Asbestos Subcontractors
Transcript
Page 1: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

Asbestos Subcontractors

Asbestos Subcontractors

Page 2: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

Prior to MobilizationPrior to MobilizationPrior to MobilizationPrior to Mobilization

– Asbestos Training Certificates– Respirator Training– Fit Test Records– Asbestos Abatement Plan– Notification to BAAQMD– SQF of Sub-Tiers– Abatement Work Included in SSSP

Page 3: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

Once On SiteOnce On SiteOnce On SiteOnce On Site

• Develop JSA & Pre-task ( a well written Asbestos Abatement Plan can be used as contractor SSSP/JSA)

• Coordinate with Building Manager• Coordinate with FCM for Utility

Shutdown• Must LO/TO with SLAC

Page 4: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

Get to WorkGet to WorkGet to WorkGet to Work

• Cordon Off Work Area• Post Signage• Establish Critical Barriers• Set Up Containment• SLAC Industrial Hygienist Conducts

Inspection Prior to Abatement • Released to Perform Abatement

4

Page 5: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

ContainmentContainmentContainmentContainment

[Negative air/HEPA filter]A SLAC IH must conduct a clearance inspection prior to taking down an enclosure

Page 6: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

SLAC OversightSLAC OversightSLAC OversightSLAC Oversight

• Provide Viewing Windows• General Contractor Manages Work • SLAC Performs Daily Job Walks• DOE Will Also Perform Job Walks

Page 7: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

SLAC WM Handles all asbestos wasteSLAC WM Handles all asbestos wasteSLAC WM Handles all asbestos wasteSLAC WM Handles all asbestos waste

1. All waste must be bagged or burrito wrapped.

2. The waste must be wetted

3. The waste bag should be filled to about 50% of its capacity

4. Wipe off tools

5. Everything goes in the waste bag

6. The waste bag must be closed with a gooseneck with duct tape

7. Ensure right waste in right container - Friable or Non-friable

8. Contact WM at ext #2399 to request containers

Page 8: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

Waste ManagementWaste ManagementWaste ManagementWaste Management

Page 9: Asbestos Subcontractors. Prior to Mobilization –Asbestos Training Certificates –Respirator Training –Fit Test Records –Asbestos Abatement Plan –Notification.

ES&H Home Page / A-Z Index / AsbestosES&H Home Page / A-Z Index / AsbestosES&H Home Page / A-Z Index / AsbestosES&H Home Page / A-Z Index / Asbestos