  • SECTOR WISE YEARLY RELEASE OF FUNDS FOR NLCPR PROJECT IN Assam

    (Rs. in Lakh)

    Sl. No.

    NLCPR Project Approved cost

    Release

    Status '98-99' '99-00' '00-01' '01-02' '02-03' '03-04' '04-05' '05-06' '06-07' '07-08' '08-09' '09-10' '10-11' '11-12' Total

    Education

    1

    Construction of 15 HSS Buildings (BAC Area)

    150.00 0.00 0.00 75.00 0.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150.00 Completed

    2

    Guwahati University Campus. Kokrajhar

    500.00 0.00 0.00 0.00 0.00 250.00 0.00 0.00 211.50 0.00 0.00 0.00 0.00 0.00 0.00 461.50

    3

    Assam University Silchar (including Diphu Campus) - CS

    1300.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1300.00 Fully

    Released

    4 I.I.T. Guwahati-CS 3400.00 0.00 3400.0

    0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3400.00 Comple

    ted

    5

    New Infrastrucutre for Cotton College.

    300.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 Completed

    6 Tezpur University-CS 2433.00 0.00 1000.0

    0 0.00 0.00 1433.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2433.00

    Project treated

    as complet

    ed (as far as

    DONER is

    concerned) on

    21.8.2006

  • 7 Sarva Shiksha Abhiyan for Assam

    2770.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2770.00 0.00 0.00 0.00 0.00 0.00 0.00 2770.00 Completed

    8

    Infrastructure Development of North Eastern Judicial Officers Training Institute, Guwahati (Assam)

    354.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.60 0.00 0.00 0.00 137.99 0.00 62.40 311.99

    9

    Sarva Shiksha Abhiyan for Assam (2006-07)

    10293.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7283.67 3009.27 0.00 0.00 0.00 0.00 10292.94 Fully

    Released

    10

    Modernisation & Augmentation of Infrastructure Development of Assam Textile Institute at Guwahati

    741.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 233.57 0.00 0.00 0.00 0.00 0.00 233.57

    11

    construction of academic - cum - Administrative building of K.K Handique Government Sanskrit College

    238.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.37 0.00 0.00 0.00 0.00 93.37

    12

    Development of infrastructure facilities of Kahrupetia college, i.e construction of class rooms , computer labratory with Ac, hostel for tennis,

    175.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.33 0.00 0.00 0.00 55.33

  • elctricity facilities, water supply and sanitary installation in darrang distt.

    13

    Infrastructure Development of Assam SLET Commission

    334.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118.04 0.00 118.04

    14

    Infrastructure Development of Assam Institute of Management, Guwahati

    1461.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 515.68 0.00 515.68

    15

    Bodo Language Research and Development centre for Gauhati University, Kokrajhar(BTC Package-2)

    295.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.90 100.00 147.90

    16

    Construction of Govt college of Arts & Crafts in Kamrup District

    500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 178.61 178.61

    Total of Education sector (16 Projects)

    25247.33 0.00

    6000.00

    75.00 0.00

    1758.00 0.00 0.00

    3093.10

    7517.24

    3102.64 55.33

    137.99

    681.62

    341.01

    22761.93

    Flood Control & Irrigation

    17

    Amreng Minor irrigation Scheme (Karbi Anglong)

    1200.00 0.00 0.00 0.00 600.00 0.00 300.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1200.00 Completed

    18

    Flood Control scheme (5 No.) 210.00 0.00 0.00 0.00 210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 210.00

    Completed

  • - Protection of different reaches from the erosion of river Dhansiri at Assam, K.A. Distt. Phase-I

    19

    Flood Control scheme (5 No.) - Protection of different reaches from the erosion of river Dhansiri at Assam, K.A. Distt. Phase-II

    165.00 0.00 0.00 0.00 165.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 165.00 Completed

    20

    Flood Control scheme (5 No.) - Protn. Of Harinagar Pt-III area cum dyke along R/B of river Surma (international boundary) from Harinagar to Nathanpur

    364.98 0.00 0.00 0.00 150.00 214.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 364.98 Completed

    21

    Flood Control scheme (5 No.) - Strengthening of Kahai spur (stone spur no. 2) to protect Dibrugarh town from the erosion of river Brahmaputra

    655.00 0.00 0.00 0.00 255.00 206.02 163.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 624.98

    22

    Washillinghadi ELIS, NC Hills minor irrigation schemes.

    270.00 0.00 0.00 0.00 270.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 270.00 Completed

    23

    Raising & strengthening Brahmaputra Dyke from Dizmore to

    1151.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 270.00 77.76 134.62 0.00 0.00 0.00 0.00 982.38

  • Sonarigaon from 14th to23.15th including closing of Amguri and Arney Nalla.

    24

    Installation of one Lakh Shallow tube wells

    6895.00 0.00 1000.00 4500.0

    0 0.00 1395.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6895.00 Comple

    ted

    25

    Flood Control Scheme (5 No.) - Protn. of Guwahati town from erosion of river Brahmaputra from Kachari Bazaar to D.C. Court

    333.21 0.00 0.00 0.00 120.00 0.00 213.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 333.21 Completed

    26

    Anti-Erosion/Flood control Schemes in 25 different locations of Brahmaputra and Barak Valley

    6066.61 500.00 500.00 0.00 3000.00 2236.00 0.00 0.00 0.00 -169.39 0.00 0.00 0.00 0.00 0.00 6066.61

    Earlier the

    approved cost of the

    project was Rs. 6236.00 lacs.

    However,

    Govt of Assam

    informed that only Rs.

    6066.61 have

    been utilised

    for these

    projects. The

    savings

  • of Rs. 169.39

    lacs have been

    diverted to

    'Assam Medica

    l College

    ' on 19.7.20

    06

    27

    Borjan Composite Irrigation Scheme in Assam (Karbi Anglong)

    2228.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 720.00 0.00 1018.00 0.00 267.78 0.00 0.00 2005.78 Fully

    Released

    28

    Champamati Irrigation Project (BTC Package)

    4385.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1973.25 0.00 1973.25 0.00 438.50 0.00 0.00 4385.00 Completed

    29

    Sukla Irrigation Project (BTC Package)

    812.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 365.85 0.00 365.60 81.27 0.00 0.00 0.00 812.72 Completed

    30

    89 Nos. of minor irrigation schemes

    2520.00 1121.00 500.00 0.00 899.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2520.00 Fully

    Released

    31

    Construction of dakhindol Lift Irrigation Scheme at Sonitpur and Joisidhi, Assam

    211.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.53 0.00 0.00 85.54 0.00 152.07

    32

    Belsiri Lift Irrigation Scheme

    217.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.48 0.00 0.00 0.00 0.00 68.48

    33

    LIS over river Buriduhing in Tengakhat Kheremia Mouza in Dibrugarh

    291.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.32 0.00 112.00 0.00 53.00 257.32

  • Distt.

    34

    LIS over river Buridihing in Sassoni Mouza in Dibrugarh Dist.

    239.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.82 0.00 91.44 0.00 42.32 211.58

    35

    Deithor Minor Irrigation cum Community Development Project(Karbi Anglong)

    222.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.42 0.00 0.00 78.42

    36

    Flow Irrigation Scheme from River Kulsik at Palashgarh

    1927.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 687.16 687.16

    37

    Burinagar Lift Irrigation scheme (Nalbari Division)

    215.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.47 73.47

    38

    Phumen Phangcho Minor Irrigation Scheme (Karbi anglong)

    609.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 218.67 218.67

    Total of Flood Control & Irrigation

    sector (46 Projects)

    31192.39

    1621.00

    2000.00

    4500.00

    5669.00

    4052.00

    1177.17

    300.00

    3329.10

    -91.63

    3796.62 81.27

    988.14 85.54

    1074.62

    28582.83

    Health

    39

    Sankaradeva Netralaya 100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00

    Completed

    40

    Upgradation of hospital at Udalguri to 100 bedded Hospital.

    169.00 0.00 0.00 85.00 0.00 0.00 84.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 169.00 Completed

  • 41

    Assam Medical College (HOPE)

    2000.00 0.00 0.00 0.00 0.00 22.00 379.00 0.00 900.00 539.10 0.00 0.00 0.00 0.00 0.00 1840.10

    The savings

    of Rs. 169.39 lacs in

    "25 no. of

    Flood Control Scheme

    s in differen

    t location

    s of Brahmaputra &

    Barak valley"

    have been

    diverted to this project

    on 19.07.2

    006

    42

    Shankar Dev Netralaya (equipments)

    82.00 0.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.00 Completed

    43

    Shankar Dev Netralaya (OT) 153.00 0.00 0.00 0.00 0.00 153.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 153.00

    Completed

    44

    Conversion of 100 bedded Civil Hospital to 200 Bedded Hospital with construction of Staff Quarters and improvement & renovation of existing buildings at Haflong(NC Hills)

    1119.81 0.00 0.00 0.00 0.00 0.00 0.00 420.00 0.00 0.00 592.64 0.00 0.00 0.00 0.00 1012.64

    4 Upgradation of 800.00 0.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 800.00 Full

  • 5 Guwahati Medical College.

    UC awaited

    46

    Renovation/Re-construction of RNB Civil Hospital at Kokrajhar (BTC Package)

    758.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 334.35 0.00 347.93 0.00 75.81 0.00 0.00 758.09 Fully

    Released

    47

    Construction of 100 bedded hospital at Kajalgaon in BTC area(BTC Package)

    3851.61 0.00 0.00 0.00 0.00 0.00 0.00 799.24 800.00 366.53 1580.60 305.24 0.00 0.00 0.00 3851.61

    48

    Construction of two storeyed building of SJN Government Homoeopathic Medical College and Hospital at Panjabari, Guwahati

    265.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 82.06 0.00 0.00 105.48 187.54

    Total of Health sector (10 Projects)

    9299.22 0.00

    800.00

    185.00 0.00

    257.00

    463.00

    1219.24

    2034.35

    905.63

    2521.17

    387.30 75.81 0.00

    105.48

    8953.98

    Miscellaneous

    49

    1250 Capacity Auditorium at Guwahati.

    2000.00 0.00 0.00 0.00 500.00 151.72 1300.00 0.00 0.00 0.00 40.10 0.00 0.00 0.00 0.00 1991.82 Fully

    Released

    50

    Construction of Multi-Storey Secretariat Complex

    6900.00 0.00 0.00 0.00 0.00 1579.00 0.00 4646.00 607.95 0.00 0.00 0.00 0.00 0.00 0.00 6832.95

    51

    Kamakhya Temple Road Development

    489.00 0.00 0.00 0.00 0.00 200.00 289.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 489.00 Completed

    5 Srimanta 485.00 485.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 485.00 Comple

  • 2 Sankardev Kalakshtra project

    ted

    53

    Centre for Plasma Physics, Guwahati.

    450.00 0.00 151.00 0.00 136.00 81.00 82.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 450.00 Completed

    54

    Construction of Bodofa Cultural Complex at Kokrajhar (BTC Package)

    1844.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 450.00 0.00 50.00 844.00 0.00 0.00 1844.00

    Cost approve

    d by SLSC =

    Rs. 1844.00 lacs

    against an

    indicative cost of Rs.

    1000.00 lacs

    55

    Construction of Cold Storage at Udalguri district(BTC Package)

    413.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 195.76 0.00 176.53 41.36 0.00 0.00 0.00 413.65

    56

    Construction of Cold storage at Kokrajahar district(BTC Package)

    413.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 195.76 0.00 176.53 41.36 0.00 0.00 0.00 413.65

    57

    Construction of North East Gate Way Bus Terminus at Srinwgai Gossaigaon(BTC Package)

    144.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.99 0.00 64.99 14.44 0.00 0.00 0.00 144.42 Completed

    58

    Construction of Joisingh Doloi Audotorium Hall at Diphu (Karbi Anglong)

    379.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.54 0.00 115.74 0.00 108.94 0.00 336.22

    5 Construction of 401.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.45 0.00 0.00 0.00 126.45

  • 9 Sankar Madhab Cultural Complex at Letekupukhuri at Bhogpur Chariali Lakhimpur iDistrict n Assam

    60

    Cashew processing Plant at Mankachar in Dhubri District in Assam

    248.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 104.15 0.00 0.00 99.29 0.00 203.44

    61

    Development and Upgradation of Jyoti Chitraban Film and Television Institute

    1346.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 424.23 0.00 0.00 0.00 0.00 424.23

    62

    Bodoland Indigenous Tribal Art & Cultural Complex-cumFilm Studio at Kathalguri, Kokrajhar

    495.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 160.66 0.00 0.00 0.00 0.00 160.66

    63

    Construction of Cultural Centre/Complex at Dotma in Kokrajhar

    221.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.05 0.00 0.00 0.00 0.00 99.05

    64

    Multi Level Parking in different parts of Guwahati

    2024.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 638.00 0.00 365.00 0.00 1003.00

    Total project cost is

    Rs. 3289.00 lakhs

    but support

    from NLCPR

  • restricted to Rs. 2024.00 lakhs

    only

    65

    Construction of Roadside drain cum footpath and provision of roadside streetlight illumination in Naharkatia town in Dibrugarh Rural Road Division

    644.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 199.10 0.00 255.43 0.00 454.53

    66

    Preservation of cultural Heritage of Majuli Natun Kamalabari satra (Phase-I)

    618.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 218.46 0.00 0.00 218.46

    67

    Street Lighting in Jorhat City leading to Jorhat Airport

    213.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.34 0.00 75.34

    68

    Comprehensive Development Plan for college of Fisheries for augmenting Human Resources in Assam

    874.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 308.76 0.00 308.76

    69

    Construction of Bus Terminals at Barpeta town

    185.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.63 0.00 65.63

    70

    Infrastructure Development of Road Transport system under Karbi Anglong Autonomous

    183.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.85 0.00 64.85

  • Council (Karbi Anglong) - Part-I

    71

    Socio-Literary Cultural Complex of Bodo Sahitya Sabha at Bathooupuri, Gorchuk, Guwahati

    841.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 296.82 0.00 296.82

    72

    Construction of Multistoried Car Parking cum City Hall, Jorhat

    1051.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 371.06 0.00 371.06

    73

    Bodoland Bhawan at Dwarka, New Delhi(BTC Package-2)

    909.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 454.92 0.00 454.92

    74

    Setting up of Integrated Agro- Processing Park at Lalpool (Udalguri))(BTC Package-2)

    907.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 453.50 0.00 453.50

    75

    construction of cold storage ar Barama (Baska))(BTC Package-2)

    890.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 445.00 0.00 445.00

    76

    Enhancement of existing facility in Verteniary hospital at titaguri (Kokrajhar), Samthaibari(Chirang) and Bornagaon in Udalguri Distict.)(BTC

    901.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.95 250.00 450.95

  • Package-2)

    77

    Proposed Integrated textile Park at Kharujan, Mushalpur(BTC Package-2)

    4100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 891.13 1158.87 2050.00

    Total of Miscellaneous

    sector (29 Projects)

    30578.18

    485.00

    151.00 0.00

    636.00

    2011.72

    1671.00

    5146.00

    1064.46

    561.54

    1246.24

    1226.45

    1062.46

    4456.62

    1408.87

    21127.36

    Power

    78

    ST&D - Construction of11/0.4 KV distribution S/S 11 KV lines and LT lines-LT lines- 100 km

    100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 Completed

    79

    ST&D- Construction of 11/.4 KV distribution S/S 11 KV lines and LT lines - 11/0.4 KV substation (500 KVA - 10 Nos., 315 KVA - 10 Nos., 250 KVA - 100 Nos., 100 KVA - 100 Nos., & 63 KVA - 50 Nos.

    688.00 0.00 0.00 600.00 0.00 88.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 688.00 Completed

    80

    ST&D-Construction of 11/0.4 KV distribution S/S 11 KV lines and LT lines - 11 KV line - 100km

    100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 Completed

  • 81

    Sub-transmission and Distribution lines (ST&D)-Construction of 33 KV, 30 Km D/C line from Chandrapur to Narengi

    200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 Completed

    82

    Renovation of BTPS-Agia-Sarusajai 220 kV D/C Transmission Line

    2838.00 0.00 0.00 0.00 0.00 1000.00 0.00 1664.10 0.00 156.51 0.00 0.00 0.00 0.00 0.00 2820.61

    83

    Electrification of Tribal Villages

    136.00 0.00 0.00 0.00 68.00 0.00 0.00 67.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 135.00

    84

    2x50 MVA , 220/132 KV Balipara (Tezpur ) Sub-station and a 132 KV Gohpur-Depota Line

    1371.00 65.30 0.00 0.00 0.00 150.00 400.00 410.60 0.00 310.32 0.00 0.00 0.00 0.00 0.00 1336.22

    85

    ST&D - Augmentation of 33/11 kV Garbhanga S/S from 2x5 MVA to 2x10 MVA

    96.00 0.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.00 Completed

    86

    ST&D - Augmentation of Duliajan 33 kV S/S from 1x2.5 MVA to 1x5 MVA

    90.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.00 Completed

    87

    ST&D - Augmentation of Hailakandi 33 kV S/S from 2x2.5 MVA to 2x5 MVA

    120.00 0.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00

  • 88

    ST&D - Augmentation of Hojai 33 kV S/S from 1x2.5 MVA to 2x2.5 MVA

    60.00 0.00 0.00 0.00 0.00 35.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00

    89

    ST&D - Augmentation of Karimganj 33 kV S/S from 1x5 + 1x3.16 MVA to 2x5 MVA

    75.00 0.00 0.00 0.00 0.00 55.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 75.00 Completed

    90

    ST&D - Augmentation of Tezpur 33 kV S/S from (1x2.5+5) MVA to 2x5 MVA

    90.00 0.00 0.00 0.00 0.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00

    91

    ST&D - Augmentation of Titabor 33 kV S/S from 2x2.5 MVA to 2x5 MVA

    105.00 0.00 0.00 0.00 0.00 105.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 105.00 Completed

    92

    ST&D - Construction of 12 km 33 kV Baitamari to Chapar line with construction of 2x2.5 MVA S/S at Chapar

    72.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 42.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 Completed

    93

    ST&D - Construction of 14.5 km 33 kV Pathsala-Nathkuchi line with augmentation of Pathsala S/S from 2x2.5 MVA to 2x5 MVA

    181.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 81.00 0.00 0.00 0.00 0.00 0.00 0.00 181.00 Completed

  • 94

    ST&D - Construction of 18 km long 33 kV line from Garmur to Pulibor alongwith 2x2.5 MVA S/S at Publibor

    124.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 24.00 0.00 0.00 0.00 0.00 0.00 0.00 124.00 Completed

    95

    ST&D - Construction of 18 km long 33 KV line from Latka tapping poing to Agamoni alongwith installation of 2.5 MVA S/S at Agamoni

    77.00 0.00 0.00 0.00 0.00 55.00 0.00 0.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 77.00 Completed

    96

    ST&D - Construction of 1x2.5 MVA, 33 kV S/S at Gogamukh

    45.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00

    97

    ST&D - Construction of 22 km long 33 kV line from Bordubi to Tengakhat with construction of 1x2.5 MVA transformer

    122.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.00 0.00 0.00 0.00 0.00 0.00 0.00 122.00 Completed

    98

    ST&D - Construction of 23 km 33 kV line from Rangia to Tamulpur

    47.00 0.00 0.00 0.00 0.00 35.00 0.00 0.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 47.00 Completed

    99

    ST&D - Construction of 26 km 33 kV Agia - Mornoi line with construction of

    163.00 0.00 0.00 0.00 0.00 80.00 0.00 0.00 83.00 0.00 0.00 0.00 0.00 0.00 0.00 163.00 Completed

  • 2x2.5 MVA S/S at Mornoi

    100

    ST&D - Construction of 37 km 33 kV line from Patharkandi to Karimganj

    119.00 0.00 0.00 0.00 0.00 50.00 0.00 0.00 69.00 0.00 0.00 0.00 0.00 0.00 0.00 119.00 Completed

    101

    ST&D - Construction of 45 km long 33 kV line from Rowta Grid S/S to Paneri and augmentation of Paneri S/S from 2x3.16 MVA to 2x5 MVA

    362.00 0.00 0.00 0.00 0.00 150.00 0.00 0.00 212.00 0.00 0.00 0.00 0.00 0.00 0.00 362.00 Completed

    102

    ST&D - Construction of 5 MVA 33 kV S/S at Biswanath Chariali

    98.00 0.00 0.00 0.00 0.00 60.00 0.00 0.00 13.40 0.00 0.00 0.00 0.00 0.00 0.00 73.40

    103

    ST&D - Construction of 5 MVA, 33 kV S/S at Missamari

    85.00 0.00 0.00 0.00 0.00 55.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.00

    104

    ST&D - Installation of 11 KV Auto Reclosers in S/S (40 Nos.)

    317.00 0.00 0.00 0.00 0.00 217.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 317.00 Completed

    105

    ST&D - Reconductoring of KahiliPara-Ulubari 33 kV feeder from raccoon to wolf conductor

    5.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 Completed

    10

    ST&D- Construction of 214.00 0.00 0.00 0.00 0.00 112.00 0.00 0.00 102.00 0.00 0.00 0.00 0.00 0.00 0.00 214.00

    Completed

  • 6 20 km 33 KV line From Garbhanga to Borjhar and interlink with the existing 33 KV Mirza-Rani line along with augmentation of 33/11 KV Mirza S/S to 2x5 MVA

    107

    ST&D -Construction of 28 km line from Rowta to Dhekiajuli on double pole suspension with wolf conductor

    151.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 51.00 0.00 0.00 0.00 0.00 0.00 0.00 151.00 Completed

    108

    ST&D -Construction of 30 km 33 kV line from Pailapool to Kabuganj

    97.00 0.00 0.00 0.00 0.00 50.00 0.00 0.00 47.00 0.00 0.00 0.00 0.00 0.00 0.00 97.00 Completed

    109

    ST&D -Construction of 33/11 kV, 1x2.5 MVA S/S with auto recloser at Manzai

    28.00 0.00 0.00 0.00 0.00 21.00 0.00 0.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 Completed

    110

    Installation of Street Lights from Lokpriya Gopinath Bordoloi International Airport upto Jalukbari near Guwahati University for National Games 2005

    239.16 0.00 0.00 0.00 0.00 0.00 0.00 83.16 0.00 0.00 133.70 0.00 0.00 0.00 0.00 216.86

  • 111

    Powerline to Balipara Industrial Growth Centre, Sonitpur

    872.89 0.00 0.00 0.00 0.00 0.00 0.00 305.89 0.00 0.00 0.00 0.00 320.72 0.00 0.00 626.61

    112

    ST&D - Augmentation of Dibrugarh 33 kV S/S from (3x5 + 1x2.5) MVA to 2x10 MVA

    76.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 0.00 0.00 0.00 76.00 Completed

    113

    ST&D - Construction of 16 km long 33 kV line from Jorhat to Kakajan alongwith installation of 2x2.5 MVA S/S at Kakajan

    90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 90.00 Completed

    114

    ST&D - Construction of 38 km, 33 kV line from Balipara to Dhalukpung

    133.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133.00 0.00 0.00 0.00 0.00 0.00 0.00 133.00 Fully

    Released

    115

    220 KV/DC Kathalguri Tinsukia line (30 Kms.)

    640.00 200.00 0.00 140.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 640.00 Completed

    116

    Installation of 2x31.5 MVA 132/33 KV transformers at Sarusajai Sub Station

    526.00 21.42 0.00 0.00 0.00 60.00 200.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 481.42

    117

    Namrup Sub- station 2x50 MVA, 220/132 kV

    10.57 10.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.57

    Project withdra

    wn. Diverte

    d Rs. 142.11

    L to

  • Sarusajai S/S,

    Rs. 21.42 L

    to Sarusaj

    ay 2X31.5

    MVA and Rs.

    10.60 to

    Balipara SS.

    118

    Tinsukia Sub-Station 2x50 MVA , 220/132 kV

    1964.00 300.00 0.00 700.00 100.00 0.00 600.00 210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1910.00

    119

    Construction of 220/132 Kv, 1x50 MVA, 132/33 Kv and 1x16 MVA Agia S/S

    738.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 227.30 422.50 0.00 0.00 0.00 649.80

    120

    Augmentation of 1x63 and 1x59 MVA, 20/132 kv Transformer by 2x100 mva at sarusajai sub station

    780.00 0.00 0.00 0.00 0.00 60.00 500.00 77.89 142.11 0.00 0.00 0.00 0.00 0.00 0.00 780.00 Completed

    121

    Augmentation of 220/132 kv 2x50 mva s/s to 2x100 s/s at mariani

    637.00 0.00 0.00 0.00 200.00 0.00 300.00 125.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 625.19

    122

    Replacement of old 11 KV MCCB by VCB at Beheting, Hezalbank,doomdooma, Duliajan, North Lakhimpur,

    510.00 0.00 0.00 0.00 0.00 245.00 0.00 0.00 265.00 0.00 0.00 0.00 0.00 0.00 0.00 510.00 Completed

  • Meherpur, karimganj, Tangla, Amingaon, Narangi, Nagaon,Kaliabor, Kathiatoli, rupohi, Samaguri, bokajan, jorhat, Balipara, Tezpur,chapaguri & Diphu S/S

    123

    Construction of 220/132 KV, 2x50 MVA and 220/33 KV, 2x40 MVA Azara Sub - Station with 220 Kv LILO line from one circuit of 220 KV DC Agia - Sarusajia line along with construction of 132 KV SC line to Boko with terminal bay at 132/33 Boko Sub-station

    3622.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1140.95 0.00 0.00 0.00 0.00 1140.95

    124

    Augmentation of Transformer Capacity of 132/33 KV Panchgram Sub Station from 2x16 MVA to 2x25 MVA in Cachar District

    440.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.60 0.00 0.00 177.40 0.00 316.00

    125

    Strengthening of 11 kV HT and LT Line

    520.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.14 0.00 0.00 0.00 260.14

  • with 12 Meter Steel Tubular Pole including Illumination of Kokrajhar Town(BTC Package)

    126

    Construction of 132 KV BTPS - Kokrajhar S/C line and 132 KV Kokrajhar S/C line 132 Kv/33Kv S/S at Kokrajhar

    4357.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1538.02 0.00 1538.02

    Total of Power sector (49 Projects)

    24533.41

    597.29 0.00

    1840.00

    668.00

    3364.00

    2000.00

    3143.83

    1713.51

    466.83

    1640.55

    682.64

    320.72

    1715.42 0.00

    18152.79

    Road & Bridges

    127

    Construction of RCC Bridge No. 1/1, 3/1 and 5/1 on Bahirjonai Berachapari Road in Dhemaji District (Assam) with approaches

    552.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 173.93 0.00 0.00 0.00 0.00 222.10 0.00 396.03

    128

    Construction of RCC Bridge No. 1/1, 4/1 and 5/1 on Sripani Jengrai Road in Dhemaji District (Assam) with approaches

    301.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95.06 0.00 0.00 0.00 0.00 0.00 0.00 95.06

    12

    Recce of Road in BAC Area 3.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00

    Completed

  • 9

    130

    Barpeta Basbari Road, Barpeta

    90.00 0.00 0.00 0.00 24.00 63.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 87.00

    131

    Kachubari-Naokata-Patharighat Road, Nalbari & Darrang

    396.00 0.00 0.00 0.00 106.00 241.12 182.88 -134.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 396.00 Completed

    132

    Kumarikata- Jalah Road, Nalbari.

    1508.00 0.00 0.00 0.00 704.00 628.36 332.64 -157.00 0.00 0.00 -11.60 0.00 0.00 0.00 0.00 1496.40

    133

    Rowta- Udalguri Road, Darrang.

    832.00 0.00 0.00 0.00 244.00 139.51 448.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 832.00 Completed

    134

    Tamulpur-Goreswar Road, Nalbari.

    473.41 0.00 0.00 0.00 251.00 253.51 183.49 -214.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 473.41 Completed

    135

    Udalguri - Kahibari road 366.00 0.00 0.00 0.00 128.00 60.74 198.26 -21.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 366.00

    Completed

    136

    Udalguri- Bhairabkunda Road, Darrang.

    586.00 0.00 0.00 0.00 488.00 126.00 0.00 -28.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 586.00 Completed

    137

    Ambagaon - Barigaon Road 763.00 0.00 0.00 0.00 0.00 63.80 0.00 0.00 200.00 34.40 414.88 0.00 0.00 0.00 0.00 713.08

    Fully Release

    d

    138

    Barangajuli-Khairabari road 210.00 0.00 0.00 0.00 0.00 36.30 0.00 23.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.30

    139

    Charuali - Nagarijuli Road

    538.00 0.00 0.00 0.00 0.00 52.00 0.00 29.00 0.00 411.30 0.00 0.00 0.00 0.00 0.00 492.30 Fully

    Released

    140

    Hardutta-Birudatta road 133.00 0.00 0.00 0.00 0.00 133.00 0.00 0.00 -1.54 0.00 0.00 0.00 0.00 0.00 0.00 131.46

    141

    Mangaldai- Bhutiachang Road, Darrang.

    120.70 0.00 0.00 0.00 0.00 120.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.70

    1 Rangiya 152.00 0.00 0.00 0.00 0.00 76.93 0.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 151.93

  • 42

    Goreswar Road

    143

    tangla - Dimakuchi Road

    251.00 0.00 0.00 0.00 0.00 118.25 0.00 0.00 0.00 0.00 132.75 0.00 0.00 0.00 0.00 251.00 Completed

    144

    Udalguri-Tamulpur Road, Darrang.

    3632.00 0.00 0.00 0.00 0.00 125.45 252.52 393.92 0.00 392.14 1212.00 969.96 0.00 0.00 0.00 3345.99

    145

    Causeway Over Kulsi, Darrang 100.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00

    Fully Release

    d

    146

    Chamuapara - Purandia Road 485.00 0.00 0.00 0.00 0.00 0.00 247.00 0.00 -132.75 0.00 0.00 166.84 0.00 0.00 0.00 281.09

    147

    Construction of RCC Bridge No. 2/2 - Haripur Sansarghat Road in Nalbari District

    226.37 0.00 0.00 0.00 0.00 0.00 126.37 0.00 0.00 56.62 0.00 0.00 0.00 0.00 0.00 182.99

    148

    Construction of RCC Bridge No. 20/1 - Nalbari Palla Road in Nalbari District

    144.36 0.00 0.00 0.00 0.00 0.00 74.36 0.00 0.00 0.00 0.00 39.38 0.00 0.00 0.00 113.74

    149

    Construction of RCC Bridge No. 42/5 & 74/1 on DLHS Road in Karbi Anglong District

    143.25 0.00 0.00 0.00 0.00 0.00 73.00 0.00 0.00 0.00 39.57 0.00 0.00 0.00 0.00 112.57

    150

    Jagun-Kharsang Road(11 KM)

    303.94 0.00 0.00 0.00 0.00 0.00 150.00 0.00 0.00 106.61 0.00 0.00 0.00 0.00 0.00 256.61

    151

    Rcc Bridge on Additional Approach to Airport road(2nos)

    173.39 0.00 0.00 0.00 0.00 0.00 123.27 0.00 0.00 41.24 0.00 0.00 0.00 0.00 0.00 164.51

  • 152

    Rcc Bridge on Mandakata North Guwahati Road(2 nos)

    240.19 0.00 0.00 0.00 0.00 0.00 128.10 0.00 61.07 0.00 0.00 0.00 0.00 0.00 0.00 189.17

    153

    RCC Bridge 4/1 on Hatigaon -Betapara

    153.84 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 33.97 0.00 0.00 0.00 0.00 0.00 133.97

    154

    Tangla - Deor Road 379.00 0.00 0.00 0.00 0.00 0.00 379.00 0.00 -379.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.00

    Project droppe

    d in 55th

    NLCPR Commi

    ttee Meeting held

    on 06.02.2

    008

    155

    Udalguri - Kharupetia Road

    925.00 0.00 0.00 0.00 0.00 0.00 312.00 0.00 -200.00 0.00 -112.00 0.00 0.00 0.00 0.00 0.00

    Project droppe

    d in 55th

    NLCPR Commi

    ttee Meeting held

    on 06.02.2

    008

    156

    Construction of RCC Bridge No. 1/2 and 3/1 on Sarupeta Bhuyapara in Barpeta District

    177.36 0.00 0.00 0.00 0.00 0.00 0.00 62.36 0.00 99.40 0.00 0.00 0.00 0.00 0.00 161.76

    157

    Construction of RCC Bridge No. 1/3, 2/1 and 3/1 on Namti Ali in Sivasagar District

    89.68 0.00 0.00 0.00 0.00 0.00 0.00 30.00 0.00 51.55 0.00 0.00 0.00 0.00 0.00 81.55

  • 158

    Construction of RCC Bridge No. 156/2, 159/1, 163/2, 165/3, 172/2, 174/2, 177/1 and 182/2 on Dhodar Ali Road in Sivasagar District

    352.51 0.00 0.00 0.00 0.00 0.00 0.00 122.51 0.00 198.74 0.00 0.00 0.00 0.00 0.00 321.25

    159

    Construction of RCC Bridge No. 4/2, 9/2, 10/2 and 17/1 on Met Na-Ali Jorhat Titabor in Jorhat District

    142.60 0.00 0.00 0.00 0.00 0.00 0.00 50.00 0.00 80.39 0.00 0.00 0.00 0.00 0.00 130.39

    160

    Construction of RCC bridge No.1/1, 2/1 and 2/2 on Jonnai Silapathar Road in Dhimaji District

    190.00 0.00 0.00 0.00 0.00 0.00 0.00 67.00 0.00 106.37 0.00 0.00 0.00 0.00 0.00 173.37

    161

    Construction of RCC bridge No.1/2 on Manja to Hidim Teron Road in Karbi Anglong District

    178.12 0.00 0.00 0.00 0.00 0.00 0.00 62.00 0.00 0.00 100.38 0.00 0.00 0.00 0.00 162.38

    162

    Construction of RCC bridge No.12/1 and 12/2 on Bangaon Jagara Road in Nalbari District

    174.81 0.00 0.00 0.00 0.00 0.00 0.00 62.00 0.00 97.50 0.00 0.00 0.00 0.00 0.00 159.50

    163

    Construction of RCC bridge No.12/3 on Balkulia

    173.51 0.00 0.00 0.00 0.00 0.00 0.00 60.00 0.00 0.00 98.14 0.00 0.00 0.00 0.00 158.14

  • Rajapathar Road in Karbi Anglong District

    164

    Construction of RCC bridge No.13/1, 14/1, 15/1, 20/3 and 22/1 on Silchar Kumbhirgram Road in Cachar District

    567.87 0.00 0.00 0.00 0.00 0.00 0.00 200.89 0.00 316.63 0.00 0.00 0.00 0.00 0.00 517.52

    165

    Construction of RCC bridge No.24/1 on Barpathar-Bokajan Deithor-Chowkihola (BBDC) Road in Karbi Anglong District

    54.42 0.00 0.00 0.00 0.00 0.00 0.00 22.00 0.00 0.00 27.00 0.00 0.00 0.00 0.00 49.00

    166

    Construction of RCC bridge No.26/3 on Samar Ali Das Road in Karbi Anglong District in Assam

    167.54 0.00 0.00 0.00 0.00 0.00 0.00 59.00 0.00 0.00 94.34 0.00 0.00 0.00 0.00 153.34

    167

    Construction of RCC bridge No.3/1, 3/2,6/3,6/4, 6/6,10/5,12/1, 13/1, 21/2 and 23/2 on Border Roads (Gar Ali) in Jorhat District

    397.56 0.00 0.00 0.00 0.00 0.00 0.00 140.00 0.00 222.84 0.00 0.00 0.00 0.00 0.00 362.84

    168

    Construction of RCC bridge No.35/2 and 53/2 on Moran Naharkatia

    114.16 0.00 0.00 0.00 0.00 0.00 0.00 40.28 0.00 63.92 0.00 0.00 0.00 0.00 0.00 104.20

  • Road in Dibrugarh District

    169

    Construction of RCC Bridge No.4/3, 10/2 and 14/1 on Pengeri Philobari Road in Tinsukia District with approaches

    233.66 0.00 0.00 0.00 0.00 0.00 0.00 113.66 0.00 102.63 0.00 0.00 0.00 0.00 0.00 216.29

    170

    Construction of RCC bridge No.40/1 on Bagals Road in Kamrup District

    128.88 0.00 0.00 0.00 0.00 0.00 0.00 44.00 0.00 73.32 0.00 0.00 0.00 0.00 0.00 117.32

    171

    Construction of RCC bridge No.40/2 on CPDMDK Road in Karbi Anglong District

    131.82 0.00 0.00 0.00 0.00 0.00 0.00 46.70 0.00 0.00 73.57 0.00 0.00 0.00 0.00 120.27

    172

    Construction of RCC Bridge No.6/1 on Udalguri Barbengera Road in Darrang District with approaches

    104.03 0.00 0.00 0.00 0.00 0.00 0.00 50.03 0.00 46.13 0.00 0.00 0.00 0.00 0.00 96.16

    173

    Construction of RCC bridge No.8/2, 20/1, 21/1, 23/3, 29/2, 32/1, 36/1 and 40/1 on Mangaldoi Bhutiachang Road in Darrang District

    684.70 0.00 0.00 0.00 0.00 0.00 0.00 240.15 0.00 375.74 0.00 0.00 0.00 0.00 0.00 615.89

  • 174

    Improvement of Bhangagarh - Bharalumukh VIP Road for National Games 2005

    982.80 0.00 0.00 0.00 0.00 0.00 0.00 344.00 0.00 0.00 548.99 0.00 0.00 0.00 0.00 892.99

    175

    Improvement of Road between Hatigaon Bhetapara Road for National Games 2005

    456.26 0.00 0.00 0.00 0.00 0.00 0.00 160.00 0.00 254.67 0.00 0.00 0.00 0.00 0.00 414.67

    176

    Kaithalkuchi-Barama Subankhata Road, North Kamrup

    61.00 0.00 0.00 0.00 0.00 0.00 0.00 61.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.00 Completed

    177

    Namati-Masalpur Road, Nalbari

    31.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 Completed

    178

    Tihu-Barama Road, Nalbari. 64.00 0.00 0.00 0.00 0.00 0.00 0.00 64.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.00

    Completed

    179

    Tangla - Bhergaon Road 0.00 0.00 0.00 0.00 0.00 29.33 0.00 -29.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.00

    Project closed

    after sanctio

    n

    180

    Diguncherra-Airport Road 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00

    Completed

    181

    Road from Jarighat to Lakhichhera.

    92.00 0.00 92.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.00 Completed

    182

    Road from Hatichhera Dudpati Mudrennamukh.

    43.00 0.00 43.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.00 Completed

    18

    Construction of RCC Bridge 516.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 162.67 0.00 0.00 205.46 0.00 0.00 368.13

  • 3 No.27/2, 28/1,29/1,30/2,32/2,35/1 and 45/1 including approaches on Dhubri-Kachugaon Road in Kokrajhar

    184

    Construction of RCC Bridge No. 1/1 and 4/1 with approaches on Nilbagan-Hojai Road in Nagaon District (Assam)

    191.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.38 0.00 110.41 0.00 0.00 0.00 170.79

    185

    Construction of RCC Bridge No.3/1 including approaches on Pukia Silapathar Road in Dhemaji District.

    136.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.08 0.00 78.81 0.00 0.00 0.00 121.89

    186

    Construction of RCC Bridge No. 4/1 and 15/1 including approaches on Nagaon - Bhuragaon Road in Nagaon District

    434.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 136.83 250.25 0.00 0.00 0.00 0.00 387.08

    187

    Construction of RCC Bridge No.38/1, 43/1,43/3 and 44/2 including approaches and subway on Silchar - Hailakandi Road in

    353.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.24 0.00 0.00 0.00 139.53 0.00 250.77

  • Hailakandi District

    188

    Improvement of Kaurbaha-Nagrijuli Road by metalling and black-topping including conversion of SPT Bridges into RCC Minor Bridges (BTC Package)

    1450.00 0.00 0.00 0.00 0.00 0.00 0.00 285.50 0.00 256.95 0.00 903.05 0.00 0.00 0.00 1445.50

    Cost approve

    d by SLSC =

    Rs. 1450.00 lacs

    against an

    indicative cost of Rs.

    571.00 lacs

    189

    Metalling and Black-topping of Narabari Dawkibari Road (Narabari to Florican Garden via Malgaon)(BTC Package)

    1595.00 0.00 0.00 0.00 0.00 0.00 0.00 797.50 0.00 717.75 0.00 79.75 0.00 0.00 0.00 1595.00

    Cost approve

    d by SLSC =

    Rs. 1595 lacs

    against an

    indicative cost of Rs. 1595 lacs

    190

    Improvement of North Kajolgaon Dangtol Road (BTC Package)

    592.67 0.00 0.00 0.00 0.00 0.00 0.00 299.21 0.00 264.11 0.00 29.35 0.00 0.00 0.00 592.67 Completed

    191

    Improvement of Bhowraguri Kachugaon Road in Kokrajhar (BTC Package)

    2373.45 0.00 0.00 0.00 0.00 0.00 0.00 1195.50 0.00 1060.15 0.00 117.80 0.00 0.00 0.00 2373.45

    Cost approve

    d by SLSC =

    Rs. 2373.45 lacs

    against an

    indicative cost of Rs.

  • 2391.00 lacs

    192

    Improvement and upgradation of Kashikotra to Basugaon Road(BTC Package)

    550.69 0.00 0.00 0.00 0.00 0.00 0.00 278.00 0.00 245.42 0.00 27.27 0.00 0.00 0.00 550.69

    Cost approve

    d by SLSC =

    Rs. 550.69

    lacs against indicative cost of Rs.

    556.00 lacs

    193

    Improvement of Sundari Bidyapur via Kakragaon Road(BTC Package)

    921.36 0.00 0.00 0.00 0.00 0.00 0.00 465.25 0.00 410.50 0.00 45.61 0.00 0.00 0.00 921.36

    Cost approve

    d by SLSC =

    Rs. 921.36

    lacs against indicative cost of Rs.

    930.50 lacs

    194

    Metalling and backtopping of Gossaigaon to Saraibil Road including improvement of existing hard crust and conversion of STP bridge to Rcc bridges(BTC Package)

    1939.00 0.00 0.00 0.00 0.00 0.00 0.00 1041.19 0.00 0.00 808.03 89.78 0.00 0.00 0.00 1939.00 Fully

    Released

    195

    Widening and Strengthening of Fakiragram-Serfanguri Road including conversion of

    2049.16 0.00 0.00 0.00 0.00 0.00 0.00 1032.04 0.00 915.40 0.00 101.71 0.00 0.00 0.00 2049.15

    Cost approve

    d by SLSC =

    Rs. 2049.1

  • STP bridge to Rcc bridges(BTC Package)

    6 lacs against

    an indicative cost of Rs.

    2064.08 lacs

    196

    Improvement of North Kajolgaon Bengtol Sonitpur road, Chirang(BTC Package)

    810.00 0.00 0.00 0.00 0.00 0.00 0.00 405.15 0.00 364.36 0.00 40.48 0.00 0.00 0.00 809.99

    Cost approve

    d by SLSC = Rs. 810

    lacs against

    an indicative cost of Rs.

    810.31 lacs

    197

    Construction of Road from NH-31 at Barama to Masalpur, Baska(BTC Package)

    1443.00 0.00 0.00 0.00 0.00 0.00 0.00 543.00 0.00 488.70 0.00 54.30 0.00 0.00 0.00 1086.00

    Cost approve

    d by SLSC =

    Rs. 1443.00 lacs

    against an

    indicative cost of Rs.

    1086.00 lacs

    198

    Improvement of Jalah Rupahi Saudarbhitha Gobardhana road, Baska(BTC Package)

    1000.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 0.00 450.00 0.00 50.00 0.00 0.00 0.00 1000.00

    Cost approve

    d by SLSC =

    Rs. 1000.00 lacs

    against an

    indicative cost of Rs.

  • 1000.00 lacs

    199

    Improvement of Udalguri Bhakatpara road via Bhairaguri, Udalguri(BTC Package)

    444.00 0.00 0.00 0.00 0.00 0.00 0.00 221.98 0.00 199.81 0.00 22.20 0.00 0.00 0.00 443.99

    Cost approve

    d by SLSC =

    Rs. 444.00

    lacs against

    an indicative cost of Rs.

    443.96 lacs

    200

    Improvement of Barnagaon Pakribari road, Udalguri (BTC Package)

    150.00 0.00 0.00 0.00 0.00 0.00 0.00 75.00 0.00 67.50 0.00 7.50 0.00 0.00 0.00 150.00

    Cost approve

    d by SLSC = Rs. 150

    lacs against

    an indicative cost of Rs.

    150 lacs

    201

    Improvement of Kalaigaon Kundarbil road, Udalguri (BTC Package)

    132.00 0.00 0.00 0.00 0.00 0.00 0.00 65.95 0.00 59.44 0.00 6.60 0.00 0.00 0.00 131.99

    Cost approve

    d by SLSC =

    Rs. 132.00

    lacs against

    an indicative cost of Rs.

    131.91 lacs

    202

    Improvement of Dhamdhama Tupalia Subankhata

    1372.00 0.00 0.00 0.00 0.00 0.00 0.00 294.50 0.00 265.05 293.73 518.72 0.00 0.00 0.00 1372.00

    Cost approve

    d by SLSC =

  • (DTS) Road (Metalling and black-topping of remaining stretches including improvement of existing metalled surface(BTC Package)

    Rs. 1372 lacs

    against an

    indicative cost of Rs.

    589 lacs

    203

    Road improvement projects in NC Hills (6 No.)

    498.00 0.00 498.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 498.00 Completed

    204

    Construction of RCC Bridge No.2/2 and 4/2 including approaches on Gurnagar Tikrikilla Road in Goalpara District

    355.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.28 0.00 0.00 0.00 0.00 141.00 252.28

    205

    Goreswar to Khoirabari Road (BTC Package)

    657.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 295.78 0.00 295.78 65.72 0.00 0.00 0.00 657.28 Completed

    206

    Bhergaon-Chouni-Khagrabari-Dimakuchi Road (BTC Package)

    131.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.40 0.00 59.05 13.16 0.00 0.00 0.00 131.61

    207

    Lailongpara-Kopati Road Via Boro Bazar(BTC Package)

    131.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.40 0.00 58.54 13.10 0.00 0.00 0.00 131.04

    208

    Khowrang Mahanpur Road (BTC Package)

    250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.50 0.00 112.50 25.00 0.00 0.00 0.00 250.00 Completed

    20

    Chapaguri-Khagrabari 630.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 283.50 0.00 283.50 63.00 0.00 0.00 0.00 630.00

    Completed

  • 9 Road(BTC Package)

    210

    Tulsijhyora-Kailamaila Road via Amguri(BTC Package)

    900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 405.00 0.00 405.00 90.00 0.00 0.00 0.00 900.00 Completed

    211

    Bijni-Panbari Road(BTC Package)

    1558.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 701.36 0.00 701.36 155.86 0.00 0.00 0.00 1558.58 Fully

    Released

    212

    Gossaigaon to Kazigaon via Bhukka, Tipkai Road(BTC Package)

    1100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 495.00 0.00 0.00 605.00 0.00 0.00 0.00 1100.00 Fully

    Released

    213

    Construction of RCC Bridge No. 2/1 on Kokrajhar Monakocha Road over River Gaurang in Kokrajhar District with approaches

    990.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 264.05 0.00 0.00 313.69 0.00 305.00 0.00 882.74

    214

    Construction of RCC Bridge No. 9/2 on Borbhogia Mikirbhata Road in Morigaon District with approaches

    238.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.84 0.00 0.00 104.09 0.00 0.00 0.00 212.93

    215

    Construction of RCC Bridge No. 17/4, 19/4, 20/2 and 26/1 on Mt. Sepon Sunpura Road in Sivasagar District (Assam) with approaches

    377.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 175.81 0.00 0.00 160.91 0.00 0.00 0.00 336.72

    2 Construction of 165.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 101.67 0.00 46.03 0.00 0.00 0.00 0.00 147.70

  • 16

    RCC Bridge No. 3/2 over River Mansiri on Charduar Road with approaches in Sonitpur District

    217

    Construction of RCC Bridge No. 4/1, 6/1 and 14/1 on North Lakhimpur Kamalabari Road

    455.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 237.60 0.00 0.00 168.09 0.00 0.00 0.00 405.69

    218

    Construction of RCC Bridge No. 2/3, 5/1, 9/1, 11/1, 15/3, 16/1, 18/1 and 19/4 on Itakhola Pavoi Road in Sonitpur District (Assam) with approaches

    875.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 456.41 0.00 0.00 0.00 0.00 0.00 0.00 456.41

    219

    Construction of RCC Bridge No. 1/1, 4/1, 8/1 and 9/2 on Fakiragram Sapatgram Road in Dhubri District with approaches

    514.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 284.36 0.00 0.00 174.12 0.00 0.00 0.00 458.48

    220

    Construction of RCC Bridge No. 6/1 on Chariali Pavoi Road in Sonitpur District with approaches, protection work and sub-way

    88.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.32 0.00 0.00 0.00 29.58 0.00 0.00 78.90

  • 221

    Construction of RCC Bridge No. 16/1, 19/1 and 19/3 on Bagals Road in Nalbari District with approaches

    404.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 127.49 0.00 0.00 0.00 111.44 0.00 0.00 238.93

    222

    Construction of Road from Beltola Chariali to Sarusajai (Bishnu Rabha Path), Guwahati (Assam)

    777.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 244.85 447.81 0.00 0.00 0.00 0.00 0.00 692.66

    223

    Improvement of Tihu Doomni Road leading to Indo-Bhutan foot hills from 7th to 25 km in Baska district(BTC Package)

    995.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 447.75 0.00 447.75 99.50 0.00 0.00 0.00 995.00 Completed

    224

    Improvement of Khoirabari MPK road (Andherighat) to Harisinga via Bhergaon, Tangla and Purandia 42.25 km length with conversion of 11 SPT bridges to RCC(BTC Package)

    2650.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1192.62 0.00 1192.62 265.02 0.00 0.00 0.00 2650.26 Fully

    Released

    225

    Construction of Kashikotra Bamungaon Bengtol Road(BTC Package)

    1169.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 526.45 0.00 525.65 116.90 0.00 0.00 0.00 1169.00 Fully

    Released

    2 Construction of 466.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.93 0.00 0.00 268.70 0.00 0.00 0.00 415.63

  • 26

    RCC Bridge No. 1/1, 3/1, 3/2 and 4/1 on Bhairabpur to Kulibazar Road in Dhemaji District (Assam) with approaches

    227

    Construction of RCC Bridge No. 6/1, 7/1, 8/1, 8/2, 9/1, 11/1 and 11/2 on Sepon Suffry Road in Sivasagar District (Assam) with approaches

    411.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 129.52 0.00 0.00 0.00 0.00 0.00 0.00 129.52

    228

    Construction of RCC Bridge No. 10/1 and approaches on Khowang Bhamun Road in Dibrugarh District of Assam

    103.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.52 0.00 0.00 59.51 0.00 0.00 0.00 92.03

    229

    Construction of Additional Two Lane Rail-Over-Bridge (ROB) on A.T. Road at Maligaon, Guwahati (Assam)

    1355.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 420.80 781.49 0.00 0.00 0.00 0.00 0.00 1202.29

    230

    Construction of RCC Bridge No. 5/1 on Burhagohain Tinthengia Road in Dibrugarh District of Assam

    98.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.13 0.00 0.00 56.93 0.00 0.00 0.00 88.06

  • 231

    Construction of RCC Bridge No. 1/1, 3/2 and 5/3 on Tupia Balijuri Road in Sonitpur District of Assam with approaches

    271.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 84.78 0.00 0.00 -84.78 0.00 0.00 0.00 0.00

    Project droppe

    d in 55th

    NLCPR Commi

    ttee Meeting held

    on 06.02.2

    008

    232

    Construction of RCC Bridge No. 4/1, 10/1, 11/1, 11/2, 12/1 and 13/1 on Dekapam to Somkong via Missamara Road in Dhemaji District of Assam with approaches

    688.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 216.75 0.00 0.00 -216.75 0.00 0.00 0.00 0.00

    Project droppe

    d in 55th

    NLCPR Commi

    ttee Meeting held

    on 06.02.2

    008

    233

    Construction of RCC Bridge No. 2/1 on Bamunbari to Jariguri Road in Dibrugarh District of Assam with approaches

    108.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.04 0.00 0.00 0.00 0.00 43.76 0.00 77.80

    234

    Construction of RCC Bridge No. 5/1 on Sonakhira Bubrighat Road in Karimganj District (Assam) with approaches and protection work

    97.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.64 0.00 56.03 0.00 0.00 0.00 0.00 86.67

    235

    Construction of RCC Bridge No. 11/1 on

    109.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.39 0.00 0.00 0.00 0.00 63.07 0.00 97.46

  • Teok Boloma Nakachari Road in Jorhat District (Assam) with approaches

    236

    Construction of RCC Bridge No. 24/2 and 32/2 on Mt. Golaghat Merapani Road in Golaghat District (Assam) with approaches and protection work

    185.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.48 0.00 0.00 0.00 74.98 31.99 0.00 165.45

    237

    Construction of approach road leading to Industrial Growth Centre at Balipara in Sonitpur District (Assam)

    268.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 84.63 0.00 0.00 157.16 0.00 0.00 0.00 241.79 Fully

    Released

    238

    Construction of RCC Bridge No. 10/1 on Gogamukh Ghilamara Road in Dhemaji District (Assam) with approaches

    108.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.15 0.00 0.00 40.30 0.00 0.00 0.00 74.45

    239

    Construction of RCC Bridge No. 5/1 on river Bharalkunda, 7/1 on Sister-par Beel, 8/1 on Dulani Beel, 9/9 on Distributary of river

    709.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 221.26 0.00 210.80 200.10 0.00 0.00 632.16

  • Champamati and 11/1 on Hill Canal including approaches on Jogighopa Chapar Road in Bongaigaon District in Assam.

    240

    Construction of RCC Bridge No. 2/3 on river Bhulla, 3/2 on river Lakhi and 7/2 on river Lakhimorasuti on Bengbari Ambagaon Road in Udalguri District, Assam

    632.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 191.70 0.00 184.23 188.00 0.00 0.00 563.93

    241

    Construction of RCC Bridge No. 2/4, 6/1 and 8/1 on river Kaldia including approaches on Dr. Jina Ram Das Road in Barpeta District (Assam)

    535.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 169.70 0.00 0.00 216.12 0.00 0.00 385.82

    242

    Improvement of Nagaon Morikolong Nanoi dakhinpath Road under Nagaon district

    199.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.56 90.79 0.00 0.00 0.00 177.35

    243

    Project for Road Network of Jorhat Master Plan Area in Jorhat District

    461.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 141.61 0.00 261.23 0.00 0.00 0.00 402.84

  • 244

    Improvement of Barpeta Bashibari Road leading to Manas Sanctuary from km. 1st to Km. 21st in Barpeta District in Assam

    1235.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 384.50 0.00 361.02 250.00 0.00 103.11 1098.63

    245

    Improvement of Roads and Natural Drainage System within Greater Tezpur Town

    2551.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 348.13 0.00 0.00 0.00 0.00 348.13

    246

    construction of RCC Br. No. 4/1 & 6/1 with approaches on J.B road in Jorhat distt.

    324.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 101.18 0.00 115.20 0.00 72.69 289.07

    247

    construction of road and minor bridge from Motinagar to Buban hill Temple - Phase I

    326.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.71 0.00 0.00 0.00 131.16 233.87

    248

    Improvement of Dalgaon Kopti Road (Orang - Dalgaon Road)

    235.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 106.26 0.00 0.00 0.00 0.00 106.26

    249

    Upgradation of Dalgaon Town to Sialmari via Dekerigaon

    251.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.82 0.00 0.00 0.00 0.00 113.82

    250

    Improvement of Nagaon-Barapujia Road under Nagaon Dist.

    298.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.87 0.00 85.63 86.04 0.00 265.54

    2 Construction / 213.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95.40 0.00 0.00 0.00 0.00 95.40

  • 51

    improvement of Batabari Kopati road

    252

    Construction of Road from Bhangarpar to Chandranathppur via babur bazar (Length 5.5 KM)

    249.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.73 0.00 0.00 100.00 0.00 179.73

    253

    Improvement of roads in Jorhat Town

    250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95.95 0.00 78.43 0.00 49.57 223.95

    254

    Improvement of Roads in Sivasagar Town

    242.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.05 0.00 108.00 0.00 0.00 216.05

    255

    Widening and Raising of Nazirakhat Sonapur Road (Length 6.00 km)

    265.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107.77 0.00 130.80 0.00 0.00 238.57

    256

    Construction of Dibrugarh Sapekhati road from km 12 to Km 18 along with 2 RCC bridges No. 18/1 and 19/1 with approches (Bridge over river Buridihing at Saraighat)

    2116.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 666.54 0.00 828.72 0.00 0.00 1495.26

    257

    Improvement of road from Kahilipara to Don Bosco School at Guwahati in Assam

    252.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.10 0.00 113.84 0.00 0.00 226.94

    25

    Improvement of Rampur 224.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.74 0.00 129.39 0.00 0.00 200.13

  • 8 Model Road starting from NH - 37 in Kamrup District

    259

    Construction of RCC Br. No. 1/1 over River Pota on Hazuwa Nalbari Road in Baska District in Assam

    264.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83.16 0.00 0.00 0.00 106.92 190.08

    260

    Construction of RCC Br. No. 1/1 over regular Channel Gadadhar on Silerpar - Borshijhora Road in dhubri District

    450.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 141.98 182.55 81.13 0.00 405.66

    261

    Construction of RCC Br. No. 1/1 over Santijan on Srimanta Sankardev Govesona Kendra Road in Nagaon Road

    280.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.37 0.00 50.00 111.62 0.00 249.99

    262

    construction of RCC Br. No. 4/1 on Belguri - Satrasal Road in Dhrubri District

    273.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.09 0.00 110.69 49.20 0.00 245.98

    263

    Metalling and Black Topping of Swapanpur to Ramchandi Road of Hailakandi District.

    379.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 119.62 0.00 153.50 0.00 0.00 273.12

  • 264

    Construction of 4 lane Tripura road including electrical works from NH - 37 to GS Road

    1136.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 690.42 332.43 0.00 0.00 1022.85

    265

    Construction of RCC bridge at 7th Km of Kathal Road over river Ghagra including approaches and protection work in Cachar District.

    250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.75 0.00 100.00 0.00 178.75

    266

    Construction of RCC bridge no. 10/1 & 18/1 on Bagals Road in Nalbari District with approaches

    308.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.10 0.00 0.00 123.45 219.55

    267

    Construction of RCC bridge no. 18/2 over stream Bahanigaon & bridge no. 19/1 over river Kachikata on Laluk-Narayanpur via Bihpuria Road in Lakhimpur District

    208.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.68 0.00 84.30 0.00 149.98

    268

    Construction of RCC bridge No. 4/1, 7/1, 8/1 and 11/1 over field canal / River Sakati on Abhyapuri Tilungia Road with approaches and

    338.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 105.42 0.00 0.00 0.00 105.42

  • protection works in Bongaigaon District

    269

    Construction of RCC Bridge no. 5/3 on Bhorbhogia Mikirbheta Dhing Road with approaches in Morigaon District

    241.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.22 0.00 0.00 96.69 171.91

    270

    Metalling and Blacktopping of Gunjung Maibang Road from 17th to 28.78 KM(NC Hills)

    640.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 198.71 0.00 0.00 198.71

    271

    Construction of RCC bridge No. 57/1 on Gaurisagar Moran Road and construction of RCC bridge no. 15/2 over River Disam on Naharkatia - Tinkhong Road under Dibrugarh Rural Road Division

    406.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.65 0.00 0.00 0.00 126.65

    272

    Conversion of SPT Bridge 20/1 over River Gangia into RCC Bridge on Gosaigaon Sapatgram Road in Kokrajhar District(BTC

    1082.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 541.34 0.00 0.00 0.00 541.34

  • Package)

    273

    Construction of RCC Br. No. 32/1 on AT road (old) including approaches with protection works in Goalpara

    739.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 230.51 0.00 0.00 0.00 230.51

    274

    Constn. of Br.No. 28/1 on Dehangi Dayangmukh Road over thaijuwari Nala & Langlodisa Nala (PWD Roads Haflong Division)(NC Hills)

    355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.76 0.00 0.00 0.00 111.76

    275

    Construction of RCC Br. No. 7/1 on Dharamtul Dandua Road with approaches

    248.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.48 0.00 99.60 0.00 177.08

    276

    Improvement of Badlapara to Dharamjuli Road under Udalguri Rural Road division

    403.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 124.58 0.00 231.32 0.00 355.90

    277

    Constn. of RCC Br. No. 22/1 over river Diffoloo on Chowkihola Panjan Deithor Malasi Dirring Kohora (CPDMDK) Road with approaches and protection

    303.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.87 0.00 0.00 0.00 94.87

  • works(Karbi Anglong)

    278

    Improvement of BBDC Road at 31 Km (Karbi Anglong)

    4017.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1216.93 0.00 0.00 1216.93

    279

    Construction of RCC Bridge No. 8/6 over river Dirring, (b) Bridge No. 18/1 over river Borjan, (c) Bridge No. 19/1 over River Borjan,(d) Bridge No. 23/3 over River Donjon, (e) Bridge No. 27/3 Over River Kokosang (2) Br. No. 2/1 ovr river Kohra (KarbiAnglon

    1138.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 351.19 0.00 0.00 351.19

    280

    Construction of RCC Bridge No. 2/1 on Nandini Karaimari Road in Assam

    658.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 204.25 0.00 0.00 204.25

    281

    Construction of RCC Bridge No. 4/1 on Garmari Gagalmari Road

    233.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.81 0.00 95.21 168.02

    282

    Rupshir Ali (Construction of Bridge Nos. 3/2,5/2 &5/4)

    210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.15 0.00 85.05 151.20

    28

    Construction of RCC Bridge 465.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 146.00 0.00 0.00 146.00

  • 3 No. 7/1,15/1 and 19/1 on Nagaon Barapujia Road(NH-38) Road division

    284

    Construction of RCC Bridge No. 12/1 on Goroimari -Dewaguri Laharighat Road with approaches in assam

    317.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.11 0.00 0.00 113.11

    285

    Improvement and upgradation of Chencoories Elgin Road including construction of Major RCC bridge over river Ghagra

    1180.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 416.60 0.00 0.00 416.60

    286

    Improvement of Municipal Roads in Narayanpur Town in Assam

    400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 141.17 0.00 0.00 141.17

    287

    Construction of RCC Br. No. 5/1 on Jajari - Chabukdhara Road over River Sonai under Nagaon Rural Road Division

    236.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.52 0.00 83.41 168.93

    288

    Construction of RCC Br. No. 6/1, 9/1 & 10/1 on Ambagaon Kathpara Solmari Singiari Road

    239.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.52 0.00 0.00 85.52

  • (NG-M-17) in Nagaon District

    289

    Construction of RCC Br. No. 8/1 on Bhalukmari in Mikirbheta Bhurbandha Road with approaches and protection work in Morigaon District

    254.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.76 0.00 0.00 90.76

    290

    Improvement of Tangla Bhergaon Ramgaon Road from Ch.00 M to 9400 M including cross drainage works in Udalguri

    1043.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 368.22 0.00 368.23 736.45

    291

    Metalling and Blacktopping of Road from Dr. Fakaruddin Ali Ahmed Path To Doulgobindapur via Nalbari Hindu Smashan, Nalbari along with Pucca Drain and RCC Slab culverts

    227.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.21 0.00 0.00 81.21

    292

    Upgradation of Nagaon - Bhuragaon Road via Dhing (SH-10) under Nagaon State Road Division (Nagaon District)

    1151.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 410.71 0.00 0.00 410.71

    2 Improvement 747.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 268.79 0.00 0.00 268.79

  • 93

    of Road Network leading towards Dibru- Chaikhowa National Park under Dibrugarh Rural Road division

    294

    Improvement of Charigaon Road under Jorhat Road Division

    556.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 199.82 0.00 0.00 199.82

    295

    Construction of RCC Bridge No. 4/1 on Dimou-Raidongia Road over river Sonai under Nagaon Rural Road Division (Nagaon District)

    270.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.50 0.00 96.50

    296

    Metalling and Blacktopping of Road from Borhapjan samdang via Nahoroni road to Sukanguri L.P School in Tinsukia Rural Road Subdivision / Division

    321.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.15 115.00 229.15

    297

    Construction of RCC Bridge No. 3/1 on Majgaon Shantipur Road over River Sonai under Nagaon rural road Division

    333.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118.76 0.00 118.76

  • 298

    Improvement of Jalah to Kumarikata including 2 Nos. of Bridges over River Kaldia and Diring in Baska District(BTC Package)

    2121.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1060.60 0.00 1060.60

    299

    Metalling & Black Topping of Road from Circuit House Tinsukia to NH-37 via Okanimuria Borguri Okanimuria Nakhrai and Lunpuria Kaibortogaon in Tinsukia Rural Road Subdivision/ Division

    524.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 185.75 0.00 185.75

    300

    Construction of Moran Netai Road, Dibrugarh

    303.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 107.49 0.00 107.49

    301

    Construction of road from Hidipi to Lahorijan - goutom Basti road in Karbi anglong

    485.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 170.76 0.00 170.76

    302

    Construction of Tiphuk Jajolipukhuri Road with RCC Bridge No. 3/3 in Sibsagar District

    559.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 199.64 0.00 199.64

    3 Construction of 290.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.49 105.31 208.80

  • 03

    Bridge No. 1/2 & Bridge No. 4/1 on old AT Road under Dibrugarh Rural Road Division in Dibrugarh Distt.

    304

    Construction of RCC Bridge over River Aie

    7883.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2810.01 0.00 2810.01

    305

    Construction of Mohmora Ali with RCC Bridge No. 9/2 in Sibsagar District

    771.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 271.80 0.00 271.80

    306

    Improvement of Tangla Kachubil Road (BTC area)

    1079.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 384.90 0.00 384.90

    307

    Construction of RCC Br. No. 2/2 and 2/3 (Renamed as Br. Nos. 3/1 and 4/6) on Shyamaprasadpur to Dossgram Road via Swapnargul over stream Singrai in Cachar District

    257.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.61 0.00 91.61

    308

    Const of RCC Br. No. Over river Aie at Chillapara Kahibari villages on the road from Kokoijana 31-National High way to Nagaon.Manik

    4001.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1425.60 0.00 1425.60

  • pur 31 National Highway via Kirtanpara, Numbarpara villages under Bongaigaon rural road Divn.

    309

    construction of RCC Bridge No. 8/1 over Gurufella river on Gossaigaon - Sapatgram Road)(BTC Package-2)

    792.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 396.00 0.00 396.00

    310

    Construction of RCC Bridge No. 6/3 over Gongia river on Dotoma - Bhawraguri Road)(BTC Package-2)

    800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 0.00 400.00

    311

    Construction of RCC Bridge No. 3/1 over Puthimari river at Dolonghat (Dhulabari))(BTC Package-2)

    800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 0.00 400.00

    312

    Improvement of Mahilapara Dongapara Barangajuli PWD Road.

    835.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 297.69 0.00 297.69

    313

    Construction of Zoo Japorigog Road (CH.0.00 to 1865.00 m from R.G. Baruah Road near State Zoo to Junction Point of Dispur Narengi Road

    619.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 223.13 0.00 223.13

  • including electrical works

    314

    Improvement of Road Network at Sonari Town under Charaideo Rural Road Division

    723.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.55 0.00 260.55

    315

    Construction of RCC Br. (a) No. 1/1 and 2/1 on Deroi Rongoli road (b) No. 2/1 on Deopling Ramuagar road and No. 3/1 ghilaguri Road

    391.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.06 0.00 138.06

    316

    Construction of RCC Bridge No. 24/1 on Morigaon Moirabari Road in Morigaon District

    315.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.92 0.00 111.92

    317

    Constyruction of RCC bridge no. 13/1, 13/2 and 30/2 on Mohbondha Road

    614.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 219.15 0.00 219.15

    318

    Construction of Br. no 2/1&4/1 on Raha Barapujia road over river Botamari and Hatibandha with approaches in Nagoan District

    369.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.69 0.00 130.69

    31

    Improvement of Roads in 1174.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 414.35 0.00 414.35

  • 9 Biswanath Chariali Town

    320

    Improvement of Bezera Balikuchi road

    370.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.20 0.00 132.20

    321

    Improvement of JB Road 297.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 105.82 105.82

    322

    upgradation of NT road through Ramphalbil Bazar to all weather road with conversion of SPT bridges into RCC bridge(International Border Areas)

    764.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 269.71 269.71

    323

    Construction of RCC Br. No. 1/1 over River Kalang on Ghahi - Borjhora Road under Nagaon Rural Road Division (Nagaon District)

    281.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.22 100.22

    324

    Improvement of Chintagaon Botiamari Road in Udalguri District

    898.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 321.72 321.72

    325

    Construction of Road with MTBT from UT Road at Dimakuchi Donbosco School to Badlapara via

    620.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 223.17 223.17

  • Kalikhola Road, Udalguri in Assam

    Total of Road & Bridges

    sector (204 Projects)

    121478.58

    25.00

    633.00 3.00

    1945.00

    2268.00

    3411.38

    9569.35

    7784.69

    11894.80

    10820.89

    9842.58

    8212.33

    12013.46

    2697.44

    81120.92

    Sports

    326

    Apex Stadium at Kokrajhar, BAC

    930.00 0.00 0.00 150.00 0.00 0.00 400.00 0.00 341.10 0.00 0.00 0.00 0.00 0.00 0.00 891.10

    327

    Mini Stadium at Chapaguri, Bongaigaon

    20.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 8.83 0.00 0.00 0.00 0.00 0.00 18.83

    328

    Creation of Main Athletic Stadium Complex alongwith a multi-purpose Indoor Hall at Guwahati for National Games 2005

    7510.00 0.00 0.00 0.00 0.00 0.00 2200.00 3310.00 1800.00 0.00 0.00 0.00 0.00 0.00 0.00 7310.00

    329

    Diphu Sports Complex at Diphu in Karbi Anglong District

    501.22 0.00 0.00 0.00 0.00 0.00 0.00 175.00 0.00 0.00 293.60 0.00 0.00 0.00 0.00 468.60 Fully

    Released

    330

    Construction of Indoor stadium at Silchar

    494.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 139.89 0.00 209.05 0.00 0.00 348.94

    331

    Development of Jorhat stadium at jorhat

    268.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 84.70 0.00 0.00 0.00 108.40 193.10

    332

    Construction of District Sports Complex at Jhagrapar in

    377.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.66 0.00 0.00 0.00 116.66

  • Dhubri District

    333

    construction of chandi barua stadium at barbapeta

    290.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.67 0.00 0.00 0.00 89.67

    334

    Construction of RCC Gallery of District Sports Association(Stadium Complex,Hailakandi)

    177.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.76 0.00 63.76

    335

    Construction of proposed stadium at Mushalpur in Baska District

    900.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 317.65 0.00 317.65

    336

    Up-gradation of Sports complex at Kajalgaon in chirang (chirang)(BTC Package-2)

    500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 250.00 0.00 250.00

    Total of Sports sector (11 Projects)

    11969.74 0.00 0.00

    160.00 0.00 0.00

    2600.00

    3485.00

    2141.10 8.83

    518.19

    206.33

    209.05

    631.41

    108.40

    10068.31

    Tourism & Culture

    337

    Development of Tourism Infrastructure at Bagori Entry Point of Kaziranga National Park(Karbi Anglong)

    329.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 116.32 0.00 0.00 116.32

    Total of Tourism &

    Culture sector (1 Projects)

    329.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    116.32 0.00 0.00

    116.32

  • Water Supply

    338

    Drinking Water supply, Gossigaon

    363.00 0.00 0.00 100.00 0.00 0.00 0.00 75.32 0.00 0.00 81.85 0.00 0.00 0.00 0.00 257.17

    339

    Greater Silchar Town Water Supply Scheme

    1230.00 0.00 0.00 0.00 0.00 359.00 0.00 581.00 0.00 0.00 218.82 0.00 0.00 0.00 0.00 1158.82

    340

    Haflong Water Supply Scheme (NC Hills)

    141.82 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00

    341

    Stabilisation of Silchar Water Supply Scheme

    386.00 0.00 0.00 0.00 0.00 0.00 0.00 135.00 215.54 0.00 0.00 0.00 0.00 0.00 0.00 350.54

    342

    kokrajhar water supply scheme (BTC Package)

    2312.00 0.00 0.00 0.00 0.00 0.00 0.00 1155.99 0.00 1040.41 0.00 115.60 0.00 0.00 0.00 2312.00 Fully

    Released

    343

    Golaghat Town Water Supply Scheme

    504.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 152.93 203.00 0.00 0.00 0.00 355.93

    344

    Sibsagar Town Water Supply Scheme

    1639.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 499.73 0.00 0.00 0.00 679.70 1179.43

    345

    Subankhata Water Supply Scheme (BTC Package)

    327.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 163.81 0.00 131.06 32.76 0.00 0.00 0.00 327.63 Fully

    Released

    346

    Dhubri Town Water Supply Scheme

    1026.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 323.20 0.00 304.43 0.00 0.00 296.25 923.88 Fully

    Released

    347

    Greater Mahur Town Water Supply Scheme in Assam (NC Hills)

    512.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.36 0.00 0.00 0.00 0.00 0.00 161.36

    348

    Udalguri Piped Water Supply Scheme(BTC Package)

    533.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 228.78 0.00 25.42 0.00 0.00 0.00 254.20

  • 349

    Bheragaon Piped Water Supply Scheme(BTC Package)

    246.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.59 0.00 12.07 120.64 0.00 0.00 241.30

    An amount

    of Rs. 120.64 lac has

    been adjusted from

    Jalah Rupohi Saudar

    vitha Gobard

    hana Road.

    350

    Uttarpar Piped Water Supply Scheme(BTC Package)

    864.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 370.26 0.00 41.14 411.42 0.00 0.00 822.82

    An amount

    of Rs. 411.42 lac has

    been adjusted from

    Jalah Rupohi Saudar

    vitha Gobard

    hana Road.

    351

    Augmentation of Greater Diphu Water Supply Scheme in Karbi Anglong District(Karbi Anglong)

    2767.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 854.64 0.00 0.00 0.00 854.64

    352

    Stabilisation of Dispur Water Supply Scheme

    729.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 225.29 0.00 0.00 289.66 514.95

    353

    Greater Bokajan Water Supply Scheme (Karbi anglong)

    1003.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 310.02 0.00 0.00 0.00 310.02

  • 354

    Langklangvong Water Supply Scheme (Karbi Anglong)

    596.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 210.51 0.00 0.00 210.51

    355

    Mangaldoi Water Supply Scheme

    1261.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 445.06 0.00 0.00 445.06

    356

    Margherita Water Supply Scheme in Tinsukia District

    933.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 328.73 0.00 0.00 328.73

    357

    Bongaigaon Town Water Supply scheme (Bongaigaon District)

    3202.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1129.46 0.00 1129.46

    358

    Kharupetia Water Supply Scheme

    1981.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 699.23 0.00 699.23

    359

    Sarupathar Piped water Supply scheme

    1029.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 363.30 0.00 363.30

    360

    Greater dokmoka Tekelangjan Water supply scheme for fluoride, Arsenic / iron affected areas from river Dikrut(KA)

    1865.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 670.74 670.74

    361

    Tamulpur Piped Water Supply Scheme

    293.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.41 103.41

    Total of Water Supply sector (24 Projects)

    25752.26 0.00 0.00

    100.00 0.00

    359.00 72.00

    1947.31

    379.35

    2232.60

    1084.39

    2124.37

    1516.36

    2191.99

    2039.76

    14047.13

    GRAND TOTAL (390

    Projects)

    280380.68

    2728.29

    9584.00

    6863.00

    8918.00

    14069.72

    11394.55

    24810.73

    21539.66

    23495.84

    24730.69

    14606.27

    12639.18

    21776.06

    7775.58

    204931.57

  • NOTE: 100% fund released => Release of 90% or more of project's approved cost.