HCU 3-31F NWNW 31 100S 200E UTU-30693 12829 Federal GW P4304734299 HCU 5-31F SWNW 31 100S 200E UTU-30693 12829 Federal GW P4304734300 HCU7-31F SF2497 31 100S 200E UTU-30693 12829 Federd (IRT P4304734316 HCU 2-27F NWNE 27 100S 200E UTU-79130 12829 Federal GW P4304734351 HCU 8-27F SENE 27 100S 200E UTU-79130 12829 Federal GW P4304734352 HCU l l-31F NWSW 31 100S 200E UTU-30693 12829 Federal GW P4304734353 HCU 13-31F SWSW 31 100S 200E UTU-30693 12829 Federal GW P4304734853 HCU 1-33F NENE 33 100S 200E 14-20-H62-4782 12829 Indian GW P4304734854 HCU3-34F NENTV 34 100S 200E 0-28203 12829 Federal Ciñ7 P4304734913 EKTU1-27F NENE 27 100S 200E U-79130 12829 Federal G1V P4304734914 HCU 3-27F NENW 27 100S 200E U-79130 12829 Federal GW P4304734915 HCU 7-27F SWNE 27 100S 200E U-79130 12829 Federal GW S4304734916 HCU 10-27F NWSE 27 100S 200E U-79130 12829 Federal GW P4304734917 ffCU 14-30F STVSTV 30 100S 200E U-30693 12829 Federal GNV P4304734918 EKID 15-30F STVSE 30 100S 200E U-29784 12829 Federal Ciñ7 P4304734919 HCU 2-31F NWNE 31 100S 200E U-30693 12829 Federal GW P4304734920 HCU 6-31F SWNW 31 100S 200E U-30693 12829 Federal GW P4304734921 HCU 4-31F NWNW 31 100S 200E U-30693 12829 Federal GW P4304735130 FLOUll-27F knBSTV 27 100S 200E U-29784 12829 Federd GPN P4304735131 HCU 2-29F NWNE 29 100S 200E U-28203 12829 Federal GW P4304735132 FLOU9-30F bnSSE 30 100S 200E U-29784 12829 Federd GAV P4304735133 HCU 10-30F NWSE 30 100S 200E U-29784 12829 Federal GW P4304735134 HCU 1-31F NENE 31 100S 200E U-36903 12829 Federal GW P4304735135 HCU 12-31F NWSW 31 100S 200E U-30693 12829 Federal GW P4304735137 HCU 2-33F NENE 33 100S 200E U-28203 12829 Federal GW P4304735139 HCU 5-34F NENW 34 100S 200E U-28203 12829 Federal GW P4304735154 FFCU13-27F NESTV 27 100S 200E U-29784 12829 Federal Ciwi P4304735230 HCU 8-33F SENE 33 100S 200E 14-20-H62-4782 12829 Indian GW P4304735307 FLOU6-29F SF249V 29 100S 200E U-28203 12829 Federal (197 P4304735470 FFOUll-29F FIESTV 29 100S 200E U-28203 12829 Federal CON P4304735471 HCU 10-29F NWSE 29 100S 200E U-28203 12829 Federal GW P

1

Page 58: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

N1095 DOMINION E and P, INC. to N2615 XTO ENERGY, INC.

api well name qtr qtr sec twp rng lease_num entity Lease well stat4304735507 HCU 12-29FA NESW 29 100S 200E U-28203 12829 Federal GW DRL4304735724 El LI 16-27F SESE 27 100S 200E U-79130 12829 Federal (39V P4304735725 HCU 9-27F NESE 27 100S 200E U-79130 12829 Federal GW P4304735726 HCU 15-27F STVSE 27 100S 200E U-79130 12829 Federed Cigr p4304735727 HCU 9-34F NESE 34 100S 200E U-79130 12829 Federal GW P4304735728 HCU 7-34F SWNE 34 100S 200E U-79130 12829 Federal GW P4304735832 HCU9-33F NESE 33 100S 200E 0-28203 12829 Federed Cini P4304735833 HCU 16-33F SESE 33 100S 200E 0-28203 12829 Federed (IST P4304735835 H(ID 11-34F NESTV 34 100S 200E U-28203 12829 Federal GNV P4304735836 FB U 12-34F 149VSTV 34 100S 200E U-28203 12829 Federal (TOT P4304735837 HCU 13-34F SWSW 34 100S 200E U-28203 12829 Federal GW P4304735838 EBOU15-34F STVSE 34 100S 200E U-79130 12829 Federed GPA' P4304735875 EU U 14-34F STVSE 34 100S 200E U-79130 12829 Federed GDN P4304735934 FFOU8-31F SE24E 31 100S 200E U-30693 12829 Federed CON P4304735935 HCU 10-31F NWSE 31 100S 200E U-30693 12829 Federal GW P4304735936 HCU9-31F 149VSE 31 100S 200E U-30693 12829 Federed GR¥ P4304735939 ILCU 16-28F SESE 28 100S 200E 0-28203 12829 Federed GNY P4304735940 HCU 6-34F SENW 34 100S 200E U-28203 12829 Federal GW P4304735996 HCU 16-34F SESE 34 100S 200E U-79130 12829 Federal GW P4304736046 FLCU14-31F STVSTV 31 100S 200E 0-30693 12829 Federed GOV P4304736251 HCD 16-30F NESE 30 100S 200E 0-29784 12829 Federed GNV P4304736319 HCU 10-28F NWSE 28 100S 200E U-28203 12829 Federal GW P4304736320 FLCU13-28F STVSTV 28 100S 200E U-28203 12829 Federal GMT P4304736321 HCU 14-28F SESW 28 100S 200E U-28203 12829 Federal GW P4304736437 HCU 5-27F SWNW 27 100S 200E U-29784 12829 Federal GW DRL4304736438 HCU 4-27F SWNW 27 100S 200E U-29784 12829 Federal GW DRL4304736439 HCU ll-28F FIESTV 28 100S 200E U-28203 12829 Federed GMT P4304736440 HCU 5-30F2 SWNW 30 100S 200E U-30693 12829 Federal GW DRL4304736601 HCU 5-33F SWNW 33 100S 200E U-28203 12829 Federal GW P4304736602 HCU 12-33F NWSW 33 100S 200E U-28203 12829 Federal GW P4304736603 HCU 6-28F SENW 28 100S 200E U-28203 12829 Federal GW S4304736604 HCU 12-28F NWSW 28 100S 200E U-28203 12829 Federal GW P4304736685 HCU 13-33F STVSTV 33 100S 200E 0-28203 12829 Federed GB¥ P4304736846 HCU9-28F NESE 28 100S 200E 14-20-H62-4781 12829 Indian GW P4304736847 HCU 8-28F SENE 28 100S 200E 14-20-H62-4783 12829 Indian GW P4304736848 HCU 7-28F SWNE 28 100S 200E U-28203 12829 Federal GW P4304736849 H(TU 1-34F NENE 34 100S 200E U-79130 12829 Federed GNV P4304736852 HCU 14-27F NESW 27 100S 200E U-29784 12829 Federal GW DRL4304736853 FF LJ 16-29F SF/sE 29 100S 200E U-28203 12829 Federal (JVV P4304737060 HCU 4-33F NWNW 33 100S 200E U-28203 12829 Federal GW P4304737202 FF U6-33F SF149V 33 100S 200E U-28203 12829 Federed GMT P4304737203 HCU 3-33F NWNE 33 100S 200E U-28203 12829 Federal OW P4304737204 HCU 15-28F NWNE 33 100S 200E 14-20-H62-4781 12829 Indian OW P4304737284 HCU 7-30F SENE 30 100S 200E U-29784 99999 Federal OW DRL4304737340 HCU5-29F STVbn¥ 29 100S 200E U-28203 12829 Federed Ciwi P4304737360 HCU l1-33F NWSW 33 100S 200E U-28203 12829 Federal GW P4304737424 HCU 12-27F NESW 27 100S 200E U-29784 12829 Federal OW DRL4304737425 HCU 14-29F STVSNV 29 100S 200E U-28203 12829 Federal CivV P

2

N1095 DOMINION E and P, INC. to N2615 XTO ENERGY, INC.

api well name qtr qtr sec twp rng lease_num entity Lease well stat4304735507 HCU 12-29FA NESW 29 100S 200E U-28203 12829 Federal GW DRL4304735724 El LI 16-27F SESE 27 100S 200E U-79130 12829 Federal (39V P4304735725 HCU 9-27F NESE 27 100S 200E U-79130 12829 Federal GW P4304735726 HCU 15-27F STVSE 27 100S 200E U-79130 12829 Federed Cigr p4304735727 HCU 9-34F NESE 34 100S 200E U-79130 12829 Federal GW P4304735728 HCU 7-34F SWNE 34 100S 200E U-79130 12829 Federal GW P4304735832 HCU9-33F NESE 33 100S 200E 0-28203 12829 Federed Cini P4304735833 HCU 16-33F SESE 33 100S 200E 0-28203 12829 Federed (IST P4304735835 H(ID 11-34F NESTV 34 100S 200E U-28203 12829 Federal GNV P4304735836 FB U 12-34F 149VSTV 34 100S 200E U-28203 12829 Federal (TOT P4304735837 HCU 13-34F SWSW 34 100S 200E U-28203 12829 Federal GW P4304735838 EBOU15-34F STVSE 34 100S 200E U-79130 12829 Federed GPA' P4304735875 EU U 14-34F STVSE 34 100S 200E U-79130 12829 Federed GDN P4304735934 FFOU8-31F SE24E 31 100S 200E U-30693 12829 Federed CON P4304735935 HCU 10-31F NWSE 31 100S 200E U-30693 12829 Federal GW P4304735936 HCU9-31F 149VSE 31 100S 200E U-30693 12829 Federed GR¥ P4304735939 ILCU 16-28F SESE 28 100S 200E 0-28203 12829 Federed GNY P4304735940 HCU 6-34F SENW 34 100S 200E U-28203 12829 Federal GW P4304735996 HCU 16-34F SESE 34 100S 200E U-79130 12829 Federal GW P4304736046 FLCU14-31F STVSTV 31 100S 200E 0-30693 12829 Federed GOV P4304736251 HCD 16-30F NESE 30 100S 200E 0-29784 12829 Federed GNV P4304736319 HCU 10-28F NWSE 28 100S 200E U-28203 12829 Federal GW P4304736320 FLCU13-28F STVSTV 28 100S 200E U-28203 12829 Federal GMT P4304736321 HCU 14-28F SESW 28 100S 200E U-28203 12829 Federal GW P4304736437 HCU 5-27F SWNW 27 100S 200E U-29784 12829 Federal GW DRL4304736438 HCU 4-27F SWNW 27 100S 200E U-29784 12829 Federal GW DRL4304736439 HCU ll-28F FIESTV 28 100S 200E U-28203 12829 Federed GMT P4304736440 HCU 5-30F2 SWNW 30 100S 200E U-30693 12829 Federal GW DRL4304736601 HCU 5-33F SWNW 33 100S 200E U-28203 12829 Federal GW P4304736602 HCU 12-33F NWSW 33 100S 200E U-28203 12829 Federal GW P4304736603 HCU 6-28F SENW 28 100S 200E U-28203 12829 Federal GW S4304736604 HCU 12-28F NWSW 28 100S 200E U-28203 12829 Federal GW P4304736685 HCU 13-33F STVSTV 33 100S 200E 0-28203 12829 Federed GB¥ P4304736846 HCU9-28F NESE 28 100S 200E 14-20-H62-4781 12829 Indian GW P4304736847 HCU 8-28F SENE 28 100S 200E 14-20-H62-4783 12829 Indian GW P4304736848 HCU 7-28F SWNE 28 100S 200E U-28203 12829 Federal GW P4304736849 H(TU 1-34F NENE 34 100S 200E U-79130 12829 Federed GNV P4304736852 HCU 14-27F NESW 27 100S 200E U-29784 12829 Federal GW DRL4304736853 FF LJ 16-29F SF/sE 29 100S 200E U-28203 12829 Federal (JVV P4304737060 HCU 4-33F NWNW 33 100S 200E U-28203 12829 Federal GW P4304737202 FF U6-33F SF149V 33 100S 200E U-28203 12829 Federed GMT P4304737203 HCU 3-33F NWNE 33 100S 200E U-28203 12829 Federal OW P4304737204 HCU 15-28F NWNE 33 100S 200E 14-20-H62-4781 12829 Indian OW P4304737284 HCU 7-30F SENE 30 100S 200E U-29784 99999 Federal OW DRL4304737340 HCU5-29F STVbn¥ 29 100S 200E U-28203 12829 Federed Ciwi P4304737360 HCU l1-33F NWSW 33 100S 200E U-28203 12829 Federal GW P4304737424 HCU 12-27F NESW 27 100S 200E U-29784 12829 Federal OW DRL4304737425 HCU 14-29F STVSNV 29 100S 200E U-28203 12829 Federal CivV P

2

Page 59: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

N1095 DOMINION E and P, INC. to N2615 XTO ENERGY, INC.

api well_name qtr qtr sec twp rng lease_num entity Lease well stat4304737426 FLOU13-29F STVSTV 29 100S 200E U-28203 12829 Federed GON P4304737427 FFOLI8-29F 14ESE 29 100S 200E U-28203 12829 Federed Cigr p4304737445 FFOU8-34F SF24E 34 100S 200E U-79130 12829 Federed CB¥ S4304737446 HCU 2-34F NWNE 34 100S 200E U-79130 12829 Federal OW DRL4304737447 HCU 7-33F SENE 33 100S 200E U-28203 12829 Federal OW DRL4304737570 HCU 10-33F NWSE 33 100S 200E 14-20-H62-4782 12829 Indian GW P4304737749 HCU 4-28F NENW 28 100S 200E U-28203 99999 Federal GW DRL4304737750 FLOU14-33F STVSE 33 100S 200E U-028203 12829 Federal (ITV DRL

4304731560 HILL CREEK ST 1-32 SENW 32 100S 200E ML-22313 12829 State GW P4304734852 HCU 4-32F NWNW 32 100S 200E ML-22313-2 12829 State GW P4304735136 HCU5-32F STVbin' 32 100S 200E híL,22313-2 12829 State (IMF P4304735870 HCU 13-32F NESE 31 100S 200E ML-22313-2 State GW LA4304735871 FFOU12-32F blESE 31 100S 200E LIL-22313-2 State CPN LA4304735872 HCU 14-32F SESW 32 100S 200E ML-22313-2 12829 State GW P4304735873 HCU 3-32F NENW 32 100S 200E ML-22313-2 12829 State GW DRL4304735874 HCU ll-32F SFlivV 32 100S 200E NIL,22313-2 12829 State D PAL

4304736322 10CLI16-32F SESE 32 100S 200E A4L-22313-2 12829 State GNV P4304736323 HCU 9-32F NESE 32 100S 200E ML-22313-2 12829 State GW P4304736324 EBOU8-32F SE24E 32 100S 200E híL,22313-2 12829 State Cini P4304736441 HCU 1-32F2 NENE 32 100S 200E ML-22313-2 12829 State GW P4304736684 HCIJ7-32F SE24E 32 100S 200E NIL-22313-2 12829 State CON P

3

N1095 DOMINION E and P, INC. to N2615 XTO ENERGY, INC.

api well_name qtr qtr sec twp rng lease_num entity Lease well stat4304737426 FLOU13-29F STVSTV 29 100S 200E U-28203 12829 Federed GON P4304737427 FFOLI8-29F 14ESE 29 100S 200E U-28203 12829 Federed Cigr p4304737445 FFOU8-34F SF24E 34 100S 200E U-79130 12829 Federed CB¥ S4304737446 HCU 2-34F NWNE 34 100S 200E U-79130 12829 Federal OW DRL4304737447 HCU 7-33F SENE 33 100S 200E U-28203 12829 Federal OW DRL4304737570 HCU 10-33F NWSE 33 100S 200E 14-20-H62-4782 12829 Indian GW P4304737749 HCU 4-28F NENW 28 100S 200E U-28203 99999 Federal GW DRL4304737750 FLOU14-33F STVSE 33 100S 200E U-028203 12829 Federal (ITV DRL

4304731560 HILL CREEK ST 1-32 SENW 32 100S 200E ML-22313 12829 State GW P4304734852 HCU 4-32F NWNW 32 100S 200E ML-22313-2 12829 State GW P4304735136 HCU5-32F STVbin' 32 100S 200E híL,22313-2 12829 State (IMF P4304735870 HCU 13-32F NESE 31 100S 200E ML-22313-2 State GW LA4304735871 FFOU12-32F blESE 31 100S 200E LIL-22313-2 State CPN LA4304735872 HCU 14-32F SESW 32 100S 200E ML-22313-2 12829 State GW P4304735873 HCU 3-32F NENW 32 100S 200E ML-22313-2 12829 State GW DRL4304735874 HCU ll-32F SFlivV 32 100S 200E NIL,22313-2 12829 State D PAL

4304736322 10CLI16-32F SESE 32 100S 200E A4L-22313-2 12829 State GNV P4304736323 HCU 9-32F NESE 32 100S 200E ML-22313-2 12829 State GW P4304736324 EBOU8-32F SE24E 32 100S 200E híL,22313-2 12829 State Cini P4304736441 HCU 1-32F2 NENE 32 100S 200E ML-22313-2 12829 State GW P4304736684 HCIJ7-32F SE24E 32 100S 200E NIL-22313-2 12829 State CON P

3

Page 60: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

United States Department of the InteriorBUREAU OF LAND MANAGEMENT

Utah State Office RKE Pit!DEP.O. Box 45155 INg ERICA

Salt Lake City, UT 84145-0155

IN REPLY REFER TO3180UT-922

Dominion Exploration & Production, Inc.Attn: James D. Abercrombie14000 Quail Springs Parkway, #600Oklahoma City, OK 73134-2600

August 10, 2007

Re: HillCreek UnitUintah County, Utah

Gentlemen:

On August 8, 2007, we received an indenture dated June 30, 2007, whereby Dominion Exploration& Production, Inc. resigned as Unit Operator and XTO Energy Inc. was designated as SuccessorUnit Operator for the HillCreek Unit, Uintah County, Utah.

This indenture was executed by all required parties and the signatory parties have complied withSections 5 and 6 of the unit agreement. The instrument is hereby approved effective August 15,2007. In approving this designation, the Authorized Officer neither warrants nor certifies that thedesignated party has obtained all required approval thatwould entitle it to conduct operations underthe HillCreek Unit Agreement.

Your statewide oil and gas Bond No. UTBOOO138willbe used to cover all operations within theRiver Bend Unit.

It is requested that you notifyall interested parties of the change in unit operator. Copies of theapproved instruments are being distributed to the appropriate federal offices, with one copy retumedherewith.

Sincerely,

/s/ Greg J. Noble

Greg J. NobleActing Chief, Branch of Fluid Minerals

EnclosureRECEIVEDAUS1 62007

DIV.0F0lL,GAS&

United States Department of the InteriorBUREAU OF LAND MANAGEMENT

Utah State Office RKE Pit!DEP.O. Box 45155 INg ERICA

Salt Lake City, UT 84145-0155

IN REPLY REFER TO3180UT-922

Dominion Exploration & Production, Inc.Attn: James D. Abercrombie14000 Quail Springs Parkway, #600Oklahoma City, OK 73134-2600

August 10, 2007

Re: HillCreek UnitUintah County, Utah

Gentlemen:

On August 8, 2007, we received an indenture dated June 30, 2007, whereby Dominion Exploration& Production, Inc. resigned as Unit Operator and XTO Energy Inc. was designated as SuccessorUnit Operator for the HillCreek Unit, Uintah County, Utah.

This indenture was executed by all required parties and the signatory parties have complied withSections 5 and 6 of the unit agreement. The instrument is hereby approved effective August 15,2007. In approving this designation, the Authorized Officer neither warrants nor certifies that thedesignated party has obtained all required approval thatwould entitle it to conduct operations underthe HillCreek Unit Agreement.

Your statewide oil and gas Bond No. UTBOOO138willbe used to cover all operations within theRiver Bend Unit.

It is requested that you notifyall interested parties of the change in unit operator. Copies of theapproved instruments are being distributed to the appropriate federal offices, with one copy retumedherewith.

Sincerely,

/s/ Greg J. Noble

Greg J. NobleActing Chief, Branch of Fluid Minerals

EnclosureRECEIVEDAUS1 62007

DIV.0F0lL,GAS&

Page 61: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Foma316tx5 . UNITED STATES FORMAPPROVED(February2005) DEPARTMENTOF THE INTERIOR g°Ëir

e 007BUREAUOF LAND MANAGEMENT 5. LeaseSerialNo.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784

Do not use this form for proposals to drill or to re-enter an 6. If Indian,AllotteeorTribeNameabandoned well. Use Form 3160 - 3 (APD) for such proposals.

SUBN1/T IN TRIPLICATE- Other instructions on reverse side. 7. IfUnitor CA/Agreement, Name and/or No.

HILL CREEK UNITL Type of)ilWell GasWell Oder 8. Well NameandNo.

HCU 14-27F2. NameofOperatorXTO ENERGY INC. 9. APIWellNo.3a Address 3b. PhoneNo. (includearea code) 4304739e4 gg

382 CR 3100 AZTEC, NM 87410 505-333-3100 10. Fieldand Pool,or ExploratoryArea4. Locationof Well (Footage,Sec.,T. R.,M, or SmveyDescription) NATURALBUTTES

1569' FSL & 1937' FWL NESW SEC 27-T10S-T203 11. CountyorParish,State

UINTAH, UTAH

12. CHECK APPROPRIATEBOX(ES)TO INDICATENATURE OFNGITCEREPORT, OR OTHERDATA

TYPEOF SUBMISSION TYPEOF ACTION

O Acidize Deepen Production(Start/Resume) WaterShut-OffNoticeof Intent AlterCasing FmotureTreat Reclamation WellIntegnty

SubsequentReport Casing Repair NewConstruction Recomplete Other OCT 2007

ChangePlans PlugandAbandon TemporarilyAbandon MONTHLY RPTFinalAbandonment Notice Converttoinjection PlugBack WaterDisposal

13 Describe ProposedorCompletedOperation(clearly stateallpertinentdetails,includingestimatedstartingdateof any proposed work and approximate dumtionthereof.Iftheproposalistodeependirectionallyor recomplete horizontally,givesubsurfacelocationsandmeasuredandtmevertical depthsofallpertinentmarkersandzones.Attach the Bondunder which thework will beperformedor providetheBondNo. onfilewithBLM/BIA.Requiredsubsequentreports must befiledwithin 30daysfollowingcompletion oftheinvolvedoperations.If theoperationresultsina multiplecompletionor recompletionina new interval,a Form3160-4must befiledoncetesting hasbeencompleted.FinalAbandonmentNoticesmust befiledonlyafterallrequirements,includingreclamation, have beencompleted,andtheoperatorhasdeterminedthatthesiteisready forfinalinspection.)

Attached is XTO Energy's monthly report for the period of 8/1/2007 to 10/4/2007.

I4. Thereby certify th t the foregoing is true and correctName (Prin d/ yped

Title REGULATORY COMPLIANCE TECH

SIS" Date 10/05/2007

THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approved by_ _

Title DateConditionsof approval,ifany, are attached. Approval ofthisnotice does not warrant orcertify thattheapplicant holdslegalor equitable titleto thoserightsinthesubjectlease Officewhich would entitletheapplicant to conduct operations thereon.Title l8 U.S.C.Section1001and Tide43U.S.C.Section1212,makeit a crime.for.anypersonknowinglyandwillfully tomake to anydepartmentor agencyofthe UnitedStates any false, fictitious or fraudulentstatements or representations as tdãilyniatterwithin itsjunsdiction.(Instructions on page 2)

RECElVEDOCT1O2007

JF OILGAM

Foma316tx5 . UNITED STATES FORMAPPROVED(February2005) DEPARTMENTOF THE INTERIOR g°Ëir

e 007BUREAUOF LAND MANAGEMENT 5. LeaseSerialNo.

SUNDRY NOTICES AND REPORTS ON WELLS U-29784

Do not use this form for proposals to drill or to re-enter an 6. If Indian,AllotteeorTribeNameabandoned well. Use Form 3160 - 3 (APD) for such proposals.

SUBN1/T IN TRIPLICATE- Other instructions on reverse side. 7. IfUnitor CA/Agreement, Name and/or No.

HILL CREEK UNITL Type of)ilWell GasWell Oder 8. Well NameandNo.

HCU 14-27F2. NameofOperatorXTO ENERGY INC. 9. APIWellNo.3a Address 3b. PhoneNo. (includearea code) 4304739e4 gg

382 CR 3100 AZTEC, NM 87410 505-333-3100 10. Fieldand Pool,or ExploratoryArea4. Locationof Well (Footage,Sec.,T. R.,M, or SmveyDescription) NATURALBUTTES

1569' FSL & 1937' FWL NESW SEC 27-T10S-T203 11. CountyorParish,State

UINTAH, UTAH

12. CHECK APPROPRIATEBOX(ES)TO INDICATENATURE OFNGITCEREPORT, OR OTHERDATA

TYPEOF SUBMISSION TYPEOF ACTION

O Acidize Deepen Production(Start/Resume) WaterShut-OffNoticeof Intent AlterCasing FmotureTreat Reclamation WellIntegnty

SubsequentReport Casing Repair NewConstruction Recomplete Other OCT 2007

ChangePlans PlugandAbandon TemporarilyAbandon MONTHLY RPTFinalAbandonment Notice Converttoinjection PlugBack WaterDisposal

13 Describe ProposedorCompletedOperation(clearly stateallpertinentdetails,includingestimatedstartingdateof any proposed work and approximate dumtionthereof.Iftheproposalistodeependirectionallyor recomplete horizontally,givesubsurfacelocationsandmeasuredandtmevertical depthsofallpertinentmarkersandzones.Attach the Bondunder which thework will beperformedor providetheBondNo. onfilewithBLM/BIA.Requiredsubsequentreports must befiledwithin 30daysfollowingcompletion oftheinvolvedoperations.If theoperationresultsina multiplecompletionor recompletionina new interval,a Form3160-4must befiledoncetesting hasbeencompleted.FinalAbandonmentNoticesmust befiledonlyafterallrequirements,includingreclamation, have beencompleted,andtheoperatorhasdeterminedthatthesiteisready forfinalinspection.)

Attached is XTO Energy's monthly report for the period of 8/1/2007 to 10/4/2007.

I4. Thereby certify th t the foregoing is true and correctName (Prin d/ yped

Title REGULATORY COMPLIANCE TECH

SIS" Date 10/05/2007

THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approved by_ _

Title DateConditionsof approval,ifany, are attached. Approval ofthisnotice does not warrant orcertify thattheapplicant holdslegalor equitable titleto thoserightsinthesubjectlease Officewhich would entitletheapplicant to conduct operations thereon.Title l8 U.S.C.Section1001and Tide43U.S.C.Section1212,makeit a crime.for.anypersonknowinglyandwillfully tomake to anydepartmentor agencyofthe UnitedStates any false, fictitious or fraudulentstatements or representations as tdãilyniatterwithin itsjunsdiction.(Instructions on page 2)

RECElVEDOCT1O2007

JF OILGAM

Page 62: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

UINTAHHCU14-27FLOCATION : NESW, Sec27, T10S, R20ECONTRACTOR: Frontier Drilling, 2

DATE: 6/21/2007OPERATION: PRESET SURFACECSGDFS: 0.5 Footage Made: Measured Depth:MW: VISC:WOB: RPM:DMC: CMC: DWC: 114,536.00 CWC: 114,536.00TIME DIST: (8.00) DRILL 550 OF 175 HOLE. (8.00) RUN CSG. (8.00) CEMENT CSG.

DATE: 7/31/2007OPERATION: MIRUDFS: 40.5 Footage Made: Measured Depth:MW: VISC:WOB: RPM:DMC: CMC: DWC: CWC: 114,536.00TIME DIST: (24.00)

DATE: 8/1/2007OPERATION: REPAIR RIGDFS: 41.5 Footage Made: Measured Depth:MW; 8.6 VISC: 26WOB: RPM:DMC: CMC: DWC: 29,750.00 CWC: 144,286.00TIME DIST: (24.00) REPAI.

DATE: 8/2/2007OPERATION: RR,TIH W/BHADFS: 42.5 Footage Made: Measured Depth:MW: 8.6 VISC:WOB: RPM:DMC; CMC: DWC: 116.059.00 CWC: 260,345.00TIME DIST: (19.50) REPAIR RIG, MU BHA AND TlH. (1.00) RU FLOOR. (3.50) PU DIREC TOOLS AND TlH.

DATE: 8/3/2007OPERATION: direc drig 12.25DFS: 43.5 Footage Made: 878 Measured Depth: 1.428MW: 8.6 VISC: 33WOB: 30 RPM: 0DMC: CMC: DWC: 44,230.00 CWC: 304,575.00TIMEDIST: (2.50) . (0.50). (6.00) . (0.50)RIGSERVICE. (14.50) .

DATE: 8/4/2007OPERATION: direcdrig 12.25 holeDFS: 44.5 Footage Made: 1,077 Measured Depth: 2,505MW: 8.7 VISC: 33WOB: 30 RPM: 0DMC: CMC: DWC: 43,320.00 CWC: 347,895.00TIME DIST: (5.50) DRLG Fl 1428 TO 1696. (0.50)RIG SERVICE. (16.50) DRLG FI 1696 TO 2457. (0.50)WORK ON PUMP SWAB.

(1.00) DRLGF/ 2457 TO 2505.

DATE: 8/5/2007OPERATION: DIRECDRLG12.25 HOLEDFS: 45.5 Footage Made: 1,029 Measured Depth: 3,534MW: 8.9 VISC: 32WOB: 30 RPM: 0DMC: CMC: DWC: 46,145.00 CWC: 394.040.00TIME DIST: (9.00) DRLG TO 2933. (0.50)RIG SERVlCE. (14.50) DRLG TO 3534.

DATE: 8/6/2007OPERATION: NU BOPEDFS: 46.5 Footage Made: 116 Measured Depth: 3,650MW: VISC:WOB: 30 RPM: 0DMC: CMC: DWC: 81,633.00 CWC: 475,673.00TIME DIST: (3.50) DRLGTO 3650. (0.50)CIRC F, CSG. (3.00) TOOH, LDDIRECTOOLS. (3.00) RU CSG CREWAND WAITON

ELEVATORS, BROUGHT OUT WRONGSIZE. (4.50) RUN CSG TO 3627'. (1.00) CIRCAND RD CSG AND RU CEMENT(3.00) CEMENT CSG. (1.50) ND DIVERTER. (4.00) NU BOPE.

DATE:

UINTAHHCU14-27FLOCATION : NESW, Sec27, T10S, R20ECONTRACTOR: Frontier Drilling, 2

DATE: 6/21/2007OPERATION: PRESET SURFACECSGDFS: 0.5 Footage Made: Measured Depth:MW: VISC:WOB: RPM:DMC: CMC: DWC: 114,536.00 CWC: 114,536.00TIME DIST: (8.00) DRILL 550 OF 175 HOLE. (8.00) RUN CSG. (8.00) CEMENT CSG.

DATE: 7/31/2007OPERATION: MIRUDFS: 40.5 Footage Made: Measured Depth:MW: VISC:WOB: RPM:DMC: CMC: DWC: CWC: 114,536.00TIME DIST: (24.00)

DATE: 8/1/2007OPERATION: REPAIR RIGDFS: 41.5 Footage Made: Measured Depth:MW; 8.6 VISC: 26WOB: RPM:DMC: CMC: DWC: 29,750.00 CWC: 144,286.00TIME DIST: (24.00) REPAI.

DATE: 8/2/2007OPERATION: RR,TIH W/BHADFS: 42.5 Footage Made: Measured Depth:MW: 8.6 VISC:WOB: RPM:DMC; CMC: DWC: 116.059.00 CWC: 260,345.00TIME DIST: (19.50) REPAIR RIG, MU BHA AND TlH. (1.00) RU FLOOR. (3.50) PU DIREC TOOLS AND TlH.

DATE: 8/3/2007OPERATION: direc drig 12.25DFS: 43.5 Footage Made: 878 Measured Depth: 1.428MW: 8.6 VISC: 33WOB: 30 RPM: 0DMC: CMC: DWC: 44,230.00 CWC: 304,575.00TIMEDIST: (2.50) . (0.50). (6.00) . (0.50)RIGSERVICE. (14.50) .

DATE: 8/4/2007OPERATION: direcdrig 12.25 holeDFS: 44.5 Footage Made: 1,077 Measured Depth: 2,505MW: 8.7 VISC: 33WOB: 30 RPM: 0DMC: CMC: DWC: 43,320.00 CWC: 347,895.00TIME DIST: (5.50) DRLG Fl 1428 TO 1696. (0.50)RIG SERVICE. (16.50) DRLG FI 1696 TO 2457. (0.50)WORK ON PUMP SWAB.

(1.00) DRLGF/ 2457 TO 2505.

DATE: 8/5/2007OPERATION: DIRECDRLG12.25 HOLEDFS: 45.5 Footage Made: 1,029 Measured Depth: 3,534MW: 8.9 VISC: 32WOB: 30 RPM: 0DMC: CMC: DWC: 46,145.00 CWC: 394.040.00TIME DIST: (9.00) DRLG TO 2933. (0.50)RIG SERVlCE. (14.50) DRLG TO 3534.

DATE: 8/6/2007OPERATION: NU BOPEDFS: 46.5 Footage Made: 116 Measured Depth: 3,650MW: VISC:WOB: 30 RPM: 0DMC: CMC: DWC: 81,633.00 CWC: 475,673.00TIME DIST: (3.50) DRLGTO 3650. (0.50)CIRC F, CSG. (3.00) TOOH, LDDIRECTOOLS. (3.00) RU CSG CREWAND WAITON

ELEVATORS, BROUGHT OUT WRONGSIZE. (4.50) RUN CSG TO 3627'. (1.00) CIRCAND RD CSG AND RU CEMENT(3.00) CEMENT CSG. (1.50) ND DIVERTER. (4.00) NU BOPE.

DATE:

Page 63: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

OPERATION: DRLG 7 7/6 HOLE @4599DFS: 47.5 Footage Made: 949 Measured Depth: 4,599MW: 8.7 VISC: 26WOB: 20 RPM: 50DMC: CMC: DWC: 50,010.00 CWC: 525,683.00TIME DIST: (5.00) TEST BOPE. (5.00) TiH W/ BHA 2. (0.50)DRLGCEMENT FLT AND SHOE TO 3650. (1.00) DRLG NEW

FORMATION. (0.50) FIT. (4.50) DRLG TO 4123. (0.50) SURVEY @4039 3 DEG. (7.00) DRLGTO 4599.

DATE: 8/8/2007OPERATION: DRLG7 7/8 HOLE @5810DFS: 48.5 Footage Made: 1,211 Measured Depth: 5,810MW: 8.6 VISC: 26WOB: 25 RPM: 50DMC: CMG: DWC: 41,525.00 CWC: 567,208.00TIME DIST: (930.00) DRLGTO 4852. (1000.00) SURVEY@ 4767 3 DEG. (1300.00) DRLGTO 5200. (1330.00) RIG SERVICE,

(1800.00) DRLGTO 5335. (2200.00) DRLGTO 5517. (2330.00) WORKON FLOOR MOTORS. (600.00) DRLGTO 5810.

DATE: 8/9/2007OPERATION: DRLGDFS: 49.5 Footage Made: 642 Measured Depth: 6,452MW: 9 VISC: 36WOB: 25 RPM: 55DMC: CMC: DWC: 42,256.00 CWC: 609,464.00TIME DIST: (1.00) DRLGTO 5866. (0.50)SURVEY @ 5791 2.4 DEG. (5.50) DRLGTO 6056, LOSINGPRESSURE DROP FLAG,

SLIGHT BUMP @5100'. (4.50) TOOH CHK FOR WO, NO WO. (0.50)FUNCTION TEST BOPE. (1.50) TlH. (1.00) FILL PIPEAND CIRC GAS OUT. (1.50) TlH WASH 50' TO BTM. (8.00) DRLG TO 6452.

DATE: 8/10/2007OPERATION: DRLGDFS: 50.5 Footage Made: 798 Measured Depth: 7,250MW: 9 VISC: 33WOB: 25 RPM: 55DMC: CMC: DWC: 39,432.00 CWC: 648,896.00TIME DIST: (9.00) DRLGTO 6832. (0.50)RIGSERVICE. (1.00) DRLG TO 6863. (0.50)SURVEY @6780 2 DEG. (1.00) DRLG TO

6895. (12.00) DRLGTO 7250.

DATE: 8/11/2007OPERATION: DRLGDFS: 51.5 Footage Made: 610 Measured Depth: 7,860MW: VISC:WOB: 20 RPM: 55DMC: CMC: DWC: 41,664.00 CWC: 690,560.00TIME DIST: (2.50) DRLD 7250'-7305' (55' @22 FPH). (0.50)RIG SERVICE, FUNCT. TEST BOP. (21.00) DRLD 7305'-7660° (555' @

26.4FPH).

DATE: 8/12/2007OPERATION: TOH FOR LOGSDFS: 52.5 Footage Made: 365 Measured Depth: 8,225MW: 9.7 VISC: 41WOB: 25 RPM: 55DMC: CMC: DWC: 39,432.00 CWC: 729,992.00TIME DIST: (11.00) DRLD 7860'-8067' (207' @ 18.8 FPH). (0.50)RIG SERVICE, FUNCT. TEST BOP, HCR. (7.00) DRLD 8067'-8225'

(158'@ 22.5 FPH). (1.50) CIRC. AND COND. HOLE FOR LOGS. (4.00) POOH LAYINGDOWN MM.

DATE: 8/13/2007OPERATION: RUNNING 5-1/2" CSG.DFS: 53.5 Footage Made: 0 Measured Depth: 8.225MW: 9.9 VISC: 43WOB: RPM:DMC: CMC: DWC: 58,999.00 CWC:

OPERATION: DRLG 7 7/6 HOLE @4599DFS: 47.5 Footage Made: 949 Measured Depth: 4,599MW: 8.7 VISC: 26WOB: 20 RPM: 50DMC: CMC: DWC: 50,010.00 CWC: 525,683.00TIME DIST: (5.00) TEST BOPE. (5.00) TiH W/ BHA 2. (0.50)DRLGCEMENT FLT AND SHOE TO 3650. (1.00) DRLG NEW

FORMATION. (0.50) FIT. (4.50) DRLG TO 4123. (0.50) SURVEY @4039 3 DEG. (7.00) DRLGTO 4599.

DATE: 8/8/2007OPERATION: DRLG7 7/8 HOLE @5810DFS: 48.5 Footage Made: 1,211 Measured Depth: 5,810MW: 8.6 VISC: 26WOB: 25 RPM: 50DMC: CMG: DWC: 41,525.00 CWC: 567,208.00TIME DIST: (930.00) DRLGTO 4852. (1000.00) SURVEY@ 4767 3 DEG. (1300.00) DRLGTO 5200. (1330.00) RIG SERVICE,

(1800.00) DRLGTO 5335. (2200.00) DRLGTO 5517. (2330.00) WORKON FLOOR MOTORS. (600.00) DRLGTO 5810.

DATE: 8/9/2007OPERATION: DRLGDFS: 49.5 Footage Made: 642 Measured Depth: 6,452MW: 9 VISC: 36WOB: 25 RPM: 55DMC: CMC: DWC: 42,256.00 CWC: 609,464.00TIME DIST: (1.00) DRLGTO 5866. (0.50)SURVEY @ 5791 2.4 DEG. (5.50) DRLGTO 6056, LOSINGPRESSURE DROP FLAG,

SLIGHT BUMP @5100'. (4.50) TOOH CHK FOR WO, NO WO. (0.50)FUNCTION TEST BOPE. (1.50) TlH. (1.00) FILL PIPEAND CIRC GAS OUT. (1.50) TlH WASH 50' TO BTM. (8.00) DRLG TO 6452.

DATE: 8/10/2007OPERATION: DRLGDFS: 50.5 Footage Made: 798 Measured Depth: 7,250MW: 9 VISC: 33WOB: 25 RPM: 55DMC: CMC: DWC: 39,432.00 CWC: 648,896.00TIME DIST: (9.00) DRLGTO 6832. (0.50)RIGSERVICE. (1.00) DRLG TO 6863. (0.50)SURVEY @6780 2 DEG. (1.00) DRLG TO

6895. (12.00) DRLGTO 7250.

DATE: 8/11/2007OPERATION: DRLGDFS: 51.5 Footage Made: 610 Measured Depth: 7,860MW: VISC:WOB: 20 RPM: 55DMC: CMC: DWC: 41,664.00 CWC: 690,560.00TIME DIST: (2.50) DRLD 7250'-7305' (55' @22 FPH). (0.50)RIG SERVICE, FUNCT. TEST BOP. (21.00) DRLD 7305'-7660° (555' @

26.4FPH).

DATE: 8/12/2007OPERATION: TOH FOR LOGSDFS: 52.5 Footage Made: 365 Measured Depth: 8,225MW: 9.7 VISC: 41WOB: 25 RPM: 55DMC: CMC: DWC: 39,432.00 CWC: 729,992.00TIME DIST: (11.00) DRLD 7860'-8067' (207' @ 18.8 FPH). (0.50)RIG SERVICE, FUNCT. TEST BOP, HCR. (7.00) DRLD 8067'-8225'

(158'@ 22.5 FPH). (1.50) CIRC. AND COND. HOLE FOR LOGS. (4.00) POOH LAYINGDOWN MM.

DATE: 8/13/2007OPERATION: RUNNING 5-1/2" CSG.DFS: 53.5 Footage Made: 0 Measured Depth: 8.225MW: 9.9 VISC: 43WOB: RPM:DMC: CMC: DWC: 58,999.00 CWC:

Page 64: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

TIME DIST: (1.00) RU SCHLUMBERGERANDHOLDSAFETY MEETING. (5.00) SCHLUMBERGERRANPLATFORMEXPRESS,FDC/CNL/DLLW/ GR &CAL.ANDDIRECTIONALSURVEYFROM 8225' LTD TO 3644', BASE INTERMED.CSG.. (2.50)FUNCT. TEST BOP AND TlH TO 3600'.. (1.50) SLIP AND CUTDRLGLINE. (2.00) TIHWASHING60' TO BTM.. (1.00) CIRCANDCOND.HOLEFOR CSG.. (5.00) RU FRANKSWESTATESLAYDOWNMACHINEANDPOOH LAYlNGDOWNDP ANDDC.. (1.00) RU FRANKSWESTATESCSG. SERV. AND HOLDSAFETYMEETING. (3.50) RUNNING5-1/2" CASINGINCOMPLETE. (1.50) REPAIR LAYDOWN TRUCK.

DATE: 8/14/2007OPERATION: RIGGINGDOWNDFS: 54.5 Footage Made: 0 . Measured Depth: 8,225MW: VISC:WOB: RPM:DMC: CMC: DWC: 63,051.00 CWC: 852,042.00TIME DIST: (1.00) LD BROKE DOWN. (3.50) RUN CSG TO 8198, COULD NOT GET LANDINGJT ON , SET SLIPS. (3.00) CEMENT

CSG. (4.00) ND BOPE AND CLEAN PITS. (12.50) RIG DOWNFOR

TIME DIST: (1.00) RU SCHLUMBERGERANDHOLDSAFETY MEETING. (5.00) SCHLUMBERGERRANPLATFORMEXPRESS,FDC/CNL/DLLW/ GR &CAL.ANDDIRECTIONALSURVEYFROM 8225' LTD TO 3644', BASE INTERMED.CSG.. (2.50)FUNCT. TEST BOP AND TlH TO 3600'.. (1.50) SLIP AND CUTDRLGLINE. (2.00) TIHWASHING60' TO BTM.. (1.00) CIRCANDCOND.HOLEFOR CSG.. (5.00) RU FRANKSWESTATESLAYDOWNMACHINEANDPOOH LAYlNGDOWNDP ANDDC.. (1.00) RU FRANKSWESTATESCSG. SERV. AND HOLDSAFETYMEETING. (3.50) RUNNING5-1/2" CASINGINCOMPLETE. (1.50) REPAIR LAYDOWN TRUCK.

DATE: 8/14/2007OPERATION: RIGGINGDOWNDFS: 54.5 Footage Made: 0 . Measured Depth: 8,225MW: VISC:WOB: RPM:DMC: CMC: DWC: 63,051.00 CWC: 852,042.00TIME DIST: (1.00) LD BROKE DOWN. (3.50) RUN CSG TO 8198, COULD NOT GET LANDINGJT ON , SET SLIPS. (3.00) CEMENT

CSG. (4.00) ND BOPE AND CLEAN PITS. (12.50) RIG DOWNFOR

Page 65: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

.TOEnergy - Farmington District Workover Report Page 1 01 i

Farmington Well Workover Report

IILL CREEK UNIT Well#14-27F MV

lbjective: Drill & Completeirst 08/13/2007teport:/14/07 Wellview has all the drilling detail and accumulated cost.

/5/07 Std inst 220' of4".188W X42 steel gas line across loc. Std tie in of 4".188W X42 steel gas line to 2" mtr run. Compl 5 -4" & l- 2" welds. MI equip to loc. SDFN.

/12/07 Cont rpt for AFE# 713966. MI build pads for sep/dehy combo unit, tk & mtr. Set 12' x 20'Natco tk (8J27301-02) w/500K htr(SN 0706-667). Set Pessco sep/dehy combo unit w/pre htr 24" x 12' w/250K heater & 16" X 6' vert sep & 16" x 15'absorbertower & dehy w/75k htr (SN 102384). Build pad & set 2" sales mtr run w/Daniels simplex w/600 psi figs. Run 2" sch 80 TBEbare pipe fr/WH to combo unit & fr/combo unit to prod tk. Run 2' In fr/combo unit to sales mtr. Run 1/2" steel tbg for heat tr totk & WH. Inst tk containment ring 44" x 52' x 10 ga & paint Carlsbad tan. Ins & tin flw ln & tk ln. Susp rpt pending furtheractivity.

/17/07 Inst new TotalFlow XFC 6413 #23107448, Ferguson ACP 5000 #07050682, MDS radio 4710B #l59537l,man, solar panel,esg. and tbg xmtr, latching vlv, tk lv1sw. Complete.

ttp://dor/rept_workover.asp

.TOEnergy - Farmington District Workover Report Page 1 01 i

Farmington Well Workover Report

IILL CREEK UNIT Well#14-27F MV

lbjective: Drill & Completeirst 08/13/2007teport:/14/07 Wellview has all the drilling detail and accumulated cost.

/5/07 Std inst 220' of4".188W X42 steel gas line across loc. Std tie in of 4".188W X42 steel gas line to 2" mtr run. Compl 5 -4" & l- 2" welds. MI equip to loc. SDFN.

/12/07 Cont rpt for AFE# 713966. MI build pads for sep/dehy combo unit, tk & mtr. Set 12' x 20'Natco tk (8J27301-02) w/500K htr(SN 0706-667). Set Pessco sep/dehy combo unit w/pre htr 24" x 12' w/250K heater & 16" X 6' vert sep & 16" x 15'absorbertower & dehy w/75k htr (SN 102384). Build pad & set 2" sales mtr run w/Daniels simplex w/600 psi figs. Run 2" sch 80 TBEbare pipe fr/WH to combo unit & fr/combo unit to prod tk. Run 2' In fr/combo unit to sales mtr. Run 1/2" steel tbg for heat tr totk & WH. Inst tk containment ring 44" x 52' x 10 ga & paint Carlsbad tan. Ins & tin flw ln & tk ln. Susp rpt pending furtheractivity.

/17/07 Inst new TotalFlow XFC 6413 #23107448, Ferguson ACP 5000 #07050682, MDS radio 4710B #l59537l,man, solar panel,esg. and tbg xmtr, latching vlv, tk lv1sw. Complete.

ttp://dor/rept_workover.asp

Page 66: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

OSTATEOFUTAH FORM9

DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS MID MNiNG 5. LEASE DESIGNATIONAND SERAL NUMBER:

U-29784

SUNDRY NOTICES AND REPORTS ON WELLS NNbA OTTEERORTRBENAME:

7 UNIT or CA AGREEMENT NAMEDo not use this form for proposals to drillnew wells, signifcantlydeepen existing wells below current bottom-hole depth, reenter plugged wells, or to HILLCREEK UNITdrillhorizontal laterals. Use APPLICATIONFOR PERMITTO DRILLform for such proposals.

1. TYPE OF WELL 8. WELL NAMEand NUMBER:OIL WELL GAS WELL OTHER HCU 14-27F

2 NAMEOFOPERATOR. 9.APINUMBER

XTO ENERGY INC. 43047368523 ADDRESSOF OPERATOR PHONE NUMBER 10. FIELD ANDPOOL. OR WLDCAT

382 CR 3100 AZTEC NM 87410 (505) 333-3100 NATURAL BUTTES4 LOCATION OF WELL

FOOTAGESAT SURFACE: 1569' FSL & 1937' FWL COUNTY: UINTAH

QTR/QTR. SECTION. TOWNSHiP, RANGE, MERIDIAN: NESW 27 10S 20E S STATE:UTAH

11. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

AClDIZE DEEPEN REPERFORATE CURRENT FORMAT10NO NOT1CEOF INTENT

(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work willstart: CASING REPA1R NEW CONSTRUCTION TEMPORARILY ABANDON

CHANGETO PREMOUS PLANS OPERATOR CHANGE TUB1NGREPA1R

CHANGE TUBING PLUG AND ABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Onginal Form Only)

O CHANGEWELLSTATUS PRODUCDON (START/RESUME) WATER SHUT-OFFDate of work completion

O COMMtNGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: MONTHLY RPT11/15/2007

CONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION 10/6/07 - 11/15/07

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Monthly Report for 10/6/2007 to 11/15/2007 attached.

RECEIVEDNov2a2eo7

DIVOFOIL,GAS&MINING

NAME(PLEASE PRINT) Y ERK S 1EGU2LATORYCOMPLIANCETECH

(This space for State use only)

(5/2000) (See Instructions on Reverse

OSTATEOFUTAH FORM9

DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS MID MNiNG 5. LEASE DESIGNATIONAND SERAL NUMBER:

U-29784

SUNDRY NOTICES AND REPORTS ON WELLSNNbA OTTEERORTRBENAME:

7 UNIT or CA AGREEMENT NAMEDo not use this form for proposals to drillnew wells, signifcantlydeepen existing wells below current bottom-hole depth, reenter plugged wells, or to HILLCREEK UNITdrillhorizontal laterals. Use APPLICATIONFOR PERMITTO DRILLform for such proposals.

1. TYPE OF WELL 8. WELL NAMEand NUMBER:OIL WELL GAS WELL OTHER HCU 14-27F

2 NAMEOFOPERATOR. 9.APINUMBER

XTO ENERGY INC. 43047368523 ADDRESSOF OPERATOR PHONE NUMBER 10. FIELD ANDPOOL. OR WLDCAT

382 CR 3100 AZTEC NM 87410 (505) 333-3100 NATURAL BUTTES4 LOCATION OF WELL

FOOTAGESAT SURFACE: 1569' FSL & 1937' FWL COUNTY: UINTAH

QTR/QTR. SECTION. TOWNSHiP, RANGE, MERIDIAN: NESW 27 10S 20E S STATE:UTAH

11. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

AClDIZE DEEPEN REPERFORATE CURRENT FORMAT10NO NOT1CEOF INTENT

(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work willstart: CASING REPA1R NEW CONSTRUCTION TEMPORARILY ABANDON

CHANGETO PREMOUS PLANS OPERATOR CHANGE TUB1NGREPA1R

CHANGE TUBING PLUG AND ABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Onginal Form Only)

O CHANGEWELLSTATUS PRODUCDON (START/RESUME) WATER SHUT-OFFDate of work completion

O COMMtNGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: MONTHLY RPT11/15/2007

CONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION 10/6/07 - 11/15/07

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Monthly Report for 10/6/2007 to 11/15/2007 attached.

RECEIVEDNov2a2eo7

DIVOFOIL,GAS&MINING

NAME(PLEASE PRINT) Y ERK S 1EGU2LATORYCOMPLIANCETECH

(This space for State use only)

(5/2000) (See Instructions on Reverse

Page 67: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

XTO Energ'y - Farmington District Workover Report Page 1 of 3

Farmington Well Workover Report

HILL CREEK UNIT Well # 14-27F MV

Objective: Drill & CompleteFirst 08/13/2007Report:AFE: 71396610/26/07 Cont for AFE #713966 to D&C. MIRU Schlumberger WL. RIH w/logging tls. Tgd PBTD @8165'. Run

CBL fr/8155' - 2000'. Cmt top @2400'. POH & LD logging tls. RU pmp trk. PT csg & frac vlv to 5000psig (OK). RDMO WL. SWI.

11/3/07 Contd rpt for AFE #713966 to D&C. MIRU WL. RIH w/3-l/8" esg guns loaded w/Owen SDP-3125-41lNT4, 21 gm chrgs. Perf stage 1 intv fr/7892' - 7894', 7966' - 7969', 7998' - 8000', 8057' - 8060' &8091' - 8093' w/3 SPF (120 deg phasing, 0.35" EHD, 34.24" pene., 36 holes). POH & LD perf guns.RDMO WL. MlRU CTU & ac pmp trk. SICP 0 psig. Fill CT & tst surf equip to 5500 psig. TIH w/1-3/4"to 8171' & displ well w/2% KCL wtr trtd w/biocide & se inhibitor. W/EOT @8093' sptd 250 gals 7.5%HCL over perfs @7892' - 8093' (ac fr/8093' - 7837'). TOH w/CT. NU pmp trk & BD perfs @3100 psig.EIR of 3 BPM @2700 psig. ISIP 2600 psig, 5" SIP 2450 psig, 10" SIP 1950 psig & 15" SIP 1950 psig.Frac grad .91. SWI & RDMO CTU & pnijttik. 18 BLWTR.

11/13/07 Contd rpt for AFE # 713966 to D&C. SICP 80 psig. MIRU Schlumberger frac equip. Frac MV perfsfr/7892' - 8093' dwn 5-1/2" csg w/30QN2 foamed XL fluid (YFll5ST ) gel w/80,934gals, 2% KCl wtrcarrying 120,835 lbs 20/40 SB sd. Max sd conc 6.6 ppg, ISIP 3357 psig, 5" SICP 3240 psig, ATP 4694psig. 0.85 Frac grad. 2051 BLWTR. RIH & set 5-l/2" CFP @7850', PT plg to 6,000 psig. Gd tst. RIHw/3-l/8" esg gun and perf MV zone # 2 fr/7676' - 78', 7718' - 21', 7770' - 73' & 7798' - 7801' w/3 JSPF( Owen 21gm chrgs, .35" dia, 34.24" pent.) 33 holes ttl. Frac MV perfs fr/7676' - 7801' dwn 5-1/2" esgw/30QN2 foamed XL fluid (YFll5ST ) gel w/80,006 gals, 2% KCl wtr carrying 98,346 lbs Jordan sd &64,750 lbs 20/40 SB sd. Max sd conc 6.7 ppg, ISIP 2975 psig, 5" SICP 2865 psig, ATP 4401 psig. 0.81Frac grad. 2082 BLWTR. RIH & set 5-1/2" CFP @7370', PT plg to 6,000 psig. Gd tst. RIH w/3-l/8" csggun and perf UB zone # 3 fr/7304' -10' w/3 JSPF ( Owen 21gm chrgs, .35" dia, 34.24" pent.) 18 holes ttl.Frac UB perfs fr/7304' - 7310' dwn 5-1/2" esg w/30QN2 foamed SlickWater w/66,206 gals 2% KCl wtr,carrying 20,800 lbs Jordan sd & 17,052 lbs 20/40 SB sd. Max sd conc 2.8 ppg, ISIP 2990 psig, 5" SICP2850 psig, ATP 4281 psig. 0.86 Frac grad. 1617 BLWTR. SWI & SDFN. 5768 BLWTR ttl.

11/14/07 SICP 1600 psig. RlH & set 5-1/2" CFP @6750', PT plg to 6,000 psig. Gd tst. RIH w/3-l/8" esg gun andperf UB zone # 4 fr/67l6' - 22' w/ 3 JSPF (Owen 21gm chrgs, .35" dia, 34.24" pent.) 18 holes ttl. Frac UBperfs fr/6716' - 6722' dwn 5-1/2" esg w/30QN2 foamed SlickWater w/ 52,552 gals, 2% KCl wtr carrying19,453 lbs Jordan & 15,927 lbs 20/40 SByd Max sd conc 2.4 ppg, ISIP 3100 psig, 5" SIP 2950 psig, ATP4143 psig. 0.91 Frac grad. 1289 BLWTR. RIH & set 5-1/2" CFP @6520', PT plg to 6,000 psig. Gd tst.RIH w/3-l/8" esg gun and perf Chapita zone # 5 fr/6255' - 57' & 6456' - 60' 3/JSPF (Owen 21gm chrgs,.35" dia. 34.24" pent.) 18 holes ttl. Frac Chapita perfs fr/6255' - 6460' dwn 5-1/2" esg w/30QN2 foamedSlickWater w/85,177 gals 2% KCl wtr, carrying 33,778 lbs Jordan & 36,778 lbs 20/40 SB sd. Max sdconc 2.5 ppg, ISIP 2560 psig, 5" SIP 2490 psig, ATP 3737 psig. 0.85 Frac grad. 2l03 BLWTR. RIH & set5-1/2" CFP @5500', PT plg to 6,000 psig. Gd tst. RIH w/3-l/8" esg gun and perf Chapita zone # 6fr/5422' - 26' & 5438' - 41' w/ 3 JSPF (Owen 21gm chrgs, .35" dia, 34.24" pent.) 21 holes ttl. Frac Chapitaperfs fr/5422' - 5441' dwn 5-1/2" esg w/30QN2 foamed XL fld (YF115ST) gel w/51,161gals 2% KCl wtrcarrying 63,301 lbs Jordan sd & 52,532 lbs 20/40 SB sd. Max sd conc 6.5 ppg, ISIP 2880 psig, 5" SIP2835 psig, ATP 3383 psig. 0.82 Frac grad. 1344 BLWTR. SWI 4hrs. RDMO Schlumberger. 10,504

http://dor/rept_workover.asp

XTO Energ'y - Farmington District Workover Report Page 1 of 3

Farmington Well Workover Report

HILL CREEK UNIT Well # 14-27F MV

Objective: Drill & CompleteFirst 08/13/2007Report:AFE: 71396610/26/07 Cont for AFE #713966 to D&C. MIRU Schlumberger WL. RIH w/logging tls. Tgd PBTD @8165'. Run

CBL fr/8155' - 2000'. Cmt top @2400'. POH & LD logging tls. RU pmp trk. PT csg & frac vlv to 5000psig (OK). RDMO WL. SWI.

11/3/07 Contd rpt for AFE #713966 to D&C. MIRU WL. RIH w/3-l/8" esg guns loaded w/Owen SDP-3125-41lNT4, 21 gm chrgs. Perf stage 1 intv fr/7892' - 7894', 7966' - 7969', 7998' - 8000', 8057' - 8060' &8091' - 8093' w/3 SPF (120 deg phasing, 0.35" EHD, 34.24" pene., 36 holes). POH & LD perf guns.RDMO WL. MlRU CTU & ac pmp trk. SICP 0 psig. Fill CT & tst surf equip to 5500 psig. TIH w/1-3/4"to 8171' & displ well w/2% KCL wtr trtd w/biocide & se inhibitor. W/EOT @8093' sptd 250 gals 7.5%HCL over perfs @7892' - 8093' (ac fr/8093' - 7837'). TOH w/CT. NU pmp trk & BD perfs @3100 psig.EIR of 3 BPM @2700 psig. ISIP 2600 psig, 5" SIP 2450 psig, 10" SIP 1950 psig & 15" SIP 1950 psig.Frac grad .91. SWI & RDMO CTU & pnijttik. 18 BLWTR.

11/13/07 Contd rpt for AFE # 713966 to D&C. SICP 80 psig. MIRU Schlumberger frac equip. Frac MV perfsfr/7892' - 8093' dwn 5-1/2" csg w/30QN2 foamed XL fluid (YFll5ST ) gel w/80,934gals, 2% KCl wtrcarrying 120,835 lbs 20/40 SB sd. Max sd conc 6.6 ppg, ISIP 3357 psig, 5" SICP 3240 psig, ATP 4694psig. 0.85 Frac grad. 2051 BLWTR. RIH & set 5-l/2" CFP @7850', PT plg to 6,000 psig. Gd tst. RIHw/3-l/8" esg gun and perf MV zone # 2 fr/7676' - 78', 7718' - 21', 7770' - 73' & 7798' - 7801' w/3 JSPF( Owen 21gm chrgs, .35" dia, 34.24" pent.) 33 holes ttl. Frac MV perfs fr/7676' - 7801' dwn 5-1/2" esgw/30QN2 foamed XL fluid (YFll5ST ) gel w/80,006 gals, 2% KCl wtr carrying 98,346 lbs Jordan sd &64,750 lbs 20/40 SB sd. Max sd conc 6.7 ppg, ISIP 2975 psig, 5" SICP 2865 psig, ATP 4401 psig. 0.81Frac grad. 2082 BLWTR. RIH & set 5-1/2" CFP @7370', PT plg to 6,000 psig. Gd tst. RIH w/3-l/8" csggun and perf UB zone # 3 fr/7304' -10' w/3 JSPF ( Owen 21gm chrgs, .35" dia, 34.24" pent.) 18 holes ttl.Frac UB perfs fr/7304' - 7310' dwn 5-1/2" esg w/30QN2 foamed SlickWater w/66,206 gals 2% KCl wtr,carrying 20,800 lbs Jordan sd & 17,052 lbs 20/40 SB sd. Max sd conc 2.8 ppg, ISIP 2990 psig, 5" SICP2850 psig, ATP 4281 psig. 0.86 Frac grad. 1617 BLWTR. SWI & SDFN. 5768 BLWTR ttl.

11/14/07 SICP 1600 psig. RlH & set 5-1/2" CFP @6750', PT plg to 6,000 psig. Gd tst. RIH w/3-l/8" esg gun andperf UB zone # 4 fr/67l6' - 22' w/ 3 JSPF (Owen 21gm chrgs, .35" dia, 34.24" pent.) 18 holes ttl. Frac UBperfs fr/6716' - 6722' dwn 5-1/2" esg w/30QN2 foamed SlickWater w/ 52,552 gals, 2% KCl wtr carrying19,453 lbs Jordan & 15,927 lbs 20/40 SByd Max sd conc 2.4 ppg, ISIP 3100 psig, 5" SIP 2950 psig, ATP4143 psig. 0.91 Frac grad. 1289 BLWTR. RIH & set 5-1/2" CFP @6520', PT plg to 6,000 psig. Gd tst.RIH w/3-l/8" esg gun and perf Chapita zone # 5 fr/6255' - 57' & 6456' - 60' 3/JSPF (Owen 21gm chrgs,.35" dia. 34.24" pent.) 18 holes ttl. Frac Chapita perfs fr/6255' - 6460' dwn 5-1/2" esg w/30QN2 foamedSlickWater w/85,177 gals 2% KCl wtr, carrying 33,778 lbs Jordan & 36,778 lbs 20/40 SB sd. Max sdconc 2.5 ppg, ISIP 2560 psig, 5" SIP 2490 psig, ATP 3737 psig. 0.85 Frac grad. 2l03 BLWTR. RIH & set5-1/2" CFP @5500', PT plg to 6,000 psig. Gd tst. RIH w/3-l/8" esg gun and perf Chapita zone # 6fr/5422' - 26' & 5438' - 41' w/ 3 JSPF (Owen 21gm chrgs, .35" dia, 34.24" pent.) 21 holes ttl. Frac Chapitaperfs fr/5422' - 5441' dwn 5-1/2" esg w/30QN2 foamed XL fld (YF115ST) gel w/51,161gals 2% KCl wtrcarrying 63,301 lbs Jordan sd & 52,532 lbs 20/40 SB sd. Max sd conc 6.5 ppg, ISIP 2880 psig, 5" SIP2835 psig, ATP 3383 psig. 0.82 Frac grad. 1344 BLWTR. SWI 4hrs. RDMO Schlumberger. 10,504

http://dor/rept_workover.asp

Page 68: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

XTO Energy - Farmington District Workover Report Page 2 of 3

BLWTR ttl. OWU on 18/64 ok. 10hrs. F. OBO, 298 BW, 10, hrs, FCP 2100 - 1900 psig, 18/64" ck. Retsof frac f1d,N2, Jt sd. 10,206 BLWTR.

Flow Zone: MV/WSTCEvent Dese: Flow Back Top Interval: 5,422 Bottom Interval: 8,093

Avg CÌloke BBLSTime Press Size Rec Commuts

8:00:00 PM 2,100 18/64 0 OWU.9:00:00 PM 1,950 18/64 16 Gas, fld & lt sd.10:00:00 PM 1,900 18/64 12 Gas, fld & lt sd.l l:00:00 PM 1,900 18/64 8 Gas, fld & lt sd.12:00:00 AM 1,900 18/64 12 Gas, fld & lt sd.1:00:00 AM 1,900 18/64 35 Gas, fld & lt sd.2:00:00 AM 1,900 18/64 46 Gas, fld & lt sd.3:00:00 AM 1,900 18/64 42 Gas, fld & lt sd.4:00:00 AM 1,900 18/64 51 Gas, fld & lt sd.5:00:00 AM 1,900 18/64 76 Gas, fld & lt sd.

Ttl Bbls: 298

11/15/07 FCP 1900 psig. F. 0 BO, 734 BLW, 21 brs., FCP 1900 - 1100 psig, 24/64ck. Rets of fld, gas, lt sd. 9,472BLWTR.

Flow Zone: MV/WSTC '

Event Desc: Flow Back Top Interval: 5,422 Bottom Interval: 8,093Avg Choke BBLS

Time Press Size Rec Comments6:00:00 AM 1,900 18/64 7 OWU.7:00:00 AM 2,000 18/64 17 Gas, f1d& lt sd.8:00:00 AM 2,000 18/64 13 Gas, fld & It sd.9:00:00 AM 0 18/64 0 SI to plumb Breco unit.12:00:00 PM 1,000 22/64 13 Fld, gas & lt sd.1:00:00 PM 1,250 22/64 82 Fld, gas & lt sd.2:00:00 PM 1,300 22/64 31 Fld, gas & lt sd.3:00:00 PM 1,300 22/64 43 Fld, gas & lt sd.4:00:00 PM 1,300 22/64 9 Fld, gas & lt sd.5:00:00 PM 1,300 22/64 74 Fld, gas & lt sd.6:00:00 PM 1,300 22/64 45 Fld, gas & lt sd.7:00:00 PM 1,300 22/64 52 Fld, gas & lt sd.8:00:00 PM 1,200 22/64 61 Fld, gas & It sd.9:00:00 PM 1,200 22/64 35 Fld, gas & lt sd.10:00:00 PM 1,200 22/64 30 Fld, gas & lt sd.I 1:00:00 PM 1,200 22/64 39 Fld, gas & It sd.

http://dor/rept_workover.asp l 1/l

XTO Energy - Farmington District Workover Report Page 2 of 3

BLWTR ttl. OWU on 18/64 ok. 10hrs. F. OBO, 298 BW, 10, hrs, FCP 2100 - 1900 psig, 18/64" ck. Retsof frac f1d,N2, Jt sd. 10,206 BLWTR.

Flow Zone: MV/WSTCEvent Dese: Flow Back Top Interval: 5,422 Bottom Interval: 8,093

Avg CÌloke BBLSTime Press Size Rec Commuts

8:00:00 PM 2,100 18/64 0 OWU.9:00:00 PM 1,950 18/64 16 Gas, fld & lt sd.10:00:00 PM 1,900 18/64 12 Gas, fld & lt sd.l l:00:00 PM 1,900 18/64 8 Gas, fld & lt sd.12:00:00 AM 1,900 18/64 12 Gas, fld & lt sd.1:00:00 AM 1,900 18/64 35 Gas, fld & lt sd.2:00:00 AM 1,900 18/64 46 Gas, fld & lt sd.3:00:00 AM 1,900 18/64 42 Gas, fld & lt sd.4:00:00 AM 1,900 18/64 51 Gas, fld & lt sd.5:00:00 AM 1,900 18/64 76 Gas, fld & lt sd.

Ttl Bbls: 298

11/15/07 FCP 1900 psig. F. 0 BO, 734 BLW, 21 brs., FCP 1900 - 1100 psig, 24/64ck. Rets of fld, gas, lt sd. 9,472BLWTR.

Flow Zone: MV/WSTC '

Event Desc: Flow Back Top Interval: 5,422 Bottom Interval: 8,093Avg Choke BBLS

Time Press Size Rec Comments6:00:00 AM 1,900 18/64 7 OWU.7:00:00 AM 2,000 18/64 17 Gas, f1d& lt sd.8:00:00 AM 2,000 18/64 13 Gas, fld & It sd.9:00:00 AM 0 18/64 0 SI to plumb Breco unit.12:00:00 PM 1,000 22/64 13 Fld, gas & lt sd.1:00:00 PM 1,250 22/64 82 Fld, gas & lt sd.2:00:00 PM 1,300 22/64 31 Fld, gas & lt sd.3:00:00 PM 1,300 22/64 43 Fld, gas & lt sd.4:00:00 PM 1,300 22/64 9 Fld, gas & lt sd.5:00:00 PM 1,300 22/64 74 Fld, gas & lt sd.6:00:00 PM 1,300 22/64 45 Fld, gas & lt sd.7:00:00 PM 1,300 22/64 52 Fld, gas & lt sd.8:00:00 PM 1,200 22/64 61 Fld, gas & It sd.9:00:00 PM 1,200 22/64 35 Fld, gas & lt sd.10:00:00 PM 1,200 22/64 30 Fld, gas & lt sd.I 1:00:00 PM 1,200 22/64 39 Fld, gas & It sd.

http://dor/rept_workover.asp l 1/l

Page 69: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

XTO Energy - Farmington District Workover Report Page 3 of 3

12:00:00 AM 1,200 22/64 22 Fld, gas & lt sd.1:00:00 AM 1,200 22/64 21 Fld, gas & lt sd.2:00:00 AM 1,100 22/64 14 Fld, gas & lt sd.3:00:00 AM 1,100 22/64 14 Fld, gas & lt sd.4:00:00 AM 1,100 22/64 42 Fld, gas & lt sd.5:00:00 AM 1,100 22/64 70 Fld, gas & lt sd.

Ttl Bbls: 734

http://dor/rept_workover.asp

XTO Energy - Farmington District Workover Report Page 3 of 3

12:00:00 AM 1,200 22/64 22 Fld, gas & lt sd.1:00:00 AM 1,200 22/64 21 Fld, gas & lt sd.2:00:00 AM 1,100 22/64 14 Fld, gas & lt sd.3:00:00 AM 1,100 22/64 14 Fld, gas & lt sd.4:00:00 AM 1,100 22/64 42 Fld, gas & lt sd.5:00:00 AM 1,100 22/64 70 Fld, gas & lt sd.

Ttl Bbls: 734

http://dor/rept_workover.asp

Page 70: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

STATEOFUTAH FORM9DEPARTMENTOF NATURALRESOURCES

DIVISIONOF OIL,GAS AND MINING 5. LEASEDESIGNATIONANDSERlALNUMBER:U-29784

6. IF INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS NORTHERN UTE INDIAN TRIBE7. UNITor CA AGREEMENTNAME:

Do not use this form for proposals to drillnew wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to HILL CREEK UNITdrillhorizontal laterais. Use APPLICATIONFOR PERMITTO DRILLform for such proposals.1. TYPE OF WELL 8. WELLNAMEand NUMBER:01L WELL GAS WELL OTHER HCU 14-27F2.NAMEOFOPERATOR: 9.APINUMBER:

XTO ENERGY INC. 43047368523. ADDRESSOF OPERATOR: PHONE NUMBER: 10. FIELDAND POOL, OR WLDCAT:382 CR 3100 , AZTEC NM 287410 (505) 333-3100 NATURALBUTTES

4. LOCATIONOF WELL

FOOTAGESATSURFACE: 1569 'FSL & 1937' FWL COUNTY: UINTAH

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: NESW 27 10S 20E STATE:UTAH

1. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDI2E DEEPEN ORA URO NOTICE OF 1NTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Appro>imate date work willstart: CASING REPAIR NEWCONSTRUCTION TEMPORARILYABANDON

CHANGETO PREMOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGEWELL NAME PLUG BACK WATER DISPOSAL(Submit Onginal Form Only)

O CHANGEWELLSTATUS PRODUCTION(START/RESUME) WATER SHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: 1ST DELIVERY11/19/2007 O CONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy inc. first delivered this well on 11/19/2007 throughthe Hill Creek CDP. Initial Flow Rate: 1500 MCFPD.

EPE E ) C PER DATE REGUOLATORYCOMPLIANCE TECH

(This space for State use only)

RECEIVEDDEC13 2007

(5/2000) (See Instructions on Reverse Side)

DIV.0FOlL,GAS&

STATEOFUTAH FORM9DEPARTMENTOF NATURALRESOURCES

DIVISIONOF OIL,GAS AND MINING 5. LEASEDESIGNATIONANDSERlALNUMBER:U-29784

6. IF INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS NORTHERN UTE INDIAN TRIBE7. UNITor CA AGREEMENTNAME:

Do not use this form for proposals to drillnew wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to HILL CREEK UNITdrillhorizontal laterais. Use APPLICATIONFOR PERMITTO DRILLform for such proposals.1. TYPE OF WELL 8. WELLNAMEand NUMBER:01L WELL GAS WELL OTHER HCU 14-27F2.NAMEOFOPERATOR: 9.APINUMBER:

XTO ENERGY INC. 43047368523. ADDRESSOF OPERATOR: PHONE NUMBER: 10. FIELDAND POOL, OR WLDCAT:382 CR 3100 , AZTEC NM 287410 (505) 333-3100 NATURALBUTTES

4. LOCATIONOF WELL

FOOTAGESATSURFACE: 1569 'FSL & 1937' FWL COUNTY: UINTAH

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: NESW 27 10S 20E STATE:UTAH

1. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDI2E DEEPEN ORA URO NOTICE OF 1NTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Appro>imate date work willstart: CASING REPAIR NEWCONSTRUCTION TEMPORARILYABANDON

CHANGETO PREMOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGEWELL NAME PLUG BACK WATER DISPOSAL(Submit Onginal Form Only)

O CHANGEWELLSTATUS PRODUCTION(START/RESUME) WATER SHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: 1ST DELIVERY11/19/2007 O CONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy inc. first delivered this well on 11/19/2007 throughthe Hill Creek CDP. Initial Flow Rate: 1500 MCFPD.

EPE E ) C PER DATE REGUOLATORYCOMPLIANCE TECH

(This space for State use only)

RECEIVEDDEC13 2007

(5/2000) (See Instructions on Reverse Side)

DIV.0FOlL,GAS&

Page 71: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

STATE OF UTAH AMENDEDREPORT FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)

DIVISION OF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERALNUMBER:U-29784

6. IF INDIAN,ALLOTTEEOR TRIBE NAME

WELL COMPLETION OR RECOMPLETION REPORT AND LOG UTE INDIAN TRIBETa TYPE OF WELL OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAME

WELL WELL HILL CREEK UNITb. TYPE OF WORK: 8. WELL NAMEand NUMBER:

W ORZ NEEP-RY S . OTHER HCU 14-27F

2.NAMEOFOPERATOR: 9.APINUMBER:

XTO Energy Inc. 43047368523. ADDRESSOF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WLDCAT

382 CR 3100 ony Aztec sum NM 87410 (505) 333-3100 NATURAL BUTTES4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP, RANGE,

MER1DIAN:ATSURFACE: 1569' FSL & 1937' FWL NESW 27 10S 20EAT TOP PRODUCING INTERVALREPORTED BELOW

AT TOTAL DEPTH:12. CON

AH13. STATE

UTAH

14. DATESPUDDED: 15. DATET.D. REACHED: 16. DATECÖMPLETED 17. ELEVATlONS(DF, RKB, RT, GL):

6/20/2007 8/11/2007 11/19/2007 ABANDONED READYTO PRODUCE 2 5171' GR18 TOTALDEPTH MD 8,225 19. PLUG BACKT.D.: MD 20 IF MULTIPLECOMPLETIONS, HOW MANY?* 21. DEPTH BRIDGE MD

PLUG SET:TVD TVD TVD

22 TYPE ELECTRICAND OTHER MECHANCAL LOGS RUN (Subnit copyof each) 23.

w/GR & CAL/DIRECSURVEY/CBL WASWELLCORED? NO YES (Submitanalysis)

WAS DST RUN? NO YES (Submit report)

DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASING AND LINER RECORD (Repon all strings set in well)

HOLE SlZE SlZEIGRADE WElGHT (#lft) TOP (MD) B TTOM (MD) STAGED TMENTER CNEOONFS

CKESVO UM BBL) CEMENTTOP ** AMOUNTPULLED

17 1/2" 13 Så H40 48 0 520 G 512 0 520 012 1/4" 9 5/8 J55 36 O 3,644 G 830 0 3644 07 7/8" 5 1/2 N80 17 0 8,217 G 795 0 8217 0

25. TUBINGRECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET(MD)

2 3/8" 7,80526. PRODUCING INTERVALS 27. PERFORATION RECORD

FORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM TVD) INTERVAL(Top/Bot - MD) SIZE NO. HOLES PERFORATION STATUS

(A) MESAVERDE 5,422 gg ( 8,091 5 422 8,091 0.35" 144 open Squeezed

(B) Open Squeezed

(C) Open Squeezed

(D) Open Squeezed

28. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERAL

5422' - 8091' Acidized w/250 gals 7.5% HCI acid Frac'd w/30Q N2 foarned XL fluid (YF115ST) gel with916,036 gals 2% KCI wtr parrying 307,874# 20/40 SB sand and 235,728# Jordan sand.

29. ENCLOSED ATTACHMENTS: 30. WELL STATUS:

ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONAL SURVEY

O SUNDRY NOTlCE FOR PLUGGINGAND CEMENTVERIFICATION CORE ANALYSIS OTHER:

RECEIVED(5/2000) (CONTINUEDON BACK)

JANO9 2008DIV.0FOIL,GAS&

STATE OF UTAH AMENDEDREPORT FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)

DIVISION OF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERALNUMBER:U-29784

6. IF INDIAN,ALLOTTEEOR TRIBE NAME

WELL COMPLETION OR RECOMPLETION REPORT AND LOG UTE INDIAN TRIBETa TYPE OF WELL OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAME

WELL WELL HILL CREEK UNITb. TYPE OF WORK: 8. WELL NAMEand NUMBER:

W ORZ NEEP-RY S . OTHER HCU 14-27F

2.NAMEOFOPERATOR: 9.APINUMBER:

XTO Energy Inc. 43047368523. ADDRESSOF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WLDCAT

382 CR 3100 ony Aztec sum NM 87410 (505) 333-3100 NATURAL BUTTES4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP, RANGE,

MER1DIAN:ATSURFACE: 1569' FSL & 1937' FWL NESW 27 10S 20EAT TOP PRODUCING INTERVALREPORTED BELOW

AT TOTAL DEPTH:12. CON

AH13. STATE

UTAH

14. DATESPUDDED: 15. DATET.D. REACHED: 16. DATECÖMPLETED 17. ELEVATlONS(DF, RKB, RT, GL):

6/20/2007 8/11/2007 11/19/2007 ABANDONED READYTO PRODUCE 2 5171' GR18 TOTALDEPTH MD 8,225 19. PLUG BACKT.D.: MD 20 IF MULTIPLECOMPLETIONS, HOW MANY?* 21. DEPTH BRIDGE MD

PLUG SET:TVD TVD TVD

22 TYPE ELECTRICAND OTHER MECHANCAL LOGS RUN (Subnit copyof each) 23.

w/GR & CAL/DIRECSURVEY/CBL WASWELLCORED? NO YES (Submitanalysis)

WAS DST RUN? NO YES (Submit report)

DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASING AND LINER RECORD (Repon all strings set in well)

HOLE SlZE SlZEIGRADE WElGHT (#lft) TOP (MD) B TTOM (MD) STAGED TMENTER CNEOONFS

CKESVO UM BBL) CEMENTTOP ** AMOUNTPULLED

17 1/2" 13 Så H40 48 0 520 G 512 0 520 012 1/4" 9 5/8 J55 36 O 3,644 G 830 0 3644 0

7 7/8" 5 1/2 N80 17 0 8,217 G 795 0 8217 0

25. TUBINGRECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET(MD)

2 3/8" 7,80526. PRODUCING INTERVALS 27. PERFORATION RECORD

FORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM TVD) INTERVAL(Top/Bot - MD) SIZE NO. HOLES PERFORATION STATUS

(A) MESAVERDE 5,422 gg ( 8,091 5 422 8,091 0.35" 144 open Squeezed

(B) Open Squeezed

(C) Open Squeezed

(D) Open Squeezed

28. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERAL

5422' - 8091' Acidized w/250 gals 7.5% HCI acid Frac'd w/30Q N2 foarned XL fluid (YF115ST) gel with916,036 gals 2% KCI wtr parrying 307,874# 20/40 SB sand and 235,728# Jordan sand.

29. ENCLOSED ATTACHMENTS: 30. WELL STATUS:

ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONAL SURVEY

O SUNDRY NOTlCE FOR PLUGGINGAND CEMENTVERIFICATION CORE ANALYSIS OTHER:

RECEIVED(5/2000) (CONTINUEDON BACK)

JANO9 2008DIV.0FOIL,GAS&

Page 72: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

31, 1NITlAL PRODUCTION INTERVALÃ(As showÑirtitem #26)

DATE FIRST PRODUCED: TEST DATE: HOURSTESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD METHOD:

11/19/2007 11/22/2007 4 RATES: 0 1,107 20 FCHOKE SIZE: TBG. PRESS CSG PRESS. API GRAVITY BTU - GA G 82QibRÀTIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:

12/64 0 1,640 0.62 1,110 RATES: 0 1,107 .20 PINTERVALB (As shown In Item #26)

DATEFlRST PRODUCED: TEST DATE: HOURSTESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD METHOD:RATES: -+

CHOKE SIZE TBG PRESS CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: 1NTERVALSTATUS:RATES:

IÑTERŸALC (As shown In Item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD. METOD:RATES: -

CHOKE SIZE TBG PRESS CSG. PRESS. API GRAVITY BTU - GAS GAS/OlL RATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: -*

INTERVÄLD (As shown in item #26)

DATE FIRST PRODUCED TEST DATE: HOURS TESTED: TEST PRODUCTION 01L - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:RATES: -*

CHOKE SlZE: TÈG PRESS CSG. PRESS. API GRAVlTY BTU - GAS GASIOlL RÁTIO 24 HR PRODUCTlON OlL - BBL: GAS - MCF: WATER - BBL: 1NTERVALSTATUS:RATES: -+

32. DISPOSITION OF GAS (Sold, Used for Fuel, Vented, Etc.)

TO BE SOLD33. SUMMARYOF POROUS ZONES (Include Aquifers): 34. FORMATION(Log) MARKERS:

Show allimportant zones of porosity and contents thereof: Cored intervals and alldrill-stem tests including depth intervaltested, cushion used, timetool open, ilowing and shut-in pressures and recovenes. A

WASATCH TONGUE 3.992UTELAND LIMESTONE 4.340WASATCH 4.480CHAPITA WELLS 5,262UTELAND BUTTE 6,503MESAVERDE 7,324TOTAL DEPTH 8,248

35. ADDIRONAL REMARKS(Include plugging procedure)

36. I hereby certify that the, regoing and attached information Is complete and correct as determined from allavailablerecords.

SNAMNE(PLEASE ) HO C. P l(I E RE4GULATORYCOMPLIANCETECH

This report must be submitted within 30 days of• completing or plugging a new well tätiligà þreviouslyplugged and abandoned welle drilling horizontal laterals from an existing well bore s itÌciÑÏýdeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation drilling hydrocarbon exploratory holes, such as core samples and stratigraphic tests

* ITEM 20: Show the number of completions if production is measured separately from two or more formations.

** ITEM 24: Cement Top - Show how reported top(s)of cement were determined (circulated (ClR), calculated (CAL), cement bond log (CBL), temperaturesurvey (TS))

Send to: Utah Division of Oil, Gas and Mining Phone: 80L538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940Salt Lake City, Utah 84114-5801

31, 1NITlAL PRODUCTION INTERVALÃ(As showÑirtitem #26)

DATE FIRST PRODUCED: TEST DATE: HOURSTESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD METHOD:

11/19/2007 11/22/2007 4 RATES: 0 1,107 20 FCHOKE SIZE: TBG. PRESS CSG PRESS. API GRAVITY BTU - GA G 82QibRÀTIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:

12/64 0 1,640 0.62 1,110 RATES: 0 1,107 .20 PINTERVALB (As shown In Item #26)

DATEFlRST PRODUCED: TEST DATE: HOURSTESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD METHOD:RATES: -+

CHOKE SIZE TBG PRESS CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: 1NTERVALSTATUS:RATES:

IÑTERŸALC (As shown In Item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD. METOD:RATES: -

CHOKE SIZE TBG PRESS CSG. PRESS. API GRAVITY BTU - GAS GAS/OlL RATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: -*

INTERVÄLD (As shown in item #26)

DATE FIRST PRODUCED TEST DATE: HOURS TESTED: TEST PRODUCTION 01L - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:RATES: -*

CHOKE SlZE: TÈG PRESS CSG. PRESS. API GRAVlTY BTU - GAS GASIOlL RÁTIO 24 HR PRODUCTlON OlL - BBL: GAS - MCF: WATER - BBL: 1NTERVALSTATUS:RATES: -+

32. DISPOSITION OF GAS (Sold, Used for Fuel, Vented, Etc.)

TO BE SOLD33. SUMMARYOF POROUS ZONES (Include Aquifers): 34. FORMATION(Log) MARKERS:

Show allimportant zones of porosity and contents thereof: Cored intervals and alldrill-stem tests including depth intervaltested, cushion used, timetool open, ilowing and shut-in pressures and recovenes. A

WASATCH TONGUE 3.992UTELAND LIMESTONE 4.340WASATCH 4.480CHAPITA WELLS 5,262UTELAND BUTTE 6,503MESAVERDE 7,324TOTAL DEPTH 8,248

35. ADDIRONAL REMARKS(Include plugging procedure)

36. I hereby certify that the, regoing and attached information Is complete and correct as determined from allavailablerecords.

SNAMNE(PLEASE ) HO C. P l(I E RE4GULATORYCOMPLIANCETECH

This report must be submitted within 30 days of• completing or plugging a new well tätiligà þreviouslyplugged and abandoned welle drilling horizontal laterals from an existing well bore s itÌciÑÏýdeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation drilling hydrocarbon exploratory holes, such as core samples and stratigraphic tests

* ITEM 20: Show the number of completions if production is measured separately from two or more formations.

** ITEM 24: Cement Top - Show how reported top(s)of cement were determined (circulated (ClR), calculated (CAL), cement bond log (CBL), temperaturesurvey (TS))

Send to: Utah Division of Oil, Gas and Mining Phone: 80L538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940Salt Lake City, Utah 84114-5801

Page 73: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Job Number MLO7368 State/Country: UT USA

Company: DOMINION E&P Declination: 11.63

LeaselWeli: HCU#14-27F Grid: North

Location: UINTACO. UT File name: C:\WINSERVEiMLO7253.SVYDIRECTIONALTECHNOl.OGY,INC.Houston 713-934-9600 Rig Name: FRONTIER #2 DatelTime: 05-Aug-07 I 12:20

ALLIS-CHALMERS ENERGY INC. RKB: O curveName: MLO7368 Work

G.L. or M.S.L.: O

Strata Directional

RECEIVEDWINSERVE SURVEY CALCULATIONS

Minimum Curvature Method AN 14 2008Vertical Section Plane 175.47

Vertical Section Referenced to Wellhead DIVOFOIL,GAS&MININGRectangular Coordinates Referenced to Wellhead

Measured IncI Drift True Vertical Dogleg BUILD WALKDepth Angle Direction Vertical N-S E-W Section Severity RATE RATE

FT Deg Deg Depth FT FT FT Deg/100 Deg/100 Deg/100

.00 .00 .00 .00 .00 .00 .00 .00 .00 .00

559.00 .00 269.40 559.00 .00 .00 .00 .00 .00

-16.21

620.00 1.30 175.50 619.99 -.69

.05 .69 2.13 2.13 -153.93

682.00 2.60 180.10 681.96 -2.80

.11 2.80 2.11 2.10 7.42743.00 5.50 176.50 742.80 -7.10

.28 7.10 4.77 4.75 -5.90

805.00 7.80 174.00 804.38 -14.25

.90 14.28 3.74 3.71 -4.03

865.00 9.60 174.30 863.68 -23.28 1.83 23.35 3.00 3.00 .50

927.00 11.20 176.50 924.66 -34.43 2.71 34.54 2.66 2.58 3.55988.00 13.62 176.90 984.24 -47.52 3.46 47.64 3.97 3.96 .66

1049.00 16.40 175.10 1043.15 -63.27 4.58 63.44 4.62 4.56 -2.95

1113.00 19.20 172.80 1104.08 -82.72 6.67 82.99 4.51 4.38 -3.59

1176.00 21.90 171.70 1163.07 -104.63 9.67 105.06 4.33 4.29 -1.75

1239.00 22.90 172.60 1221.31 -128.41 12.94 129.03 1.68 1.59 1.431303.00 24.00 174.50 1280.03 -153.71 15.79 154.48 2.09 1.72 2.971366.00 24.90 172.80 1337.38 -179.63 18.68 180.54 1.81 1.43 -2.70

1430.00 26.40 171.00 1395.07 -207.05 22.60 208.19 2.64 2.34 -2.81

1493.00 26.50 175.80 1451.48 -234.90 25.82 236.21 3.40 .16 7.621556.00 28.50 174.50 1507.36 -263.88 28.29 265.30 3.31 3.17 -2.06

1619.00 26.90 176.90 1563.14 -293.08 30.50 294.57 3.10 -2.54 3.811683.00 28.70 178.80 1619.75 -322.90 31.61 324.39 3.13 2.81 2.97

1746.00 30.80 174.90 1674.45 -354.10 33.36 355.63 4.53 3.33 -6.19

1809.00 30.30 173.90 1728.70 -385.97 36.48 387.64 1.13 -.79 -1.59

1873.00 29.70 172.30 1784.13 -417.73 40.32 419.61 1.56 -.94 -2.50

Page

Job Number MLO7368 State/Country: UT USA

Company: DOMINION E&P Declination: 11.63

LeaselWeli: HCU#14-27F Grid: North

Location: UINTACO. UT File name: C:\WINSERVEiMLO7253.SVYDIRECTIONALTECHNOl.OGY,INC.Houston 713-934-9600 Rig Name: FRONTIER #2 DatelTime: 05-Aug-07 I 12:20

ALLIS-CHALMERS ENERGY INC. RKB: O curveName: MLO7368 Work

G.L. or M.S.L.: O

Strata Directional

RECEIVEDWINSERVE SURVEY CALCULATIONS

Minimum Curvature Method AN 14 2008Vertical Section Plane 175.47

Vertical Section Referenced to Wellhead DIVOFOIL,GAS&MININGRectangular Coordinates Referenced to Wellhead

Measured IncI Drift True Vertical Dogleg BUILD WALKDepth Angle Direction Vertical N-S E-W Section Severity RATE RATE

FT Deg Deg Depth FT FT FT Deg/100 Deg/100 Deg/100

.00 .00 .00 .00 .00 .00 .00 .00 .00 .00

559.00 .00 269.40 559.00 .00 .00 .00 .00 .00

-16.21

620.00 1.30 175.50 619.99 -.69

.05 .69 2.13 2.13 -153.93

682.00 2.60 180.10 681.96 -2.80

.11 2.80 2.11 2.10 7.42743.00 5.50 176.50 742.80 -7.10

.28 7.10 4.77 4.75 -5.90

805.00 7.80 174.00 804.38 -14.25

.90 14.28 3.74 3.71 -4.03

865.00 9.60 174.30 863.68 -23.28 1.83 23.35 3.00 3.00 .50

927.00 11.20 176.50 924.66 -34.43 2.71 34.54 2.66 2.58 3.55988.00 13.62 176.90 984.24 -47.52 3.46 47.64 3.97 3.96 .66

1049.00 16.40 175.10 1043.15 -63.27 4.58 63.44 4.62 4.56 -2.95

1113.00 19.20 172.80 1104.08 -82.72 6.67 82.99 4.51 4.38 -3.59

1176.00 21.90 171.70 1163.07 -104.63 9.67 105.06 4.33 4.29 -1.75

1239.00 22.90 172.60 1221.31 -128.41 12.94 129.03 1.68 1.59 1.431303.00 24.00 174.50 1280.03 -153.71 15.79 154.48 2.09 1.72 2.971366.00 24.90 172.80 1337.38 -179.63 18.68 180.54 1.81 1.43 -2.70

1430.00 26.40 171.00 1395.07 -207.05 22.60 208.19 2.64 2.34 -2.81

1493.00 26.50 175.80 1451.48 -234.90 25.82 236.21 3.40 .16 7.621556.00 28.50 174.50 1507.36 -263.88 28.29 265.30 3.31 3.17 -2.06

1619.00 26.90 176.90 1563.14 -293.08 30.50 294.57 3.10 -2.54 3.811683.00 28.70 178.80 1619.75 -322.90 31.61 324.39 3.13 2.81 2.97

1746.00 30.80 174.90 1674.45 -354.10 33.36 355.63 4.53 3.33 -6.19

1809.00 30.30 173.90 1728.70 -385.97 36.48 387.64 1.13 -.79 -1.59

1873.00 29.70 172.30 1784.13 -417.73 40.32 419.61 1.56 -.94 -2.50

Page

Page 74: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

Measured incl Drift True Vertical Dogleg BUILD WALKDepth Angle Direction Vertical N-S E-W Section Severity RATE RATE

FT Deg Deg Depth FT FT FT Deg/100 Deg/100 Deg/1001936.00 29.50 176.40 1838.91 -448.68 43.39 450.71 3.23 -.32 6.511999.00 31.10 177.40 1893.31 -480.42 45.10 482.48 2.66 2.54 1.592063.00 31.30 175.30 1948.05 -513.50 47.21 515.63 1.73 .31

-3.28

2126.00 31.00 176.70 2001.97 -546.01 49.49 548.21 1.24 -.48 2.222190.00 29.60 176.60 2057.23 -578.24 51.37 580.49 2.19 -2.19 -.16

2253.00 28.80 177.00 2112.22 -608.93 53.09 611.22 1.31 -1,27

.63

2317.00 29.60 177.20 2168.09 -640.11 54.67 642.43 1.26 1.25 .31

2380.00 27.80 176.20 2223.34 -670.32 56.40 672.68 2.96 -2.86 -1.59

2444.00 27.40 177.60 2280.06 -699.92 58.01 702.32 1.19 -.63 2.192507.00 27.50 176.80 2335.97 -728.93 59.43 731.34 .61 .16

-1.27

2571.00 26.10 176.40 2393.09 -757.73 61.14 760.19 2.21 -2.19 -.63

2634.00 26.70 174.00 2449.52 -785.64 63.48 788.20 1.94 .95

-3.81

2697.00 26.90 174.10 2505.76 -813.89 66.43 816.60 .33 .32 .16

2761.00 25.50 172.50 2563.18 -841.95 69.72 844.83 2.45 -2.19 -2.50

2824.00 24.30 173.00 2620.32 -868.27 73.07 871.32 1.93 -1.90

.79

2888.00 22.00 173.10 2679.17 -893.24 76.11 896.46 3.59 -3.59

.16

2951.00 22.00 170.50 2737.58 -916.59 79.48 920.01 1.55 .00

-4.13

3014.00 19.20 169.60 2796.55 -938.42 83.29 942.07 4.47 -4.44 -1.43

3078.00 17.20 169.90 2857.34 -958.09 86.85 961.96 3.13 -3.13

.47

3141.00 14.80 172.10 2917.90 -975.24 89.59 979.27 3.93 -3.81 3.49

3203.00 11.10 176.30 2978.31 -989.04 91.07 993.14 6.15 -5.97 6.773267.00 8.10 184.60 3041.41 -999.69 91.10 1003.76 5.15 -4.69 12.973330.00 4.10 198.20 3104.04 -1006.25 90.04 1010.22 6.71 -6.35 21.593394.00 1.80 243.40 3167.96 -1008.88 88.43 1012.71 4.85 -3.59 70.623457.00 1.60 259.50 3230.93 -1009.48 86.68 1013.17 .82

-.32 25.56

3521.00 1.40 243.90 3294.91 -1009.99 85.10 1013.55 .71

-.31 -24.38

3584.00 1.40 248.10 3357.89 -1010.61 83.70 1014.07 .16 .00 6.673605.00 1.50 229.50 3378.89 -1010.89 83.25 1014.30 2.28 .48

-88.57

3650.00 1.50 229.50 3423.87 -1011.65 82.35 1015.00 .00 .00 .00

-Projection to Bit-3695.00 1.50 229.50 3468.86 -1012.42 81.46 1015.69

.00 .00 .00

Page 2MLO7368 Work File:

Measured incl Drift True Vertical Dogleg BUILD WALKDepth Angle Direction Vertical N-S E-W Section Severity RATE RATE

FT Deg Deg Depth FT FT FT Deg/100 Deg/100 Deg/1001936.00 29.50 176.40 1838.91 -448.68 43.39 450.71 3.23 -.32 6.511999.00 31.10 177.40 1893.31 -480.42 45.10 482.48 2.66 2.54 1.592063.00 31.30 175.30 1948.05 -513.50 47.21 515.63 1.73 .31

-3.28

2126.00 31.00 176.70 2001.97 -546.01 49.49 548.21 1.24 -.48 2.222190.00 29.60 176.60 2057.23 -578.24 51.37 580.49 2.19 -2.19 -.16

2253.00 28.80 177.00 2112.22 -608.93 53.09 611.22 1.31 -1,27

.63

2317.00 29.60 177.20 2168.09 -640.11 54.67 642.43 1.26 1.25 .31

2380.00 27.80 176.20 2223.34 -670.32 56.40 672.68 2.96 -2.86 -1.59

2444.00 27.40 177.60 2280.06 -699.92 58.01 702.32 1.19 -.63 2.192507.00 27.50 176.80 2335.97 -728.93 59.43 731.34 .61 .16

-1.27

2571.00 26.10 176.40 2393.09 -757.73 61.14 760.19 2.21 -2.19 -.63

2634.00 26.70 174.00 2449.52 -785.64 63.48 788.20 1.94 .95

-3.81

2697.00 26.90 174.10 2505.76 -813.89 66.43 816.60 .33 .32 .16

2761.00 25.50 172.50 2563.18 -841.95 69.72 844.83 2.45 -2.19 -2.50

2824.00 24.30 173.00 2620.32 -868.27 73.07 871.32 1.93 -1.90

.79

2888.00 22.00 173.10 2679.17 -893.24 76.11 896.46 3.59 -3.59

.16

2951.00 22.00 170.50 2737.58 -916.59 79.48 920.01 1.55 .00

-4.13

3014.00 19.20 169.60 2796.55 -938.42 83.29 942.07 4.47 -4.44 -1.43

3078.00 17.20 169.90 2857.34 -958.09 86.85 961.96 3.13 -3.13

.47

3141.00 14.80 172.10 2917.90 -975.24 89.59 979.27 3.93 -3.81 3.49

3203.00 11.10 176.30 2978.31 -989.04 91.07 993.14 6.15 -5.97 6.773267.00 8.10 184.60 3041.41 -999.69 91.10 1003.76 5.15 -4.69 12.973330.00 4.10 198.20 3104.04 -1006.25 90.04 1010.22 6.71 -6.35 21.593394.00 1.80 243.40 3167.96 -1008.88 88.43 1012.71 4.85 -3.59 70.623457.00 1.60 259.50 3230.93 -1009.48 86.68 1013.17 .82

-.32 25.56

3521.00 1.40 243.90 3294.91 -1009.99 85.10 1013.55 .71

-.31 -24.38

3584.00 1.40 248.10 3357.89 -1010.61 83.70 1014.07 .16 .00 6.673605.00 1.50 229.50 3378.89 -1010.89 83.25 1014.30 2.28 .48

-88.57

3650.00 1.50 229.50 3423.87 -1011.65 82.35 1015.00 .00 .00 .00

-Projection to Bit-3695.00 1.50 229.50 3468.86 -1012.42 81.46 1015.69

.00 .00 .00

Page 2MLO7368 Work File:

Page 75: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

API Well No: 43047368520000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: U-29784

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: UTE

7.UNIT or CA AGREEMENT NAME: HILL CREEK

1. TYPE OF WELL Gas Well

8. WELL NAME and NUMBER: HCU 14-27F

2. NAME OF OPERATOR: XTO ENERGY INC

9. API NUMBER: 43047368520000

3. ADDRESS OF OPERATOR: 382 Road 3100 , Aztec, NM, 87410

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL FOOTAGES AT SURFACE: 1569 FSL 1937 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NESW Section: 27 Township: 10.0S Range: 20.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

4/29/2010

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. would like to file this record cleanup for an acid treatmenton this well. Please see the attached summary report.

NAME (PLEASE PRINT) Barbara Nicol

TITLE Regulatory Compliance Tech

SIGNATURE N/A

DATE 6/18/2010

PHONE NUMBER:505 333-3159 Ext

ACID TREATMENT

PHONE NUMBER505 333-3642

June 18, 2010

June 21, 2010

iPI Well No: 43047368520000

FORM 9

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING E2A9s7E84DESIGNATIONAND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS FEINDIAN,ALLOTTEEORTRIBENAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals. HILL CREEK

1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well HCU 14-27F

2. NAME OF OPERATOR: 9. API NUMBER:XTO ENERGY INC 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:382 Road 3100 , Aztec, NM, 87410 505 333-3159 Ext NATURAL BUTTES

4.LOCATIONOFWELL COUNTY:FOOTAGESATSURFACE: UINTAH

1569 FSL 1937 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr; NESW Section: 27 Township: 10.05 Range: 20.0E Meridian: S UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAMEApproximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SDUato

UWENrkRCEPmOpReTtion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

4/29/2010 OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

SPUD REPORTPRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

Date of Spud:REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINR rtODe. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER: ACID TREATMENT

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. would like to file this record cleanup for an acid treatmenton this well. Please see the attached summary report. Accepted by the

Utah Division ofOil, Gas and Mining

FOR REÇQgggNLY

NAME (PLEASE PRINT) PHONE NUMBER TITLEBarbara Nicol 505 333-3642 Regulatory Compliance Tech

SIGNATURE DATEN/A 6/18/2010

RECEIVED June 18,

iPI Well No: 43047368520000

FORM 9

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING E2A9s7E84DESIGNATIONAND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS FEINDIAN,ALLOTTEEORTRIBENAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals. HILL CREEK

1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well HCU 14-27F

2. NAME OF OPERATOR: 9. API NUMBER:XTO ENERGY INC 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:382 Road 3100 , Aztec, NM, 87410 505 333-3159 Ext NATURAL BUTTES

4.LOCATIONOFWELL COUNTY:FOOTAGESATSURFACE: UINTAH

1569 FSL 1937 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr; NESW Section: 27 Township: 10.05 Range: 20.0E Meridian: S UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAMEApproximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SDUato

UWENrkRCEPmOpReTtion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

4/29/2010 OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

SPUD REPORTPRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

Date of Spud:REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINR rtODe. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER: ACID TREATMENT

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. would like to file this record cleanup for an acid treatmenton this well. Please see the attached summary report. Accepted by the

Utah Division ofOil, Gas and Mining

FOR REÇQgggNLY

NAME (PLEASE PRINT) PHONE NUMBER TITLEBarbara Nicol 505 333-3642 Regulatory Compliance Tech

SIGNATURE DATEN/A 6/18/2010

RECEIVED June 18,

Page 76: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

EXECUTIVE SUMMARY REPORT 3/1/2010 - 6/18/2010

Report run on 6/18/2010 at 10:35 AM

1

Hill Creek Unit 14-27F Section 27-10S-20E, Uintah, Utah, Roosevelt

4/21/2010 MIRU Production Logging Services SLU. SN @ 7,802'. PU & RIH w/fishing tools.

Fished plngr and BHBS w/out STV from SN. POH LD Fishing tools. PU & RIH w/1.625" BB. Tgd fill @ 8,137'. POH LD BB. PU & RIH w/1.908" tbg broach. Ran to 7,747' before hitting scale worked up and down, unable to get deeper. Left equipment out. SWI. POH & LD broach. RDMO Production Logging Services SLU.

4/27/2010 MIRU Frac Tech. Pumped 250 gal 15% HCL flushed with 31 bbls fresh water w/KCL substitute. SI TBG. Pumped 500 gal 15% HCL followed w/20 bbl flush fresh water. 1 hour soak. Pumped 30 bbl Flush w/fresh water. SI well RDMO Frac Tech.

4/28/2010 MIRU C & S Swabbing SWU. Bd tbg. PU & RIH w/swb tls. SN @ 7,818'. BFL @ 5,100' FS. S. 0 BO, 30 BW, 10 runs, 8 hrs. FFL @ 5,000' FS. Dropped BHBS with out ball check. SWI SDFN

4/29/2010 C & S Swabbing SWU. Bd tbg. PU & RIH w/swb tls. SN @ 7,818'. BFL @ 5,000' FS. S. 0 BO, 2 BW, 1 runs, 4 hrs. FFL @ 5,000' FS. KO Well FLWG, SITP 330 psig, SICP 485 psig. RWTP @ 11:30 a.m., RDMO C & S Swabbing SWU. Final report begin test data.

June 18, 2010

EXECUTIVE SUMMARY REPORT3/1/2010 - 6/18/2010

Report run on 6/18/2010 at 10:35 AM

Hill Creek Unit 14-27F

Section 27-10S-20E, Uintah, Utah, Roosevelt

4/21/2010 MIRU Production Logging Services SLU. SN @ 7,802'. PU & RIH w/fishing tools.Fished plngr and BHBS w/out STV from SN. POH LD Fishing tools. PU & RIHw/1.625" BB. Tgd fill @ 8,137'. POH LD BB. PU & RIH w/1.908" tbg broach.Ran to 7,747' before hitting scale worked up and down, unable to get deeper.Left equipment out. SWI. POH & LD broach. RDMO Production Logging ServicesSLU.

4/27/2010 MIRU Frac Tech. Pumped 250 gal 15% HCL flushed with 31 bbls fresh water w/KCLsubstitute. SI TBG. Pumped 500 gal 15% HCL followed w/20 bbl flush freshwater. 1 hour soak. Pumped 30 bbl Flush w/fresh water. SI well RDMO FracTech.

4/28/2010 MIRU C & S Swabbing SWU. Bd tbg. PU & RIH w/swb tls. SN @ 7,818'. BFL @5,100' FS. S. O BO, 30 BW, 10 runs, 8 hrs. FFL @ 5,000' FS. Dropped BHBSwith out ball check. SWI SDFN

4/29/2010 C & S Swabbing SWU. Bd tbg. PU & RIH w/swb tls. SN @ 7,818'. BFL @ 5,000'FS. S. O BO, 2 BW, 1 runs, 4 hrs. FFL @ 5,000' FS. KO Well FLWG, SITP 330psig, SICP 485 psig. RWTP @ 11:30 a.m., RDMO C & S Swabbing SWU. Finalreport begin test data.

1

RECE!I\/EI) June

EXECUTIVE SUMMARY REPORT3/1/2010 - 6/18/2010

Report run on 6/18/2010 at 10:35 AM

Hill Creek Unit 14-27F

Section 27-10S-20E, Uintah, Utah, Roosevelt

4/21/2010 MIRU Production Logging Services SLU. SN @ 7,802'. PU & RIH w/fishing tools.Fished plngr and BHBS w/out STV from SN. POH LD Fishing tools. PU & RIHw/1.625" BB. Tgd fill @ 8,137'. POH LD BB. PU & RIH w/1.908" tbg broach.Ran to 7,747' before hitting scale worked up and down, unable to get deeper.Left equipment out. SWI. POH & LD broach. RDMO Production Logging ServicesSLU.

4/27/2010 MIRU Frac Tech. Pumped 250 gal 15% HCL flushed with 31 bbls fresh water w/KCLsubstitute. SI TBG. Pumped 500 gal 15% HCL followed w/20 bbl flush freshwater. 1 hour soak. Pumped 30 bbl Flush w/fresh water. SI well RDMO FracTech.

4/28/2010 MIRU C & S Swabbing SWU. Bd tbg. PU & RIH w/swb tls. SN @ 7,818'. BFL @5,100' FS. S. O BO, 30 BW, 10 runs, 8 hrs. FFL @ 5,000' FS. Dropped BHBSwith out ball check. SWI SDFN

4/29/2010 C & S Swabbing SWU. Bd tbg. PU & RIH w/swb tls. SN @ 7,818'. BFL @ 5,000'FS. S. O BO, 2 BW, 1 runs, 4 hrs. FFL @ 5,000' FS. KO Well FLWG, SITP 330psig, SICP 485 psig. RWTP @ 11:30 a.m., RDMO C & S Swabbing SWU. Finalreport begin test data.

1

RECE!I\/EI) June

Page 77: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

RECEIVED: Feb. 13, 2012

 

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9 

5.LEASE DESIGNATION AND SERIAL NUMBER: U-29784

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: UTE

7.UNIT or CA AGREEMENT NAME: HILL CREEK

1. TYPE OF WELL  Gas Well

8. WELL NAME and NUMBER: HCU 14-27F

2. NAME OF OPERATOR: XTO ENERGY INC

9. API NUMBER: 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER:  382 Road 3100 , Aztec, NM, 87410 505 333-3145  Ext

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL  FOOTAGES AT SURFACE:     1569 FSL 1937 FWL   QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:     Qtr/Qtr: NESW Section: 27 Township: 10.0S Range: 20.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

 

    NOTICE OF INTENTApproximate date work will start:

    SUBSEQUENT REPORTDate of Work Completion:

1 /16 /2012

    SPUD REPORTDate of Spud:

 

    DRILLING REPORTReport Date:

 

    ACIDIZE      ALTER CASING      CASING REPAIR 

    CHANGE TO PREVIOUS PLANS      CHANGE TUBING      CHANGE WELL NAME 

    CHANGE WELL STATUS      COMMINGLE PRODUCING FORMATIONS      CONVERT WELL TYPE  

    DEEPEN      FRACTURE TREAT      NEW CONSTRUCTION 

    OPERATOR CHANGE      PLUG AND ABANDON      PLUG BACK 

    PRODUCTION START OR RESUME      RECLAMATION OF WELL SITE      RECOMPLETE DIFFERENT FORMATION 

    REPERFORATE CURRENT FORMATION      SIDETRACK TO REPAIR WELL      TEMPORARY ABANDON 

    TUBING REPAIR      VENT OR FLARE       WATER DISPOSAL 

    WATER SHUTOFF      SI TA STATUS EXTENSION      APD EXTENSION 

    WILDCAT WELL DETERMINATION      OTHER  OTHER:  CLEAN OUT

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. has performed acid treatments and cleaned out thiswell per the attached summary report.

NAME (PLEASE PRINT) PHONE NUMBER  Barbara Nicol 505 333-3642

TITLE Regulatory Compliance Tech

SIGNATURE N/A

DATE 2 /13 /2012

February 15, 2012

Sundry Number: 23066 API Well Number: 43047368520000Sundry Number: 23066 API Well Number: 43047368520000

FORM 9STATE OF UTAH

DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING U-29784

SUNDRY NOTICES AND REPORTS ON WELLS 6 F INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. HILLCREEK

1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well HCU 14-27F

2. NAME OF OPERATOR: 9. API NUMBER:XTO ENERGY INC 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:382 Road 3100 , Aztec, NM, 87410 505 333-3145 Ext NATURALBUTTES

4. LOCATION OF WELL COUNTY:FOOTAGESATSURFACE: UINTAH

1569 FSL 1937 FWLQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

QtrlQtr: NESW Section: 27 Township: 10.0S Range: 20.0E Meridian: S UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACI DIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAMEApproximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORTDate of Work Completion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

1/ 16 /2 0 12OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

SPUD REPORT PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONDate of Spud:

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORTReport Date: WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER: CLEAN OUT

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. has performed acid treatments and cleaned out this Accepted by thewell per the attached summary report. Utah Division of

Oil, Gas and Mining

FOR RECORD ONLYFebruary 15, 2012

NAME (PLEASE PRINT) PHONE NUMBER TITLEBarbara Nicol 505 333-3642 Regulatory Compliance Tech

SIGNATURE DATEN/A 2/13/2012

RECEIVED: Feb. 13,

Sundry Number: 23066 API Well Number: 43047368520000

FORM 9STATE OF UTAH

DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING U-29784

SUNDRY NOTICES AND REPORTS ON WELLS 6 F INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. HILLCREEK

1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well HCU 14-27F

2. NAME OF OPERATOR: 9. API NUMBER:XTO ENERGY INC 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:382 Road 3100 , Aztec, NM, 87410 505 333-3145 Ext NATURALBUTTES

4. LOCATION OF WELL COUNTY:FOOTAGESATSURFACE: UINTAH

1569 FSL 1937 FWLQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

QtrlQtr: NESW Section: 27 Township: 10.0S Range: 20.0E Meridian: S UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACI DIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAMEApproximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORTDate of Work Completion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

1/ 16 /2 0 12OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

SPUD REPORT PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONDate of Spud:

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORTReport Date: WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER: CLEAN OUT

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. has performed acid treatments and cleaned out this Accepted by thewell per the attached summary report. Utah Division of

Oil, Gas and Mining

FOR RECORD ONLYFebruary 15, 2012

NAME (PLEASE PRINT) PHONE NUMBER TITLEBarbara Nicol 505 333-3642 Regulatory Compliance Tech

SIGNATURE DATEN/A 2/13/2012

RECEIVED: Feb. 13,

Page 78: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

RECEIVED: Feb. 13, 2012

Sundry Number: 23066 API Well Number: 43047368520000Sundry Number: 23066 API Well Number: 43047368520000

Hill Creek Unit 14-27F

12/30/2011: MIRU. Unland tbg hgr, tbg was stuck dwn hole. Att to wk tbg free wlno success.

1/3/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, while pmpg dwn csg w/70 bbis TFW @4 BPM, to free upprod tbg wlno success.

1/4/2012: MIRU WLU. RIH w/stk tl log. Log indicated tbg was free fr/6,758' -7,772'. RIH w/free point tl. Free pointindicated, @5,450', 80% free & 5,485', 100% stk. Ppd dwn tbg w/50 gal 15% HCI Acwladds, Nalco CI-86 Corr inhib, & A1-150. Flshd w/15 bbis TFW. Ppd dwn csg w/450 gal 15% HCI Acwladds, Nalco C1-86 Corr inhib & A1-150. Flshd w/40 bbisTFW.

1/5/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, w/no success. RIH w/stuck tl log. Log indic 2 sc bridges. # 1@5,458' - 68' ( 10', 90 % stk, fr/5,462' - 66' 4', 100% stk ) & # 2 @5,476' - 78' ( 2' , 85 % stk ). POH w/WL & LD stuck tllog. RIH w/10' strg shot. Shoot off strg shot @5,460' - 70'. PU on tbg strg, tbg was free. RDMO WL. TOH w/2-3/8" tbg.

1/6/2012: Cont TOH wl2-3/8" tbg. Tbg showed hvy external sc fr/5,400' - 5,600' & It external sc fr/5,600' - EOT @7,805'.Smpl taken for analysis. TlH w/4-3/4" bit, 5-1/2" csg scr & 2-3/8" tbg.

1/9/2012: MIRU AFU. CO sc bridge fr/5,460' - 5,480'. CO sc bridge fr/8,068' - 8,100' & fillfr/8,100' - 8,166'.

1/10/2012: TOH w/2-3/8" tbg, 5-1/2" csg scr & 4-3/4" bit. TIH w/5-1/2" RBP & 5-1/2" pkr & 2-3/8" tbg.

1/11/2012: Isolate & acidize 6 stages w/10% HCI Ac, 75 gal S-262 sc inhib, 15 gal AS-290 Anti sludge, 12 gal AL-150 acinhibitor, 12 gal CL-86 corr inhib, 3 gal Feno iron control & 30 gal Nalco EC9021A H2s scavenger.Stg #1. Isolate perfs @7,892' - 8,093' & Acidize w/375 gal 10% HCI Ac. Flsd wl37 bbis TFW.Stg #2. Isolate perfs @7,676' - 7,801' & Acidize w/344 gal 10% HCI Ac. Flsd wl34 bbis TFW.Stg #3. Isolate perfs @7,304' - 7,310 & Acidize w/188 gal 10% HCI Ac. Flsd w/30 bbis TFW.Stg #4. Isolate perfs @7,616' - 6,722' & Acidize w/188 gal 10% HCI Ac. Flsd wl28 bbis TFW.Stg #5. Isolate perfs @6,255' - 6,460' & Acidize w/188 gal 10% HCI Ac. Flsd wl31 bbis TFW.Stg #6. Isolate perfs @5,422' - 5,441' & Acidize w/219 gal 10% HCI Ac. Flsd w/23 bbis TFW.TOH w/2-3/8" tbg, 5-1/2" pkr & 5-1/2" RBP.

1/12/2012: TIH w/2-3/8" tbg. EOT @8,092'. RIH w/swb tls. BFL @5,800' FS. S, O BO, 36 BLW, 8 runs, 4 hrs. FFL @5,900' FS.

1/13/2012: RIH w/swb tis. BFL @5,900' FS. S, O BO, 67 BLW, 17 runs, 8-1/2 hrs. FFL @6,300' FS.

1/16/2012: RIH w/swb tis. BFL @6,300' FS. S, O BO, 24 BLW, 6 runs, 3-1/2 hrs. FFL @6,400' FS. SICP 430 psig. TOHw/2-3/8" tbg. New EOT @7,405'. RIH w/swb tls. BFL @6,200' FS. S,0 BO,24 BLW, 5 runs, 2-1/2 hrs. FFL @6,300' FS.Well KO.

Sundry Number: 23066 API Well Number: 43047368520000

Hill Creek Unit 14-27F

12/30/2011: MIRU. Unland tbg hgr, tbg was stuck dwn hole. Att to wk tbg free wlno success.

1/3/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, while pmpg dwn csg w/70 bbis TFW @4 BPM, to free upprod tbg wlno success.

1/4/2012: MIRU WLU. RIH w/stk tl log. Log indicated tbg was free fr/6,758' -7,772'. RIH w/free point tl. Free pointindicated, @5,450', 80% free & 5,485', 100% stk. Ppd dwn tbg w/50 gal 15% HCI Acwladds, Nalco CI-86 Corr inhib, & A1-150. Flshd w/15 bbis TFW. Ppd dwn csg w/450 gal 15% HCI Acwladds, Nalco C1-86 Corr inhib & A1-150. Flshd w/40 bbisTFW.

1/5/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, w/no success. RIH w/stuck tl log. Log indic 2 sc bridges. # 1@5,458' - 68' ( 10', 90 % stk, fr/5,462' - 66' 4', 100% stk ) & # 2 @5,476' - 78' ( 2' , 85 % stk ). POH w/WL & LD stuck tllog. RIH w/10' strg shot. Shoot off strg shot @5,460' - 70'. PU on tbg strg, tbg was free. RDMO WL. TOH w/2-3/8" tbg.

1/6/2012: Cont TOH wl2-3/8" tbg. Tbg showed hvy external sc fr/5,400' - 5,600' & It external sc fr/5,600' - EOT @7,805'.Smpl taken for analysis. TlH w/4-3/4" bit, 5-1/2" csg scr & 2-3/8" tbg.

1/9/2012: MIRU AFU. CO sc bridge fr/5,460' - 5,480'. CO sc bridge fr/8,068' - 8,100' & fillfr/8,100' - 8,166'.

1/10/2012: TOH w/2-3/8" tbg, 5-1/2" csg scr & 4-3/4" bit. TIH w/5-1/2" RBP & 5-1/2" pkr & 2-3/8" tbg.

1/11/2012: Isolate & acidize 6 stages w/10% HCI Ac, 75 gal S-262 sc inhib, 15 gal AS-290 Anti sludge, 12 gal AL-150 acinhibitor, 12 gal CL-86 corr inhib, 3 gal Feno iron control & 30 gal Nalco EC9021A H2s scavenger.Stg #1. Isolate perfs @7,892' - 8,093' & Acidize w/375 gal 10% HCI Ac. Flsd wl37 bbis TFW.Stg #2. Isolate perfs @7,676' - 7,801' & Acidize w/344 gal 10% HCI Ac. Flsd wl34 bbis TFW.Stg #3. Isolate perfs @7,304' - 7,310 & Acidize w/188 gal 10% HCI Ac. Flsd w/30 bbis TFW.Stg #4. Isolate perfs @7,616' - 6,722' & Acidize w/188 gal 10% HCI Ac. Flsd wl28 bbis TFW.Stg #5. Isolate perfs @6,255' - 6,460' & Acidize w/188 gal 10% HCI Ac. Flsd wl31 bbis TFW.Stg #6. Isolate perfs @5,422' - 5,441' & Acidize w/219 gal 10% HCI Ac. Flsd w/23 bbis TFW.TOH w/2-3/8" tbg, 5-1/2" pkr & 5-1/2" RBP.

1/12/2012: TIH w/2-3/8" tbg. EOT @8,092'. RIH w/swb tls. BFL @5,800' FS. S, O BO, 36 BLW, 8 runs, 4 hrs. FFL @5,900' FS.

1/13/2012: RIH w/swb tis. BFL @5,900' FS. S, O BO, 67 BLW, 17 runs, 8-1/2 hrs. FFL @6,300' FS.

1/16/2012: RIH w/swb tis. BFL @6,300' FS. S, O BO, 24 BLW, 6 runs, 3-1/2 hrs. FFL @6,400' FS. SICP 430 psig. TOHw/2-3/8" tbg. New EOT @7,405'. RIH w/swb tls. BFL @6,200' FS. S,0 BO,24 BLW, 5 runs, 2-1/2 hrs. FFL @6,300' FS.Well KO.

Page 79: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

RECEIVED: Feb. 13, 2012

Sundry Number: 23066 API Well Number: 43047368520000Sundry Number: 23066 API Well Number: 43047368520000

Hill Creek Unit 14-27F

12/30/2011: MIRU. Unland tbg hgr, tbg was stuck dwn hole. Att to wk tbg free wlno success.

1/3/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, while pmpg dwn csg w/70 bbis TFW @4 BPM, to free upprod tbg wlno success.

1/4/2012: MIRU WLU. RIH w/stk tl log. Log indicated tbg was free fr/6,758' -7,772'. RIH w/free point tl. Free pointindicated, @5,450', 80% free & 5,485', 100% stk. Ppd dwn tbg w/50 gal 15% HCI Acwladds, Nalco CI-86 Corr inhib, & A1-150. Flshd w/15 bbis TFW. Ppd dwn csg w/450 gal 15% HCI Acwladds, Nalco C1-86 Corr inhib & A1-150. Flshd w/40 bbisTFW.

1/5/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, w/no success. RIH w/stuck tl log. Log indic 2 sc bridges. # 1@5,458' - 68' ( 10', 90 % stk, fr/5,462' - 66' 4', 100% stk ) & # 2 @5,476' - 78' ( 2' , 85 % stk ). POH w/WL & LD stuck tllog. RIH w/10' strg shot. Shoot off strg shot @5,460' - 70'. PU on tbg strg, tbg was free. RDMO WL. TOH w/2-3/8" tbg.

1/6/2012: Cont TOH wl2-3/8" tbg. Tbg showed hvy external sc fr/5,400' - 5,600' & It external sc fr/5,600' - EOT @7,805'.Smpl taken for analysis. TlH w/4-3/4" bit, 5-1/2" csg scr & 2-3/8" tbg.

1/9/2012: MIRU AFU. CO sc bridge fr/5,460' - 5,480'. CO sc bridge fr/8,068' - 8,100' & fillfr/8,100' - 8,166'.

1/10/2012: TOH w/2-3/8" tbg, 5-1/2" csg scr & 4-3/4" bit. TIH w/5-1/2" RBP & 5-1/2" pkr & 2-3/8" tbg.

1/11/2012: Isolate & acidize 6 stages w/10% HCI Ac, 75 gal S-262 sc inhib, 15 gal AS-290 Anti sludge, 12 gal AL-150 acinhibitor, 12 gal CL-86 corr inhib, 3 gal Feno iron control & 5 gal Nalco EC9021A H2s scavenger.Stg #1. Isolate perfs @7,892' - 8,093' & Acidize w/375 gal 10% HCI Ac. Flsd wl37 bbis TFW.Stg #2. Isolate perfs @7,676' - 7,801' & Acidize w/344 gal 10% HCI Ac. Flsd wl34 bbis TFW.Stg #3. Isolate perfs @7,304' - 7,310 & Acidize w/188 gal 10% HCI Ac. Flsd w/30 bbis TFW.Stg #4. Isolate perfs @7,616' - 6,722' & Acidize w/188 gal 10% HCI Ac. Flsd wl28 bbis TFW.Stg #5. Isolate perfs @6,255' - 6,460' & Acidize w/188 gal 10% HCI Ac. Flsd wl31 bbis TFW.Stg #6. Isolate perfs @5,422' - 5,441' & Acidize w/219 gal 10% HCI Ac. Flsd w/23 bbis TFW.TOH w/2-3/8" tbg, 5-1/2" pkr & 5-1/2" RBP.

1/12/2012: TIH w/2-3/8" tbg. EOT @8,092'. RIH w/swb tls. BFL @5,800' FS. S, O BO, 36 BLW, 8 runs, 4 hrs. FFL @5,900' FS.

1/13/2012: RIH w/swb tis. BFL @5,900' FS. S, O BO, 67 BLW, 17 runs, 8-1/2 hrs. FFL @6,300' FS.

1/16/2012: RIH w/swb tis. BFL @6,300' FS. S, O BO, 24 BLW, 6 runs, 3-1/2 hrs. FFL @6,400' FS. SICP 430 psig. TOHw/2-3/8" tbg. New EOT @7,405'. RIH w/swb tls. BFL @6,200' FS. S,0 BO,24 BLW, 5 runs, 2-1/2 hrs. FFL @6,300' FS.Well KO.

Sundry Number: 23066 API Well Number: 43047368520000

Hill Creek Unit 14-27F

12/30/2011: MIRU. Unland tbg hgr, tbg was stuck dwn hole. Att to wk tbg free wlno success.

1/3/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, while pmpg dwn csg w/70 bbis TFW @4 BPM, to free upprod tbg wlno success.

1/4/2012: MIRU WLU. RIH w/stk tl log. Log indicated tbg was free fr/6,758' -7,772'. RIH w/free point tl. Free pointindicated, @5,450', 80% free & 5,485', 100% stk. Ppd dwn tbg w/50 gal 15% HCI Acwladds, Nalco CI-86 Corr inhib, & A1-150. Flshd w/15 bbis TFW. Ppd dwn csg w/450 gal 15% HCI Acwladds, Nalco C1-86 Corr inhib & A1-150. Flshd w/40 bbisTFW.

1/5/2012: Wkd tbg fr/80,000# - 20,000# w/right hand torque, w/no success. RIH w/stuck tl log. Log indic 2 sc bridges. # 1@5,458' - 68' ( 10', 90 % stk, fr/5,462' - 66' 4', 100% stk ) & # 2 @5,476' - 78' ( 2' , 85 % stk ). POH w/WL & LD stuck tllog. RIH w/10' strg shot. Shoot off strg shot @5,460' - 70'. PU on tbg strg, tbg was free. RDMO WL. TOH w/2-3/8" tbg.

1/6/2012: Cont TOH wl2-3/8" tbg. Tbg showed hvy external sc fr/5,400' - 5,600' & It external sc fr/5,600' - EOT @7,805'.Smpl taken for analysis. TlH w/4-3/4" bit, 5-1/2" csg scr & 2-3/8" tbg.

1/9/2012: MIRU AFU. CO sc bridge fr/5,460' - 5,480'. CO sc bridge fr/8,068' - 8,100' & fillfr/8,100' - 8,166'.

1/10/2012: TOH w/2-3/8" tbg, 5-1/2" csg scr & 4-3/4" bit. TIH w/5-1/2" RBP & 5-1/2" pkr & 2-3/8" tbg.

1/11/2012: Isolate & acidize 6 stages w/10% HCI Ac, 75 gal S-262 sc inhib, 15 gal AS-290 Anti sludge, 12 gal AL-150 acinhibitor, 12 gal CL-86 corr inhib, 3 gal Feno iron control & 5 gal Nalco EC9021A H2s scavenger.Stg #1. Isolate perfs @7,892' - 8,093' & Acidize w/375 gal 10% HCI Ac. Flsd wl37 bbis TFW.Stg #2. Isolate perfs @7,676' - 7,801' & Acidize w/344 gal 10% HCI Ac. Flsd wl34 bbis TFW.Stg #3. Isolate perfs @7,304' - 7,310 & Acidize w/188 gal 10% HCI Ac. Flsd w/30 bbis TFW.Stg #4. Isolate perfs @7,616' - 6,722' & Acidize w/188 gal 10% HCI Ac. Flsd wl28 bbis TFW.Stg #5. Isolate perfs @6,255' - 6,460' & Acidize w/188 gal 10% HCI Ac. Flsd wl31 bbis TFW.Stg #6. Isolate perfs @5,422' - 5,441' & Acidize w/219 gal 10% HCI Ac. Flsd w/23 bbis TFW.TOH w/2-3/8" tbg, 5-1/2" pkr & 5-1/2" RBP.

1/12/2012: TIH w/2-3/8" tbg. EOT @8,092'. RIH w/swb tls. BFL @5,800' FS. S, O BO, 36 BLW, 8 runs, 4 hrs. FFL @5,900' FS.

1/13/2012: RIH w/swb tis. BFL @5,900' FS. S, O BO, 67 BLW, 17 runs, 8-1/2 hrs. FFL @6,300' FS.

1/16/2012: RIH w/swb tis. BFL @6,300' FS. S, O BO, 24 BLW, 6 runs, 3-1/2 hrs. FFL @6,400' FS. SICP 430 psig. TOHw/2-3/8" tbg. New EOT @7,405'. RIH w/swb tls. BFL @6,200' FS. S,0 BO,24 BLW, 5 runs, 2-1/2 hrs. FFL @6,300' FS.Well KO.

Page 80: as shown - UtahOk i eOra v2e2-'2S631te10 Env i ronment a l Consult a nts 303/781-8211 303/781-1167 Fax July 15, 2005 Fluid Minerals Group Bureau of Land Management Vernal Field Office

RECEIVED: Apr. 01, 2016

 

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9 

5.LEASE DESIGNATION AND SERIAL NUMBER: U-29784

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: UTE

7.UNIT or CA AGREEMENT NAME: HILL CREEK

1. TYPE OF WELL  Gas Well

8. WELL NAME and NUMBER: HCU 14-27F

2. NAME OF OPERATOR: XTO ENERGY INC

9. API NUMBER: 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER:  PO Box 6501 , Englewood, CO, 80155 303 397-3727  Ext

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL  FOOTAGES AT SURFACE:     1569 FSL 1937 FWL   QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:     Qtr/Qtr: NESW Section: 27 Township: 10.0S Range: 20.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

 

    NOTICE OF INTENTApproximate date work will start:

    SUBSEQUENT REPORTDate of Work Completion:

3 /4 /2016

    SPUD REPORTDate of Spud:

 

    DRILLING REPORTReport Date:

 

    ACIDIZE      ALTER CASING      CASING REPAIR 

    CHANGE TO PREVIOUS PLANS      CHANGE TUBING      CHANGE WELL NAME 

    CHANGE WELL STATUS      COMMINGLE PRODUCING FORMATIONS      CONVERT WELL TYPE  

    DEEPEN      FRACTURE TREAT      NEW CONSTRUCTION 

    OPERATOR CHANGE      PLUG AND ABANDON      PLUG BACK 

    PRODUCTION START OR RESUME      RECLAMATION OF WELL SITE      RECOMPLETE DIFFERENT FORMATION 

    REPERFORATE CURRENT FORMATION      SIDETRACK TO REPAIR WELL      TEMPORARY ABANDON 

    TUBING REPAIR      VENT OR FLARE       WATER DISPOSAL 

    WATER SHUTOFF      SI TA STATUS EXTENSION      APD EXTENSION 

    WILDCAT WELL DETERMINATION      OTHER  OTHER: 

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. performed an Acid Treatment on this well per thefollowing: 02/26/16: MIRU SLU. TOH w/plunger & BHBS. tgd 111' new

fill @ 8,052' (41' perfs covered). RDMO SLU. 03/01/16: MIRU pumptruck. Pump 1000 gal 15% HCL dn csg and flush w/25 bbls TFW w/5

gal T scav in flush. Pump 250 gal 15% HCL dn tbg and flush w/ 30 bblsTFW. RDMO pump truck. 03/03/16: MIRU SWU. Inspect & dropd BHBS

w/SV & single pad plunger. Cycle plunger to surf. RDMO SWU.03/07/16: Well failed to run over night. MIRU SWU. RIH w/swb tl's.

Cycle plunger to surf & RWTP, ( 03/04/2016 ). RDMO SWU.

NAME (PLEASE PRINT) PHONE NUMBER  Rhonda Smith 505 333-3215

TITLE Regulatory Clerk

SIGNATURE N/A

DATE 4 /1 /2016

April 05, 2016

Sundry Number: 70768 API Well Number: 43047368520000Sundry Number: 70768 API Well Number: 43047368520000

FORM 9STATE OF UTAH

DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING U-29784

SUNDRY NOTICES AND REPORTS ON WELLS 6 F INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. HILLCREEK

1. TYPE OF WELL 8. WELL NAME and NUMBER:Gas Well HCU 14-27F

2. NAME OF OPERATOR: 9. API NUMBER:XTO ENERGY INC 43047368520000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:PO Box 6501 , Englewood, CO, 80155 303 397-3727 Ext NATURALBUTTES

4. LOCATION OF WELL COUNTY:FOOTAGESATSURFACE: UINTAH

1569 FSL 1937 FWLQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

QtrlQtr: NESW Section: 27 Township: 10.0S Range: 20.0E Meridian: S UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

/ ACI DIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAMEApproximate date work will start:

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORTDate of Work Completion: DEEPEN FRACTURE TREAT NEW CONSTRUCTION

3/4/20 16OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

SPUD REPORT PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONDate of Spud:

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORTReport Date: WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCATWELLDETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

XTO Energy Inc. performed an Acid Treatment on this well per the Accepted by thefollowing: 02/26/16: MIRU SLU. TOH w/plunger & BHBS. tgd 111' new Utah Division of

fill @ 8,052' (41' perfs covered). RDMO SLU. 03/01/16: MIRU pump Oil, Gas and Mining

truck. Pump 1000 gal 15% HCL dn csg and flush w/25 bbls TFW w/5 FOR RECORD ONLYgal T scav in flush. Pump 250 gal 15% HCL dn tbg and flush w/ 30 bbls April 05, 2016TFW. RDMO pump truck. 03/03/16: MIRU SWU. Inspect & dropd BHBS

w/SV & single pad plunger. Cycle plunger to surf. RDMO SWU.03/07/16: Well failed to run over night. MIRU SWU. RIH w/swb tl's.

Cycle plunger to surf & RWTP, ( 03/04/2016 ). RDMO SWU.

NAME (PLEASE PRINT) PHONE NUMBER TITLERhonda Smith 505 333-3215 Regulatory Clerk

SIGNATURE DATEN/A 4/1/2016

RECEIVED: Apr. 01,


Recommended