Document Control
Change Record
Date Author Version
Change Reference
Reviewers
Name Position
Distribution
CopyNo.
Name Location
1
2
3
4
2 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
3/87
Table of Contents
Document Control...........................................................................................
ntroduction.....................................................................................................ntended audience.......................................................................................................!
List of attendees.........................................................................................................!
Related training materials...........................................................................................!
Log onto "racle Applications....................................................................................!
"#er#ie$ of "racle Ad#anced Planning.........................................................APS data flo$............................................................................................................%
Planning c&cle............................................................................................................'
Source Data Setups.........................................................................................Setup in#entor& item attri(utes..................................................................................'
MPS)MRP planning attri(utes..................................................................................**
Lead times attri(utes................................................................................................*'
Shipping+ Recei#ing+ Carrier+ and Supplier Capacit& Calendars.............................*,
-orda& Calendar..................................................................................................../0
Setup resource and department................................................................................/0
Setup routing............................................................................................................/0Setup suppl& chain.................................................................................................../0
"rder management.................................................................................................../,
Data Collection..............................................................................................Scope of data collection.........................................................................................../,
Data collection methods.........................................................................................../1
Run data collection...................................................................................................20
Define an ASCP plan.....................................................................................ASCP plan classes....................................................................................................22
ASCP plan t&pes.......................................................................................................23
Define a plan name...................................................................................................2!Set plan options........................................................................................................2!
Launch a plan...........................................................................................................3'
Cop& a plan..............................................................................................................3'
Planner -or(ench.......................................................................................Plan 4a#igator..........................................................................................................31
Suppl& chain structure..............................................................................................!0
Suppl& chain plan result anal&sis.............................................................................!%
Suppl& chain plan e5ecutions...................................................................................%!
Personal and pu(lic 6ueries......................................................................................%'
Simulation net change re7plan.......................................................................
Simulate changes......................................................................................................%,Simulation modes.....................................................................................................'*
3 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
4/87
Running net change replan simulations...................................................'*
Reports..........................................................................................................Plan comparison report............................................................................................'%
Plan detail report......................................................................................................'%
Audit information reports.........................................................................................'%
Practicing la(s...............................................................................................
8A9...............................................................................................................*. -hat calendar 6uarterl& t&pe does ASCP support..............................................''
/. ;o$ are planning (ucets and hori
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
5/87
Introduction
Intended audience
This document is prepared as an introductor& training material for the end users of"racle APPS **i. t co#ers the (asic sills needed for using "racle Ad#anced Suppl&
Chain Planning. t is customio(s+ please refer to -P Training Manual
8or sourcing and supplier constraint setups+ please refer to Purchasing Training
Manual
Log onto Oracle Applications
*. ?nter URL of "racle Applications home page to &our (ro$ser: http:))/. ?nter in &our user D and pass$ord
5 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
6/87
2. Choose Ad#anced Suppl& Chain Planner responsi(ilit& @&ou ma& ha#e a
customi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
7/87
lanning c"cle
The general process that occurs during a planning c&cle is sho$n in the figure (elo$.
The flo$ demonstrates the e& features of "racle ASCP that a t&pical planner $oulduse in the course of her)his $or.
!ource Data !etups
!etup inventor" item attributes
There are se#eral item attri(utes especiall& important to planning. Set them up
properl& to ensure desired planning results.
8or item setup in general+ please refer to n#entor& Training Manual.
4a#igation path: n#entor&BtemsBMaster temsBeneral Planning @T
$ MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
8/87
"r
n#entor&BtemsB"rgani
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
9/87
Attribute #alid
values
urpose Comment !etup
"rder9uantit&
Minimum
?nter theminimum
order 6uantit&or repetiti#erate. Use this
to define anorder 6uantit& (elo$ $hich
it isunprofita(leto (uild or purchase theitem.
Planning uses this to modif& plannedorder 6uantities or repetiti#e dail& rates.
8or discrete items+ $hen net re6uirementsfall short of the minimum order 6uantit&+ planning suggests the minimum order
6uantit&.
"rder9uantit&
Ma5imum
?nter thema5imum
order 6uantit&or repetiti#erate of the
item.
Planning uses this to modif& the si
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
10/87
Attribute #alid
values
urpose Comment !etup
SourceSu(in#entor&
?nter the su(in#entor&
$ithin thesourceorgani
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
11/87
$!%$R planning attributes
4a#igation path: n#entor&BtemsBMaster temsBeneral Planning @T
Refer to the ta(le (elo$ for the setup of each attri(ute.
Attribute #alid values urpose Comment !etup
PlanningMethod
4otPlanned+
MRP
planning+MPS planning+MRP)DRPPlanned+
MPS)DRPPlanned+DRPPlanned
Select the optionthat Planning
uses to decide
$hen to plan theitem
Not Planned : The item does notre6uire longEterm planning of
material re6uirements. Choose this
option for high #olume and)or lo$cost items that do not $arrant theadministrati#e o#erhead of planningG t&picall& dependentdemand items. ou cannot use this
option unless the Pic Componentsattri(ute is checed.
MRP planning : Choose this optionfor nonEcritical items that do notre6uire manual planning control+
t&picall& dependent demand items. MPS planning : ou masterschedule the item and re6uire
manual planning control. Choosethis option for items $ithindependent demand+ items that are
critical to &our (usiness+ or itemsthat control critical resources.
MRPDRP Planned : Choose thisoption $hen &ou $ant (oth MRPand DRP planning for the item.
MPSDRP Planned : Choose this
option $hen &ou $ant (oth MRPand DRP planning for the item.
DRP Planned : Choose this option$hen &ou ha#e multiple
organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
12/87
Attribute #alid values urpose Comment !etup
8orecastControl
Consume+Consumeand deri#e+
4one
Select an optionto determine thet&pes of demand
&ou place for theitem. This guidesthe e& processes
of t$oEle#elmasterscheduling:
forecaste5plosion+forecastconsumption+ planning+ production relief+
and shipmentrelief.
This is appropriate onl& for itemsthat are models+ option classes+options+ or mandator& components
of models and option classes.!onsu"e: forecast demanddirectl&+ rather than (& e5ploding
forecast demand.!onsu"e and derive: forecastdemand directl&+ e5plode forecast
demand+ or use a com(ination of (oth methods. None: place sales order demand (ut do not forecast demand.
?5ception Set ?nter the nameof the planning
e5ception set thatgroups togetherthe sensiti#it&
controls ande5ception time periods for itemE le#el planninge5ceptions forthe item.
The itemEle#el planninge5ceptions include:
o#ercommitted+ shortage+ e5cess+and repetiti#e #ariance. The planning process uses this attri(ute
to decide $hen to raise planninge5ceptions for the item.
CreateSuppl&
(ndicates ifsuppl) can besuggested forthis item"
CriticalComponent
(f selected*ags the itemas a criticalcomponentfor +!, and-R! planning"
This allows )ou to planmaster scheduled itemswith respect to onl) criticalcomponent and theirmaterial resourceconstraints"
12 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
13/87
Attribute #alid values urpose Comment !etup
Pegging SoftPegging+?nd
Assem(l&Pegging+?nd
Assem(l&)SoftPegging+
;ardPegging+?ndAssem(l&);ardPegging+
4one
?nter the peggingoption.
Soft Pegging: allocates suppl& todemand (ased on the Reser#ationLe#el option set in the Plan
options. #nd $sse"bly Pegging: traces theend assem(l& the item is pegged to
at the top of the (ill of material.?#en if &ou do not select endassem(l& pegging+ &ou can still
calculate and #ie$ end assem(liesonEline.
#nd $sse"bly Soft Pegging:
Choose this option for (oth soft pegging and end assem(l& pegging.
%ard Pegging: allocates suppl& todemand (ased on the Reser#ationLe#el option set in the Planoptions. This pegs suppl& to
demand and demand to suppl& (& pro>ect at all le#els of a (ill of
material. This allo$s &ou to preE allocate suppl& to demand andgenerate planned orders (ased onthe plan le#el options.
#nd $sse"bly %ard Pegging: Choose this option for (oth hard
pegging and end assem(l& pegging. None: disa(les pro>ect materialallocation+ end assem(l& pegging+and full pegging.
Plannedn#entor&
Point
ndicates if theitem is an
n#entor& Pointitem.
This means that material can (estored at the item le#el $ithout
losing materials or 6ualit&characteristics. n#entor& Pointsgenerall& point to ma>or stocing phases in the manufacturing c&cle.
ShrinageRate
?nter a factorthat representsthe a#erage
amount ofmaterial e5pectedto lose duringmanufacturing or
in storage.
The planning process inflatesdemand to compensate for thise5pected loss.
Round "rder9uantities *
ndicate $hetherthe planning process uses
decimal or $holenum(er #alues$hen calculating planned order6uantities orrepetiti#e rates.
-hen this option is checed+decimal #alues round up @ne#erdo$n to the ne5t $hole num(er.
The planning process carries an&e5cess 6uantities and rates for$ardinto su(se6uent periods asadditional suppl&.
13 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
14/87
Attribute #alid values urpose Comment !etup
Accepta(le?arl& Da&s /
?nter the num(er of da&s (efore$hich the
planning process$ill notreschedule
orders.
The planning process onl&suggests rescheduling out if thene$ calculated order date is later
than the original order due date plus the accepta(le earl& da&sG thene$ calculated order does not
#iolate the order of currentscheduled receipts.This applies to discrete items onl&.
Calculate
ATP 2ndicate $hether
to calculate and print a#aila(le to promise @ATPon the PlanningDetail Report.
"n the Planning Detail Report+
ATP is calculated asATP H Planned production Ecommitted demand
Reduce MPS3
4one+ PastDue+Demand
Time 8ence+
Planningtime 8ence
Decide $hen toreduce master production
schedule @MPS
6uantities to
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
15/87
Attribute #alid values urpose Comment !etup
DemandTime 8enceDa&s
Cumulati#emfg. leadtime+
Cumulati#etotal leadtime+ Total
lead time+UserE defined
Determine a point in timeinside $hich the
planning processignores forecastdemand and
considers onl&sales orderdemand $hen
calculating grossre6uirements.
Used to reduce the ris of carr&inge5cess in#entor&.Planning also uses the demand
time fence $hen loading masterschedules. The demand time fenceis calculated as the start date of the
master schedule load plus the #alueentered.Calculate the demand time fence as
the plan date @or the ne5t $orda&if the plan is generated on a non$orda& plus:!u"ulative "fg( lead ti"e: Thecumulati#e manufacturing leadtime for the item.
!u"ulative total lead ti"e: Thetotal manufacturing lead time forthe item.&otal lead ti"e: The total lead time
for the item.)ser*defined: The #alue &ou enter
for Planning &i"e 'ence Days.
Release Time8ence Da&s %
Cumulati#emfg. leadtime+Cumulati#etotal lead
time+ Totallead time+UserE defined+ Do
not autoE release+ Do
not release@Ian(an
Determine a point in timeinside $hich planned ordersfor discretel&
planned items areautomaticall&released as -P >o(s or purchase
re6uisitions.
4o material a#aila(ilit& chec is performed (efore -P >o(s arereleased.Calculate the release time fence asthe plan date @or the ne5t $orda&
if the plan is generated on a non$orda& plus the #alue enteredhere.!u"ulative "fg( lead ti"e: The
cumulati#e manufacturing leadtime for the item.
!u"ulative total lead ti"e: Thetotal manufacturing lead time forthe item.&otal lead ti"e: The total lead timefor the item.)ser*defined: The #alue &ou enter
for Planning &i"e 'ence Days. Do not auto*release: The itemcannot (e autoEreleased.
Do not release +,anban: 8or
Ian(an items pre#ent release of planned orders manuall& orautomaticall&.
Su(stitution-indo$
Cumulativ e mfg. leadtimeCumulativ e total leadtimeTotal leadtimeUser-dened
.alculatesuntil whattime asubstitutecan beconsideredfor an item"
Cumulative mfg. lead time: The cumulatie manufacturinglead time for the item"Cumulative total lead time:
The total manufacturing leadtime for the item"Total lead time: The total leadtime for the item"User-dened: The alue )ouenter"
Note:
15 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
16/87
*. n ASCP+ this flag is not onl& used to round planned order 6uantit&+ (ut also used to
schedule resource utili
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
17/87
Lead times attributes
4a#igation path: n#entor&BtemsBMaster temsBeneral Planning @T
Refer to the ta(le (elo$ for the setup of each attri(ute.
Attribute urpose Comment !etup
Preprocessing ?nter the da&s &ou must add to purchasing or manufacturing leadtime to place an order.
Processing ?nter the da&s re6uired to procure
or manufacture an item.
8or manufactured assem(lies+
processing da&s e6ualsmanufacturing lead time.
Postprocessing ?nter the da&s re6uired to recei#ea purchased item into in#entor&from the initial supplier receipt.
Cannot enter a #alue if the Maeor =u& attri(ute is set to Make.
8i5ed ?nter the da&s re6uired to mae an
assem(l& independent of order6uantit&+ such as setup orteardo$n time.
Varia(le ?nter the time to produce oneadditional unit of an assem(l&.
Total lead time is #aria(le leadtime multiplied (& order6uantit&+ plus fi5ed lead time.
Cumulati#e
Manufacturing
?nter the manufacturing lead time
of an assem(l& @in da&s plus thelargest ad>usted cumulati#emanufacturing lead time of itscomponents.
Purchased items ha#e no
cumulati#e manufacturing leadtime.This attri(ute can (e calculatedand updated (& rolling upcumulati#e lead times $ith"racle =ills of Material.
Cumulati#eTotal
?nter the total lead time of theassem(l& plus the largest ad>ustedcumulati#e total lead time of its
components
This attri(ute can (e calculatedand updated (& rolling upcumulati#e lead times $ith
"racle =ills of Material.
Lead Time LotSi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
18/87
!hipping& Receiving& Carrier& and !upplier Capacit" Calendars
"racle ASCP plans suppl& chain acti#ities according to #arious calendars.
Manufacturing+ supplier+ and customer facilities ma& (e a(le to mae+ ship or recei#e
goods onl& on specific da&s. "racle ASCP plans each t&pe of suppl& or demand
considering the $oring and non $oring da&s in the appropriate set of calendars.
t considers the follo$ing calendars $hile planning and scheduling:
"rgani
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
19/87
The carrier calendar indicates the operating calendar of the carrier or the ser#ice. t
does not indicate the picup or deli#er& dates of the carrier.
!upplier Capacit" Calendar
The supplier capacit& calendar go#erns ho$ supplier capacit& is accumulated o#er a
period of time. Supplier capacit& is onl& accumulated on the $oring da&s according
to the supplier capacit& calendar. The supplier capacit& calendar also go#erns ho$ thesupplier processing lead time is calculated.
'or(da" Calendar
Please refer to Routing Training Manual for $orda& calendar setups.
!etup resource and department
Please refer to Routing Training Manual for resource and department setups.
!etup routing
Please refer to Routing Training Manual for routing setups.
!etup suppl" chain
8or more information on supplier (ase setups+ please refer to the Purchasing Training
Manual.
Approved !upplier List
Appro#ed supplier list is a controlled repositor& of information that lins items and
commodities to suppliers and supplier sites that pro#ide them to a specific ship7to
organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
20/87
Refer to the ta(le (elo$ for the setup of attri(utes rele#ant to planning.
Attribute #alid
values
Comment !etup
Status Appro#ed+De(arred+ 4e$
ASCP onl& consider Appro#ed and notDisa(led suppliers
Disa(led
lo(al es+ 4o ASCP onl& plans P" for suppliers $ithlo(al H es
!upplier planning constraints
?nhance sourcing pro#ides the a(ilit& to model fle5i(le supplier capacit&.
4a#igation path: PurchasingBSuppl& =aseBAppro#ed Supplier ListBAttri(utes @=B
Planning Constraints @T
2' MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
21/87
Refer to the ta(le (elo$ for the setup of attri(utes rele#ant to planning.
Attribute Comment !etup
ProcessingLead Time
This supplier7item attri(ute o#errides the organiusts planned order release date so that
deli#eries occur on the #alid deli#er& date that coincides$ith the due date or the closest #alid deli#er& date thatoccurs prior to the due date. This calendar is independentof &our $orda& calendar.
"rderModifiers
These supplier7item attri(utes o#erride the organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
22/87
Inter)organi*ations shipping networ(s
Shipping net$ors define transportation lins form on organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
23/87
Inter)location shipping networ(s
Use the nter7Location Transit Times form to model shipping net$ors and capacities
(et$een supplier locations and in#entor& organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
24/87
assigned to an& items or group of items. Assignment sets are used to associate items
$ith sourcing rules and (ills of distri(ution.
4ote: Sourcing rules and ="Ds can (e defined at the source instances or at the APS
instance+ or at (oth places. The Assignment Set of a specific plan $ill go#ern $hich
rules are used (& that plan. ;o$e#er+ sourcing rules and (ills of distri(ution that cross
instances must (e set up on the APS instance.
4a#igation path: Suppl& Chain PlannerBSourcingBSourcing Rules
Refer to the ta(le (elo$ for the setup of attri(utes rele#ant to planning.
Attribute #alidvalues
Comment !etup
T&pe Transfer8rom+Mae At+=u& 8rom
&ransfer 'ro": Transfer (et$een internal organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
25/87
Note: * in constraint (ased planningG sources $ith the highest ran ha#e the highest
priorit&. n optimiusted cost ha#e the
highest priorit& in allocation. TimeEphasing in a sourcing rule determines $hen each
group of shipping method E ship org com(inations is in effect.
Assignment sets
"nce &ou ha#e defined &our sourcing rules+ &ou must assign them to particular itemsand)or organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
26/87
/. Select an Assigned To t&pe See: Assignment ;ierarch&
2. ?nter an organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
27/87
Note: use assignment set hierarch& to simplif& the modeling and maintaining sourcing
relationships. 8or e5ample+ $hen a plant (u&s all items (elonging to a categor& such
as fasteners from Supplier A+ create a sourcing rule and assign it to this item categor&.
At a later da&+ &ou decide to source one of the fasteners from Supplier =. ou thencreate another rule to source from Supplier = and assign this rule to that specific
fastener. The detail7to7general hierarch& directs the specific fastener to (e sourced
from Supplier =+ $hile all other fasteners still from Supplier A.
Create the minimum num(er of sourcing rules and eep the assignment sets as simple
as possi(le. Rather than create and assign a rule to each item+ &ou can assign a default
rule to an organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
28/87
"racle ASCP uses data maintained in the source @transactional ?RP modules. Data
collection programs capture a snapshot of the source data+ and cop& that snapshot to
the planning instance. The planning engine then performs multi7organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
29/87
Use Complete Refresh the first time &ou perform collections from a source instance to
the planning ser#er. ou ma& also $ish to use complete refresh collections after a
significant proportion of the setup data in &our transaction s&stem has (een altered+
and &ou $ould lie to mae a fresh cop& of all source instance (usiness entities
@items+ (ills of material+ sourcing rules+ resources+ and so on on the planning ser#er.
ou t&picall& collect all (usiness entities in a Complete Refresh Collection. Use
Complete Refresh onl& $hen it is necessar&.
Use 4et Change Refresh if &ou $ould lie to update the suppl& and demand picture
on the planning ser#er as 6uicl& as possi(le+ and the incremental changes to suppl&
and demand in the source instance since the last collection ha#e not (een e5tensi#e
relati#e to the e5isting @alread& collected (od& of suppl& and demand information. n
this case+ 4et Change Refresh is the fastest $a& to achie#e the desired update of the
planning ser#er operational data store+ (ecause it copies o#er from the source instance
onl& the incremental changes in suppl& and demand since the last collection.
Use Targeted Refresh if &ou $ould lie to update the planning ser#er information for
some @(ut not all (usiness entities+ and some of these entities fall outside the categor&
of suppl& and demand entities supported (& 4et Change Refresh. 8or e5ample+ toupdate the planning ser#er $ith a ne$l& re(uilt manufacturing calendar+ &ou $ould
run Targeted Refresh collections for >ust the calendar (usiness entit&. Data on the
planning ser#er a(out all other (usiness entities $ould remain unaffected (& this
collection. Also use Targeted Refresh @in lieu of 4et Change Refresh to (ring o#er
the latest picture of suppl& and demand to the planning ser#er in cases $hen the
incremental changes to suppl& and demand on the source instance since the last
collection are #er& e5tensi#e. n this case+ the update mechanism emplo&ed (&
Targeted Refresh collections @$holesale deletion follo$ed (& re(uilding of data on the
planning ser#er is faster than the mechanism emplo&ed (& 4et Change Refresh
collections @incremental insertions into e5isting data on the planning ser#er.
Run data collection
4a#igation path: Ad#anced Suppl& Chain PlannerBCollectionsB"racle S&stemsB
Standard Collection
2& MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
30/87
*. Ta( to the Parameters field+ Planning Data Pull Parameters form appears
/. Select indi#idual parameter as e5plained in the ta(le (elo$+ then clic on "I
arameter #alues
nstance Source instance code from list of #alues.
Collection roup ou can decide to collect data from All ena(led organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
31/87
arameter #alues
Collection Method / Complete Refresh)Targeted Refresh)4et ChangeRefresh. See the e5planation in the Data collection methods section ofthis manual
Anal&
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
32/87
arameter #alues
Recalculate Sourcing ;istor& This defaults to the #alue @es or 4o that &ou set for the Sourcing;istor& (usiness entit& in the Planning Data Pull Parameters $indo$.The #alue that &ou set here is the one that actuall& determines $hether
sourcing histor& is collected or not. f &ou select es+ then ASCP $illcollect all ne$ sourcing histor& not alread& on the planning ser#er inthe time range @toda& 7 5 months through @toda& from the source
transaction s&stem. The num(er 5 is gi#en (& the #alue that &ou set for the profile option MSC: Sourcing ;istor& Start Date "ffset @inmonths. During planning+ ASCP $ill use the total cumulati#e
sourcing histor& on the planning ser#er in addition to the plannedsourcing in the plan to determine $hether sourcing percentages insourcing rules are (eing respected or not.
Purge Sourcing ;istor& Valid #alues are es and 4o @default. f &ou select es+ then allsourcing histor& present on the planning ser#er $ill (e deleted (eforethe collection process commences.
4ote: *. Consult $ith &our s&stem administrator and D=A on the #alues of
these parameters+ for the& affect the performance of the data collection
process.!. Su(mit the data collection re6uest set
Define an A!C plan
A!C plan classes
"racle ASCP offers the follo$ing plan classes.
Unconstrained
Resource Constrained Material Constrained
Material and Resource Constrained
"ptimi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
33/87
lan Class lanning
+ori*on
,oals !cenario
Material andResource
Constrained
4ear Term8uture
enerate a feasi(le plan thatrespects material+ resource+
distri(ution+ and transportationconstraints.
mpossi(le to o#ercome materialand resource constraints and
therefore must respect them inorder to generate a feasi(le suppl&chain plan.
"ptimiunction $ith the MPS)MRP Planning T&pe item
attri(ute that is set for each item. Possi(le #alues for this attri(ute are:
• MRP Planning
• MPS Planning
• MRP)MPP Planned
• MPS)MPP Planned
•
MPP Planned
33 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
34/87
?ach ASCP plan t&pe $ill include a su(set of items in its planning process. The items
included depend upon the plan t&pe and the itemKs the MRP Planning T&pe attri(ute.
Define a plan name
4a#igation path: Ad#anced Suppl& Chain PlannerBSuppl& Chain PlanB4ames
1" ?nter a uni6ue plan name.
2" ?nter Description for the plan.
3" Chec ATP if this plan is used for glo(al order promising.
4" Chec Production if it is a production plan. n a production plan+ plannedorders can (e automaticall& released $ithin their release time fence.
5" Chec 4otifications. f this is checed+ e5ception message notifications$orflo$ for the plan is ena(led.
#" Select a Plan T&pe. Valid #alues are Manufacturing Plan+ Production Plan+ andMaster Plan. This setting interacts $ith the MPS)MRP Planning method item
attri(ute to determine $hich su(set of the items that pass the condition
imposed (& the Planned tems parameter are planned.
$" f &ou $ant to mae this plan not #isi(le as input into other plans+ or $ant to purge the plan enter an nacti#e Date.
!et plan options
4a#igation path: Ad#anced Suppl& Chain PlannerBSuppl& Chain PlanB4ames BPlan
"ptions @=
34 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
35/87
$ain tab
Use the information in the follo$ing ta(le to specif& parameters on the Main ta(.
arameter Description Comment !etup
AssignmentSet
The assignment set that holds the sourcingrules and (ills of distri(ution that define therules for material flo$ $ithin &our suppl&
chain.
DemandPriorit& Rule
-hen ASCP does detailed scheduling+ itschedules demands one (& one. The rulespecified here dictates the order in $hichdemands $ill (e considered during detailedscheduling+ and thus $hich demands $illget the first opportunities to tae up
a#aila(le materials and resource capacities.
"#er$rite* "#er$rite planned orders.
Append
Planned"rders*
Appends ne$ planned orders to current
plan.
Plannedtems/
This parameter and the ne5t one+ PlanningMethod+ control the items that are planned
in the suppl& chain plan. An item mustsatisf& conditions imposed (& (oth parameters (efore (eing included in the
suppl& chain plan.
MaterialSchedulingMethod
Choose from "peration Start Date or "rderStart Date scheduling methods. f &ouchoose "peration Start Date+ material isscheduled to arri#e at the start of theoperation for $hich it is re6uired. f &ouchoose "rder Start Date+ material is
scheduled to arri#e at the start of the orderfor $hich it is re6uired.
"rder State Date isusuall& an earlier datethan the "perationStart Date andtherefore thisselection represents
the more conser#ati#e planning logic of thet$o options.
35 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
36/87
arameter Description Comment !etup
?nd temSu(stitutionSet
f Decision Rules ta((ed region B Use ?ndtem Su(stitutions selected+ select asu(stitution set. These are defined in the
Planning Details 7 Su(stitute $indo$discussed. ou can use a set of su(stitutionrelationships to (e effecti#e for a gi#en plan
(& selecting the su(stitution set as an optionfor the plan. This allo$s &ou to runsimulations of possi(le su(stitutions and
e#aluate performance indicators gi#en possi(le future su(stitutions.
Schedule =& Set this option to instruct the planningengine to:Plan supplies (ased on sales order linere6uest+ promise+ or schedule dates foreither ship or arri#al
Consume forecasts (ased on sales order linere6uest+ promise+ or schedule dates. oumust pro#ide forecast dates that match &our
choice of this plan optionG for e5ample+ if&ou select Promise Ship date for this planoption+ mae sure &our forecast dates are in
terms of promise ship dates.f &ou do not specif& plan option DemandPriorit& Rule and ha#e not specified adefault demand priorit& rule @in the DefinePriorit& Ruled form+ the planning engineuses the #alue of this plan option as the
demand priorit& rule.
Select one of thefollo$ing sales orderline dates:Schedule Ship DateSchedule Arri#al Date
Re6uest Ship DateRe6uest Arri#al DatePromise Ship Date
Promise Arri#al DateThe default isSchedule Ship Date.
Demand
Class
f &ou $ant to limit a production plan to a
demand class+ enter it.
This field is acti#e
onl& for a ProductionPlan)MPS schedule.
Mo#e Jo(s toPP
Chec this option if &ou $ant to generate planned order suppl& e#en in the a(sence of demand in order to ensure that in#entor& isheld on the manufacturing floor onl& foritems designated as Planned n#entor&
Points.
Displa& Ie&Performancendicators
Chec this option to calculate e& performance indicators for the plan.
DemandTime 8enceControl
Chec this option to enforce demand timefence control.
Demand time fence isan item attri(ute
PlanningTime 8ence
Control
Chec this option to enforce planning timefence control.
Planning time fence isan item attri(ute
Lot for Lot Chec this option to force the creation of a
separate suppl& for each demand. This pre#ents the creation of aggregate suppliesthat satisf& multiple demands.
"rder 6uantit&
modifiers such asMinimum Lot Si
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
37/87
arameter Description Comment !etup
Do 4otSpread8orecast
The planning engine should use forecastentries as the& e5ist for planning.
Spread
8orecast?#enl&
The planning engine should spread
aggregate forecast demand e#enl& acrossthe dail& (ucets from the $orda&
calendar.8orecastDistri(utionAssignmentSet
Select a forecast distri(ution assignment setfor the glo(al forecasting process. Theforecast distri(ution assignment set containsglo(al sourcing rules used to distri(uteglo(al forecasts o#er multiple in#entor&
organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
38/87
arameter Description Comment !etup
Pegging EReser#ationLe#el
Choose a reser#ation le#el: Planning roup+Pro>ect+ Pro>ect7Tas+ or 4one.
Do not use
Pegging E
;ard PeggingLe#el
Choose a hard pegging le#el: Pro>ect+
Pro>ect7Tas+ or 4one.
Do not use
8orecastConsumption=ac$ardDa&s
f &ou are (ringing in unconsumed forecastscenarios from "racle Demand Planning asdemand schedules into "racle ASCP and$ould lie to do forecast consumptioninside ASCP @as opposed to (ringing in pre7consumed forecasts contained in master
demand schedules as demand schedules into"racle ASCP+ then set the forecastsconsumption (ac$ard da&s parameterhere. This parameter allo$s a sales orderdemand to consume forecast demand e#enif the forecast demand is up to the specified
num(er of da&s earlier than the sales order
demand. This parameter applies onl& to"racle Demand Planning scenarios that areused as demand schedules in "racle ASCP plans.
8orecastConsumption
8or$ardDa&s
This parameter allo$s a sales order demandto consume forecast demand e#en if the
forecast demand is up to the specifiednum(er of da&s later than the sales orderdemand.
Do not use
Note: *. "#er$rite and Append Planned "rders $or together to limit ho$ the
planning process reacts to firm planned orders and to sta(ili
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
39/87
Overwrite Append
lanned Orders
-ffects
Checed The planning process appends additional planned orders afterthe last entr& on the current material plan to meet an& additional
demand. The "#er$rite and Append Planned "rders options$or in com(inations+ as descri(ed (elo$.
All Checed Select this option to create a ne$ material re6uirements plan for
the plan name &ou specif&+ deleting all pre#ious planned andfirm planned orders $hile regenerating ne$ planned orders.ou can use this com(ination the first time &ou run &our plan or if &ou $ant &our plan to reflect all sources of ne$ demand.
"utside planning time
fence
Checed This option allo$s &ou to create an e5tension to the currentmaterial re6uirements plan+ delete planned and firm planned
orders outside the planning time fence and delete all plannedentries inside the planning time fence for each item. The planning process creates @appends ne$ planned orders after the planning time fence date. n this case+ since &ou are o#er$ritingafter the planning time fence+ &ou are also appending ne$ planned orders after that date. Use this com(ination to sta(ili
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
40/87
lanned Items
value
lan t"pe lanned Items in the plan
All planned items Production Plan All items in the planned organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
41/87
lanned Items
value
lan t"pe lanned Items in the plan
Demand andSuppl& schedule
items
Production Plan All items in the input demand and suppl& schedules+ and allcomponents of these items that ha#e MRP)MPS Planning
Method attri(ute code of:MPS planningMPS and MPP planning
Plus:MPS and MRP planned items that are in (et$een the a(o#eitems in the (ills of material
Demand and
Suppl& scheduleitems
Manufacturing Plan All items in the input demand and suppl& schedules+ and all
components of these items that ha#e MRP)MPS PlanningMethod attri(ute code of:MRP planningMRP and MPP planning
Aggregation tab
Use the information in the follo$ing ta(le to specif& parameters on the Aggregation
ta(.
arameter Description !etup
Start Date This is a #ie$7onl& field+ $hose #alue e6uals the start date of the
plan if the plan has alread& (een run. "ther$ise+ it defaults to thes&stem date.
?nd Date Sho$s the calculated end date for &our plan. This is a #ie$7onl&field+ calculated (ased on the (ucet si
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
42/87
Organi*ation tab
Use the information in the follo$ing ta(le to set parameters on the "rgani
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
43/87
arameter Description Note !etup
4et Purchasing Select to consider purchase orders+ purchase re6uisitions+ in7transitshipments and other non7production
order scheduled receipts as suppl& inthe planning demand)suppl& netting process. This option co#ers all
scheduled receipts not co#ered (&the 4et -P option.
Plan Safet&Stoc
Select to consider plan safet& stocdemand and suppl& in the planning
demand)suppl& netting process.
nclude Sales
"rder *Select to in#oe forecast
consumption $ithin ASCP for theselected organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
44/87
Note: *. Users can collect forecasts into the APS planning ser#er. "ptionall&+ the& can
choose to consume forecasts (& sales orders $hen the& run ASCP plans. 8orecasts are
consumed if the nclude Sales "rder chec (o5 in the "rgani
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
45/87
arameter Description !etup
?nforcePurchasingLead7time
Constraints
Select this plan option to instruct the planning engine toconstrain the plan (& purchased item lead times @item attri(utesor appro#ed supplier list.
Clear it to instruct the planning engine ne#er to miss a demanddue date (ecause of a purchased item lead time.
Scheduling Specif& $hether to ena(le detailed scheduling.
Minutes=ucet Si
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
46/87
arameter Description !etup
Use Alternate="M)Routing
f selected+ use primar& routings and use alternates onl& ifnecessar&. f cleared+ use onl& primar& (ills of material androutings.
Use Alternate
Sources
f selected+ use primar& sources and use alternate sources onl& if
necessar&. f cleared+ use primar& sources onl&. The planningengine does not use alternate sources @ran / or higher as a
sources of suppl&.
Launch a plan
4a#igation path: Ad#anced Suppl& Chain PlannerBSuppl& Chain PlanB4amesB
Launch Plan @=
8or an ASCP plan+ accept the defaults on the re6uest parameters form and clic on
"I then su(mit the re6uest.
Cop" a plan
4a#igation path: Ad#anced Suppl& Chain PlannerBSuppl& Chain PlanB4amesBCop&
Plan @=
4# MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
47/87
1" ?nter a 4ame for the ne$ plan
2" ?nter Description+ optionall&3" Select or clear ATP+ Production+ and 4otification as &ou $ould if &ou are
creating a ne$ plan on the Plan 4ames form.
4" f &ou $ant to cop& onl& the plan options from one plan to another of a
different plan t&pe+ select Cop& Plan "ptions "nl&
5" Plan T&pe defaults to the plan t&pe of the source plan and &ou cannot change it
if &ou $ant to cop& all plan information.
#" Clic on "I
lanner 'or(bench
The Planner -or(ench is the primar& O$or area for anal&sis of the plan andactions taen (ased on plan recommendations
Multi7$indo$ format
A(ilit& to ha#e se#eral screen open at the same time
Strong na#igational interactions (et$een different $or(ench $indo$s
Conte5t passed (et$een $indo$s using right clics or (uttons
A(ilit& to see data at detailed and summar& le#els and drill do$n)up from one
to the other
4a#igation path: Ad#anced Suppl& Chain PlannerBSuppl& Chain PlanB-or(ench
4$ MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
48/87
Plans ta( displa&s the entities associated $ith the plan in a hierarchical fashion @user
can select the drill do$n hierarch&
9ueries ta( displa&s onl& those entities $ithin the plan that the user $ants to focus on
@as pre7defined (& the user
lan Navigator
Displa&s list of plans defined under the organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
49/87
!uppl" chain structure
!uppl" Chain !tructure . Items and Item Details
Right Clic on tem @in 4a#igator B tems
Ie& data displa&ed include Lead Times and "rder 9uantities
Variet& of other planning related item attri(utes a#aila(le for displa& through
8older functionalit&
tems $indo$ is a launching pad to more detailed structural information on
the item
Suppl& Chain =ill
o Displa&s Sourcing and ="M structure for the item
o Can also sho$ the ORe#erse ="M .e. the end items $here a
component is used
Sources
o Displa&s Sourcing @other orgs or Suppliers from $hich the tem is
sourced from
o Sho$s relati#e allocation percentages or rans
o Supplier nformation: Lead Times+ Costs+ time #ar&ing capacities and
fle5 fences
Destinations
o Displa&s Destinations @other orgs to $hich this item is shipped to
4& MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
50/87
-here Used: The items in the ne5t le#el up in the (ill of material that use this
item as a component
Components: The components defined in this itemKs (ill of material @primar&
and alternates
Co7Products: f the process that produces this item also produces other
products+ those are displa&ed here Routing "perations: The operations $ithin the routings @primar& and
alternate that are used to produce this item
Safet& Stoc: Prescri(ed safet& stoc targets for this item. This screen onl&
sho$s safet& stoc defined in the Source ?RP as 6uantit& @t does not sho$
safet& stoc input from " or the target d&namicall& calculated (& the plan
(ased on safet& stoc da&s of suppl&
Su(stitutes: f this item is sold as an end item+ the #alid su(stitutes that can (e
offered to a customer re6uesting this item
n#entor& Le#els: 4ot used (& ASCP
tem:
Destination:
-here Used:
5' MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
51/87
Components:
Routing "perations and Resources:
51 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
52/87
Suppl& Chain:
!uppl" Chain !tructure . Resources
Right Clic on Resource @in 4a#igator B Resources
Displa&s information a(out the resource E Department+ T&pe+ Cost etc.
tems E Sho$s the items made on this resource A#aila(ilit&
o Summar&: Displa&s summar& of resource a#aila(ilit& at the planning
time (ucet le#el
o Detail: Sho$s the shift le#el capacit& for the selected da&. Also allo$sfor update of resource a#aila(ilit&
52 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
53/87
antt Chart E Sho$s graphical #ie$ of acti#ities planned on the resource
Re6uirements E Sho$s 8orms (ased #ie$ of acti#ities planned on the resource
antt Chart:
A#aila(ilit&:
53 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
54/87
A#aila(ilit& B Details:
Re6uirements:
54 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
55/87
!uppl" chain plan result anal"sis
"pen Planner $or(ench
Re#ie$ IPs
Re#ie$ ?5ceptions
8rom the conte5t of an e5ception anal&
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
56/87
?5ample: Late Replenishment for 8orecast. Ie& information
o tem
o "rg
o "rder 4um(er
o Customer
o Demand Due Date
o Da&s Late
8older)8ind and Sort capa(ilit&
4a#igation to related entities: tems and Suppl&)Demand
4a#igation to cause anal&sis
o Related ?5ceptions
o antt Chart
Action Taen: Mar the e5ception once action is taen
!uppl" Chain lanning Results . Related -/ceptions
Right Clic 8rom ?5ception Details B Related ?5ceptions
Certain Classes of Planning ?5ceptions ha#e ORelated ?5ceptions @$hen the
Related ?5ceptions pop up menu ena(led
o Late Replenishment for Sales "rders)8orecasts
o Sales "rder ) 8orecast at Ris
o Sales "rder ) 8orecast at Ris due to Resource)Material Shortage
Related e5ceptions point to root causes
Sho$ the cause E effect across multiple le#els in the suppl& chain structure
Root causes could (e
o Resource capacit& shortages
o Material capacit& shortages
o Lead Times
5# MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
57/87
!uppl" Chain lanning Results . +ori*ontal lan
There are 3 t&pes of ;oriected a#aila(le (alances at the planning (ucet le#el
/. Resource Capacit&: Vie$ of Resource hours a#aila(le #ersus used along $ith
capacit& utili
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
58/87
!uppl" Chain lanning Results . +ori*ontal lan 0$aterial1
Sho$s time phased #ie$ of suppl&+ demand and in#entor& for an item)org
@multi7select also possi(le
Drill do$ns from demand and suppl& ro$s to Suppl&)Demand -indo$
@discussed later Can optionall& displa& a graph
o raph up to ma5imum of 2 ro$s at a time
o Select num(er of (ucets ) chart t&pe
Right Clic on ?nterprise Plan+ Sho$s the supplies and demands summari
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
59/87
!uppl" Chain lanning Results . +ori*ontal lan 0!upplier Capacit"1
Sho$s time phased #ie$ of A#aila(le Capacit&+ Re6uired capacit&+ net
a#aila(le @in that (ucet and cumulati#e a#aila(le @running total across
(ucets for Supplier)Supplier Site)tem com(ination
Unlie Resource capacit&+ supplier capacit& accumulates o#er time
Drill do$ns to Suppl&)Demand $indo$ for the purchased item
Can optionall& displa& a graph
o raph up to ma5imum of 2 ro$s at a time
o Select num(er of (ucets ) chart t&pe
5& MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
60/87
!uppl" Chain lanning Results . #ertical lan
Sho$s #ertical listing of Supplies and Demands for an tem)"rg
4ot often used. Most people use ;ori
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
61/87
!uppl" Chain lanning Results . !uppl"%Demand 'indow ) Calendar
Right clic on an& Suppl& or Demand B Calendar
Su( menu lists out the #arious calendars that ha#e influenced the timing of this
order
The gra&ed out options are not applica(le to this order t&pe
The Calendar $indo$ sho$ the $oring non $oring da&s as $ell as shift
timings if applica(le for that calendar
t also sho$s the inheritance le#el for the calendar
!uppl" Chain lanning Results . !uppl"%Demand 'indow ) egging
Pegging esta(lishes relationships (et$een supplies and demands across
multiple le#els in the suppl& chain
Pegging can (e from a Suppl& or a Demand and could (e up or do$n the
suppl& chain
#1 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
62/87
Used e5tensi#el& (& ASCP customers to e#aluate impacts of suppl& shortages
at lo$er le#els in the suppl& chain (ill on end customer demand
"ptions
o 4a#igate (ac$ards and for$ards
o Refresh the suppl&)demand $indo$ $hen pared on a specific node in
the pegging tree
o Peg up or do$no ;ide Dependent demands
o ;ide "perations and Resources
Right Clic on Properties pro#ides information additional to $hat is sho$n in
the pegging tree
!uppl" Chain lanning Results . ,antt Chart
4a#igate from an& suppl&+ demand+ resource+ and resource re6uirement
"nl& acti#e in constrained plans
raphical #ie$s of
o Supplies+ operations and resource re6uirements sho$n in the conte5t of
a pegging tree @"rders Vie$
o Late demands and the reasons $h& the& are late @Late Demand Vie$+
onl& a#aila(le for late demands.
o Resources and acti#ities planned on them @Resource Vie$
Late Demand Vie$
o "ne late demand at a time
o Anal&
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
63/87
"rder Vie$:
Resource Vie$:
#3 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
64/87
!uppl" chain plan e/ecutions
!uppl" Chain lanning Actions . 2irming Orders in !uppl"%Demand 'indow
antt Chart allo$s firming of specific resource acti#ities
?ntire orders @supplies can (e firmed using the Suppl&)Demand $indo$
Select O8irm chec(o5
?nter
o 4e$ Dateo 4e$ 9uantit&
"ptionall& enter
o 4e$ sourcing information
o 4e$ ="M)Routing information
-hen ASCP runs again @O"#er$rite option should (e set appropriatel& it
$ill retain this planned order @all non firm planned orders are $iped out and
regenerated
Can also enter ne$ supplies and demands in the Suppl&)demand -indo$
#4 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
65/87
!uppl" Chain lanning Actions . Rerunning the lan
-hen users mae manual changes to the plan the& $ould $ant to rerun the
plan so that the rest of the plan that the& ha#e not distur(ed aligns $ith their
changes
There are se#eral options to rerun the plan
o Launch 4e$ Plan: This $ill generate the plan from scratch. 8irm
supplies $ill (e retained (ased on the o#er$rite option (ut antt chart (ased firming is ignored
o =atch Re7plan: ASCP $ill figure out $hat the user has changed and
mar a set of items that need to (e re7planned. "nl& those items are re7
planned @effects of common components+ resources are taen into
account
o "nline Replan: Similar to =atch replan (ut used for the mode $here
the user $ants to mae se#eral changes one after the other and rerun
the plan after each change. Also allo$s for OUndo capa(ilit& on the
changes @(ut not on the plan. The plan has to (e rerun after undoing the
user change
Refer to Simulation and net change re7plan of this te5t.
4ote:
User changes are sho$n in pin color
Supplies that are changed after (atch)online replan are sho$n in (lue color
!uppl" Chain lanning Actions . Releasing Orders
Releasing orders means ha#ing planned orders in ASCP get con#erted into-or "rders+ Purchase "rders+ nternal Re6uisitions etc. in the ?RP s&stem
#5 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
66/87
Suppl&)Demand $indo$ is used for releasing orders
T&pical use case
o Use 8ind $indo$ to specif& criteria for releasing orders
o "nce results are sho$n in the $indo$ do Plan @Top Menu B Select All
for Release
o Do Plan B Release
Selecti#e release
o Select a specific order for release using the ORelease chec(o5
o Select the ORelease Properties ta(
o 8ill in details for the Omplement As columns as appropriate @there
are se#eral mplement columns that are hidden
o ;it the Sa#e (utton @or Ctrl S
o Right clic ORelease or Plan B Release
A summar& $indo$ $ill pro#ide information on $hich orders $ere released
successfull& and $hich orders $ere not
ersonal and public 3ueries
Pro#ides a $indo$ to the plan that does not in#ol#e drill do$n through the
plan name Accessed using the 9ueries ta( on the planner $or(ench
9uer& is a stored set of (usiness criteria that are used to generate results that
ser#e as starting point for plan anal&sis
9ueries can (e Pu(lic @a#aila(le to all users or Pri#ate @onl& a#aila(le to the
user $ho has defined the 6uer&
9ueries are a#aila(le for
o tems
o Resources
o Suppliers
o ?5ceptions
## MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
67/87
Define 9uer& 4ame B Specif& Criteria B ?5ecute 9uer& B Vie$ Results B
4a#igate to the Planner $or(ench for more anal&sis
Clic Sa#e to sa#e the 6uer&
Clic Sa#e As to sa#e it under another name
Clic Delete to delete it
Clic ?5ecute to run the 6uer&
!imulation net change re)plan 4et change re7plan simulation is ASCPKs -hat7f anal&sis feature that lets &ou update
a plan (& planning onl& the items &ou ha#e changed in the Planner -or(ench. Re7 planning is (ased on the snapshot data gathered during the original planning run and
the changes &ou ha#e made through the Planner -or(ench.
!imulate changes
'hat changes can "ou simulate4
• Supplier capacity: To simulate item suppl& changes+ &ou can add ne$ supplier
capacit& and ad>ust a supplierKs capacit& o#er a specified time frame.
• Resource availability: ou can add ne$ resource a#aila(ilit& and modif& ho$
man& resources are a#aila(le o#er user defined time frame. Resourceconstraints include a#aila(le machine hours+ a#aila(le $orer hours+ and
adding or remo#ing shifts.
• Supplies: Add ne$ planned orders. 8irm planned orders+ discrete >o(s+ and
purchase orders. Modif& 6uantities+ dates+ sources+ and alternates
• Demands: Alter demand priorit& of an& demand. Modif& 6uantities and due
dates for independent demand @MDS entries. Add ne$ Manual MDS.
Change supplier capacit"
*. 9uer& the item for $hich &ou $ant to change supplier capacit&
/. Clic on the Sources (utton
#$ MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
68/87
2. Clic on Supplier Capacit& (utton
Change resource availabilit"
*. 8ind the resource
/. Clic on A#aila(ilit& (utton
2. Clic on Details (utton
3. Under update resource+ mae capacit& changes
!. Clic Appl&
Change suppl"
*. "pen the Suppl&)Demand $indo$
/. Clic on the 4e$ (utton on the tool(ar
2. ?nter "rg code
3. ?nter tem code
!. Select Planned "rder as "rder T&pe
%. ?nter 4e$ Date as the suppl& due date
'. ?nter 4e$ 9t& as the suppl& 6uantit&
,. "ptionall&+ enter sourcing information under the Sourcing ta( E Source "rg+Source Supplier+ Source Supplier Site
#% MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
69/87
1. Sa#e
Note: $hen &ou manuall& create suppl&+ the order t&pe is Planned "rder and the order
is 8irm.
Change demand
*. "pen the Suppl&)Demand $indo$
/. Clic on the 4e$ (utton on the tool(ar
2. ?nter "rg code
3. ?nter tem code
!. Select Manual MDS as "rder T&pe
%. ?nter 4e$ Date as the suppl& due date
'. ?nter 4e$ 9t& as the suppl& 6uantit&
,. ?nter "rder Priorit&
#& MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
70/87
Note: $hen &ou manuall& create demand+ the order t&pe is Manual MDS and the
order is 8irm (& default.
!imulation modes
5atch $ode lanner: Replan at the (ac end+ return the front end to user
immediatel&+ and gi#e other users access to the plan $hen &ou are performing
simulations.
Online lanner: t is more interacti#eG &ou can mae changes and replan as man&
times as necessar& (efore release. t generates the full set of e5ception messages
follo$ing a replan. ou are allo$ed to enter changes (efore and after+ (ut not during
"nline Replan session. The changes &ou made during an online session can (e
undone. ou are not allo$ed to start another "nline Planner session nor are &ou
allo$ed to mae changes to the plan $hen "nline Replan is progressing.
Running net change replan simulations
*. =efore running net change replan simulation+ sa#e and mae a cop& of &our (aseline plan (efore running replan and mae modifications onl& to the cop&
@Ocurrent.
/. Clic Plan on the Menu+ select Sa#e Actions. This $ill sa#e a ne$ #ersion of the
plan.
$' MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
71/87
ou ma& sa#e as man& #ersions as &ou need.
2. o to the left pane of the -or(ench+ change to Vie$ =& Actions and highlight the
OCurrent #ersion.
3A. Run =atch Replan
• Mae desired changes to the plan
• Sa#e changes
• Su(mit (atch replan concurrent program+ choose Plan B =atch Replan
•Verif& the concurrent program completes successfull&
• Re76uer& the plan to re#ie$ the changes
$1 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
72/87
• f the results are not satisfactor&+ repeat the a(o#e steps
3=. Running "nline Replan
• Start "nline Planner
• Mae the desired changes to &our plan $hen the status $indo$ informs &outhat the session is read& for planning
• Sa#e
• Choose Plan B "nline Replan
• -hen the replanning completes+ re#ie$ the plan results• Repeat these steps as needed
$2 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
73/87
• Stop online planner session+ Choose Plan B Stop "nline Planner. Clic "I to
confirm &our choice.
Note: t is recommended that the online planner (e stopped as soon as a series of
simulations is complete. An acti#e online planner could consume a lot of s&stem
resource @CPU)memor&.
#iewing 6ndo !ummar"
The Undo Summar& $indo$ lists the users and timestamps for e#er& action)change
made to the plan. t includes online planning changes+ sorted (& user.
Select Plan B Undo Summar&
The Undo Summar& $indo$ appears
$3 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
74/87
Create 6ndo 5oo(mar(
ou can create sa#e points @Undo =oomar for undoing online planner actions.Su(se6uentl&+ &ou can undo onl& those online planner actions made after the
(oomar.
Select Plan B Add Undo =oomar
"r clic Add =oomar on the Undo Summar& $indo$.
"n the Add =oomar $indo$+ enter a =oomar 4ame+ then clic "I.
6ndo action
"n the Undo Summar& $indo$+ select a change &ou initiated in the online planner.
Clic Undo.
$4 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
75/87
ou cannot undo other usersK changes.
Reports
lan comparison report
The Plan Comparison Report compares t$o plans. To compare t$o plans:
Specif& criteria for comparison attri(utes @preference sets and the comparison
displa& @filtering criteria
Select the plans to compare and #ie$ the comparison: ou can drill do$n from
e5ception group comparison to e5ception t&pe comparison to e5ception detailscomparison.
lan detail report
The Planning Detail Report pro#ides a simple and consolidated report that sho$s the
output of the ad#anced suppl& chain planning process. The report gi#es detailed
information to help &ou understand and anal&
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
76/87
The planning process in#ol#es collecting and using source data to dri#e planning.
Data from source instances need to (e accurate and need to (e set up properl& in order
for relia(le planning output. Data from the source can (e corrupt due to man& reasons+
including: (ad transactions+ missing transactions+ human error+ improper formats+
conflicting and)or missing setups and profile options.
The Audit Statements Reports are self7e5planator& reports that e#aluate data setups. tsuggests remedies for the pro(lems that are found.
Audit Collections !etup report
Used for auditing collected data integrit&
Audit lanning Data report
Used for auditing the planning engine
Audit 6I Data report
Used for auditing the user interfaceG for e5ample+ to chec the #alidit& of materiali
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
77/87
The /! da&s dail& (ucet ends on *27APR7/00%+ (ut the ne5t $ee starts on
*'7APR7/00% (ecause $eel& (ucets can onl& start on a $ee (eginning da&
from the manufacturing calendar. f the dail& hori
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
78/87
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
79/87
time+ staging+ or teardo$n times. "racle =ills of Material concurrent
processes calculate fi5ed lead time (ased on scheduled lot7(ased
resource usages.
Variable: The time re6uired to complete the tass to mae an assem(l&
that is proportional to the order 6uantit&+ for e5ample+ operation time.
"racle =ills of Material concurrent processes calculate this #aria(le
lead time (ased on scheduled item7(ased resource usages. Processing : The time re6uired for a supplier or &our transfer from
facilit& to deli#er an item to &our recei#ing doc or for &ou to
manufacture an item. 8or mae items+ this is also no$n as
manufacturing lead7time. 8or (u& and transfer items+ it includes in7
transit time to &our facilit&.
Postprocessing : The time re6uired to recei#e a (u& or transfer item
from the recei#ing doc to in#entor&.
Cumulative Manufacturing : 8or mae items+ the time re6uired to
mae the item if &ou ha#e all of the (u& items in stoc and ha#e to
mae all su(assem(lies if an& and the item itself. Cumulative Total : 8or mae items+ the time re6uired to mae the item
if &ou ha#e to purchase all of the (u& items+ mae all su(assem(lies+
and mae the item itself.
ead Time ot Si!e: The t&pical 6uantit& of order si
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
80/87
times must alread& (e defined in shipping net$or for transfer from and in
inter7location transit time for (u& from.
=9 'hat lead times ma" be used b" A!C4
See the ta(le (elo$ for the lead times used (& ASCP:
T"pe of lead time 6sed4 Comment
"rg7item lead times es ASCP uses preprocessing+ processing+
post processing lead time for (u& items.
t uses #aria(le and fi5ed lead times for
mae item planning.
Su(in#entor&7item lead
times
4o ASCP plans at organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
81/87
Suggested Due Date:
Unconstrained plans: 4eed (& Date
Constrained plans: The a#aila(le date of the suppl& (& for$ard
scheduling
Suggested Doc Date:
Unconstrained plans: Due Date 7 Postprocessing
Constrained plans: The latest deli#er& da& for $hich the capacit& is
a#aila(le and the material is needed
f the purchased suppl& item has an Appro#ed Supplier List deli#er&
calendar: The planning engine #erifies that the Suggested Doc Date is
a $or da& on the deli#er& calendar. f it is not+ the planning engine
changes Suggested Due Date to the ne5t earliest $oring da& of the
deli#er& calendar.
Suggested Ship Date: Doc Date 7 Production duration
Production Duration:
f the purchased suppl& item has an Appro#ed Supplier List Supplier
Processing lead7time: Appro#ed Supplier List Supplier Processinglead7time
f the purchased suppl& item does not ha#e an Appro#ed Supplier List
Supplier Processing lead7time: tem attri(ute Processing lead time
Suggested Start Date: Ship Date
Suggested "rder Date: Start Date 7 Preprocessing.
Note: the transit time defined at inter7location transit time is not used (& ASCP
for purchased item.
For transferred supply:
4eed =& Date @recei#ing organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
82/87
Constrained plans: Doc Date 7 ntransit Time+ considering constrained
transportation duration. The planning engine considers transportation
constraint ma5imum transfer 6uantit& per da&. ntransit Time is
calendar da&s.
Suggested Start Date @shipping organi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
83/87
?9 +ow does A!C calculate suppl" dates4
ASCP schedules planned orders and scheduled receipts (ased on Demand Due
Date of the demand that the suppl& is pegged to. f a suppl& is pegged to
multiple demands+ it uses the earliest Demand Due Date. t calculates the
other dates as follo$s:
4eed =& Date: t is the earliest demand due date of all demands pegged to asuppl&.
Suggested Due Date: The date (& $hich the suppl& is a#aila(le for use (& its
demand.
n an Unconstrained or Constrained 7 ?nforce demand due dates plan
this is the same as 4eed =& Date.
n a Constrained 7 ?nforce capacit& constraints plan this is the
scheduled a#aila(ilit& date of the suppl&.
Suggested Doc Date: 8or (u& or transfer orders+ it is the date $hen the order
is e5pected to arri#e on &our recei#ing doc.
Suggested Ship Date: 8or transfer orders+ the date of departure from the sourceorgani
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
84/87
$indo$. =ut the resource re6uirements of the same order indicate the order
starts at 207D?C7/00' *2:2,:00 and ends at 037JA47/00' *2:!1:00. -h&
The dates on the resource re6uirements are deri#ed from the process of
(ac$ard or for$ard scheduling @using lead time offset of the order
considering constraints as set (& plan options. "nce these dates are o(tained+ if
the order is in a $eel& or period (ucet+ ASCP right7>ustif& all the dates to
the last minute of the last $orda& of the (ucet in $hich the dates fall in.
The period calendar is sho$n (elo$.
The last $or da& of period D?C7/00% is /17D?C7/00%. The last $or da& of period JA47/00' is /%7JA47/00'.
Note: $hen the planned order as the one aforementioned is released from
planner $or(ench to -P+ -P $ill use the Suggest Due Date as the
Completion Date and schedule the >o( accordingl& if -P is setup to use
unconstrained scheduling. The resource re6uirements scheduling from ASCP
is ignored.
Appendi/ Constraint based planning
Constraint7(ased planning and scheduling taes into account constraints at theenterprise and plant le#els. Material and capacit& constraints are considered
%4 MSAT InternalPage 7
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
85/87
simultaneousl&. Capacit& constraints include factor&+ distri(ution+ and transportation
resources and their respecti#e a#aila(ilities. ou can specif& different constraints and
different le#els of granularit& in the different periods of the planning hori
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
86/87
Suppliers: supplier capacit&+ supplier ran+ supplier calendar+ fle5 fences+
supplier order modifier
Demands: sales orders)forecasts+ demand priorit&+ demand priorit& rules
These data should ha#e (een set up correctl& in the transaction instances.
!et constraints for different plan t"pes
The follo$ing ta(le descri(es ho$ to set constraints for #arious plan t&pes:
lan T"pe Options tab setting Aggregation tab setting
Unconstrained Chec ?nforce DemandDue Dates
Unchec Plan Capacit&.
Unconstrained=ut calculate resource
re6uirements
Chec ?nforce DemandDue Dates
Chec Plan Capacit&.All Resource Constraints fields are set to
4o.All Material Constraints fields are set to 4o.
;ard constraint: Demand DueDates.Soft constraint: Capacit& EMaterial Constrained
Chec ?nforce DemandDue Dates Chec Plan Capacit&.All Resource Constraints fields are set to 4o.At least one Material Constraints field is
set to es.
;ard constraint: Demand DueDates.Soft constraint: Capacit& EResource Constrained
Chec ?nforce DemandDue Dates
Chec Plan Capacit&.All Material Constraints fields are set to 4o.At least one Resource Constraints field isset to es.
;ard constraint: Demand DueDates.
Soft constraint: Capacit& E
Resource and MaterialConstrained
Chec ?nforce DemandDue Dates
Chec Plan Capacit&.At least one Resource Constraints field is
set to es.
At least one Material Constraints field isset to es.
;ard constraint: Capacit& EMaterial Constrained.Soft constraint: Demand DueDates.
Chec ?nforceCapacit& Constraints
Chec Plan Capacit&.All Resource Constraints fields are set to 4o.At least one Material Constraints field is
set to es.
;ard constraint: Capacit& E
Resource Constrained.Soft constraint: Demand DueDates
Chec ?nforce
Capacit& Constraints
Chec Plan Capacit&.
At least one Resource Constraints field isset to es.All Material Constraints fields are set to 4o.
;ard constraint: Capacit& E
Material and ResourceConstrained.
Soft constraint: Demand DueDates
Chec ?nforce
Capacit& Constraints
Chec Plan Capacit&.
At least one Resource Constraints field isset to es.
At least one Material Constraints field isset to es.
Rules used in constrained plans
-hen running a constrained (ut not optimi
8/16/2019 Ascptrainingmanualv1 150601035202 Lva1 App6892
87/87
• Alternate routings $ill not (e considered
• Su(stitute items $ill not (e considered
• Alternate resources in the primar& routings $ill (e
considered
Note: -hen Demand Priorities are not specified+ the default priorities of the #ariousdemand t&pes are @in order: sales order+ forecast+ and safet& stoc.