+ All Categories
Home > Documents > Asera Report 62

Asera Report 62

Date post: 09-Apr-2018
Category:
Upload: dedi-apriadi
View: 220 times
Download: 0 times
Share this document with a friend

of 23

Transcript
  • 8/7/2019 Asera Report 62

    1/23

    1

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Preface

    This exploration report is result of exploration activity on mining concession area base on Konawe

    regent permit No. 62/2007 at February 19th

    , 2007 with covering 5.923 Ha. This Concession area is

    located on Asera district North Konawe Regency South east Sulawesi Province.

    Inside of this report is discuss about exploration activity that conducted by geologist and exploration

    team of PT. Pertambangan Bumi Indonesia with 1 year duration. These activities are geological mapping,

    drilling, sampling analysis, and resources evaluation.

    On the end, we hope this report will useful for next plan.

    Kendari, December 2008

    PT. Pertambangan Bumi Indonesia

  • 8/7/2019 Asera Report 62

    2/23

    2

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    ABSTRACT

    Exploration activity is accomplished by PT. Pertambangan Bumi Indonesia and it is continuity activity for

    founding out nickel deposit on concession area. This activity is base on Konawe regent permit No.

    62/2007, February 19th, 2007 with covering 5.923 Ha. Located in Asera District North Konawe Regency

    South East Sulawesi.

    Concession area divides as 3 major blocks and 11 sub blocks. The blocks as follows:

    1. Block I is located on south of concession area and divide into 6 sub blocks, with block 2, 3, 5, and6 has drilling by hand augers.

    2. Block II is located on middle of concession area. This block has drilling by Jacro drilling machine.38 bore hole is accomplished with vary range of depth between 20 m to 41 m; totally depth is

    932 m with 200 m grid space.

    3. Block III is located on north of concession area. This block divide into 5 sub block, with block 1and block 2 has drilling by hand augers.

    Concession area is administratively located on Sambandete, Paka Indah and Flora Indah Village, with

    positions is 0301515,36-03

    02349,54S and 122

    00618,46-121

    01057,38E.

    Local geology is dividing into 2 major parts: South part is covering by ultramafic rock with Lasolo Rivers

    as a border and North part is covering by Pandua formation and ultramafic rock on the hilly. Base on

    observation fields, commonly ultramafic rock has serpentinization process excluding on middle part of

    concession area.

    From observation on surface and drilling record shown saprolite zone appear on around ultramafic hilly

    with high at 200 m above sea level. Float quartz box work as silicification process is founded at the top

    of ultramafic hilly, this is indication of fracture on dunite rock and it is suitable for nickel laterite process.

  • 8/7/2019 Asera Report 62

    3/23

    3

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Content

    Page

    Chapter I Introduction 4

    1 Background 4

    2 Permit 5

    3 Aim and Objective 5

    4 Time and Place 5

    5 Tools and Exploration Equipments 6

    6 General Information 6 - 7

    7 Personnel 7

    Chapter II Regional Geology and Characteristic of Nickel Laterite Deposit 9

    Chapter III Exploration Activity 11

    1 Literature study and pre-field survey 11

    2 Geological mapping 11

    3 Sampling grab 11

    4 Sampling analysis 11

    5 Mining route design 12

    6 Data processing 12

    Chapter IV Exploration Activity Result 13

    1 Rock and Soil Sampling 13

    2 Drilling 13

    3 Potential 13

    4 estimation Reserve 13

    Chapter V Closing 22

    Bibliograpy 23

    - Correlation grade map- Planning map- Jacro and Hand augers drilling-

    Jacro and Hand Augers Grade Table- Hand Augers Description Table- Exploration Activity Documentation- Coordinate table- North Konawe Regent Permit

  • 8/7/2019 Asera Report 62

    4/23

    4

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Chapter I

    Introduction

    I.1 Background

    Term of Laterite is origin from Latin word as mean as brick earth or soil with color similar as brick.

    Geology term is soil with rich of iron (Fe) and alumina (Al) on oxidation form (Lelong et al, 1976).

    Laterite is residual mechanical weathering process of rich iron magnesium rock, than deposit by erosion

    or none. Commonly iron magnesium rock is depiction appearance of olivine, pyroxene, amphibole, andbiotite minerals.

    The weathering process is owing to climate change such as rain and humidity. The process depend on

    speed of erosion, hydrology and permeability factor of rock, if speed of erosion is high than altered rock

    or soil can be deposit to the low land or foot hill, but if speed of erosion low but ground water content

    carbonate acid and permeable rock is high than laterite will deposits near to source rock (insitu).

    Nickel laterite deposits is laterite content high of nickel (Ni) element. Not many of rock and minerals has

    nickel matter, only olivine group such as Fo90 Fa10 content 0,3 % Ni and pyroxene group but such as

    ortho pyroxene has 0,03 0,06 % Ni grade only. This statement shown that Dunite rock as source rock

    will result much nickel content if it alterated.

    Serpentine mineral is olivine mineral alterated by process hydration and oxidation. Serpentine rock has

    iron and nickel is namely garnerite, with chemical process as follows:

    2Mg2SiO4 + 4H + 0,5O2Mg3SiO5(OH)4+Mg-2(aq)

    Olivine Serpentine

  • 8/7/2019 Asera Report 62

    5/23

    5

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    I.2 Permit

    Concession area is located in Asera District North Konawe Regency with covering 5.923 Ha, this base on

    Konawe Regent Permit No. 62/2007, expire for 3 (three) years, start on February 19, 2007 until February

    19, 2010.

    I.3 Aim and Objective

    This activity aim is to known nickel laterite scattering potential and deposit in concession area. It is

    purpose for zoning of prospected area and data for next stage of mining planning.

    I.4 Time and Place

    This activity is conducted at Q1 and Q2 on 2008. It taking place on Asera District. Collection data is result

    from drilling, pit test, rotary drilling (Jacro), rock sampling and Soil sampling.

    Picture 1. Exploration survey location

  • 8/7/2019 Asera Report 62

    6/23

    6

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Location of survey area can be reach by vehicle from Kendari city to Asera district North Konawe

    Regency, approximately 4 hours.

    I.5 Tools and Exploration equipment

    Tools and equipments are use in this activity as follows

    1. Geology Hammer.2. Brunton Compass.3. Sunton Compass.4. Garmin Global Positioning System (GPS).5. Digital camera.6. Altimeter.7. Nitton x-ray.8. 50 M roll mater.9. Plastic sampling bag.10.Stationery.11.Field note.12.

    Topography map scale 1:50.000.

    13.Hand augers.14.Rotary drilling (Jacro).

    I.6 General Information

    I.6.1 General Condition of study area

    Concession area is located in Asera District North Konawe Regency with covering 5.923 Ha, it is occupied

    by Protected forest 335 Ha, Production forest 2.805 Ha, Conversion Production forest 2.200 Ha, and

    Transmigration 563 Ha.

  • 8/7/2019 Asera Report 62

    7/23

    7

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    The tribe in this area are composite of Bugisness, Tolaki, Mekongga, and a little from Javanese and

    Baliness. The economics of local peoples are majorly farmers, a few of government officer, and

    entrepreneurs. The religions are majorly Islam and a few of Christian and Hindu.

    I.6.1 Basic data

    This study is use some of basic data as reference such as Indonesia Land Form Map Scale 1 : 50.000

    issued by BAKOSURTANAL, South East Sulawesi Forestry map Scale 1: 50.000 issued by South East

    Sulawesi Forestry Service and Geology and Mining Potential Map Scale 1 : 630.000 issued by South East

    Sulawesi Mining and Energy Service.

    I.7 Personnel

    No. Job Group Name Job Description Others

    1 2 3 4 5

    1 Management 1. Tjong Hon Khong2. Hendri3. Junianto

    1. President Director2. Branch Manager3. Operation Head

    2 Expert 1. Lediyantje Lintjewas, ST

    2. Umar Iribaram, ST

    3. Abram Padaunan, ST

    4. Yunus Faidiban, ST5. Muh. Kasim, ST6. Anwar

    1. Geologist2. Geologist3. Geologist4. Geologist5. Geologist6. Geologist

    3 Surveyor 1. Sutarno2. Yan Gustaf3. Kameluddin4. Muh. Basri5.

    Darwis Koko

    6. Ansar7. Lajoni8. Feri9. Rayon10.Asep Sujator P.11.Nurdin

    1. Operator2. Operator3. Operator4. Operator5.

    Helper

    6. Helper7. Helper8. Helper9. Assistant Geologist10.Assistant Geologist11.Assistant Geologist

  • 8/7/2019 Asera Report 62

    8/23

    8

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    12.Suwartoyo 12.Assistant Geologist4 Maintenance 1. Samson

    2. A. Riady1. Maintenance2. Maintenance

    5 Sampling

    handler

    1. Suardi2. Rudy

    1. Keeper2. Keeper

    6 Administration 1. Ramli Jaya, SH2. Susanty3. Lisa Febrianty4. Udin SE5. Felix

    1. HRD2. Finance3. Accounting4. HRD Staff5. HRD Staff

    7 Security 1. Abdul Azis2. Abdul Kadir3. Abdul Hamid4. Haerul

    1. Security2. Security3. Security4. Security

    8 Logistic 1. Susanty2. Paddah

    1. Staff2. Staff

  • 8/7/2019 Asera Report 62

    9/23

    9

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Chapter II

    Geology Regional and Characteristic Nickel Laterite Deposit

    II.1 Geology Regional

    Concession area of PT. Pertambangan Bumi Indonesia is located at Asera district, It is North Ultramafic

    block that geologically separated from their main Ultramafic Block namely Hialu Ultramafic Block

    Province. Lasolo Rivers is interpretation as boarder; it is thrust fault that linked to Landawe Rivers on

    south that turn to east. This fact is explanation of variation of rock associated on study area. Hilo

    Ultramafic Block is ofiolite and arrangement of peridotit, harzburgit, dunit and serpentinit.

    Three distinctly different geology provinces are recognized in Sulawesi Island. They are west and east

    Sulawesi, which are divided by the north-trending fault zone at about 120025 east longitude, and third,

    the Baggai Islands, Sula Islands, and Buton Islands. The Study area is located on East Sulawesi geology

    province.

    East Sulawesi province consists largely of basic and ultrabasic igneous rocks as known as ultramafic

    complex and associated schistose metamorphic rock. The western part consists predominantly of schist

    in with gaucophane increase in abundance westward to the boundary with west Sulawesi province.

    Basic and ultrabasic rocks cover large areas in the eastern part of east arm as namely Hialu Trending

    Ultramafic block. It is Cretaceous Ultramafic complex consist peridotit, harzburgit, dunit and serpentinit.

    Mesozoic deep water carbonate and clastics associated with radiolarian cherts occur in the province.

    Paleogene rocks are restricted to the northeastern part, but neogene rocks are much more widespread

    in the province and form the Celebes Molasse.

    Most contact between metamorphic rocks, ultramafic rocks, and Mesozoic sedimentary rocks are fault

    contacts. The ultramafic rocks have been thrust over Eocene to middle Miocene carbonates in the

    northeastern part.

  • 8/7/2019 Asera Report 62

    10/23

    10

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    II.2 Geology of Study Area

    Geology of study area can divided in 2 parts. First part is ultramafic complex in southern part of study

    area and second part is Pandua formation and a little ultramafic part in northern part. Pandua formation

    is laying on ultramafic rock, and covering plain and low land near Lasolo Rivers.

    Field observation is found that ultramafic rock is commonly serpentinization except on middle part.

    Drilling and outcrops data is shown of saprolitic zone at hilly with high at 200 m above sea level. Float

    quartz box work as silicification process is founded at the top of ultramafic hilly, this is indication of

    fracture on dunite rock and it is suitable for nickel laterite process.

    II.3 Characteristic Nickel Laterit Deposit on Concession Area

    Drilling and outcrops data are shown that nickel laterite deposit at study area can divided into 3 groups,

    as follows:

    1. Nickel laterite deposit resulted from dunit alteration.2. Nickel laterite deposit resulted from peridotit alteration.3. Nickel laterite deposit resulted from dunit float rock alteration.

    Cause of 3 groups above than make different laterite layer include of their saprolitic zone. Laterite

    comes from peridotit alteration is very common in study area.

    Limonite layer is found with iron oxides nodul, it is widespread around Paka Indah Village, Drilling record

    is shown after 20 m under limonite layer is sandstone and conglomerate from Pandua Formation laying.

    This is interpretation that Pandua formation is the basement of Paka Indah valley and Hilly has

    arrangement from ultramafic rock that weathering and erosion going down to Paka Indah valley and

    deposit there.

  • 8/7/2019 Asera Report 62

    11/23

    11

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Chapter III

    Exploration Activity

    III.1 Literature Study and Field Planning

    Literature study is conduct to get of early information about situation of study area such how to reach

    study area, social economic on study area, geology, and nickel laterite deposit potential.

    Field planning is done for design of survey such as schedule survey, budgeting, person and material for

    supporting so exploration activity can run smoothly.

    III.2 Geology Mapping

    Geology mapping is carrying out to known of morphology, variation and distribute of lithology,

    mineralization, wide of concession area, prospecting area and others aspect. Mapping method is used

    in this study is surface mapping, geology measured, and kinematic tracking GPS. Tools and equipments

    are used such as working map scale 1: 12.500, geology hammer, geology compass, GPS, camera, plastic

    sampling and others.

    III.3 Sampling grab.

    Amount of sampling that carry out for analysis as follows;

    No. Sample Amount (bag)

    1

    2

    3

    4

    5

    Pit test

    Rotary drilling (Jacro)

    Hand augers

    Channel sampling

    Soil sampling

    -

    38

    243

    27

    6

  • 8/7/2019 Asera Report 62

    12/23

    12

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    III.4 Sampling Analysis

    Chemical analysis method is using for known percentage of Ni, Fe, SiO2, CaO and MgO on sample. This

    analysis is done at PT. Pertambangan Bumi Indonesia Laboratory with X-Ray Analysis.

    III.5 Mining route planning

    Mining route survey is conduct to know how of carrying of nickel ore after digging out. This method is

    trace of potential access such as waterway or land route. The result of this activity as follows:

    1. Rivers route :Concession area has potential waterway such as Lalindu River, wide of Lalindu river about 50

    300 m, depth 5 10 m, length to open sea about 32 Km, current river is 1,48 m/s 2,42 m/s.

    2. Land route :Concession area has main road that can be useful to carrying out material to open sea.

    Concession area is near coastal line that is others advantage.

    III.5 Data Processing

    Data processing is conduct at PT. Pertambangan Bumi Indonesia Office in Kendari. Data form is dividing

    as 2 group as follows; 1. Drilling record, and 2. Analysis sampling record. Both data is storage with

    confidential and safety by using restricted procedure. Drilling record and laboratory record will put in

    computer for further analysis and core drilling and rock sampling will put in storage.

  • 8/7/2019 Asera Report 62

    13/23

    13

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Chapter IV

    Exploration Activity Result

    IV.1 Rock and Soil Sampling

    This activity is done with geology mapping. This activity is conduct to know spread of source rock and

    trend of laterite in concession area.

    Rock sampling is done at outcrop of fresh ultramafic rock and soil sampling is done at red soil

    appearance. Channel sampling is 27 points and soil sampling is 6 points.

    IV.2 Drilling

    Drilling is conduct after geology mapping. There are 2 drilling methods as hand augers and rotary drilling

    (jacro). Hand augers is use if in the concession area is found laterite zone and rotary drilling is use after

    hand augers result shown positive prospect.

    This activity is done by 243 hand auger bore hole and 38 rotary drilling bore hole. Depth is varying

    between 6 to 10 m for hand auger and 20 to 41 m for rotary drilling. Total depth approximately 932 m.

    Locations drilling are spread as 59 points in northern part of concession area, 44 points in southern of

    concession area, and 140 points in middle of concession area.

    IV. Potential

    Extensive laterite deposits drived from ultramafic rock contain potential of nickel laterite deposit in

    concession area. The iron capping is normally restricted to exceptionally flat plain area. The ultramafic

    rock is also containing chromite and some manganese. Ni content is vary between 0,98 to 2,29%Wt, Fe

    content between 13,20 to 54,36%wt, and high of Cr and a few of Mn.

    IV. Estimation Reserve

    Concession area is Nickel laterite deposit from data interpretation as 92.376.000 Ton with 0,98 to 2,1%

    Ni.

  • 8/7/2019 Asera Report 62

    14/23

    14

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    15/23

    15

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    16/23

    16

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    17/23

    17

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    18/23

    18

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    19/23

    19

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    20/23

    20

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    21/23

    21

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

  • 8/7/2019 Asera Report 62

    22/23

    22

    PT. Pertambagan Bumi Indonesia. Batam Centre Industrial Estate Block A 1.2.3 Batam Island Indonesia 29432Tel: 62-778-467596, 62-778-467597 Fax: 62-778-462501 [email protected] www.pbimining.com

    Chapter VI

    Closing

    1. Source rock of nickel laterite in concession area is dominated of serpentinite rock fromultramafic rock groups.

    2. Bore drilling core result that saprolite zone is appeareance at 2 to 6 meter with avarage thick 4m at morphology hilly with 25 100 m above sea level and 2 to 12 m with avarage thick 10 m at

    steeply hills.

    3. 243 hand augers bore result that laterite zone thick 6 to 10 m.4. Concession area is Nickel laterite deposit from data interpretation as 92.376.000 Ton with 0,98

    to 2,1% Ni.

  • 8/7/2019 Asera Report 62

    23/23

    23

    Bibliography

    Bammelen, 1949, The Geology of Indonesia , martinus Nijhoff The Hague.

    Sabarna, 2006 Laporan Penyelidikan Umum Pada Daerah Asera Kabupaten Konawe Utara Provinsi

    Sulawesi Tenggara. PT. Pertambangan Bumi Indonesia.


Recommended