5
M3.0 Platform 1) Foundation – Concrete reinforced. 2) Assembly of S01 (first part of the static tower). 3) Assembly of S04 (first part of the dynamic tower – telescopic) 4) Assembly of S05/S06 (of dynamic tower). S01 – Static. S04,05 and 06 (dynamic) assembled separately
Transcript
Page 1: Assembly Procedures of Wind Turbine

M3.0 Platform

1) Foundation – Concrete reinforced.

2) Assembly of S01 (first part of the static tower).

3) Assembly of S04 (first part of the dynamic tower – telescopic)

4) Assembly of S05/S06 (of dynamic tower).

S01 – Static.

S04,05 and 06 (dynamic)

assembled separately

Page 2: Assembly Procedures of Wind Turbine

M3.0 Platform

5) Assembly S02 (of static tower).

6) Assembly S07 (of dynamic tower).

7) Assembly S03 (support of hoists on static tower).

8 ) Positioning of Pulleys support device.

S02 (Static)

S03 (Static)

S07 (Dynamic)

Pulley Device

Page 3: Assembly Procedures of Wind Turbine

M3.0 Platform

9) Assembly of Nacelle

10 ) Assembly of rotor

11) Pre commissioning

12) Testing (YAW, Pitch)

Nacelle and Rotor

assembly

Page 4: Assembly Procedures of Wind Turbine

M3.0 Platform

13) Ropes connection (for climbing system).

14) Tower raising.

15) Final connection.

16) Final commissioning.

17) Final testing (YAW, Pitch, Rotation, power generation, cooling).

RopesRopes

Hoists

Pulley device

Page 5: Assembly Procedures of Wind Turbine

M3.0 Platform

18) Remove the hoists and cables.

19) Connect to the grid.

20) and... Enjoy the Power!!!!!