OV E RV I E W O F L A B C LO S E O U T S 1 . GWC B 6 3
2 . VA H O S P I TA L3 . P S F 5 7 7
ASU Closures Requiring Follow Up Actions
EH&S is made aware of lab status change.EH&S conducts initial closure inspection.Areas of concern are identified.Proposal is generated and funding is discussed.EH&S coordinates all aspects of the project including
sub contactors, sample analysis, materials and waste disposal.
EH&S completes closeout inspection.
Goldwater B63Axitron MOCVD
Goldwater B63
Gas Lines Cleaned cut and capped 2012.Proposal submitted/ accepted.Dismantling prep.Scrubber and tanks removed.Decontaminate reaction chamber, glove box, tools, benches, flooring.Rack system and electronics removed.Lab checkout completed
Goldwater B63Scrubbers
Polytechnic VA HospitalGenerators
Polytechnic Campus VA HospitalHVAC/Mechanical shops
Proposal Submitted/Accepted.
400 lbs of hazmat collected.
Fuel removed from tanks, generators and piping . Piping disconnected from generators.
Piping trenches and generator pads decontaminated.
Over half of the Hazmat diverted for reuse.
Closure completed
PSF 577Mercury Vacuum Lines
PSF 577 Abandoned Chemicals
PSF 577Proposal submitted/accepted
Vacuum lines and glass tubing collected.
350 lbs of Hg debris, 200 lbs elemental mercury and 200 lbs of RCRA waste removed.
Lab floors, and bench tops were decontaminated.
Mercury vapor surveys were conducted before, during and after project.
Lab closeout was issued.