TENDER ESTIMATION
ADVANCED CONSTRUCTION TRAINING ACADAMYBTEC HND IN QUANTITY SURVEYING
ASSIGNMENT FEEDBACK/TEMPLATE SHEET
Learners Name
ACTA Registration Number Edexcel Registration Number
Email Mobile
Information of Unit Assessed
Title Code
Learning Outcomes Assessor
Learner Declaration
I certify that the work submitted for this assignment is my own and research sources fully acknowledged.
Learner signature: Date:
Issuing Date Submission Date
Review Dates
Assessor Comments
Assessor Signature
Assessors Feedback/Comments
GRADE
Assessor Date
Internal Verifier Date
7/27/2019 Assignment_sample.docx
2/12
TENDER ESTIMATION
Introduction
Two assessment methods will be used for this assignment
1. An Individual written Report
Students are required to submit a report for Tasks 1, 2.1,2.2, 3.1,4, 5.1 and 5.2
2. An Individual Class Room Activity
Tasks 2.2, 3.2& 5.3 are carried out in the class room under the supervision of the Assessor
within the specified time duration.
Assignment Scenario
Suppose you are working as an estimator of a contracting company,and you have received a set of
tender documents for tendering to a proposed multi story auditorium building and you are given
only 45 days to submit your bid. Some of the project particulars are as follows.
Client:- Urban Development Authority
Funding Agency: World Bank
Location: Nugegoda
Contract period:- 12 months
Condition of contract:- FIDIC
Type of Contract:- Fluctuating price contract
Interim payments: Monthly
It was a busy time for your tender department when you review the tender document because you
are already in the process of pricing few other projects with limited resources and the labour force
of the construction department of your company also limited. Resources in the mechanical
department are inadequate and many of the plants items are hired. However the management of
the company is more interesting to win this contract therefore you have decided to price the BOQ
Followings are some of your findings during the site visit
Proposed site is located in an urban area but isolated, surrounded by a lake and it is a
marshy land Access road is adequate but there is no existing bridge over the lake.
Land is a bare land and no any existing buildings.
Surround area is highly commercial area no any permanent residence
Task 1 Demonstrate knowledge and understanding of the principles of Tender Pricing
1.1 State and describe the steps of tender pricing process that will be useful to above project.(P1)
1.2 Analysethe management decision to tender how this will effect to prices and how do you solve
the above mentioned problems(M2)
7/27/2019 Assignment_sample.docx
3/12
TENDER ESTIMATION
1.3 List the factors to be considered in pricing a tender and highlight the factors which effect the
above tender.(P2)
1.4 Evaluate critically in term of pricing and decide, the importance or value of findings of site visit
mentioned above. include precise and detailed information and assess possible alternatives,
bearing in mind their strengths and weaknesses if they were applied instead.( D1)
1.5 List the sources and nature of information for cost estimating (P3)
1.6 Designa reasonable tender time table for above project(M1)
Task 2 Prepare standard rates for labour, construction plant and materials
It is also estimators responsibility to establish all-in rates for labour, material and plants which
can be used during the pricing process.
2.1 List the factors to be considered when calculate all in rates for labour, plants andmaterial(P4)
2.2 Analyse the factors listed in 3.1 and explain how each one contributes to the topic(labour
cost, material cost and plant cost)(M2)
2.3 Establish all-in rates for labour (skilled labour), material (cement, ready mixed concrete,
structural timber) and plants (dumper). (P5, M1)
Task 2.3 will be completed as a classroom activity with the information to be
provided. The students are allowed to refer only the lecture notes issued by the
assessor and any relevant printed text books and not allowed to share any materials
during the activity period
Task 3 Build up unit rates for trade work itemsAssume that you have decided to calculate new unit rates for major work items as a part of pricing.
The following work items were selected to calculate the unit rates
Item Description Qty Unit Rate Amount
2.E.1 GR 20 (20) reinforced concrete in
columns 220 m
2.F. 2 150mm thick concrete block wall in
cement mortar 1:6 250 m
2.F.5 25mm thick plywood Formwork to
sides and soffit of beam 300x225
sectional area
465 m
2.F.6 12mm diameter mild steel bar
reinforcement in beam
1.10 t
2.M.2 600x600mm floor tiles with 12mm
joints, filled with matching colourtile grout, including 20mm thick,
338 m
7/27/2019 Assignment_sample.docx
4/12
TENDER ESTIMATION
1:5 cement mortar bedding
2.M.6 Prepare, 1 coat sealer, 2 coats
emulsion paint on plastered walls
1120 m
3.1 State the factors which effect the unit rates of each work item .(P6)
3.2 Analyse the unit rate for above work items.(P7, M1,M2,M3,D3)
Task 3.2 will be completed as a classroom activity with the information to be
provided.The students are allowed to refer only the lecture notes issued by the
assessor and any relevant printed text books and not allowed to share any materials
during the activity period
Task 4 Demonstrate ability to costing of preliminaries / overhead cost of the
Contractor
The items found in the preliminaries section of a bill of quantities are usually the most difficult and
arbitrary of all to price. The nature and the conditions of contact of every job are different and the
items encountered in the Preliminaries are therefore necessarily unique toeach particular project,and
whilst records from previously priced jobs will be useful and will assist in some measure in
estimating the cost of the current set of preliminaries.
4.1 Explain preliminaries and overhead costs in a Bill of quantities(P8)
4.2 Demonstratethemethods that can be used to calculate cost of preliminaries. Relevant
examples should identify from site visit detail given above(M2,M3)
4.3 Calculate the cost of above preliminary examples identified by you, with your own
assumptions (Assumptions must indicate clearly) (P9)
Task 5 Describe the procedure followed in preparation of a quotation
5.1 Design twosample Inquiry letters to subcontractor and supplier in order to collect theirquotations. (P10)
5.2 Describe the different form of discounts offered in the construction industry and explain how
you in corporate them in pricing (P11)
You have called for quotations from three different suppliersin order to purchase 150000 bricks
and suggested likely delivery programme as follows
50000 bricks to be delivered to site by 2nd May
Another 50000 to be delivered by 15th June
Another 50000 to be delivered by 15th July and total 150000 bricks.
Information abstracted from three quotations are as follows:
7/27/2019 Assignment_sample.docx
5/12
TENDER ESTIMATION
Sub contractor 1 Sub contractor 1 Sub contractor 1
150000 will be
delivered as
scheduled prime cost of a brick
Rs. 16.00 including
loading cost
Transportation cost
Within 5Km free and
Rs. 500/ per 1000
bricks per additional
Km, (Distance to the
site 12Km)
Unloading cost Rs.
500/ per 1000 bks
cash discount: 2.5%
on prime cost, if the
bills are paid within
7days
Trade Discount 2.5%
on prime cost, for
every 50000
purchased
Only 100000 bks can
be delivered as
scheduled prime cost of a brick
Rs. 16.00 including
loading and
unloading cost
Transportation
costRs. 500/ per
1000 bricks per Km,
(Distance to the site
20Km)
cash discount: 2.5%
on prime cost, if the
bills are paid within
14days
Trade Discount not
applicable
150000 will be
delivered as
scheduled prime cost of a brick
Rs. 15.00 including
loading and
unloading cost
Transportation cost
Within 5Km free and
Rs. 600/ per 1000
bricks per additional
Km, (Distance to the
site 10Km)
cash discount: 2.5%
on prime cost, if the
bills are paid within
14 days
Trade Discount 5%
on prime cost, for
every 50000
purchased
5.3 Evaluate and review the above information and select the most successful supplier/s and
prepare a letter to inform that their quotation/s are accepted and inform the likely delivery
programme.(D1,D3)
Task 5.3 will be completed as a classroom activity with the information to be
provided.The students are allowed to refer only the lecture notes issued by the assessor
and any relevant printed text books and not allowed to share any materials during the
activity period
7/27/2019 Assignment_sample.docx
6/12
TENDER ESTIMATION
Note:Answers should be concise, directly addressing the question and should be limited to amaximum of 20 pages for all the tasks excluding 2.2 , 3.2& 5.3
7/27/2019 Assignment_sample.docx
7/12
TENDER ESTIMATION
7
CriteriaIndicative characteristics/ Possible
EvidenceTask No
Evidence/
Reference
(to be fi ll ed by
the student)
Achieved
(Yes/ No)
Assessors
Comments
PASS CRITERIA
LC-1:Demonstrate knowledge and understanding of the principles of Tender Pricing
P1 Describe the tender pricing process
Explain tender pricing process from decision
to tender to compiling the tender for
submission.
Task 1.1
P2Identify the factors that need to be
considered in pricing
Factors to be considered in pricing a tender is
identified.
Task 1.3
P3Identify the sources and nature of
information for cost estimatingA reasonable list of sources identified
Task 1.5
LC-2: Prepare standard rates for labour, construction plant and materials
P4 Identify the factors affecting labour,
material and plant rates
Recognise the factors affecting labour,
material and plant cost. Consider the
prevailing market prices
Task 2.1
P5Compute all in labour rates, all in material
rates and all in plant rates
Analysis of all in labour rate, all in material
rate and all in plant rate. Consider the
Holidays, Incentives, and other related cost
effective items
Task 2.3
LC-3 Build up unit rates for trade work items
P6Identify the factors that need to be considere
building up unit rates
Factors affectingnorms, basic prices and
methods for building up rates
Task 3.1
P7
Develop unit rates that reflect the current
local market prices for the measured
work items in a BOQ
Build up unit rates for items in the measured
works sections of the bills of quantities.
Identify the method of construction and build
up rates accordingly
Task 3.2
7/27/2019 Assignment_sample.docx
8/12
TENDER ESTIMATION
8
LC-4:Demonstrate ability to costing of preliminaries / overhead cost of the contractor
P8Discuss preliminary / overhead costs in a
bill ofQuantities
Recognize preliminaries items and analyse the
items of head office overheads
Task 4.1
P9 Calculate the cost of site facilities to be
provided bythe contractor
Identify the factors to be considered in pricing
preliminaries, and build up prices of the same.
Task 4.3
LC-5 Describe the procedure followed in preparation of a quotation .i.e. how to decide costs, charges, discounts etc
P10Prepare letters of enquiries for supply of
materials and subcontract services
Solution to show the information to be
provided in the letters of enquiries and
identify the terms and conditions stated in the
Quotations received for supply of materials
and subcontract services
Task 5.1
P11
Discuss different forms of discounts given
on orders
Transferring of suppliers quotations to a
tender.
Task 5.2
7/27/2019 Assignment_sample.docx
9/12
TENDER ESTIMATION
9
CriteriaIndicative characteristics/ Possible
EvidenceTask No
Evidence/
Reference(to be fill ed by the
student)
Achieved (Yes/
No)Assessors
Comments
MERIT CRITERIA
M1Identify and apply
strategies to find
appropriate solutions
Effective judgments have been made
An effective approach to study and
research has been applied (effective
use of examples)
1.6
2.3
3.2
M2
Select / design and apply
appropriate methods /
techniques
The design of methods and
techniques has been justified
A range of sources of information has
been used (use appropriate prices
from range of prices)
The selection of methods and
techniques / sources has been
justified
1.2
2.2
3.2
4.2
M3
Present and communicate
appropriate findings
The appropriate structure and
approach has been used
Coherent, logical development of
principles / concepts for the intended
audience
A range of methods of presentation
have been used and technical
language has been accurately used
3.2
4.2
7/27/2019 Assignment_sample.docx
10/12
TENDER ESTIMATION
10
CriteriaIndicative characteristics/ Possible
EvidenceTask No
Evidence/
Reference(to be fill ed by the
student)
Achieved (Yes/
No)Assessors
Comments
DISTINCTION CRITERIA
D1
Use critical reflection to
evaluate own work and
justify valid conclusions
Conclusions have been arrived at
through synthesis of ideas and have
been justified
The validity of results has been
evaluated using defined criteria
Self-criticism of approach has taken
place
Realistic improvements have been
proposed against defined
characteristics for success
1.4
5.3
D2
Take responsibility for
managing and organizing
activities
Autonomy/ independence has been
demonstratedSubstantial activities, projects or
investigations have been planned,
managed and organized submitting
on time,
The importance of independence has
been recognized and achieved
All tasks
7/27/2019 Assignment_sample.docx
11/12
TENDER ESTIMATION
11
D3
Demonstrate convergent /
lateral / creative thinking
Problems have been solved
Innovation and creative thought have
been applied
Effective thinking has taken place in
unfamiliar context
3.2