SOFTWARE APPLICATION
Group Member:
NG SIEW QING 0325750
NGIENG TIEN YUNG 0320221
NGO JIA HAUR 0320144
OOI YIN JI (LEADER) 0319962
PANG KAI YUN 0319802
SAM WEI YIN 0320364
SANDRABROOKE GOH 0329884
PART A
BILL OF QUANTITIES
FUNCTIONS
FUNCTIONS
COMPOSITE RATES ANALYSIS
MULTI-LEVEL MARK UP FUNCTION
LIMITATION
PERMANENTLY DELETED VIRUS ATTACK
UNABLE REVIEW BUILDING MODELING
FUNCTIONS
CREATE 3D MODEL
DIRECTLY IMPORT THE ELECTRICAL DRAWING
CHANGES AND VARIATIONS CAN BE DONE QUICKLY
REBAR QUANTITIES
CALCULATION
PRODUCE REBAR SCHEDULE FOR FABRICATION
FUNCTIONS
AUTO IDENTIFY PIPES, WIRES,
CABLES, DUCTS
PROVIDE SUMMARISED
QUANTITY REPORT
FUNCTIONS
COST NEWLY INTRODUCED TO INDUSTRY
LACK OF EXPERTS
LIMITATIONS
SUPPORT 2D TAKING OFF
SUPPORT 3D TAKING OFF WORKBOOK
FUNCTIONS
AUTO-REVISIONING SUB-CONTRACTORCOMPARISON
FUNCTIONS
COST AND LICENSE REBAR DETECTION
LIMITATIONS
TAKEOFF MANAGER
● PRODUCE QUICK AND HIGH ACCURACY OF QUANTITY TAKEOFF
COST PLANNER
● COST ESTIMATING & CALCULATION● VALUE ENGINEERING
MODULE
CONSTRUCTABILITY MANAGER
● DETECT CONSTRUCTABILITY ISSUE
FUNCTIONS
INEFFICIENT
LIMITATIONS
SUMMARY
EFFICIENT BETTER VISUALISATION TIME SAVING
RECOMMENDATION
PART B
BRIEFING STAGE
BIM MEASUREMENT
VISUALIZATION IMPROVED BY 3D
MODEL
IMPROVE THE COMMUNICATION AND THE COORDINATION AMONG DIFFERENT
PARTIES
BENEFITS
CONSTRAINTS
HIGH COST FOR SOFTWARE AND TRAINING
CAD MEASUREMENT
DATABASE FOR
MANUFACTURING
INCREASE VALUE TO
CLIENTVISUALISATION
BENEFITS
CONSTRAINTS
HIGH INITIAL COST
SOFTWARE COMPLEXITY
MANUAL MEASUREMENT
COST EFFECTIVENO TRAINING IS
REQUIRED
BENEFITS
CONSTRAINTS
ERRORS TIME CONSUMING
DESIGN STAGE
BIM MEASUREMENT
HIGH GRAPHIC PERSPECTIVE OF
3D MODELINGIMPROVE
EFFICIENCYREDUCE THE
MATERIAL USAGE
BENEFITS
CONSTRAINTS
REQUIRE TRAINED OR EXPERIENCED TECHNICAL STAFF
CAD MEASUREMENT
BENEFITS
ACCURATE DESIGN COST MODELLING
CONSTRAINTS
LACK OF STANDARDISATION
IN DESIGN
LOSS OF WORK DUE TO NOT
SAVING
MANUAL MEASUREMENT
COST EFFECTIVE NO TRAINING IS REQUIRED
CLIENT’S SATISFACTION
BENEFITS
ERRORSCAN’T PROVIDE
BETTER VISUALIZATION
SHARING OF INFORMATION
CONSTRAINTS
PRE-CONSTRUCTION STAGE
BIM MEASUREMENT
SCHEDULING BY 4D BIM
IMPROVE SAFETY
COST ESTIMATING BY 5D BIM
BENEFITS
CONSTRAINTS
DEFECTIVE OF 4D BIM
CAD MEASUREMENT
BENEFITS
ENHANCE COMMUNICATION
QUICK MEASUREMENT
ACCURATE TAKING OFF
CONSTRAINTS
UNABLE TO PRODUCE BQ
NEED TO BE EXPORTED TO
OTHER SOFTWARE
MANUAL MEASUREMENT
COST EFFECTIVE NO TRAINING IS REQUIRED
FLEXIBILITY IN WORKFLOW
BENEFITS
CONSTRAINTS
ERRORSUNABLE TO
MAKE CHANGES QUICKLY
CONSTRUCTION STAGE
BIM MEASUREMENT
SAVE TIME REDUCE WASTAGE
PROMOTES PREFABRICATION
BENEFITS
CONSTRAINTS
PRICE FLUCTUATIONS
CAD MEASUREMENT
BENEFITS
REDUCE WASTAGE
REDUCE CONFUSION
DETECT INTERFERENCES
CONSTRAINTS
LIMITED TO 2D VOLUME CANNOT BE MEASURED
MANUAL MEASUREMENT
COST EFFECTIVE NO TRAINING IS REQUIRED
SAFE AND SECURED
BENEFITS
CONSTRAINTS
PROJECT TIME EXTENDED
REDUCE ACCURACY OF
DATA
POST CONSTRUCTION STAGE
BIM MEASUREMENT
MODEL DATA RECORDED
SUSTAINABILITY AND FACILITY
MANAGEMENT
BENEFITS
CULTURAL BARRIER TOWARD A NEW TECHNOLOGY
CONSTRAINTS
CAD MEASUREMENT
BENEFITS
DATA MANAGEMENT
EASY TO REPRODUCE
CONSTRAINTS
LIMITED INFORMATION
UNABLE TO VISUALISE
SOFTSCAPE ELEMENT
MANUAL MEASUREMENT
EASY TO OBTAIN INFORMATION
REDUCE THE RISK OF LOSS OF
INFORMATION
BENEFITS
REQUIRE PLACE TO STORE THE
DRAWING
TIME NEEDED AFTER
COMMISSIONINGLIMITED
INFORMATION
CONSTRAINTS
THANK YOU !