1. ASAD ONLINE TRAINING SERIES (OTS) Module #1: PROJECT SETUP Presenter: Tim Hiteshew Start Time: 12:00 noon (login begins at 11:50) Module Outline 1. General Facts about ASAD 2. Files Structure 3. User Flowchart 4. Creating a New Project 5. Secondary Files: Top Files/Report Files/Cell Libraries/Level Name Library 6. Option Settings 7. Project ID 8. Baseline Geometry – Key-in & Importing 9. Profile Geometry – Key-in & Importing 10. Roadway Cross Slope Geometry revised 3/2/2008
Transcript
Page 1: ASAD Project Setup - Hiteshew

1. ASAD ONLINE TRAINING SERIES

(OTS)

Module #1: PROJECT SETUP

Presenter: Tim Hiteshew

Start Time: 12:00 noon (login begins at 11:50)

Module Outline

1. General Facts about ASAD

2. Files Structure

3. User Flowchart

4. Creating a New Project

5. Secondary Files: Top Files/Report Files/Cell Libraries/Level Name Library

6. Option Settings

7. Project ID

8. Baseline Geometry – Key-in & Importing

9. Profile Geometry – Key-in & Importing

10. Roadway Cross Slope Geometry

revised 3/2/2008

Page 2: ASAD Project Setup - Hiteshew

Project Setup Page 2

ASAD – Online Training Series Version 3.x.x

GENERAL FACTS about ASAD

Hydraulics

• Up to 1000 nodes per system • Maximum of 50 systems per project • Runoff computed using the rational method • Rainfall Intensity using IDF curves or user defined curves • Full and partial flows supported • Computes backwater curve with junction and exit loss options • Roadway spread analysis using HEC-22 method • Time of concentration worksheet, TR-55 and Kinematic wave.

Automatic Calculations

• Pipe sizing • Pipe lengths (structure center-to-center & actual quantity lengths) • Inlet / Top / Grate elevations • Onsite drainage areas • Pipe invert elevations

Plans Production

• Drainage structure cross-sections drawn • Storm sewer drawn in plan view • Profile view of storm sewer with hydraulic and energy grade lines • Cross section pattern lines drawn at each node location. These lines may be used

by other software such as GEOPAK to generate the existing and proposed roadway cross sections.

• Drawings annotated to user specifications • All plans production tools draw directly into Intergraph/MicroStation CAD format

files (*.dgn)

Reports

• Storm sewer hydraulic tabulation • Summary of drainage structures - draw into CAD or export to spreadsheet • Inlet spread/intercept/bypass analysis report • Time of concentration worksheet • Underground utility conflicts • Profile elevation report • Storm sewer cost analysis

Page 3: ASAD Project Setup - Hiteshew

Project Setup Page 3

ASAD – Online Training Series Version 3.x.x

FILES STRUCTURE

PRIMARY FILES BACK-UP these files regularly!

ASAD

(ASAD3.EXE) c:\programfiles\asadv3\

CAD ENGINE

Files located on ASAD CD–Rom and installed during SETUP.EXE

LEVEL NAMES LIBRARY

(fdot_v8_level_ library.dgn)

c:\programfiles\asadv3\

CELL LIBRARY

(drplan.cel)

c:\programfiles\asadv3\

IMPORT TEXT FILES

(*.inp)

EXPORT TEXT FILES

(*.txt)

TOP FILES

(*.top)

c:\programfiles\asadv3\

REPORT FILES

(*.rpt)

c:\programfiles\asadv3\

ASAD DATABASE

(*.mdb)

ASAD SEED DATABASE

(seedv3.mdb)

c:\programfiles\asadv3\

V8 CAD FILES

(*.dgn)

Page 4: ASAD Project Setup - Hiteshew

Project Setup Page 4

ASAD – Online Training Series Version 3.x.x

USER FLOWCHART

Create a new project: File>New Project (MDB)

Start

Yes No

Open an existing project: File>Open Project (MDB)

Verify path to secondary files: File>Top/Report/Cell Files

Setup Project Information: Project

Need to compute pipe lengths, inlet

elevations, and drainage areas?

Enter Baseline data:

Edit>Baseline Geometry or

File>Import>Geometry from GEOPAK Input Text File

Yes

No

Need to compute low point station adjustments, inlet elevations, and drainage

areas?

Enter Profile data: Edit>Profile Geometry

or File>Import>Geometry from

GEOPAK Input Text File

Yes

No

Need to compute inlet elevations?

Enter Cross Slope data:

Edit>Roadway Cross Slopes

Yes

No

10

New Project?

Module 1: Project Setup

Page 5: ASAD Project Setup - Hiteshew

Project Setup Page 5

ASAD – Online Training Series Version 3.x.x

10

Need to compute drainage areas?

Enter Cross Width data:

Edit>Roadway Cross Widths

Yes

No

Create a new drainage system: Edit>Storm Sewer System Add/Delete/Rename

Define the outfall and storm event: Edit>SS System Outfall and Header Details

Create multiple nodes and reaches?

Create multiple nodes & reaches: Edit>Node/Reach Automatic Creation

Yes No

Create and edit individual nodes: Edit>Nodes

Create and edit individual reaches: Edit>Reaches

Compute low point station adjustment, north & east coordinates, reach lengths, inlet elevation, and drainage areas:

Compute/Reports>Step 1 – S.S. Geometry & Drainage Areas

Compute pipes sizes:

Compute/Reports>Step 2 – Compute Pipe Sizes

Compute pipe flow line elevations:

Compute/Reports>Step 3 – Set Flow Lines

Compute hydraulics and print storm tabulations report:

Compute/Reports>Step 4 – Compute/Print FDOT Storm Tabs

20

Module 2: Design (Pt. 1)

Module 3: Design (Pt. 2)

Page 6: ASAD Project Setup - Hiteshew

Project Setup Page 6

ASAD – Online Training Series Version 3.x.x

20

Draw plan view – Drainage system, drainage areas, and cross section pattern lines:

CAD>Storm Sewer>Draw Plan View

Draw profile view – Drainage system:

CAD>Storm Sewer>Draw Profile

Draw drainage structures in cross section view:

CAD>Storm Sewer>Draw Drainage Structures

Compute and draw Summary of Drainage Structures sheets:

Compute/Reports>Summary of Drainage Structures

Done

Module 4: Plans Prep. (Part 1)

Module 5: Plans Prep. (Part 2)

Page 7: ASAD Project Setup - Hiteshew

Project Setup Page 7

ASAD – Online Training Series Version 3.x.x

CREATING A NEW PROJECT

1) Create the new project database (OTS.MDB) from the ASAD seed database (SEEDv3.MDB) using pulldown File>New Project

Figure 1

2) Enter the ‘New Database Name’ 3) Select the ‘Seed File Name’. Typically SEEDv3.MDB

Figure 2

4) Open the new project database (OTS.MDB). Use pulldown File>Open Project and select the file.

Figure 3

Figure 4

Page 8: ASAD Project Setup - Hiteshew

Project Setup Page 8

ASAD – Online Training Series Version 3.x.x

SECONDARY FILES Top Files/Report Files/Cell Libraries/Level Name Library

1) Verify the path to secondary ASAD files. Use pulldown File>Top Files/Report Files/Cell Libraries/Level Name Library

Figure 5

Figure 6

Page 9: ASAD Project Setup - Hiteshew

Project Setup Page 9

ASAD – Online Training Series Version 3.x.x

OPTION SETTINGS

1) Set program options. Use pulldown Options

Figure 7

2) Set the number of monitors using the ‘Monitor’ tab.

Figure 8

3) Turn off the automatic ASAD Master Level List update function. Set the number seconds to 0.

Figure 9

4) Compress CAD file: Turn On (check) both options. ‘Cross Section Cell Coordinate Source’ set to ‘Vertices’.

Figure 10

Page 10: ASAD Project Setup - Hiteshew

Project Setup Page 10

ASAD – Online Training Series Version 3.x.x

PROJECT ID

1) Set the Project information using pulldown Project.

Figure 11

2) Set the units (English or Metric) for the project. A change of units takes affect the next time the database is opened.

Figure 12

Page 11: ASAD Project Setup - Hiteshew

Project Setup Page 11

ASAD – Online Training Series Version 3.x.x

CREATING A NEW STORM SEWER SYSTEM

1) Use pulldown Edit>Storm Sewer System Add/Delete/Rename to create a new pipe network.

Figure 13

2) Key in the storm sewer system name in the ‘New System’ field and press the ‘Add’ button.

Figure 14

3) Select the new system name as the Active System using the listbox as seen in Figure 15.

Figure 15

Page 12: ASAD Project Setup - Hiteshew

Project Setup Page 12

ASAD – Online Training Series Version 3.x.x

BASELINE GEOMETRY

Enter Baseline by Key In 1) Use the Edit/Baseline Geometry pulldown to Key-in baseline data.

Figure 16

2) In the ‘Header’ section, press the ‘Add’ button to enter the name of the baseline. 3) In the ‘Header’ section, enter the ‘Begin Station’ which equates to the station of the first P.I. (first in the ‘Segment’ list).

4) In the ‘Segment’ section, click the ‘Add’ button to create a new P.I. in the segment list. 5) In the ‘Segment’ section, click on the row (from the table) of the segment to be entered. Key in data into North, East and Arc Radius text boxes.

Figure 17

Page 13: ASAD Project Setup - Hiteshew

Project Setup Page 13

ASAD – Online Training Series Version 3.x.x

Enter Baseline by Importing ASAD can import baseline geometry from GEOPAK. This is a two-step process: First, export the baseline(s) geometry from GEOPAK to a text file.

1) Enter GEOPAK COGO. Make sure you have the correct GEOPAK database (GPK file) open. 2) Key in one of the following lines:

make input file c:\program files\asadv3\baseline.inp cha * make input file c:\program files\asadv3\baseline.inp cha CLCONST

3) Exit GEOPAK Second, in ASAD:

1) Use the File>Import>Geometry from GEOPAK Input Text File pulldown to import baseline data from an ASCII text file.

Figure 18

2) Select the ‘GEOPAK Chains’ tab. 3) ‘Browse’ to select the file to be imported. 4) Highlight the baseline(s), from the ‘Selection’ listbox, to be imported. 5) Click ‘OK’ to execute the import process. Note: If importing a baseline that already exist in the ASAD database then check (ON) the ‘Overwrite existing’ checkbox.

Figure 19

Page 14: ASAD Project Setup - Hiteshew

Project Setup Page 14

ASAD – Online Training Series Version 3.x.x

PROFILE GEOMETRY Enter Profile by Key In 1) Use the Edit/Profile Geometry pulldown to Key In profile data.

Figure 20

2) In the ‘Header’ section, press the ‘Add’ button to enter the name of the profile. 3) In the ‘Segment’ section, click the ‘Add’ button to create a new VPI in the segment list. 4) In the ‘Segment’ section, click on the row (from the table) of the segment to be entered. Key in data into Station, Elevation, and Vertical Curve text boxes.

Figure 21

Page 15: ASAD Project Setup - Hiteshew

Project Setup Page 15

ASAD – Online Training Series Version 3.x.x

Enter Profile by Importing ASAD can import profile geometry from GEOPAK. This is a two-step process: First, export the profile(s) geometry from GEOPAK to a text file.

1) Enter GEOPAK COGO. Make sure you have the correct GEOPAK database (GPK file) open. 2) Key in one of the following lines:

make input file c:\program files\asadv3\profile.inp cha * make input file c:\program files\asadv3\profile.inp cha PGL

3) Exit GEOPAK Second, in ASAD:

1) Use the File>Import>Geometry from GEOPAK Input Text File pulldown to import baseline data from an ASCII text file.

Figure 22

2) Select the ‘GEOPAK Profiles’ tab. 3) ‘Browse’ to select the file to be imported. 4) Highlight the profile(s), from the ‘Selection’ listbox, to be imported. 5) Click ‘OK’ to execute the import process. Note: If importing a profile that already exist in the ASAD database then check (ON) the ‘Overwrite existing’ checkbox.

Figure 23

Page 16: ASAD Project Setup - Hiteshew

Project Setup Page 16

ASAD – Online Training Series Version 3.x.x

ROADWAY CROSS SLOPE GEOMETRY Figures 24 and 25 illustrate a typical roadway section.

Figure 24

Figure 25

Page 17: ASAD Project Setup - Hiteshew

Project Setup Page 17

ASAD – Online Training Series Version 3.x.x

1) Use the Edit>Roadway Cross Slopes to edit pavement cross slopes of the typical sections. 2) Click on the ‘Add’ button and key in the new cross slope name. 3) Enter the distance between the baseline and its adjacent PGL location into the ‘PGL/Baseline Tie’. 4) Enter up to 3 cross slopes moving away from the PGL.

Figure 26


Recommended