Assembly and installation of TM0 Lab

Date post: 15-Feb-2016
Category:
Upload: teryl
View: 34 times
Download: 0 times
Share this document with a friend
Description:
Assembly and installation of TM0 Lab. F. Rossi. February 8th, 2012. MAGNETS & VACUUM TANKS. 4 DBQ (for 2 TM0) Installation on girders -> COMPLETED Alignment -> COMPLETED 2 VACUUM TANKS (for 2 TM0) Installation on girders -> COMPLETED. PETS UNITS. 2 PETS units (for 1st TM0) - PowerPoint PPT Presentation
Popular Tags:
7
[email protected] 1 Assembly and installation of T0 module La [email protected] Assembly and installation of TM0 Lab F. Rossi February 8th, 2012
Transcript
Page 1: Assembly and installation of TM0 Lab

[email protected]

1 Assembly and installation of T0 module Lab

[email protected]

Assembly and installation of TM0 Lab

F. Rossi

February 8th, 2012

Page 2: Assembly and installation of TM0 Lab

[email protected]

2 Assembly and installation of T0 module Lab

MAGNETS & VACUUM TANKS4 DBQ (for 2 TM0)

• Installation on girders -> COMPLETED• Alignment -> COMPLETED

2 VACUUM TANKS (for 2 TM0)

• Installation on girders -> COMPLETED

Page 3: Assembly and installation of TM0 Lab

[email protected]

3 Assembly and installation of T0 module Lab

PETS UNITS2 PETS units (for 1st TM0)

• Final brazing -> COMPLETED• Vacuum test -> COMPLETED• Fiducialisation -> COMPLETED• EBW -> COMPLETED• Vacuum test -> COMPLETED• Final dimensional control on Leitz -> COMPLETED• Installation on girders -> COMPLETED

STATUS: 100%

Page 4: Assembly and installation of TM0 Lab

[email protected]

4 Assembly and installation of T0 module Lab

AS

# STEP1st TM0

1st half 2nd half

1st AS 2nd AS 3rd AS 4th AS 1st AS 2nd AS 3rd AS 4th AS

1 Delivery V V V V V V V V

2 Cleaning V V V V V V V V

3 Brazing WFM and disk stacks V V V V W07 W07 W07 W07

4 Machining WFM V V V V W08 W08 W08 W08

5 Cleaning WFM V V V V W08 W08 W08 W08

6 Cooling circuit test of disk stacks V V V V W09 W09 W09 W09

7 Brazing manifolds (1st) V V V V W10 W10 W10 W10

8 Brazing manifolds (2nd) V V V V W10 W10 W10 W10

9 Machining manifolds V V V V W11 W11 W11 W11

10 Brazing AS (1st) V V W07 W07 W12 W12 W12 W12

11 Brazing AS (2nd) V V W08 W08 W12 W12 W12 W12

12 Brazing small covers W07 W07 W08 W08 W12 W12 W12 W12

13 Vacuum test of AS W08 W08 W08 W08 W12 W12 W12 W12

14 Brazing super AS W09 W09 W13 W13

15 Brazing 1 stack W10 W14

16 Vacuum test of stacks W10 W14

17 Cooling circuit test of stacks W10 W14

18 Fiducialisation W11 W15

19 EBW 2 stacks W16

20 TIG welding vacuum flanges W16

21 Vacuum test of MB W16

22 Installation on girders W17

Page 5: Assembly and installation of TM0 Lab

[email protected]

5 Assembly and installation of T0 module Lab

RF NETWORK & COMPACT LOAD2+2 RF networks (for 1 TM0)• Cleaning -> COMPLETED• 1st brazing -> COMPLETED• Intermediate machining -> COMPLETED• Cleaning -> COMPLETED• 2nd brazing -> COMPLETED• 3rd brazing -> IN PROGRESS• Vacuum test

STATUS: 80%

20 Compact loads (for 1 TM0)• Final brazing -> COMPLETED• Vacuum test -> COMPLETED

STATUS: 100%

Vacuum network (for 2 TM0)• Delivery to Lab -> COMPLETED

STATUS: 100%

Page 6: Assembly and installation of TM0 Lab

[email protected]

6 Assembly and installation of T0 module Lab

SUMMARY

SUB-ASSEMBLY Q.TY STATUS

Magnets 2 100%

Vacuum tank 1 100%

PETS units 2 100%

AS 8 30%

Clamps for AS and PETS 100%

RF network 2+2 80%

Compact load 20 100%

Vacuum network 4 100%

Extremity flanges 1+1 100%

Supports for extremity flanges 2 100%

Cooling circuits under manufacturing

Gaskets, blank flanges, screws, swagelok under procurement

1st TM0

Page 7: Assembly and installation of TM0 Lab

[email protected]

7 Assembly and installation of T0 module Lab

SUMMARY

SUB-ASSEMBLY Q.TY STATUS

Magnets 2 100%

Vacuum tank 1 100%

PETS units 2 30%

AS 8 under manufacturing

Clamps for AS and PETS 100%

RF network 2+2 70%

Compact load 20 70%

Vacuum network 4 100%

Extremity flanges 1+1 100%

Supports for extremity flanges 2 100%

Cooling circuits under manufacturing

Gaskets, blank flanges, screws, swagelok under procurement

2nd TM0