Asset Standards Authority Update to IRSE NSW | 1
Asset Standards Authority Update to Institution of Railway Signal Engineers (IRSE)
Australasia – Sydney Local Meeting Jim Modrouvanos, Director
28 May 2015
Asset Standards Authority Update to IRSE NSW | 2
Scope
• ASA purpose and organisation
• Work priorities and progress
• Future challenges, changes and goal
• Questions
Asset Standards Authority Update to IRSE NSW | 3 28 May 2015
Our organisation, purpose and tasks
Asset Standards Authority Update to IRSE NSW | 4
New Minister – Hon. Andrew Constance MP
Hon. Andrew Constance MP
Minister for Transport
and Infrastructure
Hon. Duncan Gay MLC
Minister for Roads,
Maritime and Freight
Asset Standards Authority Update to IRSE NSW | 5
TfNSW
Asset Standards Authority Purpose, priorities and progress | 5
Asset Standards Authority Update to IRSE NSW | 6
ASA’s Policy and Regulation team
Policy
and
Regulation
ASA Maritime
Management Centre
Centre for Road Safety
National Strategic Review &
Policy Initiatives
Efficiency & Effectiveness
Safety & Quality
Corporate Planning &
Performance
Asset Standards Authority Update to IRSE NSW | 7
ASA organisation details
Item Detail Comment
Location Chatswood 12 Help Street
Located near the Chatswood Interchange
Organisational Staff - 125 A branch of the Policy and Regulation Division of
Transport for NSW
Asset Standards Authority Update to IRSE NSW | 8
Our people
28 May 2015
Asset Standards Authority Update to IRSE NSW | 9
ASA leadership
Asset Standards Authority Update to IRSE NSW | 10
ASA engineering team
Asset Standards Authority Update to IRSE NSW | 11
ASA Signals and Control Systems team
Peter McGregor Lead Engineer
Greg Hockings Principal Engineer
Electronic Systems
Omer Saricilar Principal Engineer
Control Systems
Daniel Oakes Principal Engineer
Technical Standards
Russell Freeman Principal Engineer
Mechanical
Dave Nolan Principal Engineer
Signalling Systems
Paul Zammit Principal Engineer
Signals Assurance
Asset Standards Authority Update to IRSE NSW | 12
ASA – beyond standards to whole of life assurance
• “Making it clearer and simpler”
– for Transport Cluster
– for Supply Chain
• Collaborating and supporting
TfNSW to be an informed and
efficient asset owner
– whole of life assurance
– asset management
– standards
– risk based decision making
• Facilitate increased private sector
participation and capability
• Transport Values and Customer
focus
Asset Standards Authority Update to IRSE NSW | 13
Role and products
• TfNSW is asset owner/custodian
• Operations and maintenance contracted out
• ASA works on behalf of the asset owner/custodian
• Authority defined under ASA Charter
Asset Standards Authority Update to IRSE NSW | 14
Many pieces to build….but do they make sense?
Scale of TfNSW’s Network
Network • 43000 lane km of state roads
• 1505km of electrified overhead
• 1763km of mainline track
• 24 Bus Depots
• 1 Shipyard
• 10 Train Maintenance Centres
• 1 Light Rail Maintenance Centre
• 9321 Bridges
• 370 Stations, 14 Stops, 107
Wharves & Jetties
• Plus bus stops, substations,
transmission lines, cctv, lifts,
culverts, seawalls, passenger info
Fleet • 2124 buses
• 1947 train carriages (144 diesel
and 1803 electric)
• 13 light rail vehicles (65
carriages)
• 30 ferries
• Plus vessels/watercraft, road
vehicles, trailers, locomotives,
wagons, track machines and
plant
• $10A4bnsset St
anin
da rds as
Aseuthori
tsty Update to IRSE NSW | 15
Asset Standards Authority Update to IRSE NSW | 16
Providing TfNSW with assurance
• Engineering decisions
• Obligations to the owner
• Industry service providers
• Deployment of TfNSW protocols
• Enabling O&M efficiencies and effectiveness
TfNSW Asset Life Cycle Model
Asset Standards Authority Update to IRSE NSW | 17
Assuring TfNSW across all modes
Asset Standards Authority Update to IRSE NSW | 18
Our work priorities and progress
28 May 2015
Asset Standards Authority Update to IRSE NSW | 19
Authorised Engineering Organisation (AEO)
0.0
1.0
2.0
3.0
4.0
5.0
EngineeringManagement
CompetencyManagement
ConfigurationManagement
QualityManagement
SystemsEngineering
Maturity ratings summary
Documented Average Deployed Average Combined Average Highest average
Asset Standards Authority Update to IRSE NSW | 20
Industry engagement - sharing and listening
Industry • Updates, guidance, thought leadership and awareness
Briefings • Two to four per year to 150+
Industry • Discuss and dissect key topics from industry briefings
Round Tables • Two to four per year to approx 60+
Industry • Large technical audiences
• Detailed and application-specific technical Seminars learnings and contemporary subject matter
Technical • Capture and share knowledge and experience
Forums • 20-30 attendees tailored to the subject matter
Asset Standards Authority Update to IRSE NSW | 21
Signals & Control System industry engagement
Technical Forums
• 2014 - • May – “Design”
• Sep – “Control Systems”
• 2015 - • April “Maintenance and access”
• Specialist areas (ATP/ETCS, Control systems, interface to rolling stock)
Technical Committees
• 2014 to 15 – RISSB Train Control Systems and Infrastructure Standing committee
Asset Standards Authority Update to IRSE NSW | 22
Standards - ASA business activities
• Alignment to international standards (ISO)
• Commitment to a national approach
• RISSB relationship
– Board position
– Method of alignment to classifications (national / state)
– Joint development agreement
• NWRL / SRT
• Light Rail
• Ferries
• Roads
Asset Standards Authority Update to IRSE NSW | 23
Standards - ASA signals and control systems
• Signals and Control Systems standards:
– Found in strong position at ASA commencement
– Strong legacy due to previous diligent management!
• Current work:
– Reviewing Design process and ETCS Lv2 onboard
– Priorities on combined service routes,
Asset Standards Authority Update to IRSE NSW | 24
Standards – monitoring popular documents
Train Operating Conditions
Manual – General Instructions
Circuit Design Standards
Signal Design Principles
Train Operating Conditions
Manual – Division Pages
Train Operating Conditions
Manual – Track Diagrams
Track Geometry and Stability
Asset Standards Authority Update to IRSE NSW | 25
ASA website – quick links to popular docs
Asset Standards Authority Update to IRSE NSW | 26
Change to Signals - ASA website – Signals and
Control Systems
Asset Standards Authority Update to IRSE NSW | 27
Future challenges, changes and goal
28 May 2015
Asset Standards Authority Update to IRSE NSW | 28
Our challenges ahead
• Managing growth
• Integrating across a changing
TfNSW landscape
• Supporting TfNSW procurement
• Benefits realisation
• Industry capability & capacity
Asset Standards Authority Update to IRSE NSW | 29
Our challenges ahead
• Sydney Rapid Transit (NWRL)
• Light Rail
• Professional development
• More work but different work
Asset Standards Authority Update to IRSE NSW | 30
Our challenges ahead
• ATCS ETCS Level 2
• Stakeholder and sponsor
• Constructability – limited
possession access - work at
night?
• Digital and data railway to give
better customer outcomes
Asset Standards Authority Update to IRSE NSW | 31
Future TfNSW structure
Asset Standards Authority Update to IRSE NSW | 32
The complete picture – a work in progress…
YOU?
Asset Standards Authority Update to IRSE NSW | 33
Questions?
28 May 2015
Asset Standards Authority Update to IRSE NSW | 34
ASA contacts Name Position Contact
Jim Modrouvanos Director [email protected]
John Paff A/Chief Engineer [email protected]
Mark Smith Principal Manager, Industry &
Technical Development
Peter McGregor Lead Engineer – Signals &
Control Systems
Russell Freeman Principal Engineer
Mechanical
Greg Hockings Principal Engineer
Electronic Systems
Dave Nolan Principal Engineer
Trackside Systems
Daniel Oakes Principal Engineer
Technical Standards
Asset Standards Authority Update to IRSE NSW | 35
ASA contacts Name Position Contact
Omer Saricilar Principal Engineer
Control Systems
Paul Zammit Principal Engineer
Signals Assurance