+ All Categories
Home > Documents > Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Date post: 14-Dec-2015
Category:
Upload: kaia-cranmer
View: 222 times
Download: 1 times
Share this document with a friend
Popular Tags:
17
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT
Transcript
Page 1: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Asia BRT Conference

HUBLI-DHARWAD BRTS PROJECT

Presented by:

Commissioner, DULT

Page 2: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Growth direction: along the corridor between the two cities.

NAVANAGAR

DHARWAD

NAVALGUND

HUBLI

KALGHATGIKUNDGOL

INDIA

KARNATAKA

DHARWAD DISTRICT

Twin cities separated by about 20 km.

Single municipal area: 202 sqkm

Population : 0.94 million(2011)Density: 4678 persons per sq.km.

Hubli: commercial centre and business hub of the region.

Dharwad: administrative seat of the District and Educational hub of the region.

SOME FACTS

Page 3: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Travel Characteristics

• Two lane road.• Average time taken: Peak period : 64 mins• Public transport: main mode. • 0.17 million use PT every day. • PT operator: NWKRTC, a state government

undertaking.• 6000-7000 PHPDT.

Buses comprises 7 % of total traffic along the corridor; carry 70 % of the passengers.

Page 4: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

ContextProject sanctioned for

widening of two lanes to four lanes.

Overall PT mode share for the twin cities: 30%

Two-wheelers: 67% of total vehicles.

Vehicle growth rate: 9.5 %Mobility plan projected drop

in PT share to 25% by 2028.

Concerns for PT45% of fleet over-aged, Congested buses, poor infrastructure, lack of

last mile connectivity.

Page 5: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

ISSUES

Wouldn’t widening to four lanes be enough?

Is BRT required at this point of time?• BRT-land acquisition costs, resettlement

issues.

Page 6: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

• Present V/C : 1.3

• Even with 4 laning : V/C > 1 before 2020.

• With BRTS, V/C : 0.84 in 2031.

Wouldn’t widening to four lanes be enough?

Page 7: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Is BRT required at all?BRT-land acquisition; costs, resettlement issues.

High EIRR( 29.5%)Benefits: savings in vehicle operating costs, commuter time, benefits due to accident reduction, savings due to reduction in carbon emissions etc. Total benefits valued at US $ 611 million in present value terms.

Makeover of PT required to retain present share; to attract more commuters.

Public transport needs focus - NOW not LATER.

Page 8: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

OPERATING COSTS NEED NOT BE SUBSIDIZED.

Page 9: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Proposed BRTS Corridor

Dharwad CBT

Hubli CBT

Hubli Rly Station

Airport

Tarihal Industrial area

Karnataka University

NWKRTC terminal

BRT Corridor

Terminal

LEGEND

N Gopankoppa

Electricity Grid

FEEDER

Navanagar

Hosur cross

Rani Chennamma circle (OCBS)

Jubilee circle

PROPOSED BRT CORRIDOR: 22.25 Km

FEEDER SERVICE: 19.7 km

Dedicated corridor:21.35 kmMixed traffic: 0.9 km

BRT - NETWORKDHARWAD

HUBLI

Page 10: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Elements of HDBRTS Dedicated corridor for 21.35 km. In mixed traffic : 0.9km.Central bus lanes with Median bus stops; Closed system. Regular/Express services. Passing lanes. At-level boarding & alighting; Off-board fare collection

system ; Fare structure: Increase by 16-20% over prevalent fares.

Rolling stock: 160 : 12m, 900 mm floor buses; articulated buses(30)

Access to the corridor: At-grade pedestrian crossings; FOBs, Pelican signals.

Page 11: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Comprehensive development of the city transport infrastructure: Depots, workshops, terminals both for BRT and

feeder buses. Integration, physical, service, fare, information. ITS for BRT, Depot/workshop management, feeder

services and traffic management. Last-mile connectivity.

Integrated Land use and transport planning.Communications and outreach.

Elements of HDBRTS

Page 12: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Project financingTotal project Cost including Land acquisition:

$133.6 million.

Page 13: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

INSTITUTIONAL ARRANGEMENT• Special purpose vehicle created for

implementing the project: Hubli-Dharwad BRTS Company Limited– Company registered under the Companies act.– Stakeholders represented on the Board of

Directors.

• BRT bus operations by NWKRTC.– Service level agreement between NWKRTC and

SPV.

Page 14: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

WHERE ARE WE TODAY• DFR prepared by CEPT University, consultants

for the project.• Physical Design : Design of Corridor and Transit

Infrastructure completed.• Preparation of RFPs, Bid Documents under way.• Land Acquisition under progress.• BRT Corridor work under progress.

BRT Project completion date: January, 2015.

Page 15: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

HDBRTS - SNAPSHOTS

BRT STATION

Page 16: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

BRT Workshop, Gokul road, Hubli

Divisional workshop, Airport road, Hubli BRT depot, Dharwad

OCBS Hubli

Page 17: Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Recommended