COMPANY PROFILE
Ashok Leyland is the flagship of the Hinduja group and is the second
largest manufacturer of commercial vehicles in India. The company
was established as ASHOK MOTORS in 1948 and entered into
collaboration with Brit ish Leyland in 1955 with current name as
ASHOK LEYLAND. The company has grown as a reputed
manufacturer of quality automotive products ranging from light
commercial vehicles to heavy duty vehicles and engines for
automotive, industrial and marine applications.
The products of the company are of proven design for
durabil i ty and reliabil i ty and are hence very popular both in Indian
and overseas markets. In recent years , the product range is
upgraded to the latest technological developments in the World, for
which the company has technical support from IVECO ( FIAT
group ) , Italy for manufacture of IVECO Cargo range of vehicles ;
HINO Motors Japan for manufacture of fuel eff icient engines and
ZF , Germany for manufacture of synchromesh gear boxes.
The company has its corporate off ice registered at
Chennai. The marketing headquarters at Chennai and sales and
services network and spare parts warehouses are spread throughout
India with regional sales off ices, area off ices and service centers
located in all major cit ies and towns in the country. The products are
also exported to overseas customers. The marketing personnel
maintain constant interaction with customer for application
development and feedback for continuous improvement of the
product. The service function is carried out by qualif ied personnel,
whose skil ls are continuously upgraded through training, to meet the
servicing requirement of newer or improved products. The design
function is carried out by product development division operating
through 3 centers viz. product development Encore for engineering
services engine R&D; technical center , vell ivoyalchowadi for design
of vehicles and aggregates , prototype development, vehicle and
component testing , R& D engines, Hour for design and development
of engines.
MANUFACTURING PLANTS:-
Ashok Leyland presently has six manufacturing plant in India.
1. Encore plant ( mother plant) near Chennai
2. Hosur- 1
3. Hosur-2 ( along with a press shop near Bangaluru)
4. Bhandara ( assembly plant)
5. Alwar ( assembly plant)
One new upcoming plant is coming which is in Pant nagar
(Uttaranchal). The total covered space at these six plant exceeds
4,50,000 sqm and together employ over 11,000 personnel.
Two new upcoming plants are also being established outside our
country are:-
1. Sri lanka &
2. Dubai (UAE)
ORGANISATION PROFILE
The head off ice of ASHOK LEYLAND is in Chennai, India and the
company is owned by the Hinduja group. Mr. Parmanand D. Hinduja
was the founder of Hinduja group.
Mr. R. J. Shahaney
Mr. R. Seshasayee
Mr. Vinod k. Dasari
Mr. R.R.G. Mennon
Mr. Rajinder Malhan
Mr. A. K. Jain
Mr. K. Sridharan
Mr. M. Natraj
Mr. A. R. Chandra Sekharan
Mr. Anup Bhat
Mr. J. N. Amrolia
Chairman
Managing director
Chief operating off icer
Executive director- product development
Executive director- International operations
Executive director –Projects planning
Chief f inance off icer
Chief programmer mentor
Executive Director & Company Secretary
Executive Director- Strategic sourcing
Executive Director- Construction & All ied Businesses
Certification and Awards obtained
ISO 9002: 1987 1993 Ennore & Hosur unit -1
ISO 9001: 1994 1994 Ennore, Hosur unit- 1 & 2, Bhandara, Alwar & Corporate function
QS 9000: 1998 1998 Ennore, Hosur unit- 1& 2/CPPS, Bhandara, Alwar & Corporate function
ISO 9001: 2000 2003 Ennore, Hosur unit- 1& 2, Bhandara, Alwar & Corporate function
ISO 14001: 1996 2001 Ennore
ISO 14001: 1996 2002 Ennore , Hosur unit-1 & 2 & CPPS
ISO 14001: 1996 2003 Ennore , Hosur unit -1 & 2 & CPPS , Alwar & Bhandara
BS 7799-2: 2002 2005 Information security management system for Ennore data center
ISO/ TS- 16949-2002 2006 Ennore, Hosur unit-1 & 2/ CPPS, Bhandara, Alwar & Corporate function
PRODUCTS
From 18-seater mini-buses used by schools and corporate to 82-
seater double-decker buses, from 7.5 tone to 49 tone in haulage
vehicles, from numerous special vehicle applications to diesel
engines for industrial, marine and genset applications, Ashok
Leyland offers a wide range of products. Through timely innovations,
the Company has created new product and application segments,
thereby expanding the market. From eggs to steel, from flowers to
cars... what doesn’t move on Ashok Leyland vehicles?
Ashok Leyland have made and sold products l ike roadways buses,
CNG buses, defense trucks, double-decker buses, vestibule buses,
luxury buses, rear engine buses, school buses tipper, and dumper,
vehicle for f ire-brigade.
Mostly AL produces the chassis of vehicles which gives flexibil i ty for
the customer that he can make the body of his own choice and
requirement. Some of the products are made with body by the
company. The bus running at Delhi – Lahore route is also made by
AL.
Apart from these AL makes the engines also, which are being used
for gensets /generator, marine and industrial applications. AL makes
three kinds of engines-AL engine, HINO-engine, and IVECO engine.
Mostly HINO-engines are being used.
The products are l isted below:-
School bus – stag (ICV)
Bus (MDV)- Viking cheetah, Viking super, falcon
Double-decker
Vestibule bus
Rear-engine bus-panther, cruiser, enviro
Luxury bus – luxura, foton
CNG bus – Viking , Viking super, lynx,4.2&4.9
Multi-axle vehicle
Haulage-comet, comet gold, bison, tusker super
Tipper
Dumper
Tractor- comet, tusker turbo, beaver, hippo, rhino, 4018,4921
LCV/ICV-cargo 759,cargo 909 100.12
Water tender-16KL
Fire fighter- comet gold 4x2, RIV 4x4, CFT 6x6
Defence- stallion 4x4,YAK 4x4, HMV 6x6,RAT 6x6,LRV 4x4, TFF 4x2
ASHOK LEYLAND ALWAR
Alwar is a strategic town in Rajasthan midway between Delhi and
Jaipur is located with national capital region. As a part of expansion
programme alwar unit was added to the family of ASHOK LEYLAND
& started its operation in 1982 & has completed its 25 years
successfully. It is basically an assembly plant where the chassis is
assembled.
Ashok Leyland, Alwar is world’s largest CNG Vehicle producing
plant; CNG is used as an alternate fuel to diesel and is very less
polluting. The pollution of CNG vehicle is less than ever Euro-4
vehicle which is known for its lesser pollution vehicle.
The total covered area of Alwar plant is 352 acres and the
fencing is done in around 161 acres of area. The plant comprises of
8 shops called shop-1, shop-2 & shop-5. the plant has three gates
one is main gate, one for entering the goods carrier, third for the
products going out of the plant for sale.
There is an administrative off ice one P & A department block, a
medical centre, a canteen, a newspaper reading room library, a
training centre & system department, regional sale off ice yard &
construction is going on for new stores.
WORK SHOP:-
There are four shops in the plant:-
SHOP-1:- chassis assembly takes place in a l ine by odd assembly
method & the PDI (Pre Delivery Inspection) is carried painting of
chassis is done.
SHOP-2:- chassis assembly takes place on conveyor l ine in 20
stages.
SHOP-4:- It is used as store and RSO re-furbishing work.
SHOP-7:- PDI & GR & D work is carried out.
VISION
The vision of Ashok Leyland is to be among the top Indian
corporation acknowledged nationally and internationally for:-
Excellence in quality of i ts product
Excellence in customer focus and service.
MISSION
Be a leader in the business of commercial vehicles excell ing in
technology quality value to customer ful ly supported by customer
service of the highest order & meeting nationally and international
environment and safety standards.
EMPLOYEES
We consider our employees as our most valuable assets and are
committed to provide full encouragement and support to them to
enhance their potential and contribution to the company businesses.
Quality policy
Ashok Leyland is committed to achieve customer satisfaction by
anticipating and delivering superior value to the customer in relation
to their own business through the products and services offered by
the company and to comply with statutory requirement. Towards this
the quality policy of Ashok Leyland is to make continuous
improvements in the processes that constitute the quality
management system to make them more robust ant to enhance their
effectiveness and eff iciency in achieving stated objective leading
to:-
Superior products manufactured by the company as also
services offered by the company.
Maximum use of employee’s potential to contribute to
quality and environment, by progressive up gradation of
their knowledge and skil ls as appropriate to their functions.
Seamless involvement from vendors and dealers in the
mission of the company to address customer changing
needs and protection of the environment.
It is mandatory on the part of every employee of Ashok
Leyland to understand, implement and maintain the quality
policy of the company and to implement the procedures
incorporated in this manual and other associated quality
system documents issued by the manufacturing units and
corporate functional divisions on the basis of guidelines in
this manual.
Environmental policy
Any type of activity that is performed or any type of product that is
manufactured had an effect on the surrounding or environment.
At Ashok Leyland are committed to preserving the environmental
through a comprehensive environmental policy and productive
approach in planning and executing our manufacturing and service
activit ies.
We are concerned about the earth our children wil l inherit that’s why
we make sure our vehicles consume less fuel and pollute less. This
concern is reflected in the manufacturing systems, the various
processes energy conservation measure and conscious greening
indicate of the company.
A system is employed to control or minimize the adverse
impact on the environment is environmental management system
(EMS).
Objective of Ashok Leyland Environmental policy are:-
To adhere to all applicable environment legislation and
regulations
To adopt pollution preventive techniques in design and
manufacturing of our products.
To conserve all such resources such as power, water, oi l , gas,
compressed air etc. & optimizes their usage through scientif ic
methods.
To provide a clean working environment to our employees,
contractors and neighbors.
Commit to comply with all relevant legal and other
requirements.
Continuously strive to minimize waste generation by all
possible ways and to reuse and recycle the same through a
t ime bound action plan
Things done to protect the environment and achieve the goal
of the policy:-
Conserving natural resources l ike wood , coal , petroleum
products
Avoiding wastage water at plant area
Switching off the idle engine, motors, pump & l ights
Avoiding spil l ing oil , grease, paints on the floor
Do not through oil into drain
By planting many trees inside the company area
Recently planting plants on 5 June 2008(world environment
day)
5-S HOUSE KEEPING
1. SEIRI (Clearing Up)
2. SECTION (Arraying)
Arrange necessary items in good order so that they can be easily picked for use.
A place for everything & everything in its place.3. SEISO (Cleaning)
Clean the workplace completely so that there is no dust on the floor machines and equipments.
4. SEIKETSU (Standardising Cleanliness)
Maintain high standards of housekeeping and workplace organization at all t imes.
5. SHITSUKE (Training Discipline)
Train people to always follow good housekeeping disciplines.
Safety and Health Policy
Intension & commitment of the top management
Ashok Leyland aff irms that all i ts employees irrespective of the rank
need to be safe guarded against any person injuries or damage to
the properties during working period. That the management
recognises the principle that accident prevention contributes in the
long run progress and development of the organisation.
Ashok Leyland is committed to:- Implementing all practical safety measures l ike safe working
and environmental condit ion.
Carrying out a systematic crit ical appraisal of al l potential
hazards involving personal, plant services and operating
methods.
Following strictly safety rules and regulations incorporated in
the factories act and rules.
Maintaining safe and healthy working environment at al l
working places conductive to the success of the management
safety programs in the long run.
Implementing safe and health education programmes for
employee with specif ic emphasis on creating safety and health
awareness.
Welcoming useful and constructive suggestions and ideas in
regard to safety and health.
MISSION GEMBA
ENHANCING EMPLOYEES FOR WORLD CLASS GLOBALISED PERFORMANCE VISION:-
Achieving leadership in the domestic commercial vehicle markets
and a signif icant presence in the world markets and a signif icant
presence in the world market by 2014 through transport solutions by
enhancing the employ for their excellent work to promote them to do
their best for the goal of organization.
It ’s a playful part of the company. It is totally based on the potential
of the employee how can they do more, higher productivity can be
generated and how efficiently their jobs do. If any employee renders
his service for a new invention or a way by which the production,
quality standards or any other standards can grow rapidly. Then the
employee is awarded by senior off icers or respective head of
mission gemba.
The main emphasis is on the increase of the potential of the
employee. Motivate them through learning’s; self respect, honesty,
hard work, etc... Have to become the essential part of an employee
working in the organization
It creates a posit ive psychological effect in the mind of employee. If
he perform just different job, respective with a aspect of
development of the company, he is being awarded and the same
employee works with a difference in the company with more
advantageous style.
It gives a fr iendly and competit ive environment which helps
employee and the organization to achieve their ambitions.
GEMBA is a Japanese word which means “SHOP FLOOR’’. It
provides quality assurance, fastest delivery and least cost to
customers by
Offering appropriate products and services.
Adopting lean manufacturing systems & practices through
employee empowerment and participation.
Bench marking products, process and people against best in
the industry
In processing of this plan everyday all permanent workers,
engineers, managers amount up on the GEMBA floor and discuss
their problems and solutions with each other.
Every day for their improvement suggestion every guy is awarded
marks according to the performance and after a period the highest
scorer is awarded the GEMBA mission award.
A BRIEF OF DEPARTMENTS
1. PERSONNEL & ADMINISTRATION DEPARTMENT
Personal department has a very signif icant role in any organization.
Here it is headed by Mr. Ramesh Yadav.
This department has to perform a number of functions:-
Providing manpower as per production plan
Call ing application, application blank, conducting tests/
interviews, short l ist ing applicants, sending appointment
letters, joining formalit ies
Issue of circulars / notices
Transfer, promotion , rel ieving letters
Arranging induction program
Disciplinary actions as per standing orders, ID act, concil iation
proceeding
To arrange & attend meeting with union, concil iation meeting
in labour department
To attend & follow up all court cases relating to P& A.
Grievance procedure – attending every grievances to srt i t out
at init ial stage
Maintaining a vigil on movement of union/workmen
Maintaining a high morale of employees
Lessoning with government department concerning P& A
Correspondence with corporate personnel, insurance & other
department.
ADMINSTRATION:-
Purchase of soaps every month &distributed to workmen Arranging measurement of uniform & distribution
Issue of tea mugs on quarterly basis
For executives processing of major medical claim, LTA, minor
medical ETC
Mail dispatch through franking machine/ courier
Horticulture activity
Transport
Communication system
Engagement of house keeping contractor & all related activity
CORRESPONDANCE:-
Monthly report to corporate personnel, insurance accident
reports to factories inspector and ESI department
Quarterly report to EMP exchange
Half yearly report o factory inspector
Renewal of l icense- factories, DD units
Correspondence with corporate personnel on policy matters
any clarif ication
Correspondence for approval with MM
Correspondence for approval – diwali sweets, gifts
MEDICAL CENTRE:-
Up keeping the medical centre
Providing medicines
Tetvec injections/ medicines to all employees -6 month basis
Doctor appointment & relating correspondence
VEHICLES:-
Up keeping jeep , ambulance, f ire tenders, arranging repairs,
providing transport to all
CANTEEN:-
A watch on activit ies on canteen on daily basis, arranging
repairs , equipments, canteen contractor, ensuring hygienic
condit ion in canteen attending to complaints
SECURITY:-
A watch on security
Correspondence with security agency
Renewal of security contract- al relating action l ike ADVT,
Invit ing quotation, interviewers, spot inspection
Correspondence on security lapses , theft cases
HRD/ TRAINING:-
EMS work ( environment management system)
Identifying training needs
Selecting training programme
Notice for training programme
Nominating participants
Attendance , feed back, evaluation of all training programme
Analyzing all data regarding activity l ike Bench Marketing,
targets customer satisfaction reports, graphs.
2. PRODUCTION DEPARTMENT:-
This department handles all the plant work for production. This
department is responsible for all tech production and its process
going at assembly l ine and also the PDI (Pre Delivery Inspection).
They deal with all the workers to get the work output from them for
production. They decide which model is to be assembled according
to the availabil i ty of material and demand of production.
3. QUALITY CONTROL DEPARTMENT
Aiming the target of zero defects in their product this department
has to play a very challenging role. Attainment of prestigious quality
certif icate such as QS 9000 as Ashok Leyland has the landmark of
being the first auto industry in India to receive this honour. So to
keep the real value responsibil i ty of this department becomes
tougher. So personnel of this department has to keep a sharp eye on
every activity so that a minute kind of defect must not be allowed
with their product.
The QC department of Ashok Leyland, Alwar is running under wise
guidance of Mr. Vinay Bhargava along with cooperation of Mr.
Rajendra Yadav & Vinay Gupta.
Currently nine personnel are deployed under this department and
QC department work is distributed among three sections: f irst one is
GR&D, LINE and the last one is PDI.
This department is responsible for the quality of products and parts
whatever they sell or purchase. The quality checking is done in
three processes which are given as follows:
Incoming material inspection
In-process inspection
Final inspection
There is a GR & D (Goods receipt and dispatch) section which
receives good and QC department inspect them and ensure the
quality as per the recommended standards and then send them to
store.
For in-process inspection they use one chassis-card in which the
worker check whether all things has been done which he had to do
and then do signature in the card. This is known as self-certif ication.
When the chassis become off-track to the assembly l ine then the
chassis goes for a road-test. The defects and shortcoming in the
chassis are noted such as noise, smoke, driving control etc. Then an
inspection of chassis takes place at PDI and then all the defects are
noted and are rectif ied. After that the chassis is passed to sales
department by QC department.
PDI (PRE DELIVERY INSPECTION):-
It under comes the quality department but it has much uti l i ty that it
has an important role in the production.
The vehicle coming from assembly l ine is not perfect in quality. It
has many defects. So the chassis is inspected, faults are arrested in
this section and all the defects and faults are noted. The chassis
comes into PDI section after road-testing.
Then all the defects and faults found in the chassis are rectif ied
using necessary tools and items. Then the chassis is painted in the
paint booth and if there is any dent on the chassis FES, then it is
removed and finally passed to sales department. The chassis
passed from PDI is fault free and perfect in quality.
Painting of the chassis is also done under this department.
GR&D (Goods Receive and Dispatch)
This department is provided or giving their services when the goods
are received in the plant as a material from outside and when it
dispatch outside the plant.
This basically gives their service for quality and amount assuring.
UNIT PLANNING DEPARTMENT:-
This department basically does the planning work. They are given
the project of some new units to be prepared in the plant for which
they plan the appropriate place installation of the new unit the
approximate duration of completion of project cost estimation and
benefits of the installation of new unit.
Presently they are taking care of new rear axle assembly conveyor
l ine project being installed in shop-2 paint booth for body painting of
futon bus in shop-5.
PURCHASE DEPARTMENT:-
Raw material is very important for the production. All the raw
material is purchased by purchase department from various dealers
and companies. They decide which material should from which
company.
They also look at the cost of material to be purchased and the
transportation charges. It is better if the material is coming from a
place near to the plant because the transportation cost wil l be
reduced.
They also decided the firm to sell the scrap items of iron, wood etc.
The tender wil l be given to whoever wil l pay more.
They also hire the contractors from the market by tendering to
manage much work in plants l ike material unloading, transportation
construction.
FINANCE DEPARTMENT:-
This department takes care of al l f inancial things of the plant. It
keeps record of al l the salaries and all al lowances of the employees,
the money spent on purchasing the things for the plant, the money
earned by the sale of products and other f inancial activit ies. It
prepares a monthly and annual budget of the plant.
It also monitors the attendance of the employees by an electronic
card punching attendance system. All the employees are provided
with an electronic card which is punched in the card punching
machine at the t ime of entering the plant and at the t ime of leaving
the plan. The time of punching wil l be noted by the machine and
thus the department gets the data.
SALES AND MARKETING DEPARTMENT:-
Products are made in the plant and they need to be sold to the
customers. This department takes care of al l the marketing
activit ies. After the product is passed from QC department, sales
and marketing activit ies. After the product is passed from QC
department, sales and marketing department keeps all the products
at R.S.O. (Regional Sales Office). With safety the vehicle is kept in
the R.S.O. after f i t t ing the heat guards, warning triangles, RUPD
(Rear Under Protection Device) and Canopy as per the government
rule. Then at demand and requirement the products are sent to the
dealers.
They look at the demand of product in the market and the
customer’s feedback about the product. They also provide the
training for servicing of the product.
They send their report that in what amount has demand to
production department so that they can decide the amount of
production that they can.
PPC DEPARTMENT:-
Production planning and control department is known as PPC
department. This department control GR & D section and store-
rooms. They receive the goods coming from the factories. Then
according to the vouchers, counting of parts is done. They prepare a
daily report of goods received and send it to Finance department for
further procedure.
They allot part number for the parts and parts arranged according to
the part number in the store-room. They keep all the records of
store-room. Monthly counting of parts is also done.
CONCLUSIONS
The bird eye view of my project is that in this competit ive market
human resources are the major assets of an organization. Therefore,
ASHOK LEYLAND Alwar, India really focuses to f ind out the
effective sources of recruitment & selection process. The researcher
has done enough research on sources of recruitment & selection
process of the company. The researcher has come up with certain
recommendations that are to be adopted, which on implementation
would be beneficial for the company in long run. There are certain
inferences what was found through the project in the company and
are given below-
ASHOK LEYLAND Alwar is using both sources of recruitment i.e.
internal and external sources.
ASHOK LEYLAND Alwar, India prefers to use placement
agencies as a method of external sources of recruitment.
Company also recruits candidates through employee reference as
an internal source.
ASHOK LEYLAND Alwar, India recruits the temporary
employees on daily and weekly basis as well as
occasionally because when company feels shortage of manpower
in the lower level management, at that junction it recruits the
candidates on daily basis where as shortage of manpower in
middle level management at that point of t ime recruitment
and selection is done but this situation comes occasionally.
Theoretically, there are eight standard steps of selection process
but company follows one to f ive steps for selecting the
candidates, for example temporary employees are selected with
in one to two steps where as permanent employees and
executive are selected with in three to f ive steps.
After selection of the candidates they are on a probation period
of six months and after six months if their performance matches
with the job description, they are appointed on the payroll of the
company.
There are some internal and external factors which affect the
recruitment and selection process and the factors which affect
most are place of posting and compensation structure.
Apprentice is recruited from the organization whose temporary
employees completed 6 month period.
LIMITATIONS OF THE STUDY
This project is l imited to one plant of Ashok Leyland Alwar, which
is based in Alwar (Rajasthan).
Some data was confidential and not disclosed as per the
company’s policy.
Time l imitation was the major factor for the study.
RECOMMENDATIONS
On the basis of the research work there are several points, which
came as a conclusion and according to that there are some points
which are pointed out as recommendations, and if company follows
these points then company can effectively recruit and select the
candidates and increase the retention of the employees. These
points are given as follows:-
1. The Company at present is mostly uti l izing the source of
recruitment by employee referrals and placement agencies. If the
company goes for other effective sources of recruitment l ike job
portals and advertisements, i t can get some effective and
eff icient candidates for recruitment and selection.
2. Company should decrease the complexity of the selection
procedure for lower level employees while hiring the candidates
for judging their competencies.
3. For selecting the candidates, company should go for some new
technical and creative tests as a compulsory test apart from the
aptitude and trade test for the employees.
4. At present the probation period in ASHOK LEYLAND, ALWAR is
up to six months. It is advisable for the company that people at
the different post should be given different probation period.
BIBLIOGRAPHY
I got all the information regarding the study of Recruitment &
Selection with written proofs from the following references.
Books:
HUMAN RESOURCE AND PERSONNEL
MANAGEMENT by K.Aswathappa
HUMAN RESOURCE MANAGEMENT by Gary Dessler
HRM & IR by P Subba Rao
Manuals:
HRD MANUAL
Websites:
www.hrfactor.com
www.hrguide.com
www.hrtrends.com
www.ashokleyland.com
PROJECT
TITLE:Study of the production of goods Trucks and Buses.
INTRODUCTION:The project is related to the improvement of the production rate of the Goods Truck & Buses. Since truck & Buses assembly is recently started in Alwar plant of ASHOK LEYLAND LTD, therefore some improvement for reducing assembly time &increase in productivity & also making easier assembly process inevitable. It includes suggestion & taking them under consideration for new layout & new manufacturing system.
INTRODUCTION TO PRODUCTION (Trucks & Buses):
Assembly stages are given below:● Framing● Lay Down● Bracketing Stages● Piping Stages● Engine Mounting 1● Engine Mounting 2● Lubrication● Off track 1●Off track 2● Road Testing● Pre Delivery Inspection(PDI)
FRAMING
This is the first stage of the whole assembly line. As the name suggesting at this stage frame of chassis is given the shape in form of ladder. This ladder shape form is given with help of two side members and several cross members. Number of cross member varies from model to model.All cross members along with brackets, which hold and support other components that will assemble later on are made connected to side member, which comes previously drilled form. So all cross member along with brackets made fixed at their respective position with help of bolts and nuts. Flitchs are also inserted to side member which provides extra strength to frame.General brackets which assembled to frame are to support radiator, engine bracket, spring brackets. The size and structure of each bracket varies from model to model.Material for all frames is mild steel and length of cross member remains constant that is about 850 mm.After building frame, it is checked for bend, which may be produced while assembling cross members to side member. It is made to inspect frame assembly line and rectification also made on this stage.For conforming whether bend is present or not in frame stretchable thread is use and if there is end of specification of 0.5mm per meters then frame having this much bend would be allowable. Direction of bend present in both side members is in the same direction then maximum of two is considered. And if the bend present in two side members are in opposite direction then their summation is considered. And if bend present is in wavy form then two summation would be considered and maximum of these summation would be considered. So this is general method used for inspecting amount of bend present in frame. Specifications of some of frame models that have been built in
ASHOK LEYLAND ALWAR are given below.
MODEL FRAMELENGTH (in mm)
WHEEL BASE (in mm)
NO. OF CROSS MEMBERS
210 CH HINO EI 9678 210 7
222 VIK HINO EI 10100 210 7
222 CNG IVECO 10541 222 8
222 W/SA/SHIN 10541 222 7
LAY DOWN
The lay down stage is the very stage of the framing stage. It comprises three distinct stages and the working of these stages varies model after model. Generally the work carried out at this stage Consists of assembly front and rear axle on chassis along with springs.Generally chassis are made to available with three kind of suspension system. These are mechanical suspension, Weller suspension, air/ webller suspension. Ordinary chassis are equipped with mechanical kind of suspension, as CNG chassis are equipped with Weller kind of suspension as CNG chassis have to bear heavy load of 12 cylinder of CNG, and last kind of suspension are employed on luxury chassis as this suspension is known for its absolute shock free comfort. The procedure for mounting of mechanical kind of suspension is followed:Passenger models, like 203 cheetah passenger chassis (6 wheeler) have processing stages, are as follows:
1. Axle dressing 2. Axle coupling 3. Torque stand So a brief description regarding process for passenger chassis carried out at this stage is mentioned below.
AXLE Dressing:-
In this stage front and rear axles are assembled with leaf spring. The front leaf spring are assembled on front axle with I bolt and nut having inserted packing plates and shocker plates on which shockers are mounted.On the other side the rear leaf spring is assembled with the help 9f U- bolt. The brake boosters are also assembled on rear axle at this stage while on the front axle brake chambers are already assembled previously.
Axle Coupling:-
At the coupling stage the front and rear axles assembled with leaf spring are coupled with frame. The coupling is done with the help of shackle pin, which inserts in bracket and hole of the springs. The shackle pin has a very min tolerance and that special type of key pin is made with taper arrangements so proper alignment is required to fix that pin in leaf spring with brackets of frame.
Torque stand:-
At the torque stand tightening of all the nuts that have been bolted on previous two stages are done as on previous stages components have been just assembled, lightly on frame. After tightening nuts the strength of their tightness is checked with help of impact wrench.Of all type of rear suspension used on with rear axle vehicle the non reactive suspension has been chosen owing to its simplicity and safe riding Characteristics. Theterm non-reactive means that under all static and dynamic conditions the suspension is self-compensating. Unlike the balance beam, this is not self-compensating under all condition. The other advantages offered by this suspension are;
1. It allows the load on spring of one axle tube shared by the springs of other when an uneven road surface is encountered and results in minimal vertical movement of frame. On the account of the load being always shared equally by the axles road damage is considerably reduced.
2. In normal twin rear axles vehicles while braking there is transfer of weight from front axle to back axle of the rear axle and thus can cause the wheels on forward rear axle to lave the road surface or at very least in loose tyre grip on road the result is loss in braking efficiency of vehicle But in non-reactive suspension the forward rear axle does not raise on braking preventing loss in brakin efficiency.
3. This suspension reduces the shock loads with resultant life extension chassis components.
So this simple arrangement provides lot of advantages.The arrangement includes trailing springs anchored at front end with load equalization b\w the axles through ball crank levers and connecting rod.
FRAME DRESSING:- At this stage tie rod is made to assemble on frame which is carrying two moveable parts called shackles to which front end of both rear springs would made to connect to brackets , and at axle coupling stage both rear axles come without having rear springs opposite to case of ordinary in which they comes along with rear springs. So firstly both rear springs are to made connected to tie rod and frame. So this is work that is carried out during lay down stage of multivalent vehicle such as 2214.
Below is specification of components assembled at this stage:MODEL FRONT
AXLE CAPREAR AXLE CAP
REAR AXLE RATIO
NO. OF LEAVES IN F.A.
IN REAR
210 CHE 5460 10200 5.833:1 12 15222 CNG 5460 10200 5.8333:1 111112 12222 VIK 5460 10200 5.833:1 12 122214 MA 6000 19000 6.167:1 12 13
(9500*2)222WA 5460 10200 5.8333:1 12 10
BRAKETING STAGE:-
This is next staged hat lies in assembly operation. The components assembled here are steering box, fuel tank, brackets for air tanks, dual brake valve, clutch pedal and carrier for spare wheel. Steering bar is mounted on chassis with arm, which is further connected to drag link & connection of drag links is made with fitment arm. By rotating steering wheel drop arm moves in required direction. In addition to mounting of above components wheel alingnment is also done on its stage. The purpose behind this is to sure that stub axle are exactly parallel to each other this is done by measuring b\w fronts & back portion of stub axle.
MODEL STEERING RATIO ANGLEOFST G. DEG.
WHEEL DIA
210 VIKING POWER 73 533.5222 (IVECO,HINO)
POWER 73 533.5
2214 HINO POWER 34.5:1 71 533
PIPING STAGE:-
As name suggesting work carried out on this stage consists of making pipe arrangement for bake system of chassis. At this stage whole ckt. Of brake sys. Is laid down on chassis with help of metallic pipes. The brake sys. Of all models of ASHOK LEYLAND VECHICLE has being designed by SUNDRA CLAYTON LIT. of Chennai, and name given to such arrangements called DUAL BRAKE SYSTEM. This dual brake sys. a split sys. of air brake to actuate front and rear foundation brake separately, there by insuring partial braking for vehicle
Working System:-As the system starts charging the preferential arrangement in SPV allow air in to service reservoir (primary/secondary) As the pressure reaches above opening pressure of auxiliaries in the sys. the auxiliaries line start charging. As long as the sys. Pressure is below he opening pressure of the auxiliaries, the hand brake is inoperative and the spring brakes are applied condition.As soon as the compressor start’s pumping air in to the sys. & the sys. Pressure is below the opening pressure of auxiliaries, the low pressure indicator switch continue to give warning. The warning from the low pressure indicator switch stop’s when the sys. Pressure reaches above opening pressure of the auxiliaries & with lever of graduated hand release valve in BRAKE OFF position. In this position the spring brake in rear are fully released.So when the dual brake valve pedal is pressed, compressed air from the primary reservoirs fed into the service port (11) of he spring brake actuators through dual brake valve primary & applies brake in rear. Simultaneously compressed air in the secondary reservoir is fed into the brake chamber through the dual brake valve secondary & applies the brakes in fronts, foundation brakes are actuated by the slack adjusters connected to the brake chamber & springs brake actuators in the fronts & rear brake the brake chamber & springs brake actuators in the fronts & rear brake respectively.In case of releasing the load from pedal air from service port (11) of brake actuators through dual brake valve primary & applies brake in rear. Simultaneously compressed air in the secondary reservoir is fed in to the brake chamber through the dual brake valve secondary & applies the brakes in fronts. Foundation brakes are actuated by the slack adjuster connected to the brake chamber & spring brake actuators in the front & rear brake respectively.In case of releasing the load from pedal air from service port(11) of springs brake actuators is exhausted by dual brake valve. During
same time air from the brake chamber is exhausted through the dual brake valve thus releasing brake in front.So this is about working of DUAL BRAKE SYSTEM of chassis having single axle in case of multi axle drive working is quite similar ht only ht only difference is due to addition of some components. These components are only assembled incase of multi axle drive a little detail about these components along with components that are assembled in single axle chassis, which also assembled in multi axle, is give below.
RELAY VALVE:-
In air pressure braking system employing long piping running between brake valve and brake chamber relay valves are used the signified by brake valves. The relay is connected to reservoir and air delivered to and release from brake chamber is passed through relay valve and only a small amount of air used to actuate relay valve is delivered and exhausted from brake valve. This gives quick braking response and also permits the same pressure to brake chamber as delivered by brake valve.
QUICK RELEASE VALVE:-
The component ensures faster exhaust of air pressure from brake chambers.
AIR FILTER:-
The component prevents dirt from reaching pipe line and valve in brake system. When air filter jammed due to dust then during suction of air, vacuum is created in air filter. There is a vacuum valve on the front penal of FES which is connected with air filter. Now due to jam in air filter, the spring inside the vacuum valve goes down, this gives indication to driver to clean the air filter.
BRAKE CHAMBER:-
The function of brake chamber is to convert energy of compressed air in to mechanical force and motion necessary to operate brake.
DUAL BRAKE VALVE:-This valve gradually charges and exhausts air from brake chambers and spring brake actuators. Dual brake valve has two brake valves assembled in tandem. When brake is applied the plunger moves the primary piston downwards closing the exhaust passage and subsequently opening primary inlet valve thus admitting compressed air in delivery line connected to spring brake actuators in rear and applies the brake.When brake is released the inlet valves in the primary and secondary closes inlet passage and opens the exhaust passage by the secondary piston end subsequently opens the inlet valve of secondary thus admitting compressed air in delivery line connected to brake chambers in rear and applies the brake.When brake is released the inlet valves in the primary and secondary closes inlet passage and opens the exhaust passage allowing the compressed air from brake chambers and spring brake actuators to atmosphere.
GRADUATED HAND RELEASE VALVE:-
This valve charges and exhausts compressed air gradually form spring brake actuators for releasing and applying parking brake.
SPRING BRAKE ACTUATORS:-
THIS COMPONENT products necessary braking force at the foundation brake in service & hand brake application .This unit has diaphragm type brake chamber operation service brake connected port(11) & a spring brake operating the parking/hand brae connected port 12.When air pressure is applied to service port11 diaphragms flexes & operates the push rod which in turn moves slack adjuster to operate foundation brake. The spring brake portion when hand brake valve is operated, air pressure from spring brake portion is exhausted to atmosphere &heavy coil spring pushes the push rod through diaphragm sand brakes are applied.
SILENCER-
All vehicles of ASHOK LEYLAND Ltd. are double silencer which reduces noise pollution at higher extent. It is all about brief description about working & functions of components assembled in vehicles. So at this stage lay down of all this components connecting through pipes is laid down along with connection of components by using air hoses & metallic pipes certain
Other components are assembled on this stage such as oil Bundy pipes all this which senses pressure of oil in engine & pressure of air in two tanks are connected tr. Hydraulic pipes which is connected to Hyd. Reservoir coming from stg. Box also leakage of whole arrangement is checked.
ENGINE MOUNTING 1
The next that lies during assembly operation is engine mounting 1 work carried out during this stage include following fitments of components .
FITMENT OF PROPELLOR V SHAFT:-
Previously a dressed propeller shaft that is dressed offline is mounted on chassis. Two propeller shafts (P.P.S.) refitted case on heavy vehicle & in case passenger three PPS are fitted. So we take general case of two PPS. Two PPS are fitted b/w gear box & rear axle supports by center bearing at center. The front shafts have a fixed joint near gear box & rear end is supported on center bearing with a splinted stub shafts to take up rear propeller shafts. The rear shafts consists of fixed joints at rear end a slip joint at free end for a longer end trouble free life these joints are to be lubricated periodically.
ENGINE MOUNTING:-
As the name given to this stage because of figment of this components. Previously dressed engine whose dressing is done off line with could plate, pressure plate & some other accessory made available to online & at this stage it is mounted.After fitting engine on chassis no. of connection of different components to engine is made connection such as asir cleaner which provide supply of air to engine if modal is of passenger then air cleaner is directly mounted to engine if it of heavy then air cleaner is the separate unit exists which is assembled to engine by a pipe going to intake manifold of engine.Second connection is of tail pipe coming out through exhaust manifold & a head of this a silencer is mounted a head of which an exhaust pipe is fitted. Other connection is of fuel hose from diesel tank to feed pump that already mounted on engine, return fuel hose fro governor to fuel tank. This component that assembles here on chassis is radiator to engine, is which is also previously dressed off line connection of radiator to engine, is made through hose that are of radiator. One hose goes to engine it serves as inlet to engine second hose comes
from engine to radiator which act outlet for coolant & third hose that comes from diesel tank also act inlet hose of one way type outlet hose come through a thermostat valve which opens at definite temp. so until this temp. is achieved coolant cant go through engine. The basic function of thermostat valve is to support engine to attain its working temp. as early as possible.And last component fitted is steering column to steering box. Steering column is connected to steering box through knuckle joint in case of CNG many other components are assembled on chassis at this stage components like first stage regulator, second stage regulator are mounted on chassis .The function on these components is to reduce pressure of CNG which is filled in cylinders at a pressure of these components is to reduce pressure of CNG which filled in cylinder at a pressure of 200 bar to 9 bar So first stage regulator pressure reduces so drastically results in decrease in temperature which may result in freezing of CNG so to avoid this two pipes are made connected to this components which carries hot water from engine & circulates around it so that the above case may happen.
ENGINE MOUNTING 2
This is a next stage lie during assembly line. In case of assemble of ordinary chassis this stage is not much us. This stage comes in to its full operation in case of CNG chassis assembly. In case of assembly of ordinary chassis work carried out is composed of bumper, mounting of Head lights along with indicator lights so not tool much work is carried out.
In case of CNG work carried out consists of various small tasks these includes connection of 3 WAY SOLENOID SWITCH Along with connection of hot water hoses to first stage regulator, connection of first stage regulator to second stage regulator, Along with this joining of spring brake actuators to the slack adjustor. Connection for hydraulic system is made i. e. one hose is connected from hydraulic rear oil to steering box &second hose is connected to hyd. Pump. Other outlet of hyd. Pump is made to connect with steering an one hose from steering goes into the hyd. Pump so with this arrangement hyd. Oil keeps circulate from hyd. Reservoir to steering with help of hyd. Pump. Along with this mounting of bumper & head and indicators light is done. A steering column is connected to steering box through universal joint. The most arduous task performed here dismounting CNG cylinders on the chassis .12 cylinder each are having capacity of about 9 it. Is mounted on chassis in from of to channels each carrying 6 cylinders. At the outlet of each cylinder a valve is connected which act as a safety cum delivery
valve. The purpose of this valve is to provide safety case of leakage of CNG from cylinder. In case of leakage the safety valve would be open & through ventilation arrangement gas would disperse in to atmosphere. Gas piping arrangement for supply of CNG from all the hoses are made up of CDS and are very costly about 300/- per ft. so passing the transducer supply goes into first stage regulator. Also arrangement for ventilation is made at this stage hoses from the safety portion of valve are connected to tow hoses one for each side consisting of 6 cylinders and these tow hoses are left open for further connection where there would be further connected to tow main pipe which opens in air at rear side of chassis. As CNG is lighter then air it would readily diffuse in air as comparison to LPG which is heavier than air and in case of leakage it accumulates near to area of dispersion so in this case CNG in safer fuel then LPG.
LUBRICATION:-
As name suggesting the kind of work done during this stage is filling of oil to the various components of chassis and application pf grease to grease nipples so that operation of all these parts may take place smoothly with least friction so top ensure their long life. The work carried out on this stage mainly consists of oil and application no grease to components chassis. And wheels mounting on both front and rear axles are also done on this stage.Different type of oil is filled in number of components engine oil is filled in engine, gear oil in gear box, rear axle, hydraulic oil in steering box and addition of filling of DIESEL in fuel tank is also done about 20 Lt of diesel is filled in fuel tank and filling of water in radiator is also done. And application of grease to all grease nipple is done grease is applied to grease nipple until it starts to come out from other part of nipple. Tightening of all wheel bolt which are mounted on both front and rear axles is done keeping the torque of 400 lb. ft.
In radiator, The ratio to coolant & waters in for passenger vehicle-3:7For Goods vehicle 1:1Specification of oil changes from model to model and also from season to season. Quantity of oil also varies from model to model.
OFFTRACK 1
This is next stage that lies after lubrication stage in sequence of assembly line. At this stage wooden trame on which driver seat has been mounted is made to mount of chassis. Wooden str. Is made to mount in case of ordinary chassis but in case of chassis for heavies a steel str. Takes place of wooden str. Called FES (front-end Structure). Generally it can be said as cabin with no roof but having all features which have to be made available around driver such as dashboard having all displays, horn, steering wheel, head light, indicator light, acc. Pedal, brake pedal, clutch pedal, wiper motor. This str. is made to mount on chassis which one is needed. In addition of mounting of str. two batteries of 12 volt each is made to mount on chassis and +ve of one battery is made to connect with –ve of second battery thus providing series connection and –ve terminal of first battery is earth connected thus avoiding the danger of lcaage and +ve of second battery is made to connect with starter motor. And in addition of this a pedal is made to link with throttled valve. And incase of CNG filling of gas to all 12 cylinder is done. So this much amount of work is done at this stage.
OFFTRACK 2
This is last stage that lies during assembly operation. The chassis is made to run for very fist time. The work carried out at this stage involves connection of all electrical equipment. In addition to above task another operation which are preformed at this stage are mounting of steering wheel to steering column, mounting of dash board having all displays which will be further connected to respective components. Also max. cut is given to chassis at this stage. The purpose behind this is to set maximum limit to which a vehicle can take turn. The chassis is given so such limits by adjusting max cut screw mounted on front axle by adjusting the distance between outer edge of chassis and leaf spring of front axle. This is set at 505 inch. In the case of power steering another cut is also given in addition to max cut and this is called hydraulic max cut. The purpose behind this cut is to introduce safety factor. In case of hydraulic max cut the additional setting is done by keeping a distance of 3 mm between axle beam and front axle whether in former case i.e. in mech. Max cut axle beam and max cut screw touch each other.
And in last chassis is made to start for first time. All kind of leakage is checked along with proper functioning of each road testing.
ROAD TESTING
So it is testing time for chassis. After coming from assembly line chassis is first time subjected to run on road. A testing of about 15 Km is given to chassis and during this 15km functioning of all components comes under observation. And after completing drive road tester made ROADTEST INSPECTION REPORT in which he motions defects that has been occurred during drive. The general area where defects are found to develop arête chances of oil leaks in engine, gear box, rear axle, steering box, power steering, diesel leaks, radiator leakage, propeller shaft leakage. And in addition to oil leakage functioning of brake system of chassis is observed. Observation regarding whether brake drum are over heating, hand brake functioning produced in various components are examined whether any axle noise, water pump noise, timing gear noise are observed overheating of engine and remark regarding pick up is also mentioned in inspection report.
PRE DELIVERYINSPECTION (PDI)
As name suggesting function of this department is to rectify all defects in chassis, which may be left online and have been developed after road testing. In addition of rectifying other task involved filling of coolant in radiator by replacing water. Trouble shooting for some din d of defects which are found in chassis are done as for if engine is not starting then possible reason may be one or more of following (insufficient gas pressure in CNG chassis, starter motor not working, insufficient air flow to carburetor and many more.)So after finding the fault the cause for fault is find out and rectified by workers of this department. In addition of rectifying all defects present in chassis specified work of this department is following:-
1. Start engine and build air pressure to 8.25 Kgf/cm.2. Check leak from pipe joints and valve with soap and rectify
if any.3. Tight all drain plug 4. Check ignition timing and adjust if required 5. Remove about 13 Lt. of water from radiator and fill coolant
of specified quantity.6. Cover dashboard with polythene.
So this is general work carried out by PDI department both QC and PRODUCTION department.