ASME Boiler and Pressure Vessel Code SECTION XI INTERPRETATIONS Volume 39 The Interpretations to the Code will be issued twice a year upto the publication of the 1998 Edition of the Code: each July (designated 7/95, 7/96, and 7/97) and with each Addenda (designated A95, A96, and A97). The Interpretations for each individual Section are published separately and are part of the update service to that Section; Interpretations of Section 111, Divisions 1 and 2, are part of the update service to Section Ill, Subsection NCA. Interpretations are not part of the Code or the Addenda. Interpretations Volumes 30 through 35 were included with the update service to the 1992 Edition of the Code; Volume 36 is the first Interpretations volume to be included with the update service to the 1995 Edition. Section Vol. 36 VOl. 37 Vol. 38 VOl. 39 Vol. 40 Vol. 41 I Il-A 11-8 Il-c 11-D Ill-NC4 IV V VI VI I VIII-1 VI 11-2 IX X XI 7/95 7/95 7/95 ... ... 7/95 7/95 ... 7/95 7/95 7/95 7/95 7/95 A95 ... ... ... ... A95 A95 A95 ... ... A95 A95 A95 A95 ... 7/96 7/96 ... ... ... 7/96 7/96 7/96 ... 7/96 7/96 7/96 7/96 7/96 *.. A96 ... ... A96 A96 ... ... A96 A96 A96 A96 A96 COPYRIGHT American Society of Mechanical Engineers Licensed by Information Handling Services
Transcript
Page 1: Asme Sec Xi Int Vol 39

~~

S T D * A S M E SEC XI I N T VOL 37-ENGL 377b 0757b70 0577773 78b

ASME Boiler and Pressure Vessel Code SECTION XI

INTERPRETATIONS Volume 39

The Interpretations to the Code will be issued twice a year up to the publication of the 1998 Edition of the Code: each July (designated 7/95, 7/96, and 7/97) and with each Addenda (designated A95, A96, and A97). The Interpretations for each individual Section are published separately and are part of the update service to that Section; Interpretations of Section 111, Divisions 1 and 2, are part of the update service to Section Ill, Subsection NCA. Interpretations are not part of the Code or the Addenda.

Interpretations Volumes 30 through 35 were included with the update service to the 1992 Edition of the Code; Volume 36 is the first Interpretations volume to be included with the update service to the 1995 Edition.

Section Vol. 36 VOl. 37 Vol. 38 VOl. 39 Vol. 40 Vol. 41

I Il-A 11-8 Il-c 11-D Ill-NC4 IV V VI VI I VIII-1 VI 11-2 IX X XI

7/95 7/95 7/95 ... ...

7/95 7/95

... 7/95 7/95 7/95 7/95 7/95

A95 . . . . . . . . . . . .

A95 A95 A95 . . . . . .

A95 A95 A95

A95 . . .

7/96 7/96 . . . . . . . . .

7/96 7/96 7/96 . . .

7/96 7/96 7/96 7/96 7/96

* . .

A96

...

... A96 A96 ... ...

A96 A96 A96 A96 A96

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 2: Asme Sec Xi Int Vol 39

INTERPRETATIONS NO. 39 SECTION XI

Replies to Technical Inquiries January 1, 1996 through June 30, 1996

FOREWORD

General Information

This publication includes all written interpretations issued between the indicated dates by the ASME Staff on behalf of the ASME Boiler and Pressure Vessel Committee in response to inquiries concerning interpretations of the ASME Boiler and Pressure Vessel Code. A contents is also included which lists subjects specific to the interpretations covered in the individual volume. These interpretations are not a part of the Addenda or the Code.

These interpretations are taken verbatim from the original letters, except for a few typographical and editorial corrections made for the purpose of improved clarity. In some instances, a review of the interpretation revealed a need for corrections of a technical nature. In these cases, a revised interpretation is presented bearing the original Interpretation Number with the suffix R and the original file number with an asterisk. Following these revised interpretations, new interpretations and revisions to them issued during the indicated dates are assigned Interpretation Numbers in chronological order. Interpretations applying to more than one Code Section appear with the interpretations for each affected Section.

ASME procedures provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement of Policy in the Code documents, ASME does not “approve,” “certify,” “rate,” or “endorse” any item, construction, proprietary device, or activity.

Each interpretation applies to the Edition and Addenda stated in the interpretation, or if none is stated, to the Edition and Addenda in effect on the date of issuance of the interpretation. Subsequent revisions to the Code may supersede the interpretation.

For detailed instructions on preparation of technical inquiries to the ASME Boiler and Pressure Vessel Committee, refer to Appendix V in Division 1, Appendix I11 in Division 2, and Appendix VI in Division 3.

Subject and Numerical Indexes

Subject and numerical indexes have been prepared to assist the user in locating interpretations by subject matter or by location in the Code. They cover interpretations issued from Volume 12 up to and including the present volume, and will be updated with each volume.

325

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 3: Asme Sec Xi Int Vol 39

~

STD-ASME SEC X I I N T VOL 3 7 - E N G L L77b 0757b70 0577773 7 5 7

SECTION

Subject

XI

Interpretation Fie No.

Appendix W. W-4240, Supplemental Training (1989 Edition and Later Editions and Addenda Through the 1995 Addenda) ............................. XI-1-95-40 IN-

Code Case N-504-1; Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel piping (1986 Edition) ................................ XI-1-95-39 IN96-001

IWA-2u)o; Personnel Qualification (1986 Edition) ................................ XI-1-95-38 IN95419 IWA-5OOO and Code Case N-416-1; System Leakage Test (1992 Edition). ........... XI-1-95-37 IN95415 TWD-2500-1 and IWD-3ooO; Acceptance Criteria for Visual Examination

of (VT-3) of Class 3 Components (1989 Edition) .............................. XI-1-95-36 IN94-012 IWDIIWC-3500; h p t a n c e Standads (1989 Edition and Addenda Through the 1990 Addenda) ................................................ XI-1-95-35 IN96-007

327

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 4: Asme Sec Xi Int Vol 39

STD.ASME SEC X I I N T VOL 3 7 - E N G L 1 7 9 6 0 7 5 9 6 7 0 0 5 7 7 7 7 6 qb8

Location

Subsection IMA IMA-5200 IMA-5210

Subsection IMB Table IMB-2500-1 IMB-5000 IMB-5100

Subsection IMC IMC-2500

Subsection IMF IMF-1500 IMF-2500

Subsection I W A IWA-1200 IWA-1310 IWA-1320

IWA-1400

IWA-2000

IWA-2100 IWA-2120

IWA-2130 IWA-2200 IWA-2213 IWA-2214 IWA-2222 IWA-2232

IWA-2240 IWA-2300

Interpretation

XI-3-89-02 XI-3-89-02

XI-3-89-01 XI-3-89-01 XI-3-86-01

XI-3-89-01

XI-3-83-01 XI-3-83-01

XI-1 -86-07 XI-1 -83-78 XI-1 -83-44 XI-1-83-77 XI-1-83-78 XI-1-89-64 XI-1-89-64R XI-1-92-02 XI-1-83-71 XI-1 -83-71 R XI-1 -86-22 XI-1 -83-48 XI-1 -86-64 XI-1-83-79 XI-I -89-02 XI-1 -95-27 XI-1-83-69 XI-I -83-64 XI-1-83-29 XI-1 -83-31 XI-I -83-84 XI-1-86-71 XI-1-86-72 XI-1-89-09 xi-1-89-1 3 XI-1 -89-49 XI-I -86-28 XI-I -83-1 6 XI-1 -83-1 8 XI-1-83-23 XI-I -83-24 XI-1-83-29

NUMERICAL

File No. -

lN86-0248 lN86-0248

IN86-024C IN86-024C IN86-024A

IN86-024C

BC81-330 BC8l-330

BC85-481 BC84-682 BC83-448 BC84-603 BC84-682 IN89-0178 IN89-017B* IN91 -01 2 BC80-583 BC80-583* IN86-010 BC84-177 IN87-028A BC84-684 IN88-001 IN94-006A BC84-616 BC84-562 BC82-050 BC82-630 BC83-654 IN87-005A lN87-0058 IN87-019 IN89-005 IN90-013 lN86-008 BC82-775 BC83-060 BC83-056 BC83-178 BC82-050

Page No. -

21 1 21 1

169 169 153

169

11 11

94 76 50 76 76

231 241 242

71 90

108 52

147 77

1 65 314

69 60 32 33 80

156 156 168 176 21 7 111 20 21 29 29 32

INDEX

Location

IWA-2300(a) IWA-2300(a)(l)

IWA-2300(~) IWA-2300(d) IWA-2300(e)

IWA-2324 IWA-2325

IWA-2400

IWA-2410 IWA-2430(d) IWA-2600

I WA-3 1 00

IWA-3200 IWA-3400

IWA-3410 IWA-4000

Interpretation

XI-1-83-40 XI-1-83-40R XI-1 -83-45 XI-1-83-63 XI-I -83-82 XI-1 -86-40 XI-1 -86-56 XI-I -86-66 XI-I -89-06 XI-1-89-26 XI-1-92-39 XI-1-92-42 XI-1-92-70 XI-I -95-38 XI-I -86-1 6 XI-1 -86-19 XI-1 -86-73 XI-1 -92-28 XI-1 -86-1 9 XI-I -83-01 XI-1 -83-36 XI-1 -92-54 XI-I -92-54 XI-1-92-70 XI-1-86-54 XI-1-89-58 XI-1-83-41 XI-1-92-57 XI-1 -92-06 XI-1 -95-05 XI-1 -89-1 6 XI-1 -89-45 XI-1-92-38 XI-I -86-52 XI-1-86-52R XI-1 -83-1 7 XI-1 -83-10 XI-1-83-1 3 XI-1-83-28 XI-I -83-28R XI-I -83-50 XI-1-83-50R XI-1-83-65 XI-1-83-66 XI-1-86-1 3R XI-1-86-36 XI-1 -86-41 XI-1 -86-44 XI-1-86-47 XI-1 -86-44R

File No. -

BC84-043 BC84-043; BC83-535 BC84-310 BC83-176 BC85-571 lN86-028 IN87-015 IN88-006 BC80-231* lN92-032 lN92-030 lN93-022 IN95-019 BC85-142 BC85-071 IN87-029 lN92-019 BC85-071 BC80-582 BC83-585 IN93-015 IN93-015 lN93-022 IN87-001 lN90-025 BC84-064 lN93-002 IN91 -01 9 lN93-035 IN89-001 B IN90-006 lN92-031 BC85-524 BC85-524* BC82-597 BC82-277 BC82-407 BC83-344 BC83-344* BC84-175 BC84-175* BC84-647 BC84-652 BC85-I 11 * lN86-021 lN86-005 IN86-015 IN86-025B IN86-015*

Page No. 42 67 50 60 78

123 137 153 167 194 267 268 293 330 1 05 106 157 257 106

5 40

276 276 293 136 228 43

282 244 301 178 209 266 135 187 20 17 18 31

185 54 68 61 61

225 121 124 126 127 144

-

Cumulative Index - Interpretations Vols. 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 5: Asme Sec Xi Int Vol 39

S T D - A S M E S E C XI I N T VOL 37-ENGL L77b 0757b70

I WA-4100

IWA-4120

IWA-4130

IWA-4150 IWA-4170 IWA-4200

IWA-4210 IWA-4300

IWA-4310 IWA-4330 I WA-4400

Location Interpretation

Subsection IWA (Cont'd) XI-1 -86-59 XI-1-86-55 XI-1-86-55R XI-1 -89-28 XI-1 -89-30 XI-1 -89-40 XI-1 -89-56 XI-1 -89-64 XI-1 -89-641 XI-1 -92-2 1 XI-1 -92-31 XI-1 -92-68 XI-1 -95-09 XI-1 -95-14 XI-81 -1 1 R XI-1 -83-26 XI-1-83-26R XI-1 -83-40 XI-1 -83-40R XI-1 -83-57 XI-1 -86-38 XI-1 -92-32 XI-1 -92-60 XI-1 -83-57 XI-1 -92-06 XI-1 -95-01 XI-1 -95-29 XI-1-83-57 XI-1 -92-35 XI-1 -92-35R XI-1 -89-01 XI-1 -83-43 XI-1 -83-55 XI-1 -83-81 XI-1 -89-01 XI-1 -92-08 XI-1 -92-59 XI-1 -95-29 XI-1 -83-83 XI-1 -89-35 XI-1-83-05 XI-1-83-28 XI-1-83-34 XI-1 -83-35 XI-1 -83-37 XI-1-83-3712 XI-1-83-54R XI-1-83-58 XI-1-86-25 XI-1-86-75 XI-1-89-1 8 XI-1 -89-1 9

IWA-4400(a) XI-1-83-35R XI-1 -89-31

IWA-4400(b)(5) XI-1-83-35R XI-1-83-58 XI-1-86-35

IWA-4500 XI-1 -86-51 XI-1 -95-29

IWA-4600 XI-1 -83-26 XI-1-83-26R XI-1 -83-54R

(b)

File No. -

BC85-550 lN87-002 lN87-002. lN89-021 IN89-011 IN89-017A IN90422 IN89-017B IN89-0178* lN92-0098 IN91 -01 8 lN94-005 IN94-014 lN93-029 BC81-369. BC83-244 BC83-244* BC84-043 BC84-043* BC84-392 BC85-141 IN91 -031 lN93-024 BC84-392 IN91-019 lN93-003 IN95-001 B BC84-392 lN92-023 IN92-023* lN87-036 BC84-179 BC84-322 BC84-687 lN87-036 IN91 -024 lN93-023 IN95-001 B BC83-179 lN89-006 BC82-425 BC83-344 BC83-587 BC83-588 BC82-425 BC82-425** BC84-321* BC84-422 BC85-528 lN87-032 lN86-031 lN88-009 BC83-588. lN89-023 BC83-588* BC84-422 IN86-019 lN86-027 IN95-001 B BC83-244 BC83-244. BC84-321*

Page No. -

145 137 153 195 202 207 227 231 241 254 2 63 292 302 304 87 30 87 42 67 57

122 263 283

57 244 299 315

57 265 289 165 44 56 78

165 245 282 315 79

204 7

31 39 40 41

185 186 57

110 158 188 188 67

203 67 57

120 129 315 30 87

186

Location

IWA-5000

IWA-5200

Table IWA-5210-1

IWA-5211

IWA-5212 IWA-5213 IWA-5214

IWA-5220 IWA-5224

IWA-5240

IWA-5241 IWA-5242

IWA-5244

IWA-5250

0 5 7 7 7 7 7 3TL(

Interpretation

XI-1-83-85 XI-1 -83-86 XI-1 -83-8613 XI-1 -86-51 XI-1 -92-65 XI-1 -83-05 XI-1-83-54 XI-1-86-35 XI-1 -89-08 XI-1 -89-1 8 XI-1 -95-37 XI-1-83-35 XI-1-86-13 XI-1 -83-70 XI-1 -83-701 XI-1 -92-1 9 XI-1 -83-1 9 XI-1 -83-34 XI-1 -83-49 XI-1 -83-63 XI-1 -83-70 XI-1-83-70R XI-1-86-03 XI-1 -86-03R XI-1 -86-1 3R XI-1 -86-34 XI-1 -86-53 XI-1 -89-1 5 XI-1-89-33 XI-1 -92-04 XI-1 -92-1 8 XI-1-92-23 XI-1 -86-46 XI-1 -86-46 XI-1 -83-63 XI-1 -83-63R XI-1 -83-70 XI-1 -83-70R XI-1 -86-1 3R XI-1 -86-27 XI-1 -86-27R XI-1 -86-29 XI-1-86-29R XI-1-89-08 XI-1 -89-37 XI-1 -89-42 XI-1 -89-52 XI-1 -92-30 XI-1 -89-45 XI-1-83-67 XI-1-89-54 XI-1-83-63 XI-1-92-34 XI-1 -92-64 XI-1 -89-39 XI-1 -89-39R XI-1 -92-64 XI-1 -92-47 XI-1 -92-64 XI-1 -83-1 9 XI-1 -92-52 XI-1 -89-64 XI-1 -89-64R

File No. -

BC84-683 BC85-113A BC85-113A* lN86-027 IN94-001 BC82-425 BC84-321 IN86-019 IN87-018 lN86-031 IN95-015 BC83-588 BC85-111 BC84-198 BC84-198* lN92-005 BC82-607 BC83-587 BC82-776 BC84-310 BC84-198 BC84-198. BC83-112 BC83-112' BC85-111* IN86-017B IN86-017A IN88-002A IN88-017 IN91-009 lN92-003 IN86-0178 lN86-023 lN86-023 BC84-310 BC84-310' BC84-198 BC84-198' BC85-111* lN86-007 lN86-007. lN86-009 lN86-009. IN87-018 IN88-002C IN90-001 lN88-0028 IN92-015 IN90-006 BC82-606 IN90-018B BC84-310 lN92-020 IN93-038 IN89-013A IN89-013A' lN93-038 lN92-046 lN93-038 BC82-607 lN93-005 IN89-0178 IN89-0178.

~~

Page No. - 81 82

102 129 2 90

7 55

120 168 188 329 40

104 70

201 253 27 39 53 60 70

201 92

1 03 225 120 136 178 203 243 253 255 127 127 60

101 70

201 225 111 187 112 143 168 205 208 21 9 258 209 62

226 60

264 290 206 289 290 2 74 290

27 2 76 231 241

Cumulative Index - Interpretations Vols. 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 6: Asme Sec Xi Int Vol 39

IWA-5260

IWA-5262

IWA-5265

IWA-5300 IWA-5350 IWA-6000

IWA-6230

IWA-6300 IWA-7000

IWA-7120 IWA-7121 IWA-7210

~-

STDmASHE S E C XI I N T VOL

Location Interpretation

Subsection IWA (Cont'd) XI-I -92-01 XI-I -92-03 XI-I -92-1 9 XI-1 -92-31 XI-1-92-48 XI-1 -92-64 XI-1-89-74 XI-1-92-1 0 XI-1-83-49 XI-1-83-49R XI-1 -86-75 XI-1 -89-54 XI-I -89-66 XI-1 -95-07 XI-1 -92-51 XI-1 -86-1 4 XI-1 -86-1 4R XI-1-89-64 XI-1-89-64R XI-1-92-02 XI-1-83-03 XI-1 -83-08 XI-1 -83-1 5 XI-1 -89-48 XI-I -83-28 XI-1 -83-2813 XI-1-83-38 XI-1 -83-42 XI-1-83-46 XI-I -83-47 XI-1-83-50 XI-1-83-50R XI-1-83-52 XI-1 -83-54 XI-I -83-65 XI-I -83-66 XI-1 -86-1 3R XI-I -86-44 XI-1-86-44R XI-I -86-47 XI-1 -86-55 XI-1-86-55R XI-1-86-58 XI-1-86-65 XI-1 -89-22 XI-1-89-40 XI-1 -89-56 XI-I -89-64 XI-1 -89-64R XI-1-92-31 XI-1-95-09 XI-1 -95-13 XI-I -89-34 XI-1-83-83 XI-1 -83-20 XI-1 -83-21 XI-1-83-21R XI-1-83-40 XI-1-83-40R XI-1 -83-72 XI-1 -86-08 XI-1 -86-1 2

37-ENGL 1 7 9 b 0759b70

File No. -

lN90-023 IN91 -01 7 lN92-005 IN91 -01 8 IN93-001 lN93-038 IN91 -008 IN91 -029 BC82-776 BC82-776' lN87-032 IN90-0188 IN90-018A IN94-011 IN93-011 BC85-112 BC85-112. IN89-017B IN89-017B* IN91 -01 2 BC82-406 BC82-523 BC82-610 IN90-011 BC83-344 BC83-344' BC84-122 BC84-123 BC83-595 BC84-197 BC84-175 BC84-175' BC83-625 BC84-321 BC84-647 BC84-652 BC85-111* lN86-015 lN86-015* IN86-O25B lN87-002 lN87-002' IN87-010 lN87-031 lN89-009 IN89-017A IN90-022 IN89-0178 IN89-0178' IN91 -01 8 lN94-014 lN93-0278 IN89-012 BC83-179 BC82-430 BC82-434 BC82-434* BC84-043 BC84-043' BC81-568A BC81-568B BC85-098

Cumulative Index - Interpretations Vols. 12-39

Page No. - 242 242 253 2 63 274 290 235 246

53 89

158 226 232 301 2 75 104 118 231 241 242

6 9

19 21 7 31

185 41 43 51 52 54 68 55 55 61 61

225 126 144 127 137 153 138 148 191 207 227 231 241 263 302 304 204

79 27 28

117 42 67 72 94

103

Location

IWA-7210(~)

IWA-7220

IWA-7300

IWA-7310 IWA-7320 IWA-7330

IWA-7400

IWA-7400(d)

IWA-7520

IWA-7530

Subsection IWB IWB-l22O(a)

IWB-I 22O(b) IWB-2200

IWB-2410 IWB-2412 Table IWB-2412-1

IWB-2430(a) IWB-2430

0577778 230 m

Interpretation

XI-1-86-59 XI-1-89-07 XI-1 -89-20 XI-1 -89-24 XI-1-89-29 XI-1-89-34 XI-1-89-46 XI-1-89-46R XI-1-89-68 XI-I -86-1 8 XI-I -86-38 XI-1 -86-38R XI-1-86-39 XI-1 -86-39R XI-1 -89-41 XI-1 -92-1 5 XI-I -95-02 XI-1-83-72 XI-1-86-03 XI-I -86-03R XI-1-86-08 XI-1 -83-50R XI-1 -83-72 XI-I -83-02 XI-I -83-46 XI-1-83-72 XI-1-89-24 XI-1 -83-37 XI-1 -83-37R2 XI-1 -83-54R XI-I -89-36 XI-1 -92-27 XI-I -83-26 XI-1-83-83 XI-1-83-85 XI-1 -83-86 XI-I -83-861 XI-I -86-65 XI-1 -89-04 XI-1 -92-32 XI-1 -92-44 XI-I -92-66 XI-1 -83-38 XI-1 -86-68 XI-1-83-37 XI-1 -86-51 XI-I -89-36

XI-1-92-40 XI-1 -92-45 XI-1-86-45 XI-1-86-20 XI-1 -86-50 XI-1 -89-63 XI-1 -86-24 XI-1 -83-71 XI-1-95-1 1 XI-I -95-1 0 XI-1 -86-74 XI-1-92-1 2 XI-1-92-24 XI-I -92-61

File NO.

BC85-550 IN88-011 lN88-014 IN89-014 lN89-008 IN89-012 IN90-008 IN90-008* IN90-015 BC85-254 BC85-141 BC85-141 BC85-525C BC85-525C* lN89-025 IN91 -040 lN93-026 BC81-568A BC83-112 BC83-112' BC81-568B BC84-175. BC81-568A BC81-476 BC83-595 BC81-568A IN89-014 BC82-425 BC82-425** BC84-321. IN89-024 IN92-016 BC83-244 BC83-179 BC84-683 BC85-113A BC85-113A* lN87-031 lN88-004 IN91-031 IN91 -031 B lN93-041 BC84-122 lN87-024 BC82-425 lN86-027 IN89-024

-

IN92-022A lN92-0228 lN86-020 1N86-006 IN86-026C lN90-034 BC85-526 BC80-583 lN94-024 lN94-023 IN86-003A lN91-025 IN91 -01 4 IN93-027A

Page No.

145 167 189 193 2 02 204 210 225 232 106 122 143 123 144 207 252 299

72 92

103 94 68 72 6

51 72

193 41

185 186 205 257

30 79 81 82

102 148 166 263 273 291 41

154 41

129 205

-

267 273 126 107 128 230 109

71 303 3 03 157 251 255 2 83

(C)

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 7: Asme Sec Xi Int Vol 39

Location Interpretation

Subsection IWB (Cont'd)

~~~~ ~ ~

IWB-2500 Fig. IWB-2500-7 Fig. IWB-2500-8

Fig. IWB-2500-13

Fig. IWB-2500-14 Fig. IWB-2500-15

Table IWB-2412-1 Table IWB-2500-1

Table IWB-2600-1

IWB-3000

IWB-3112 IWB-3142 I WB-3 1 44 Table IWB-3410-1 IWB-3500

XI-1-95-1 3 XI-1 -9240 XI-I -86-71 XI-I -83-75 XI-I -89-49 XI-1-83-75 XI-I -89-21 XI-1-89-27 XI-1-89-21 XI-1-89-21 XI-I -89-27 XI-I -95-1 1 XI-1-83-1 1 XI-I -83-1 2 XI-I -83-33 XI-1-83-39 XI-I -83-40R XI-I -83-51 XI-1-83-56 XI-1-83-69 XI-1-83-76 XI-1-86-04 XI-1-86-1 0 XI-1-86-20 XI-1-86-21 R XI-1-86-24 XI-1-86-34 XI-I -86-45 XI-I -86-62 XI-1-86-71 XI-I -86-74 XI-I -89-1 1 XI-1 -89-1 4 XI-1 -89-21 XI-1-89-27 XI-I -89-33 XI-I -89-43 XI-1-89-49 XI-1-89-50 XI-1-92-05 XI-I -92-09 XI-I -92-1 2 XI-1-92-1 3 XI-1-92-23 XI-1-92-43 XI-I -92-46 XI-I -92-56 XI-I -95-28 XI-I -95-27 XI-1 -83-51 XI-1-86-1 0 XI-1-86-07 XI-1-86-52R XI-1-89-67 XI-I -92-1 9 XI-1-92-35 XI-1-92-35R XI-I -86-37 XI-I -86-62 XI-I -86-62 XI-1 -92-24 XI-1-83-29

File No. -

IN93-027B IN92-022A IN87-005A BC83-055 IN90-013 BC83-055 IN89-004A IN89-004C IN89-004A IN89-004A IN89-004C lN94-024 BC82-304 BC82-230 BC83-589 BC83-527 BC84-043* BC83-240 BC84-388 BC84-616 BC84-390 BC83-438 BC84-393 lN86-006 lN86-004* BC85-526 IN86-0178 lN86-020 lN86-032 IN87-005A IN86-003A IN88-016 lN86-0038 IN89-004A IN89-004C IN88-017 IN90-003 IN90-013 IN90-014 IN91 -01 6 IN91 -027 IN91 -025 lN91-026 IN86-0176 lN92-033 lN92-043 IN93-013 IN94-0068 IN94-006A BC83-240 BC84-393 BC85-481 BC85-524* IN89-017C iN92-005 lN92-023 lN92-023* lN86-022 lN86-032 lN86-032 IN91 -01 4 BC82-050

Page No. -

304 267 156

75 21 7

75 190 195 190 190 195 303

17 18 39 42 67 54 56 69 75 92 95

1 07 186 109 120 126 146 156 157 1 75 1 76 190 195 203 2 08 21 7 21 8 243 245 251 251 255 268 274 281 315 314

54 95 94

1 87 232 253 2 65 289 121 146 146 255 32

Location

Table IWB-3510-1 IWB-3512 IWB-3514.2 Table IWB-3514-2 IWB-3517.1 IWB-3600 IWB-4000

IWB-4212 IWB-4230 IWB-4300 IWB-4340

IWB-4400

IWB-5000 IWB-5200

IWB-5210 IWB-5222

Subsection IWC iwc-1200 IWC-1220

IWC-1221

IWC-2000 IWC-2100 IWC-2200 IWC-2410 IWC-2411 IWC-2412 Table IWC-2412-1 IWC-2430

IWC-243O(a)

Table IWC-2500-1

Interpretation

XI-I -86-52 XI-I -86-52R XI-1-83-06 XI-I -83-32 XI-1-92-58 XI-I -83-07 Xi-I -89-45 XI-I -83-29 XI-I -86-41 XI-I -92-21 XI-I -89-70 XI-I -95-33 XI-I -92-32 XI-1 -83-09 XI-I -83-09R XI-I -83-41 XI-I -83-41 R XI-1-89-08 XI-1-86-34 XI-1-92-23 XI-1-83-25 XI-I -89-74

XI-1-83-27R XI-I -83-27 XI-I -86-43 XI-1-86-431 XI-1-89-53 XI-1-89-61 XI-I -86-05 XI-I -86-42 XI-I -95-03 XI-I -86-57 XI-I -86-22 XI-1 -89-42 XI-I -95-1 0 XI-I -83-68 XI-1-86-74 XI-1-95-1 1 XI-I -83-04 XI-I -92-24 XI-1-95-06 XI-I -92-61 XI-I -95-1 3 XI-I -83-39 XI-I -83-40R XI-1 -83-51 XI-I -83-53 XI-I -83-69 XI-1-83-80 XI-1-83-80R XI-1-86-57 Xi-I -86-74 XI-I -89-2 1 XI-I -89-30 XI-I -89-43 XI-I -89-51 XI-1-89-53 XI-I -89-57 XI-1-89-58 XI-I -89-61 XI-1-89-75

177 m

File No. -

BC85-524 BC85-524. BC82-428 BC82-437 lN93-021 BC82-429 IN90-006 BC82-050 lN86-005 IN92-009B IN91 -005 lN94-031 IN91-031 BC82-604 BC82-604* BC84-064 BC84-064. lN87-07 8 IN86-0176 IN86-0176 BC83-219 IN91 -008

BC83-437. BC83-437 IN86-012 IN86-012. 1N90-019 iN90-032 BC84-686 IN86-011 lN93-042 lN87-007 IN86-010 IN90-001 lN94-023 BC83-441 IN86-003A lN94-024 BC82-427 IN91-014 IN94-002A IN93-027A lN93-0278 BC83-527 BC84-043. BC83-240 BC83-656 BC84-616 BC84-685 BC84-685* lN87-007 IN86-003A IN89-004A IN89-011 IN90-003 IN90-017 IN90-019 IN90-024 lN90-025 lN90-032 IN91 -01 0

~

Page No. - 135 187

8 33

282 8

209 32

124 254 233 322 263

9 10 43 88

168 120 255 30

235

88 31

125 125 21 9 229 93

124 300 138 108 208 3 03 62

157 303

7 255 301 283 304 42 67 54 55 69 77

241 138 157 1 90 202 208 218 219 227 228 229 235

Cumulative Index - Interpretations Vols. 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 8: Asme Sec Xi Int Vol 39

STD.ASME SEC XI INT V O L 39-ENGL L79b M 0757b70 0577780

Location Interpretation

Subsection IWC (Cont'd)

Fig. IWC-2500-5 iwc-2520 Table IWC-2520

Table IWC-2600-1

IWC-3000

IWC-3112 IWC-3500 iwc-4000 iwc-5000

iwc-5210

IWC-521 O(a) IWC-5222

iwc-5223 iwc-7000

Subsection IWD IWD-1220 IWD-2000 IWD-2410 Table IWD-2412-2 Table IWD-2500-1

IWD-2600 IWD-2620 IWD-3000

IWD-3500 IWD-4000 IWD-5000

IWD-5210 IWD-5223

Xi-1-92-05 Xi-1-92-47 XI-1-92-62 Xi-1-89-38 Xi-1 -83-27 Xi-1-83-51 XI-I -83-68 Xi-1-83-51 Xi-1 -83-68 XI-I -83-68R Xi-1 -89-67 Xi-I -92-1 9 Xi-I -92-24 XI-I -92-35 XI-1-92-35R XI-1 -86-37 Xi-1-95-35 Xi-1-86-27R Xi-1 -86-32 Xi-1 -89-08 Xi-1-92-34 Xi-I -83-25 Xi-1 -92-1 8 XI-I -92-62 Xi-I -83-67 Xi-I -86-09 Xi-1 -89-30 Xi-1 -89-66 Xi-1 -89-74 XI-I -83-67 XI-1 -86-2713

XI-1-89-47 Xi-1-86-67 Xi-I -95-1 0 XI-I -95-1 1 Xi-I -83-40R Xi-1 -83-69 Xi-1 -86-1 5 XI-1 -86-1 5R Xi-I -86-69 Xi-1 -89-43 XI-I -89-58 Xi-1 -89-75 Xi-1-92-05 Xi-1-95-36 Xi-1-83-27 Xi-1 -89-47 Xi-1 -89-67 XI-1 -92-1 9 Xi-1 -92-35 Xi-1-92-35R XI-I -95-36 xi-I -95-35 Xi-1-86-27R XI-I -86-32 Xi-1 -89-08 Xi-1-92-34 XI-1-92-1 8 Xi-1 -83-67 XI-I -89-66

File No. -

IN91 -01 6 lN92-046 iN93-030 iN89-007 BC83-437 BC83-240 BC83-441 BC83-240 BC83-441 BC83-441* iN89-017C iN92-005 IN91 -014 iN92-023 lN92-023* iN86-022 lN96-007 iN86-007* BC85-5258 iN87-018 iN92-020 BC83-219 lN92-003 lN93-030 BC82-606 BC84-391 IN89-011 iN90-018A IN91 -008 BC82-606 lN86-007'

IN90-009 iN87-022 iN94-023 lN94-024 BC84-043* BC84-616 BC85-130 BC85-130' iN87-008 iN90-003 lN90-025 IN91 -01 0 IN91 -01 6 IN94-012 BC83-437 iN90-009 iN89-017C lN92-005 iN92-023 iN92-023" IN94-012 iN96-007 iN86-007* BC85-5258 iN87-018 iN92-020 iN92-003 BC82-606 iN90-018A

Cumulative Index - Interpretations Vols. 12-39

Page No. -

243 274 284 206 31 54 62 54 62

101 232 253 255 265 2 89 121 329 187 119 168 264

30 253 2 84

62 94

202 232 235

62 187

21 0 154 303 3 03

67 69

1 05 135 155 208 228 235 243 329 31

210 232 253 265 289 329 329 187 119 1 68 264 253

62 232

Location

IWD-7000

Subsection IWE Table IWE-2500-1

IWE-3519.3 IWE-5221

Subsection IWF IWF

IWF-1100 IWF-1300

IWF-2000 IWF-2200

IWF-241 O(b) iWF-2420(b) IWF-2430

IWF-2500

Table IWF-2500-1

Table IWF-2500-2 IWF-2510

Table iWF-251O(b) IWF-3000

IWF-4000

Subsection IWP IWP

IWP-3100 IWP-3210

Interpretation

Xi-1 -89-74 XI-1 -86-27R

Xi-1 -86-70 Xi-I -89-43 Xi-1 -92-33 Xi-1 -92-33 xi-I -95-34

Xi-I -86-02 XI-1-86-1 1 Xi-1-86-1 7 Xi-1-86-50 Xi-1-83-30 Xi-1 -89-69 XI-I -92-20 Xi-1 -92-22 Xi-I -92-29 Xi-I -92-55 XI-I -86-48 Xi-1-89-44 Xi-1-95-1 0 Xi-I -86-30R Xi-1-86-30 XI-I -86-301 Xi-I -89-60 Xi-1 -95-30 XI-1 -95-32 Xi-1 -83-1 2R Xi-1-83-12R-2 XI-I -89-59 XI-I -83-1 2 Xi-1 -83-1 2R Xi-1-83-1 2R-2 Xi-1-89-69 Xi-1-86-48 XI-I -83-1 2 Xi-1 -83-1 2R Xi-1 -83-1 2R-2 Xi-I -86-26 XI-I -86-49 Xi-I -86-69 Xi-1 -89-47 Xi-I -89-61 XI-I -89-72 Xi-1-86-63 Xi-1-86-30 Xi-1-86-30R Xi-1-89-60 Xi-1 -89-67 XI-1 -92-35 Xi-1 -92-35R Xi-1 -92-55 Xi-1 -89-28

XI-82-06R XI-I -83-08 Xi-1-86-21 R XI-1-92-63 Xi-1-92-63

9 9 9 M

File No. -

IN91 -008 iN86-007*

iN87-011 iN90-003 IN91-043 IN91 -043 iN95-009

BC82-753 BC85-253A BC85-2538 iN86-026C BC82-522 iN90-027 iN92-0068 iN92-010 iN92-006A iN93-016 IN86-026A IN90-004 lN94-023 IN86-013' iN86-013 iN86-013* iN90-029 iN95-004A iN95-004B BC82-230* BC82-230** lN90-026 BC82-230 BC82-230* BC82-230** IN90-027 iN86-026A BC82-230 BC82-230* BC82-230** iN86-002 iN86-026B lN87-008 iN90-009 iN90-032 lN90-035 lN87-004 iN86-013 iN86-013' iN90-029 iN89-017C iN92-023 iN92-023' iN93-016 iN89-021

BC82-340* BC82-523 iN86-004* iN93-036 iN93-036

Page No. - 235 187

155 208 264 264 323

91 96

1 05 128 32

233 254 254 257 281 127 2 09 303 321 112 321 229 316 322 49 49

228 18 49 49

233 127

18 49 49

110 128 155 21 0 229 234 147 112 321 229 232 2 65 289 281 195

5 9

186 284 284

(e)

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 9: Asme Sec Xi Int Vol 39

STD-ASME SEC XI I N T VOL 37-ENGL

Location Interpretation

Subsection IWP (Cont'd) IWP-3500 IWP-4110 Table IWP-4110-1

IWP-4120

subsection Iwv IWV

IWV-1OOo IWV-1100

IW-1200

IWV-1300 IWV-2200 IWV-3200

IWV-3300 IWV-3400 IWV-3410

IWV-3412

IWV-3413 IWV-3420 IWV-3426 IWV-3427 Table IWV-3510-1 IW-3511 IW-3512

IWV-3514 IWV-3520

IWV-3522

Subsection IWX IWX-2100 IWX-2500

Table IWX-2500-1 IWX-3100 IWX-4000

Appendix 1 I 1-2000

1-2220 1-2300 1-4421 1-4422

cn

XI-1-92-63 XI-1 -89-55 XI-1 -89-55 XI-1 -92-14 XI-1 -86-33 XI-1 -89-55

XI-82-06R XI-1 -83-08 XI-1 -83-59 XI-1 -86-21 R XI-1 -89-36 XI-1 -89-71 XI-1 -89-71 R XI-1 -83-59 XI-1 -83-59R XI-1 -83-1 7 XI-1 -83-62 XI-1 -83-1 4 Xi-1 -86-60 XI-1-92-1 6 XI-1-92-50 xi-1 -89-1 0 Xi-1 -86-60 XI-1-83-1 7 '

Xi-1-92-41 Xi-1-92-41 R XI-1-83-74 XI-1 -89-1 0 XI-1-92-50 XI-1 -89-1 0 XI-1-83-62 XI-1-83-61 XI-1-83-60 XI-1 -89-25 XI-1-89-25 XI-1 -89-65 XI-1 -92-37 XI-1 -89-65 XI-1 -92-41 XI-1-92-41 R XI-1 -83-73 XI-1-66-01

XI-1 -83-75 XI-1 -83-75 XI-1 -86-52 XI-1 -86-52R XI-1-86-52R XI-1 -92-59 XI-1 -86-21 XI-1 -95-25

XI-1 -89-62 XI-1 -89-1 2 XI-1 -89-1 3 XI-1-95-24 XI-1-95-24 XI-1-83-22 Xi-1-83-22

File No. -

lN93-036 IN90-021 IN90421 IN91437 BC85-5298 IN90421

BC82-340' BC82-523 BC83-439 lN86-004' lN89-024 lN90-036 lN90-036* BC83-439 BC83-439' BC82-597 6C84-178 BC82-626 IN86-001 IN91-045 iN92-041 IN88-015 IN86-001 BC82-597 IN92-025A IN92-025AC BC82-752 IN88-015 lN92-041 IN88-015 6C84-178 BC84-176 BC84-095 IN89-019 IN89-019 IN90-002 IN92427

IN92425A IN92425A'

IN90-002

BC82-665A BC82-6658

BC83-055 BC83-055 BC85-524 BC85-524. BC85-524' lN93-023 lN86-004 IN95-001

IN90-033 IN89-001A lN89-005 lN94-026 lN94-026 BC80-567 BC80-567

Page No. -

284 226 226 251 119 226

5 9

58 186 205 234 281

58 90 20 59 19

145 252 2 75 169 145 20

268 273

74 169 275 169 59 59 58

193 193 231 266 231 268 273

73 91

75 75

135 187 187 282 107 313

230 1 75 1 76 31 3 31 3

28 28

Location

1-4430 1-4450 1-7000

Appendix I1 Form NIS-2

Appendix 111 111

111-1 100 111-3230

ill-3310 111-3320 111-3330 Ill-3400

111-341 0 111-4420 111-4430

111-4500

Appendix IV IV-2300 IV-3000 IV-4000

Appendix VI1 Vll-3300

Vli-4240

Vll-4310(a)

Vll-4310(b) Vll-4323 VlI-4342 Supplement 1, 9

Appendix Vlll VIII-11 OO(c) Vlll-2100 Vlil-3100 Supplement 4, 1.1 supplement 6, 1.1 Vlll-4OOo

Code Cases N-98 N-308

N-408

N-416

N-416-1 N-458

Interpretation

XI-1 -83-22 XI-1 -83-22 XI-1 -83-22

XI-1 -92-07

XI-1 -89-49 XI-1 -92-58 XI-1 -86-61 XI-1 -89-1 1 XI-1 -89-1 7 XI-1 -89-21 XI-1 -89-23 XI-1 -89-05 XI-1 -92-1 7 XI-1 -92-1 7 XI-1 -89-1 1 XI-1 -89-1 1 XI-1 -86-28 XI-I -89-23 Xi-1 -89-1 1 XI-1 -89-21 Xi-1 -89-23 XI-1-83-84

XI-1-92-67 XI-1-92-67 Xi-1-92-67

XI-1-92-42 XI-1 -92-53 XI-I -95-31 XI-1 -92-1 1 XI-1 -95-40 XI-1 -95-22

XI-1-95-23 XI-1 -92-69 XI-1 -92-53 XI-I -95-08

XI-1-92-49 XI-1 -92-39 XI-1 -95-04 XI-1-92-09 XI-1-92-36 XI-1-92-36 XI-1-95-21

XI-1 -89-09 XI-1-83-02 XI-1 -83-47 XI-1-69-03 XI-1 -95-03 XI-1-92-25 XI-1 -95-1 2 XI-1-95-37 Xi-1 -95-1 5

~~

8 2 5 D

File No. -

BC80-567 BC80-567 BC80-567

IN91 -022

IN90-01 3 IN93421

IN8841 6 IN89-004B IN89-004A IN8941 0

lN86-030

1N88-005 IN92-001 IN92-001 IN88-016 IN89-001A lN86-008 IN89-010 IN89-016 IN89-004A IN89-010 BC83-654

lN94-004 lN94-004 IN94404

IN92-030 lN93-007 lN95-008 iN91-035 lN96-005 lN94-016 lN94-022 IN94-019 lN94-007 lN93-007 IN94-015

lN93-006 IN92-032 lN94-009 lN91-027 lN92-026 lN92-026 lN94-013 lN94-025

IN8741 9 BC81-476 BC84-197 lN88-003 lN93-042 lN92-012 lN94-028 IN95-015 lN93-019

~~

Page No.

28 28 28

-

244

21 7 282 146 175 1 79 190 192 167 252 252 175 175 111 192 1 75 190 192 80

291 291 291

2 68 2 76 321 246 330 312

31 2 292 2 76 302

275 267 300 245 265 265 31 2

168 6

52 166 300 256 304 329 309

Cumulative Index - Interpretations Vols. 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 10: Asme Sec Xi Int Vol 39

File Page File Page Location Interpretation No. - NO. Location Interpretation - No.

Code Cases (Cont’d) N-498 XI-1 -92-25 IN92-012 256 256 330

N-460 XI-1 -89-32 lN89-026 203 1 XI-1-92-26 IN92-014 N-481 XI-1-92-26 IN92-014 256 N-504-1 XI-1 -95-39 IN96-001

Cumulative Index - Interpretations Vok 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 11: Asme Sec Xi Int Vol 39

~

S T D - A S M E S E C XI INT VOL 39-ENGL L97b 0757b70 0577783 bTB

SUBJECT INDEX

Subject Interpretation Acceptance Criteria applicable code .................................................... XI-1-63-75

XI-1 -86-37 XI-1 -89-1 6

Class 1 . reactor vessel ferritic material ................................ XI-1 -83-06 constructed to 831.7 ............................................... XI-1 -83-07 definition of flaw depth ............................ : ................ XI-1-83-32 fabrication defects - additional examinations ........................... XI-1 -83-04 flaw evaluation ..................................................... XI-1 -86-52

flaw evaluation . Section XI in lieu of construction code .................. XI-1 -92-35

indications outside examination area ................................... XI-1 -86-52

leakage .......................................................... XI-1 -92-1 9 not specified ...................................................... XI-1-69-45

XI-1-86-52R

XI-1 -92-35R

XI-1 -86-52R

Applicability alternative weld repair . removal cavity ............................... corrective measures . of new bolting ................................. fabrication of replacements .......................................... flaws detected outside of an inservice examination ....................... installation requirements ............................................. instrument tubing .................................................. leakage - not found during a system pressure test ....................... material removal process - nonwelded ................................ metal removal to prepare surface for NDE .............................. owner ...........................................................

XI-1-95-25 XI-1 -95-29 XI-1 -92-01 XI-1 -83-72 XI-1 -89-67 XI-1 -83-85 XI-1 -83-52 XI-1 -92-03 XI-1 -89-70 XI-1 -89-56 XI-1-83-63

preventive maintenance ............................................. XI-1 -89-1 9 redundant canopy seal .............................................. XI-1 -89-1 9 repair program - installing replacements ............................... XI-1-63-42 repaidreplacement activities - off site ................................. XI-1-95-09 repair subsequent to N-Stamping - prior to N.3 ......................... XI-1-63-10

shot peening ...................................................... XI-1-69-73 small items - replacement of ........................................ XI-1 -92-60 storage tank - examination .......................................... XI-1-69-51 through wall leakage ................................................ XI-1 -89-64 use of AIA for installing replacements .................................. XI-1 -83-38

Brazing .......................................................... XI-1 -86-47 procedures and personnel ........................................... XI-1 43-65

XI-1-63-46

XI-1-83-86 XI-1 -83-861

Repair/Replacement Program ........................................ XI-1 -86-23

Calibration angle beam ....................................................... XI-1 -89-1 1 confirmation - period of use ........................................ XI-1 -89-05 demonstration of equivalence ........................................ XI-1 -86-28

File No . BC83-055 lN86-022 IN89-001 B BC82-428 BC82-429 BC82-437 B(382-427 B(385-524 BC85-524* lN92-023 IN92423 BC85-524 BC85-524' lN92-005 IN90-006

IN95-001 IN95401 B lN90-023

IN89-01 7C BC81-568A

BC84-683 BC83-625 IN91 -01 7 IN91 -005 lN90-022

lN88-009 BC83-179

lN88-009 BC84-123 IN94-014 BC82-277 BC83-595 IN91 -006 lN93-024 IN9041 7 IN89-0178 BC84-122

lN86-0258 BC64-683 BC85-113A BC85-113A* BC85-5250

IN88-016 lN88-005 lN86-008

Page No . 75

121 178

8 8

33 7

135 187 265 289 135 187 253 209

313 31 5 242

72 232

81 55

242 233 227

79 188 188 43

302 17 51

234 283 218 231 41

127 81 82

102 108

175 167 111

Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 12: Asme Sec Xi Int Vol 39

Subject Interpretation

Calibration (Cont'd)

electronic memory ................................................. XI-1 -92-1 7 interim check ..................................................... XI-I -89-62 of gages .......................................................... XI-1 -83-49 series of test ...................................................... XI-1-83-49

XI-1 -86-61

standard ......................................................... XI-1-86-28

Calibration Blocks different specification ............................................... XI-1 -86-61 material .......................................................... XI-1 -86-72 notch reflectors .................................................... XI-1 -89-09 reactor vessel ...................................................... XI-1 -86-71 side drilled holes ................................................... XI-1 -89-1 1 ultrasonic examination .............................................. XI-1 -89-1 2 V path ........................................................... XI-1 -89-21

Classification of Systems high pressure safety injection ......................................... XI-1 -8642 instrument tubing .................................................. XI-1-83-78 penetrates the containment .......................................... XI-1 -83-44 piping -. visual examination ......................................... XI-1-86-67

Component Supports additional examinations ............................................. XI-1 -95-32 associated supports ................................................. XI-1-86-49

coiled wire rope device ............................................. XI-1-92-55 corrective measures - additional examinations .......................... XI-1 -86-1 7

examination requirements - exemptions ............................... XI-1 -83-27 XI-1 -92-22

integral attachments ................................................ XI-1 -89-47 XI-1 -89-59

Interfaces ......................................................... XI-1-92-29 integrally attached .................................................. XI-1-86-69 integrity by analyses ................................................ XI-1 -86-30

multiple components ............................................... XI-1 -86-26

not constructed to Section 111 ......................................... XI-1-63-30 preservice examination .............................................. XI-1 -86-48

XI-1 -86-50 XI-1-89-44

removal of insulation ............................................... XI-1-89-69 XI-1-92-20

Repair/Replacement Program ........................................ XI-1-86-23 repair - requirements .............................................. XI-1-89-28 representative sample ............................................... XI-1 -89-72 scope expansion ................................................... XI-1 -89-60 selection of supports for examination .................................. XI-1 -83-12

XI-1-66-50

XI-1 -95-30

XI-1 -86-30R

XI-1 -86-63

XI-1 -83-1 2R XI-1 -83-1 2R-2 XI-1 -86-48 XI-1-86-49 XI-1-86-63 XI-1-89-61

Construction Code hydrostatic test .................................................... XI-1 -83-83

XI-1 -86-22 XI-1 -86-52R

material manufacturers and suppliers .................................. XI-1 -83-501 XI-1 -89-24

File No .

lN86-030 IN92-001 lN90-033 BC82-776 BC82-776 lN86-008

lN86-030 lN87-0058 IN87-019 IN87-005 IN88-016 I N89-001 A IN89-004A

IN86-011 BC84-682 BC83-448 lN87-022

IN95-0048 IN86-026B IN86-026C IN93-016 BC85-2538 IN95-004A BC83-437 IN92-010 IN90-009 lN90-026 IN92-006A lN87-008 IN86-013 IN8641 3* lN86-002 lN87-004 BC82-522 IN86-026A IN86-026C IN90-004 lN90-027 IN92-006B BC85-525D lN89-021 lN90-035 lN90-029 BC82-230 BC82-230' BC82-230** IN86-026A lN86-0268 lN87-004 lN90-032

BC83-179 IN86-010 BC85-524* BC84-175* lN89-014

~

Page No . 146 252 230

53 53

111

146 156 168 156 175 175 190

124 76 50

154

322 128 128 281 105 316 31

254 210 228 257 155 112 321 110 147 32

127 128 209 233 254 108 195 234 229

18 49 49

127 128 147 229

79 108 187 68

193

Cj) Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 13: Asme Sec Xi Int Vol 39

STD.ASME SEC XI I N T VOL 37-ENGL 1 9 9 b W 0757b70 0 5 7 7 7 8 5 q70

Subject Interpretation Construction Code (Coed) reconciliation ...................................................... repair activities . removal cavity ..................................... repair/replacement . design requirements ............................. replacement of Section 111 components ................................. replacement pressure vessel .......................................... surface examination - acceptance criteria .............................. use of later editions of ..............................................

use of later editions of . stamping ....................................

XI-1-89-41 XI-1-95-25 XI-1 -95-29 XI-1 -95-01 XI-1 -89-68 XI-1 -89-46 XI-1 -89-46R XI-1 -86-52 XI-1 -86-1 2 XI-1 -86-38R XI-1 -86-39R XI-1-86-44R XI-1 -89-20 XI-1-83-21R XI-1 -86-4413

welding requirements ............................................... XI-1-86-51

Documentation (see Records and Reports)

Hydrostatic Test (see also System Pressure Test) after a repair ...................................................... XI-1-83-66

XI-1-86-75 XI-1 -89-1 8

after a replacement ................................................. XI-I -83-54

alternative test ..................................................... XI-1-86-25

core criticality ..................................................... XI-1-86-53 elevated temperatures .............................................. XI-1 -86-34 exempt from ...................................................... XI-1 -83-34 fabricated spool piece - Construction Code ............................ XI-1-86-58 impractical ........................................................ XI-1-86-25 induction stress improvement ......................................... XI-1 -83-71 inspection interval extension ......................................... XI-I -89-58 nonwelded modification ............................................. XI-1-86-03R NPS 1 and smaller - component connected to .......................... XI-1-86-35 open ended portions of systems ...................................... XI-1 -89-30 piping, pumps, and valves - preservice ................................ XI-1 -86-22 pressurization pressure factors ........................................ XI-1 -86-32 removal of a seal weld .............................................. XI-1-83-28 repair to a flange .................................................. XI-1-89-31 requirements ...................................................... XI-1-83-37R2

static head considerations ............................................ XI-1 -89-54

system pneumatic test in lieu of ....................................... XI-1-92-04

test pressure ...................................................... XI-1 -83-67

test pressure - gage accuracies ....................................... XI-1-89-74 test temperature ................................................... XI-1-92-23 through-wall leakage ................................................ XI-1 -89-40 when performed - order ........................................... XI-I -89-63

XI-1 -83-66

XI-1 -92-30

XI-1-83-54R

XI-1 -89-66

XI-1 -92-1 8

XI-1-92-23

Inservice Inspection Summary Report additional examinations . similar components .......................... XI-1-95-13 pressure retaining components and their supports ........................ XI-1 -8343 pumps and valves .................................................. XI-1 -83-08 when performing preservice inspection ................................. XI-1-83-1 5

Inspection Interval extension of ...................................................... XI-1 -86-54 extended or decreased .............................................. XI-1-92-57

File No.

lN89-025 IN95-001 IN95-001 B lN93-003 IN9041 5

IN90-008*

BC85-098

IN90-008

BC85-524

BC85-141* BC85.525C * IN86-015' IN88-014 BC82-434* lN86-015* lN86-027

BC84-652 lN87-032 lN86-031 BC84-321 BC84-652 BC85-528 IN9241 5 IN86-017A IN86-0176 BC83-587 IN87-010 BC85-528 BC80-583 IN90425 BC83-112* IN86-019 IN89-011 lN86-010 BC85-525B BC83-344 lN89-023 BC82-425** BC84.321 * IN9041 8B IN90-018A IN91 -009 lN92-003 BC82-606 IN86-0178 IN91 -008 IN86-0178 IN8941 7A IN90434

lN93-0278 BC82-406 BC82-523 BC82-610

IN87401 lN93-002

Page No .

207 313 31 5 299 232 210 225 135 103 143 144 144 189 117 144 129

61 158 188

55 61

110 258 136 120 39

138 110

71 228 103 120 202 108 119 31

203 185 186 226 232 243 253 62

255 235 255 207 230

304 6 9

19

136 282

Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 14: Asme Sec Xi Int Vol 39

Subject

Inspection Interval ( h t ' d ) hydrostatic test . interval extension ................................... inspection completion percentages . calculation of ...................... multiple components - NDE ........................................ scheduling requirements . applied by ................................. support examinations - percentage requirements ........................ visual examination - multiple stream .................................. volumetric examination - successive ..................................

Interpretation

XI-1-89-58 XI-1-95-1 1 XI-1 -86-26 XI-1-86-74 XI-1 -95-1 0 XI-1-83-68R XI-1 -89-50

Instrument Tubing ................................................. XI-1 -83-52 XI-1-83-77 XI-1 43-86 XI-1 -83.861

l iquid Metal Cooled Plants inspection of inaccessible welds ....................................... XI-3-83-01 preservice system leakage test ........................................ XI-3-89-02 system leakage monitoring ........................................... XI-3-86-01

Material Manufacturer or Material Supplier qualification of .................................................... XI-1 -83-50

Quality Assurance Program - update .................................. XI-1-86-44R XI-1-86-55R

Metric Versus Customary ........................................... XI-1 -86-76

Nondestructive Examination ( s e e also Ultrasonic. Visual. and Volumetric Examinations) examination of dissimilar metal welds .................................. XI-1-89-57 induction stress improvement ........................................ XI-1-83-71 items NPS 1 and smaller ............................................ XI-1 -83-86

XI-1 -83-86R XI-1 -86-45

for installation welds ................................................ XI-1-86-51 liquid penetrant comparator blocks .................................... XI-1-83-64 longitudinal welds .................................... ............. XI-1-83-51 magnetic particle - material used for .................................. XI-1-95-23 multiple stream - pressure retaining bolting ............................ XI-1-83-68R multiple stream - pressure retaining nozzle weld ........................ XI-1 -83-53 nonferromagnetic steam generator heat exchanger tubing .................. XI-1 -92-67 of emergency core cooling systems .................................... XI-1 -92-45 of pipe lugs ....................................................... XI-1-89-38 performance demonstration - thermal fatigue crack ...................... XI-1-92-49 piping - pressure retaining welds ..................................... XI-1 -86-57 reactor vessel ................................. i .................... XI-1-86-71 requirements ...................................................... XI-1 -83-85 surface - flaw evaluation ........................................... XI-1-86-52

use of one examination to satisfy two Categories ......................... XI-1-83-33

Nonpressure Retaining Welds ....................................... XI-1 -83-28R

XI-1 -86-521

Nonwelded Work maintenance . requirements ........................................ mechanical tube plugging ............................................ modification . hydrostatic test ....................................... pressure retaining material - requirements ............................. repair program .................................................... replacement . documentation ....................................... sleeving of heat exchanger tubes ...................................... sleeving of steam generator tubes .....................................

XI-1 -86-21 XI-1-86-21R XI-1-86-41 XI-1 -92-44 XI-1 -86-031 XI-1 -86-21 XI-1 -86-21 R XI-1-83-42 XI-1-86-14R XI-1-92-32 XI-1 -86-41

File No . IN90425 lN94-024 lN86-002 IN86-003A

BC83-441* IN90-014

lN94-023

BC83-625 BC84-603 BC85-113A BC85-113A*

BC81-330 lN86-0248 IN86-024A

BC84-175 IN87-002* IN86.015

IN87435

lN90-024 BC80-583 BC85-113A BC85-113A* lN86-020 lN86-027 BC84-562 BC83-240 IN94419 BC83-441*

lN94-004 IN924228

lN93-006 IN87407 IN87-005A

BC83-656

lN89-007

BC84-683 BC85-524 BC85-524" BC83-589

BC83-344*

lN86-004 lN86-004 *

IN914316

lN86-004 lN89-004'

lN86-005

BC83-112*

BC84-123 BC85.112 IN91431 lN86-005

Page No .

228 303 110 157 303 101 218

55 76 82

102

11 211 159

54 153 144

158

227 71 82

102 126 129 60 54

312 101 55

291 273 206 275 138 156 81

135 187 39

185

107 186 124 273 103 107 186 43

118 263 124

(1) Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 15: Asme Sec Xi Int Vol 39

Subject Interpretation

Nonwelded Work (Conrd) use of an AIA ..................................................... XI-1 -83-1 3

XI-1-83-36

NPS 1 and Smaller connected to a valve . hydrostatic test ................................ XI-1-63-58

XI-1-66-35 exempted . pressure test ........................................... XI-1 -83-851

heat exchanger tube plugging ........................................ XI-1 -92-44 heat exchanger tube . sleeving ...................................... XI-1-92-32 items . exempted from ............................................ XI-1-83-66

XI-1 -83-83

XI-1-83-86R XI-1 -8645 XI-1 -92-66

piping, valves, and fittings . exemptions ............................... XI-1 -83-26 XI-1-83-26R XI-1 -89-04 XI-1 -92-68

piping, valves, and fittings . supports for ............................... XI-1 -86-65 valve replacements . exemptions ..................................... XI-1-69-36

Piping component connected to NPS 4 and smaller . NDE ..................... XI-1-66-4311

NDE . installation welds ............................................ XI-1-66-51

XI-1 -92-56

multiloop y t e m . inspection ....................................... XI-1-86-1 5R

pressure retaining welds . NDE ...................................... XI-1 -86-57

supports . examination ............................................. XI-1-66-49

supports . exempted .............................................. XI-1-66-65 XI-1 -86-63

supports . multiloop system .................... , .................... XI-1 -86-63 system . visual inspection ........................................... XI-1 -86-67

Preservice Examination ............................................. XI-1 -86-24 componentsup ports ................................................ XI-1-86-46

XI-1 -86-50

edition of W o n V ................................................ XI-1-89-02 exemptions - gasket replacements .................................... XI-1-69-36 integrally cast steam generator nozzle .................................. XI-1-66-71 limited to ......................................................... XI-1-66-24 Of Class 2 ves~el ................................................... XI-1-69-42

piping, pumps, and valves - hydrostatic testing ......................... XI-1-66-22 pumps and valves - VT-3 prior to service .............................. XI-1-86-20 ultrasonic examination - acceptance standards .......................... XI-1 -86-37

of manways - bolting .............................................. XI-1-83-1 1

Pressure Retaining bolting . documentation ........................................... XI-1-69-22

bolting . removal of insulation ....................................... XI-1 -89-39R bolting . visual examination .......................................... XI-1 -83-68R

bolting . manways ................................................ XI-1-83-1 1

XI-1 -86-45 XI-1 -92-64

bolts and studs . examination ....................................... XI-1-63-76 boundary . alternative test .......................................... XI-1-66-25

component . through-wall leakage ................................... XI-1 -89-64R components and their supports . summary report ....................... XI-1-63-03 components . exempt from visual .................................... XI-1-69-53 material . nonwelded work. ........................................ XI-1-66-21

material . sealants ................................................. XI-1-95-26

boundary . flaw evaluation . , ....................................... XI-1 -92-35

XI-1 -86-21 R

Cumulative Index . InterpretationsVols . 12-39

File No .

BC82407 BC84-122

BC84-422 IN86-019 BC83-588' BC83-179 IN91431B IN91-031 BC85-113A BC85-1l3A8 lN86-020 lN93-041 BC83-244 BC83-244' lN88-004 lN94-005 lN87-031 IN89424

lN86-012* BC85.130 * lN86-027 lN87-007 IN93-013 IN86-026B lN87-004 lN87-031 lN87-004 IN87422

BC85-526 IN86-026A IN86-026C

IN88-001 lN89-024 IN87-005A BC85-526 IN90-001 BC82-304 IN86-010 IN86-006 lN86-022

lN89-009

IN89-01 3A'

lN86-020

BC82-304

BC83-441*

lN93-038 BC84-390 BC85-528 lN92-023 IN89-0178* BC82-406 IN90419 lN86-004 lN86-004' lN95-002

Page No .

18 41

57 120 67 79

273 263 82

102 126 291 30 87

166 292 147 205

125 135 129 138 281 128 147 147 147 154

109 127 128

165 205 156 109 208

17 108 107 121

191 17

289 101 126 290

75 110 265 241

6 219 107 186 314

(m)

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 16: Asme Sec Xi Int Vol 39

~~~~~

STD-ASME S E C XI I N T VOL 37-ENGL L 7 7 b D 0759b70

Subject Interpretation

Pressure Retaining (Coned) parts . hydrostatic test ............................................. XI-1 -83-83 parts . brdered as spares ........................................... XI-1 -83-21 R welds . examination schedule requirements ............................ XI-1-89-14 welds in piping . NDE ............................................. XI-1-86-57

welds in vessels . examination ....................................... XI-1 -86-70 welds . preservice examination ...................................... XI-1 -86-24

Procurement of material .......................................................... XI-1-86-55R material . MM and MS qualification .................................. XI-1-83-50R

parts as material ................................................... XI-1-83-21 R parts by non-Certificate Holder ....................................... XI-1 -89-29 pipings, valves, and fittings - NPS 1 and smaller ......................... XI-1-89-04 pressure retaining part - Code Data Report ............................ XI-1-83-21 R replacements - later edition ......................................... XI-1 -86-1 2 replacements - perform work on it ................................... XI-1 -86-59 replacement - stamping ............................................. XI-1 -83-20 spares ........................................................... XI-1-83-21R

spares - transfer of custody ......................................... XI-1 -89-07

Pumps instrument accuracy ................................................ XI-1-89-55

testing of - inservice ............................................... XI-1-92-63 visual VTr3 - prior to service ........................................ XI-1-86-20 vibration measurement instrumentation ................................. XI-1-86-33

XI-1 -92-56

XI-1 -89-24

XI-1 -86-1 8

XI-1 -92-1 4

Qualification of NDE Personnel certification date ................................................... XI-1 -86-73 certification examinations ............................................ XI-1 -86-56

XI-1 -86-66 XI-1 -86-73 XI-1 -89-06

certified to a later edition of SNT.TC.1A ................................ XI-1-83-18 XI-1 -83-24 XI-1-86-40

certified to an earlier edition of SNT.TC.1A ............................. XI-1-83-24 certified to SNT-TC-1 A .............................................. XI-1 -83-1 8

XI-1 -83-23 XI-1-83-29 XI-1 -83-82 XI-1 -89-26

color vision examination - frequency ................................. XI-1 -83-36 duties of Authorized Inspector ........................................ XI-1-83-48 examinations w r i n g ................................................ XI-1 -92-54

examinations - random seledon ..................................... XI-1 -95-22

examinations - use of grading unit ................................... XI-1-95-23 experience requiremenk ............................................ XI-1-92-28 eyeexamination ................................................... XI-1-83-01 for pumps and valves ............................................... XI-82-06R other than to SNT-TC-lA., .......................................... XI-1-83-45 outside agency .................................................... XI-1 -92-53 perform examinations to earlier editions ................................ XI-1-86-40

performance demonstration .......................................... XI-1-92-39 practical examination requirementr - alternatives to ..................... XI-1 -92-69 pressure loss, flow change and test .................................... XI-1 -92-52 pumps and valves .................................................. XI-1-92-37

XI-1 -92-70

XI-1 -92-70

File No . BC83-179 BC82-434

lN87-007 IN9341 3 IN87-01 1

IN86-0036

BC85-526

lN87-002+ BC84.175 * IN89-014 BC82-434*

lN88-004 BC82-434; BC85-098 BC85-550

lN89-008

BC82-430 BC82-434; BC85-254 IN88-011

IN90-021 lN91-037 lN93-036 lN86-006 BC85-5298

IN87429 IN86428 IN87-015 lN87-029 lN88-006 BC83-060 BC83-178 BC85-571 BC83-178 BC83-060 BC83-056 BC82-050 BC83-176 BC80-231 BC83-585 BC84-177 IN9341 5 IN93422 IN94-016 lN94-022 lN94-019 IN92419 BC80-582 BC82-340* BC83-535 lN93-007

IN93422 IN92432 lN94-007

BC85-571

lN93-005 lN92-027

Page No .

79 117 176 138 281 155 109

153 68

193 117 202 166 117 103 145 27

117 106 167

226 251 284 107 119

157 137 153 157 167

21 29

123 29 21 29 32 78

194 40 52

276 293 312

312 257

5 5

50 276 123 293 267 292 276 266

(n) Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 17: Asme Sec Xi Int Vol 39

~~

S T D - A S M E S E C XI INT VOL 39-ENGL L 9 9 b = 0759b70 0577787 OLb

Subject Interpretation

Qualification of NDE Personnel (Cont'd) recertification . ASNT certification .................................... XI-1 -86-66 recertification . examinations ........................................ XI-1 -86-1 6 recertification . Level 111 ............................................ XI-1-66-19 supplemental training - Level 111 ..................................... XI-1-95-06

XI-1 -95-40 to another code ........................................... ....... XI-1 -83-40R ultrasonic examination technicians ..................................... XI-1-92-39 ultrasonic examination - annual training ............................... XI-1 -92-1 1 ultrasonic examination - outside agency ............................... XI-1 -95-31 used to perform repair examinations ................................... XI-1-63-40 visual examination - SNT-TC-1A ..................................... XI-1-63-16 visual examination - VT1, VT2, VT3 .................................. XI-1-95-36

Quality Assurance Program qualification of plant and contractor personnel ........................... XI-82-06R review of ......................................................... XI-1 -86-64 updating to a later Construction Code .................................. XI-1-66-44

XI-1 -86-44R

Records and Reports

Code Data Repoh ................................................. design documents .................................................. documentation . construction code ..................................

certificate of compliance and CMTR ...................................

documentation . inservice degradation ................................ documentation . installation of replacement ........................... documentation - test temperature .................................... inservice inspection plan - requirements ............................... manufacturer's data report - NIS-2 ................................... NIS forms - signature .............................................. nonwelded replacement ............................................. Ownen data form .................................................. retention of radiographs ............................................. use of NIS-1 Form .................................................

for pressure retaining bolting .........................................

replacements ......................................................

use of NIS2 Form .............................................. weld reference system ..............................................

XI-1 -83-21 R XI-1 -83-21 R XI-1-69-34 XI-1 -89-20 XI-1-89-34 XI-1 -89-48 XI-1 -89-64R XI-1 -95-02 XI-1 -95-07 XI-1 -89-22 XI-1 -92-02 XI-1 -92-07 XI-1-83-65 XI-1 -83-79 XI-1 -86-1 4R XI-1 -83-02 XI-1 -86-68 XI-I -89-48 XI-1-63-47 XI-I -86-1 4R XI-1-66-31 XI-1-86-31 XI-1 -86-68 XI-1-92-06

Repair/Replacement Program activities . off site ................................................. XI-1-95-09 applies to ......................................................... XI-1 -86-36

XI-1 -86-41 XI-1 -86-62

component supports ................................................ XI-1 -86-23 failure ........................................................... XI-1 -92-1 5 impractical NDE - alternative examination ............................. XI-1 -86-51 initiation of ........................................................ XI-1 -95-14 items NPS 1 and smaller ............................................ XI-1 -83-86

nonpressure boundary material ....................................... XI-1-66-23 Owner's responsibility .............................................. XI-1-95-09 Quality Assurance Program - review of ................................ XI-1 86-64 use of later rules ................................................... XI-1 -86-25

XI-1 -83-86R

XI-1 -86-31

sealantp Use Of ........................................................... XI-I -89-40

File No .

IN87-015 BC85-142 BC85-071 IN9441 5 lN96-005

lN92-032 IN91435

BC84-043'

IN95-008 BC84-043 BC82-775 IN95-019

BC82.340 * IN87-028A IN86-015 IN86-015;

BC82-434' BC82-434; IN89-012 lN88-014 IN89-012 IN90-011 IN89-0178' lN93-026 IN94-011 lN89-009 IN91 -01 2 IN91-022 BC84-647 BC84-684 BC85-112' BC81-476 lN87-024 IN90-011 BC84-197 BC85-112' BC85-525A BC85-525A lN87-024 IN91 -01 9

IN94-014 lN86-021 lN86-005 lN86-032 BC85-525D IN91-040 lN86-027 lN93-029 BC85-113A BC85-l13A* BC85-525D lN94-014 IN87-028A BC85-528 BC85-525A

IN89-017A

Page No . 153 105 106 302 330 67

267 246 321 42 20

330

5 147 126 144

117 117 204 189 204 21 7 241 299 301 191 242 244

61 77

118 6

154 217

52 118 118 118 154 244

302 121 124 146 108 252 129 304 82

1 02 108 302 147 110 118

207

Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 18: Asme Sec Xi Int Vol 39

Subject Sealants (Cont'd)

Interpretation

XI-1 -95-26

Shutdorm cdd ............................................................. XI-1-83-73

XI-1-83-74 extended - valve testing. ........................................... XI-1-92-41 R valve testing. ...................................................... XI-1 -83-74

Spares (see Procurement of)

Stamping installation of replacement parts ...................................... XI-1-83-02 of replacement parts - ordered as spares .............................. XI-1-83-21 R of replacement parts - valves. ....................................... XI-1 -83-20 Section 111 ........................................................ XI-1-83-72

System Pressure Test (also see Hydrostatic Testing) after a repair or replacement. ........................................ XI-1-63-05 applies to.. ....................................................... XI-1-63-34

XI-1-83-37R2 XI-1 -86-1 3 XI-1-86-1 3R XI-1 -86-21 XI-1 -86-21 R

corrective measures ................................................ XI-1 -92-1 9

exempted from - N K 1 and smaller.. ................................ XI-1-83-351 leak test - core criticality ........................................... XI-1 -86-53 open ended portions of systems ...................................... XI-1 -89-30 pressurizing medium. ............................................... XI-1 -83-25

XI-1 -92-51

XI-1-86-34 XI-1-92-23

pressure retaining boundary. ......................................... XI-1 -95-34 reassembled components/breaking pressure boundary .................... XI-1 -83-63R

XI-1-63-70 XI-1-83-70R XI-1 -86-1 3 XI-1-86-1 3R XI-1 -86-27 XI-1-86-27R XI-1 -86-29R XI-1 -89-1 5 XI-1 -89-33 XI-1-89-37 XI-1 -89-52

reduction of pressure - visual examination ............................. XI-1 -86-46 replacement of bolts, studs, and nuts .................................. XI-1-89-06

systems not required to operate. ...................................... XI-1 -92-62 through-wall leakage. ............................................... XI-1 -89-64

through-wall leakage - corrective action ............................... XI-1-92-31

XI-1-92-65

XI-1 -89-641

Temporary Repair. ................................................ XI-1-83-14 XI-1-63-57

Ultrasonic Examination bolts and studs .................................................... XI-1 -95-24 calibration. ....................................................... XI-1-92-1 7 detection specimens - orientation. ................................... XI-1 -92-36 equalized sensitivity - recording of ................................... XI-1 -83-22 evaluation of flaws ................................................. XI-1-83-29 full penetration weld of nozzles.. ..................................... XI-1-83-56

File No.

IN95402

BC82-665A BC82-752 IN92-025A' BC82-752

BC81-476 BC82-434* BC82-430 BC81-568A

BC82-425

BC82-425** BC83-587

BC85-111 BC85-111* lN86-004 lN86-004*

IN9341 1

IN8641 7A

lN92-005

BC83-588'

IN89-011 BC83-219 IN86-0176 IN86-0178* lN95-009 BC84-3 1 0. BC84-198 BC84-198' BC85-111 BC85-111' lN86-007 lN86-007* lN86-009* IN88-002A IN8841 7 IN88402C IN88-0026 lN86-023 IN87-018 IN94-001 lN93-030 IN89-0176 IN89-0178' IN91 -01 8

BC82-626 BC84-392

IN94426 IN92-001 lN92-026 BC80-567 BC82-050 BC84-388

Page No.

314

73 74

273 74

6 117 27 72

7 39

185 104 225 107 186 253 275

67 136 202

30 120 255 323 101 70

201 104 225 111 187 143 1 78 21 3 205 219 127 168 290 284 231 241 263

19 57

313 252 265 28 32 56

(P) Cumulative Index - Interpretations Vols. 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 19: Asme Sec Xi Int Vol 39

Subject Interpretation

Ultrasonic Examination (Cont'd) material attenuation ................................................ XI-1 -89-1 7 nozzle-to-safe end welds - extent of .................................. XI-1-89-49 performance demonstration .......................................... XI-1 -92-36 piping - outer surface .............................................. XI-1 -92-58 procedure qualification - search unit .................................. XI-1 -95-21

qualification outside agency .......................................... XI-1 -95-31 qualified by performance demonstration ................................ XI-1-92-09 reflectors ......................................................... XI-1-83-84 requirements ...................................................... XI-1 -83-84 search unit overlap ................................................. XI-1 -89-1 3 sweep display ..................................................... XI-1 -89-23 three-point DAC ................................................... XI-1-83-31 welds in piping .................................................... XI-1-95-24 V path ........................................................... XI-1-89-23

Use of Code Cases N-98 ............................................................ XI-1-89-09 N-308 ........................................................... XI-1-83-02

XI-1 -83-47 N-408 ........................................................... XI-1-89-03 N-416-1 ......................................................... XI-1-95-12

XI-1 -95-37 N-416 ........................................................... XI-1-92-25 N-458 ........................................................... XI-1-95-15 N-460 ........................................................... XI-1-89-32 N-481 ........................................................... XI-1-92-26 N-498 ........................................................... XI-1-92-10

XI-I -92-25 ' XI-1 -92-26

N-504-1 ......................................................... XI-1-95-39

Valve classification ...................................................... XI-1 -83-59

XI-1-83-62 XI-1 -92-1 3

disc and seat - hard facing .......................................... XI-1 -92-35 examination - bolts and studs ....................................... XI-1 -83-76 exercising test ..................................................... XI-1 -89-1 0 full stroke exercising ................................................ XI-1-92-50 inservice testing program - corrective action ............................ XI-1-86-60 inservice testing - scope of .......................................... XI-1-89-71

limiting values of stroke time ......................................... XI-1-83-1 7 measured leakage rate .............................................. XI-1-83-60

packing adjustment - seat leakage testing .............................. XI-1-92-38 replacements - NPS 1 and smaller ................................... XI-1-89-36 set point adjustments ............................................... XI-1 -89-65 stroke time ....................................................... XI-1 -92-1 6 supervisor qualification - set point testing .............................. XI-1-92-37 supports - exempted .............................................. XI-1-86-65 test scheduling - extended shutdown ................................. XI-1-92-41 R test scheduling - outage ............................................ XI-1-89-25

visual VT-3 - prior to service ........................................ XI-1 -86-20

XI-1-89-71 R

XI-1-83-61

XI-1 -92-41

Visual Examinations

core support structure ............................................... XI-1-92-46 exempt from ...................................................... XI-1 -89-53 leakage .......................................................... XI-1 -92-1 9

components exempt . volumetric and surface .......................... XI-1 -92-40

XI-1 -92-48

Cumulative Index . Interpretations Vols . 12-39

File No .

IN89-004B IN90-013 lN92-026 lN93-021 IN94-013 lN94-025 lN95-008 lN91-027 BC83-654 BC83-654 lN89-005 IN89-010 BC82-630 lN94-026 IN89-010

IN87-019 BC81-476 BC84-197 lN87-003 lN94-028 IN95-015 IN92-012 lN93-019 I N89-02 6 1N92-014 IN91 -029 1N92-012 1N92-014 IN96-001

BC83-439 BC84-178 lN91-026 lN92-023 BC84-390 IN88-015 1N92-041 IN86-001 lN90-036 IN90-036* BC82-597 BC84-095 BC84-176 lN92-031 lN89-024 IN90-002 IN91 -045 lN92-027 lN87-031 IN92-025A' IN89-019 IN92-025A lN86-006

IN92-022A lN92-043 IN90-019 lN92-005 IN93-001

Page No .

179 217 265 282 312

321 245

80 80

176 192 33

313 192

168 6

52 166 304 329 256 309 203 256 246 256 256 330

58 59

251 265

75 169 275 145 234 281

20 58 59

266 205 231 252 266 147 273 193 268 107

267 274 219 253 274

(q)

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 20: Asme Sec Xi Int Vol 39

Subject Interpretation

Visual haminations (Cont'd) XI-1-92-51

liquid-metal containing components ................................... XI-3-69-01 multiple stream . pressure retaining bolting ............................ XI-1 -83-68R piping system . dassification ........................................ XI-1 -86-67 pressure test . pressure requirements ................................. XI-1 -86-46 removal of insulated ................................................ XI-1 -89-39 reactor vessel . spaces below the core ................................ XI-1 -95-28 reactor vessel . spaces within ....................................... XI-1 -95-27 vessels . pressure retaining welds ...... , ............................. XI-1 -86-70 VT categories . requirements .. , ..................................... XI-1-89-26 VT-1 . base metal .......... , ...................................... XI-1-92-33 VT.l, VT-3 - interchangeable , ..... , ................................ XI-1-63-69 VT-1 - pressure retaining bolting ....... , ............................. XI-1-86-45

VT-2 of borated water systems ........................................ XI-1-89-39 VT-2 during a functional test ......................................... XI-1-89-75

VT-2 of buried components, ......................................... XI-1 -83-1 9

VT-2 - personnel ................................................. XI-1-83-63R VT-2 - removal of insulation ........................................ XI-1-92-47 VT.2, VT-3 - piping system ......................................... XI-1 -86-67 VT-3 - bolted connection ........................................... XI-1 -92-48 VT-3 - dass 3 components ......................................... XI-1 -92-51

VT-3 - pumps and valves prior to service., ...... .,. .................... XI-1-66-20 VT-3 - reactor v e s s e l .............................................. XI-1-95-28

XI-1 -92-34

XI-1-95-36

XI-1-95-27 VT.3-s~pporh ................................................... XI-1-89-26 W - 4 - pumps and valves ........................................... XI-1-83-69 VTM-2 - Accessibility .............................................. XI-3-69-01 welds on multiple components ....................................... XI-1-86-26

Volumetric Examinations and surface - exemptions to ........................................ XI-1-86-43R

XI-1-92-40 XI-1-92-45 XI-1-95-03

as an alternative to surface ........................................... XI-1-89-21

Code Case N.460 .................................................. XI-1-89-32 fabrication defeck - additional examinations ........................... XI-1 -83-04 or surface ........................................................ XI-1 -89-1 1

piping - outer surface ....... , .... , ................................. XI-1-92-58 prior to hydrostatic test ............. , ................................. XI-1-89-63 required volume to be examined ..................................... XI-1-89-32 successiw inspection intervals ........................................ XI-1-69-50

Weld accessible - preservice examination .......... , ... , .................... XI-1 -86-24 additional examinations - similar components ....................... , .. XI-1 -92-61 between different P.numben ................ , ........................ XI-1 -83-39 connecting NPS 1 and less - hydrostatic test ........................... XI-1 -86-35 examination - dissimilar metal welds ...................... , ........... XI-1-92-13 examination - full penetration ................... , ................... XI-1-89-43 examination of integrally welded attachments ........... , ... , ........... XI-1-92-05 examination of pipe ... , .. , ......................................... XI-1-83-60

examination - partial ............. , ... , ........................ , ... XI-1-92-12 examination - partial penetration ........................ , ....... , ... XI-1-89-43 examination schedule requirements ... , ............... , ... , ... , ....... XI-1-89-14 flow size - acceptance standards ..................................... XI-1-95-35

fusion welding - repair of tube or tubesheet ............................ XI-1-95-33

XI-1-89-27

XI-1 -92-43

XI-1-83-80R

XI-1-92-24

File No .

IN93-011 IN86-024C BC83-441 lN87-022 lN86-023 IN89-013A IN94-006B IN94-006A IN87-011 BC80-231* IN91 -043 BC84-616 lN86-020 IN91 -01 0 IN89-01 3A BC82-607 lN92-020 BC84-310* lN92-046 lN87-022 IN93-001 IN93-011 IN94-012 lN86-006 lN94-0068 IN94-006A BC80-231* BC84-616 IN86-024C lN86-002

IN86-012* IN92-022A lN92-0228 lN93-042 IN89-004A IN89-004C lN89-026 BC82-427 IN88-016 lN92-033 lN93-021 lN90-034 lN89-026 IN90-014

BC85-526 IN93-027A BC83-527 lN86-019 IN91-026 IN90-003 IN91 -01 6 BC84-685 BC84-685* IN91-025 IN90-003 lN86-0038 lN96-007 IN91-014 I N94-03 1

Page No .

2 75 169 101 154 127 206 315 314 155 194 264 69

126 235 206

27 264 101 274 154 274 275 329 107 315 31 4 194 69

169 110

125 267 273 300 190 195 203

7 175 268 282 230 203 218

109 283 42

120 251 208 243

77 241 251 208 176 329 255 322

(r) Cumulative Index . Interpretations Vols . 12-39

COPYRIGHT American Society of Mechanical EngineersLicensed by Information Handling Services

Page 21: Asme Sec Xi Int Vol 39

S T D B A S M E SEC XI I N T VOL 39-ENGL L s 7 b M 0759b70 0 5 7 7 7 7 3 5 4 7 M

Subject

Weld (Cont’d) half bead weld repair . automatic ....................................

items NPS 1 and smaller . requirements ...............................

multiple components - NDE ........................................

multiple loop piping - inspection .....................................

nonpressure retaining ............................................... NDE examination requirements .......................................

overlay cladding to replacement parts .................................. piping - additional examinations ..................................... piping - examination of (calibration method) ........................... piping - NDE requirements .........................................

piping supports - examination . . . . . . . . . . . . . . . I ....................... pressure retaining boundary - alternative test ........................... procedure qualification record - sharing of ............................. procedures - qualification . . . . . . . . . . . . . . . . . . I .......................

reference system . recording of ...................................... reference system . identification of ................................... Repair/Replacement Program ........................................

repair - steam generator tube plug ...................................

tungsten-inert gas process - automatic ................................

vessels - examination ..............................................

repair - internal wall thinning .......................................

temper bead method ...............................................

Interpretation

XI-1 -83-09 XI-1 -83-09R XI-1 -83-86 XI-1 -83-861 XI-1 -86-1 5R XI-1 -86-26 XI-1 -86-1 5R XI-1 -86-51 XI-1 -83-28R XI-1-86-36 XI-1 -95-06 XI-1 -95-04 XI-1 -86-51 XI-1 -86-57 XI-1 -86-49 XI-1 -86-25 XI-1 -92-08 XI-1-83-41 XI-1-83-55 XI-1-83-81 XI-1 -89-01 XI-1 -92-06 XI-1 -95-05 XI-1 -86-23 XI-1-92-59 XI-1-92-21 XI-1-89-1 8 XI-1-83-09 XI-1 -83-09R XI-1-86-70

Welder qualification ....................................................... XI-1 -83-55

requalification - change in contractor ................................. XI-1 -83-43 required qualification - Section IX .................................... XI-1-89-01 supervision ....................................................... XI-1 -83-81

qualification of - simultaneously ..................................... XI-1-89-35

File No .

BC82-604 BC82-604* BC85-113A BC85-113A* BC85-130* lN86-002 BC85-130: lN86-027 BC83-344* lN86-021 IN94-002A lN94-009 lN86-027 lN87-007 lN86-0268 BC85-528 IN91 -024 BC84-064 BC84-322 BC84-687 lN87-036 IN91 -01 9 lN93-035 BC85-525D lN93-023 lN92-0098 lN86-031 BC82-604 BC82-604* IN87-011

BC84-322 IN89-006 BC84-179 lN87-036 BC84-687

Page No .

9 10 82

102 135 110 135 129 185 121 301 300 129 138 128 110 245

43 56 78

165 244 301 108 282 254 188

9 10

155

56 204 44

165 78

Cumulative Index . Interpretations Vols . 12-39