+ All Categories
Home > Documents > Assembly instructions Part 1 PPE & Tools

Assembly instructions Part 1 PPE & Tools

Date post: 23-Feb-2016
Category:
Upload: spence
View: 27 times
Download: 0 times
Share this document with a friend
Description:
Sunrider II. Assembly instructions Part 1 PPE & Tools. 19 January 2014. Contents part 1 Section Subjest Slide part 1 – 1HSE 4 part 1 – 2Tools5. 1 . Persoonlijke beschermings-middelen (PBM). Use appropriate Personal Protective Equipment (PPE): Work gloves. Disposable gloves. - PowerPoint PPT Presentation
Popular Tags:
12
Assembly instructi ons Part 1 PPE & Tools 19 January 2014 Sunrider II
Transcript
Page 1: Assembly instructions Part 1 PPE & Tools

Assembly instructionsPart 1PPE & Tools

19 January 2014

Sunrider II

Page 2: Assembly instructions Part 1 PPE & Tools

Contents part 1Section Subjest Slidepart 1 – 1 HSE 4part 1 – 2 Tools 5

Page 3: Assembly instructions Part 1 PPE & Tools

1.Persoonlijke beschermings-middelen (PBM)

Page 4: Assembly instructions Part 1 PPE & Tools

Use appropriate Personal Protective Equipment (PPE):

• Work gloves.• Disposable gloves.• Hearing protection.• Dusk mask.• Safety goggles.

Page 5: Assembly instructions Part 1 PPE & Tools

2.Tools.

Page 6: Assembly instructions Part 1 PPE & Tools

Hole saw.

‘Cats-tail’ file.

Page 7: Assembly instructions Part 1 PPE & Tools

Multi saw.

(battery) drill.

Power file.

Page 8: Assembly instructions Part 1 PPE & Tools

Blind rivet pliers.

Locking pliers.

Rivet insert nut plier.

Page 9: Assembly instructions Part 1 PPE & Tools

ScaleMixing cups, large, small.Stir wood.

Grain 150 sandpaper.Sanding block.

Page 10: Assembly instructions Part 1 PPE & Tools

Vice.

Page 11: Assembly instructions Part 1 PPE & Tools

Benzene.

Clamps, jaw length ~ 90 mm and 140 mm.

Page 12: Assembly instructions Part 1 PPE & Tools

Sharp knife.

Mastic gun.

Ballast, minimum 25 kg (2x).


Recommended