ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN 131 125 025 and BrisConnections Investment Trust ARSN 131 124 813 Address Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 Australia PO Box 412 Lutwyche Qld 4030 Australia Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia Web www.brisconnections.com.au 27 February 2012 BrisConnections announces financial results BrisConnections (ASX: BCS) today announced financial results for the sixmonth period to 31 December 2011. The financial results were in line with expectations and reflect the substantial progress BrisConnections has made in progressing towards operations in mid 2012 of the Airportlink toll road in Brisbane, almost 95% complete by dollar spend by 31 December 2011. The project remains on time and on budget. During the period a number of milestones were achieved including Over $450 million spent on Airportlink bringing the total to over $3.5 billion spent on construction activities Completion of Bowen Hills bridges and ramps Reached over 25 million hours worked Tolling system development and systems testing undertaken Continued marketing of the benefits of Airportlink with briefings to individuals and stakeholder organisations Relocation into our permanent home at Airportlink Operations Centre (ALOC) enabling the growth of operations resources to start in readiness for operations to commence in mid 2012. BrisConnections’ Chairman Mr Trevor Rowe AO said preparations for commencement of operations in mid 2012 are well underway. “The past six months has been a busy period as we prepare for the transition from construction to an operating entity. This has involved marketing and customer service, ramping up operations and maintenance (including with our O&M contractor), planning and recruitment – all essential aspects for launching Airportlink later this year” Mr Rowe said. “As I have said before there is much more to establishing a major motorway, even one such as Airportlink which will revolutionise the Brisbane road network, than just construction. The engagement with our end users – drivers of Brisbane and South East Queensland – is also critical and this is not something which can be done overnight. That is why we started our marketing last year, well before opening and indeed, we believe, much earlier than any other toll road in Australia has done in the past.” “Not only have we learned from other toll road experiences but we have also listened to potential customers and briefed individuals and stakeholder organisations. That consultation indicated road users need time to become familiar with Airportlink and how it benefits their journeys and to recognise the significant time savings using Airportlink will offer. As a result, we are now looking at options which benefit all Brisbane tollroad account holders and users including pricing options, rewards programmes and navigational/travel time signage,” Mr Rowe said. Mr Rowe also noted that Airportlink continued to benefit from ongoing support of the Queensland Government and other important stakeholders in the project such as Brisbane City Council and our banking syndicate. For personal use only
Transcript
Page 1: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

ASX Release 

BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust  ARSN 131 125 025 and  

BrisConnections Investment Trust ARSN 131 124 813 Address  Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 

Australia   PO Box 412 Lutwyche Qld 4030 Australia 

Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia 

Web www.brisconnections.com.au 

 

27 February 2012   BrisConnections announces financial results   BrisConnections (ASX: BCS) today announced financial results for the six‐month period to 31 December 2011.    The financial results were in line with expectations and reflect the substantial progress BrisConnections has made in progressing towards operations  in mid 2012 of the Airportlink toll road  in Brisbane, almost 95% complete by dollar spend by 31 December 2011.  The project remains on time and on budget.  During the period a number of milestones were achieved including  

Over $450 million spent on Airportlink bringing the total to over $3.5 billion spent on construction activities  Completion of Bowen Hills bridges and ramps 

Reached over  25 million hours worked 

Tolling system development and systems testing undertaken  

Continued  marketing  of  the  benefits  of  Airportlink  with  briefings  to  individuals  and  stakeholder organisations 

Relocation  into our permanent home  at Airportlink Operations Centre  (ALOC)  enabling  the  growth of operations resources to start in readiness for operations to commence in mid 2012. 

 BrisConnections’ Chairman Mr Trevor Rowe AO said preparations for commencement of operations in mid 2012 are well underway.  “The past six months has been a busy period as we prepare for the transition from construction to an operating entity.   This has  involved marketing and  customer  service,  ramping up operations and maintenance  (including with our O&M  contractor), planning and  recruitment – all essential aspects  for  launching Airportlink  later  this year” Mr Rowe said.  “As I have said before there is much more to establishing a major motorway, even one such as Airportlink which will revolutionise the Brisbane road network, than just construction. The engagement with our end users – drivers of Brisbane and South East Queensland –  is also critical and this  is not something which can be done overnight.  That  is why we started our marketing  last year, well before opening and  indeed, we believe, much earlier than any other toll road in Australia has done in the past.”  “Not only have we learned from other toll road experiences but we have also listened to potential customers and briefed individuals and stakeholder organisations.   That consultation indicated road users need time to become familiar with Airportlink and how  it benefits  their  journeys and  to  recognise  the  significant  time  savings using Airportlink will  offer.   As  a  result, we  are  now  looking  at  options which  benefit  all Brisbane  tollroad  account holders and users including pricing options, rewards programmes and navigational/travel time signage,” Mr Rowe said.    Mr Rowe also noted that Airportlink continued to benefit from ongoing support of the Queensland Government and other important stakeholders in the project such as Brisbane City Council and our banking syndicate. 

For

per

sona

l use

onl

y

Page 2: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

ASX Release 

BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust  ARSN 131 125 025 and  

BrisConnections Investment Trust ARSN 131 124 813 Address  Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 

Australia   PO Box 412 Lutwyche Qld 4030 Australia 

Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia 

Web www.brisconnections.com.au 

 

 Financial Results As at 31 December 2011, BrisConnections had net assets of $986 million.   Assets  include cash of $157.9 million. For  the  financial  period,  BrisConnections  incurred  approximately  $451.0  million  in  construction  expenses associated with  the  project, which  includes  approximately  $53.2 million  of  construction  expenses  incurred  in December but paid after the period.   In accordance with its accounting policies, since inception BrisConnections has capitalised as future tolling rights approximately $3.5 billion including interest associated with the design and construction phase of the project.     “Airport Roundabout Upgrade has already been completed in July 2011 and we remain confident that Airportlink and  Northern  Busway  (Windsor  to  Kedron)  will  be  completed  and  operational  on‐time  and  on‐budget,  in accordance with the construction contract timetable of June 2012.” Mr Rowe said.   ENDS ~~~~~~ About BrisConnections BrisConnections has been awarded a 45 year concession  to design, construct, operate, maintain and  finance  the Airport Link  tollroad  in Brisbane. Airport Link is a 6.7 kilometre multi‐lane electronic free‐flow tollroad with dual 5.7 kilometre tunnels.  Upon completion, Airport Link will  operate  as  a multi‐destinational  road  connecting  Brisbane’s  northern  suburbs with  Brisbane’s  CBD  and  Brisbane Airport,  the CLEM7 Tunnel and the  Inner City Bypass.    It will also serve as a key distribution road, connecting some of Brisbane’s major destinations such as Brisbane Airport, the CBD, Royal Brisbane Hospital, Australia TradeCoast and Chermside Shopping Centre.   Airport  Link  is  being  constructed  using  a  world  class,  innovative  design  solution,  with  connections  avoiding  intersection  delays  and streamlining traffic  flows.   Lane configuration will provide  for separate traffic movements, with early decision points, to minimise traffic weaving and merging.  Airport Link  is being built around an electronic  free‐flow  tolling design.   Electronic  free‐flow  tolling  is mandatory across all Queensland tollroads and Airport Link tags will be fully interoperable with other Queensland and Australian tollroads.  BrisConnections is also designing and constructing a portion of the Northern Busway between Windsor and Kedron and an upgrade of the East‐West Arterial  / Airport Drive  / Gateway Motorway  interchange at Brisbane Airport, both of which are  funded by  the Queensland Government.   BrisConnections will not  receive any  revenue  from  these projects and  they will both be handed over  to  the Queensland Government upon commissioning.  An  investment  in BrisConnections Unit Trusts comprises a stapled security made up of one unit  in BrisConnections  Investment Trust and one unit  in BrisConnections Holding Trust.   Stapled  securities  in BrisConnections are  listed on  the Australian Stock Exchange under  the code “BCS”. There are many factors that may affect the results of an investment in BCS which are outside the control of the Directors of the Responsible Entity or may not be capable of being foreseen or accurately predicted. 

For

per

sona

l use

onl

y

Page 3: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

ASX Release 

BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust  ARSN 131 125 025 and  

BrisConnections Investment Trust ARSN 131 124 813 Address  Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 

Australia   PO Box 412 Lutwyche Qld 4030 Australia 

Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia 

Web www.brisconnections.com.au 

 

27 February 2012   

BrisConnections Investment Trust and  BrisConnections Holding Trust  

Appendix 4D Half Year report 

Information for the half‐year ended 31 December 2011 given to ASX under listing rule 4.3A  Pursuant  to  listing  rule 4.3A.3,  the  following  information  is given  to  the ASX by BrisConnections Management Company Limited ACN 128 614 291 as responsible entity for BrisConnections Investment Trust ARSN 131 124 813 and BrisConnections Holding Trust ARSN 131 125 025 (“BrisConnections”). The following information should be read in conjunction with the attached financial report together  with  any  public  announcements made  by  BrisConnections  and  its  controlled  entities  during  the  half‐year  ended  31 December 2011 in accordance with the continuous disclosure obligations arising under the Corporations Act 2001.   

 Details of the reporting period and the previous corresponding period Current period:      1 July 2011 to 31 December 2011 Prior corresponding period:  1 July 2010 to 31 December 2010  Results for announcement to the market The Board of BrisConnections is pleased to report on the half year results for the period to 31 December 2011.  Half year to 31 December 2011 highlights:  

Construction  continued  with  the  project  almost  95%  complete  (by  dollar  spent)  with many  of  the  final permanent structures and bridges completed as we progress towards commencement of operations  in mid 2012. Construction during the period saw  

o Completion of Bowen Hills bridges and ramps o Reaching over  25 million hours worked o Tolling system development and systems testing undertaken  

Continued marketing of the benefits of Airportlink with briefings to individuals and stakeholder organisations 

In November 2011, BrisConnections moved into our permanent home at Airportlink Operations Centre (ALOC) enabling the growth of operations resources to start in readiness for operations to commence in mid 2012. 

 The BrisConnections team in the next half year will continue to progress the final stages of this exciting project, and prepare for the commencement of operations in mid 2012.   

For

per

sona

l use

onl

y

Page 4: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

ASX Release 

BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust  ARSN 131 125 025 and  

BrisConnections Investment Trust ARSN 131 124 813 Address  Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 

Australia   PO Box 412 Lutwyche Qld 4030 Australia 

Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia 

Web www.brisconnections.com.au 

 

Key BrisConnections Performance Statistics 

Period ending  31 December 2011  31 December 2010  Change (%)

  $’000s  $’000s  Change (%)

Net operating income  456,785  727,764  (37.2)

Net  profit(loss)  before  tax  attributable  to members  

(2,805)  294  (1054.1)

Income tax benefit/(expense)  20,878  13,049  60.0

Net  profit(loss)  after  tax  attributable  to members 

18,073  13,343  35.4

EPS  Cents  Cents 

Earnings per stapled security (basic) (cents)  17.12  11.24  52.3

Distributions       

  Amount per stapled security 

Amount per stapled security 

 

Interim distribution  n/a  n/a 

Record  date  for  determining  entitlement  to distributions 

Date

n/a 

Date 

n/a 

Period ending  31 December 2011  30 June 2011  Change (%)

NTA  Cents  Cents 

Net asset backing per stapled security (cents)  252  279  (9.7)

NTA per stapled security (cents)(1)  (902)  (777)  (16.1)(1) Under the Listing Rules, Net Tangible Asset backing per security must be determined by deducting from total tangible assets all 

claims on those assets ranking ahead of the ordinary securities (ie. All liabilities, preference shares, outside equity interests etc).  The NTA per stapled security is a negative amount for the half year ending 31 December 2011.  It is anticipated that this amount will continue to grow until construction completion, scheduled for mid 2012.  As disclosed in the 2011 Annual Report, Australian Accounting Standards require the capitalisation of all motorway related construction costs to be recorded as an intangible asset rather than as property, plant and equipment.  Accordingly, whilst the Group’s intangible assets will significantly increase with construction, the Group’s tangible assets will not, resulting in the negative NTA per stapled security. 

 Change to capital During the half year ending 31 December 2011, there were no changes to capital.  Controlled entities  

Name of entities where control was gained in the half year Date control gained

n/a  ‐

Name of entities where control was lost in the half year Date control lost 

n/a  ‐

 There are no other entities over which control has been gained or lost.  Distribution details BrisConnections announced on 20 November 2009 it has suspended its distributions until further notice. 

For

per

sona

l use

onl

y

Page 5: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

ASX Release 

BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust  ARSN 131 125 025 and  

BrisConnections Investment Trust ARSN 131 124 813 Address  Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 

Australia   PO Box 412 Lutwyche Qld 4030 Australia 

Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia 

Web www.brisconnections.com.au 

 

 

  Half‐year ended 31/12/11 Half‐year ended 31/12/10

Interim  distribution  per  stapled security  

n/a n/a

 There is no foreign sourced distribution.  A distribution  reinvestment plan  (DRP)  is  in place and unless security holders elect not  to participate,  they will receive any distributions in stapled securities.  Securities are allocated at the daily weighted average market price of  the  Schemes  securities  on  the  ASX  over  a  period  of  20  business  days  commencing  on  the  day  before  the distribution record date.  As distributions have been suspended, there can be no allocation of securities under the DRP.  Investment associates and joint ventures 

Name  Ownership Interest (%) 

Material interests in associates and joint ventures are as follows:

n/a Material interests held for sale associates are as follows: 

n/a 

 Subsequent events There has not been any matter or circumstance, other than that referred to in the attached financial statements or notes thereto, that has arisen since the end of the half year ending 31 December 2011 which has significantly affected, or may significantly affect,  the operations of BrisConnections,  the  results of  those operations, or  the state of affairs of BrisConnections of future financial years.  Outlook The Board expects that the pace of construction will continue until commencement of operations  in mid 2012.  Airport Roundabout Upgrade was completed on 1 July 2011 and BrisConnections remains confident at this time that the Airport Link and Northern Busway (Windsor to Kedron) projects will be finished and operational by the contractual completion date of June 2012.  This report is based on the attached half year financial report which has been subject to an audit.  The financial report contains: 

A statement of financial performance together with the notes to the statement prepared in compliance with Accounting Standards 

A statement of financial position together with notes to the statement 

A statement of cash flows together with notes to the statement 

A statement of changes in equity showing movements The financial statements are not subject to any audit dispute or qualifications. The Schemes have a duly constituted audit committee.      

For

per

sona

l use

onl

y

Page 6: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

ASX Release 

BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust  ARSN 131 125 025 and  

BrisConnections Investment Trust ARSN 131 124 813 Address  Level 2, Airportlink Operations Centre, Cnr Stafford & Clarence Roads, Kedron Qld 4031 

Australia   PO Box 412 Lutwyche Qld 4030 Australia 

Investor Hotline 1800 236 994 or +61 7 3170 1900 Link Market Services Limited, Locked Bag A14, South Sydney, NSW 1235 Australia 

Web www.brisconnections.com.au 

 

For and on behalf of the Board 

Trevor C Rowe AO DUniv Chairman 27 February 2012 

……….. About BrisConnections  BrisConnections has been awarded a 45 year concession to design, construct, operate, maintain and finance the Airport Link tollroad in Brisbane. Airport Link is a 6.7 kilometre multi‐lane electronic free‐flow tollroad with dual 5.7 kilometre tunnels.  Upon completion, Airport  Link will operate  as  a multi‐destinational  road  connecting Brisbane’s northern  suburbs with Brisbane’s CBD  and Brisbane Airport,  the CLEM7 Tunnel and  the  Inner City Bypass.    It will also serve as a key distribution  road, connecting some of Brisbane’s major destinations such as Brisbane Airport, the CBD, Royal Brisbane Hospital, Australia TradeCoast and Chermside Shopping Centre.   Airport Link  is being constructed using a world class,  innovative design solution, with connections avoiding  intersection delays and streamlining  traffic  flows.   Lane configuration will provide  for  separate  traffic movements, with early decision points,  to minimise traffic weaving and merging.  Airport  Link  is  being  built  around  an  electronic  free‐flow  tolling  design.    Electronic  free‐flow  tolling  is  mandatory  across  all Queensland tollroads and Airport Link tags will be fully interoperable with other Queensland and Australian tollroads.  BrisConnections is also designing and constructing a portion of the Northern Busway between Windsor and Kedron and an upgrade of  the East‐West Arterial  / Airport Drive  / Gateway Motorway  interchange at Brisbane Airport, both of which are  funded by  the Queensland Government.  BrisConnections will not receive any revenue from these projects and they will both be handed over to the Queensland Government upon commissioning.  An investment in BrisConnections Unit Trusts comprises a stapled security made up of one unit in BrisConnections Investment Trust and one unit  in BrisConnections Holding Trust.   Stapled  securities  in BrisConnections are  listed on  the Australian Stock Exchange under the code “BCS”. There are many factors that may affect the results of an investment in BCS which are outside the control of the Directors of the Responsible Entity or may not be capable of being foreseen or accurately predicted. 

 For further information please contact  Nick Lattimore, CFO T: 617 3170 1902;  M: 0419 243 092;  E: [email protected]  

  

For

per

sona

l use

onl

y

Page 7: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      1 

  

  

BrisConnections Investment Trust  ARSN 131124813 

and  BrisConnections Holding Trust 

ARSN 131125025 

 Interim Financial Report 

For the period ended 31 December 2011  

Contents Directors’ Report ............................................................................................................................................................ 2 

Audit Independence Letter ............................................................................................................................................. 9 

Consolidated interim statement of financial position .................................................................................................. 10 

Consolidated interim statement of comprehensive income ........................................................................................ 11 

Interim statement of changes in equity ‐Consolidated ................................................................................................ 12 

Consolidated interim statement of cash flows ............................................................................................................. 14 

Condensed Notes to the Financial Statements ............................................................................................................ 15 

Directors’ Declaration ................................................................................................................................................... 33 

Independent Audit Report ............................................................................................................................................ 34 For

per

sona

l use

onl

y

Page 8: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

                         

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      2 

Directors’ Report Your  Directors  present  their  report  on  BrisConnections  Unit  Trusts  (“BrisConnections”)  together  with  the consolidated financial statements of BrisConnections and its controlled entities (”the Group”), for the period 1 July 2011 to 31 December 2011 and the audit report thereon.   The period 1 July 2011 to 31 December 2011 is hereafter referred to as the period ended 31 December 2011. The comparative period  is 1 July 2010 to 31 December 2010 with the exception of the statement of financial position which uses the 30 June 2011 comparatives.  The  information disclosed  in  the  interim Directors’ Report and accompanying  financial  report  is  significantly  less than is required for a full financial year report.  Trust Information BrisConnections  is  made  up  of  two  Australian  unit  trusts,  BrisConnections  Holding  Trust  (“BCHT”)  and BrisConnections  Investment Trust  (“BCIT”). Units  in BrisConnections  comprise a unit  in BCHT and a unit  in BCIT stapled together and traded as one on the ASX.  BrisConnections  is  managed  by  BrisConnections  Management  Company  Limited  (“BMCL”),  a  wholly‐owned subsidiary of BrisConnections RE Holdings Pty Limited, a wholly owned subsidiary of BCHT. BMCL’s only function is to act as the responsible entity of BCIT and BCHT.  BMCL  has  delegated  management  of  the  day‐to‐day  business  affairs  of  BrisConnections  to  BrisConnections Operations Pty Limited  (BCOps), which  is a wholly owned subsidiary of BrisConnections Holdings 2 Pty Limited, a wholly owned subsidiary of BCHT. BMCL retains responsibility for the corporate governance of BCIT and BCHT and the  protection  of  unitholders’  interests.  BMCL,  therefore, monitors  BCOps’  compliance with  its  regulatory  and contractual obligations.   AASB 3 “Business Combinations” requires entities combining under stapling arrangements to identify one entity as acquirer or parent entity. The parent entity is required to prepare consolidated financial statements in accordance with the principles of AASB 3 and AASB 127 “Consolidated and Separate Financial Statements”.  On  19  May  2008  the  Group  was  awarded  the  concession  from  the  State  of  Queensland  (“State”)  to  design, construct,  operate, maintain  and  finance  the  Airportlink  Project,  and  to  construct  on  behalf  of  the  State  the Northern Busway  (Windsor  to Kedron) and  the Airport Roundabout Upgrade. A project deed was executed on 2 June 2008 to reflect the award of the Concession (“Project Deed”).  Units in BCHT and BCIT were stapled and registered with ASIC prior to entering into the Project Deed. Accordingly, the combination of the BrisConnections Group occurred prior to being awarded the Project Deed when there were only nominal assets and liabilities in each Trust. As a result, no fair value adjustment is required on consolidation of the BrisConnections Group.  In the above circumstances BCIT has been identified as the parent entity of the BrisConnections Group on the basis that it comprises 99% of the value of the stapled units on issue.  The  financial  statements  have  been  prepared  by  consolidating  the  financial  statements  of  all  the  entities  that comprise BrisConnections Group being: 

1. BCIT and its controlled entities by ownership interest and  2. BCHT and its controlled entities, as a result of the contractual arrangements represented by the staple. 

For

per

sona

l use

onl

y

Page 9: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Directors’ Report (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      3 

Consistent  accounting  policies  have  been  employed  in  the  preparation  and  presentation  of  the  financial statements.  In preparing  the  financial  statements,  all  transactions within  the BrisConnections Group have been eliminated.  The  Group  includes  the  following  entities:  BCIT  and  its  controlled  entities:  BrisConnections  Asset  Trust, BrisConnections Investment Trust 2 and BrisConnections Finance Pty Limited, and BCHT and its controlled entities: BrisConnections  Holding  2  Pty  Limited,  BrisConnections  Nominee  Company  Pty  Limited,  BrisConnections Operations  Pty  Limited,  BrisConnections  Contracting  Pty  Limited,  Northern  Busway  Contracting  Pty  Limited, AirportlinkM7  Pty  Limited,  BrisConnections  RE  Holdings  Pty  Ltd  and  BrisConnections  Management  Company Limited. 

The ASX, without limiting its discretion, has reserved the right to remove BCHT or BCIT or both from the official list if any of the units in BCHT and the units in BCIT cease to be stapled together, or any equity securities are issued by either of the Stapled Trusts which are not stapled to equivalent securities in the other entity. 

 Directors and Officers of Responsible Entity The Board of directors (“Board”) has power to appoint additional persons as directors.   The names of BrisConnections’ Directors in office during or since the end of the financial year are as follows:  Trevor C Rowe    Chairman and Independent Non‐executive Director    Appointed 23 May 2008 Raymond H Wilson  Managing Director and CEO*        Appointed 23 May 2008 John G Allpass    Independent Non‐executive Director      Appointed 23 May 2008 Andrea C Harcourt  Independent Non‐executive Director      Appointed 1 December 2010 Martin DE Kriewaldt  Independent Non‐executive Director      Appointed 24 October 2008 Richard JE Wharton  Independent Non‐executive Director      Appointed 23 May 2008 Mark A Snape    Non‐executive Director          Appointed 24 October 2008                     Retired 15 December 2011 Mark H Lynch    Non‐executive Director (alternate to Mark A Snape)     Appointed 21 November 2008                     Retired as alternate 15 December 2011       Non‐executive Director          Appointed 15 December 2011 *Dr. Wilson was originally appointed Non‐Executive Director on 23 May, 2008 and then became Managing Director and CEO on 3 November, 2008 

 Each of the above Directors has been in office since the date of appointment noted above and up to the date of this report, unless retired.  Principal activities  BrisConnections has been awarded a 45 year  concession  from 2008  to design,  construct, operate, maintain and finance Airportlink toll road in Brisbane. Airportlink is a 6.7 kilometre multi‐lane electronic free‐flow toll road with dual 5.7 kilometre  tunnels.  It  is Australia’s  largest privately  funded  transport  infrastructure project which, when complete  in mid‐2012, will  reduce  congestion,  transform  the  road network  and help  to build  a better Brisbane community through its economic and social value to the city.   Airportlink is a key connector road, and will boost business efficiency in the economic heart of one of Australia’s highest growth capital cities.   Upon completion, Airportlink will connect multi‐destinations including Brisbane’s northern suburbs, Brisbane’s CBD and Brisbane Airport, the Clem 7 (North‐South Bypass Tunnel) and the Inner City Bypass. It will also serve as a key distribution  road,  connecting  some  of  Brisbane’s major  destinations  such  as  Brisbane  Airport,  the  CBD,  Royal Brisbane Hospital, Australia TradeCoast and the Chermside Shopping Centre area.   

For

per

sona

l use

onl

y

Page 10: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Directors’ Report (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      4 

BrisConnections also designed and constructed a portion of  the Northern Busway between Windsor and Kedron and an upgrade of the East‐West Arterial / Airport Drive / Southern Cross Drive  interchange  (“ARU”) at Brisbane Airport, both of which are funded by the Queensland Government. BrisConnections will not receive any profit from these  projects  and  they  are  both  being  handed  over  to  the  Queensland  Government  upon  completion.  ARU reached practical completion on 1 July 2011.  In the opinion of the Directors there were no significant changes in the state of affairs of the Group that occurred during  the period ended 31 December 2011  (other  than progress made  towards completion of  the projects) not otherwise disclosed in this report or the financial statements.  Review of Operations BrisConnections  is  in  the design  and  construction phase of  the Airportlink, Northern Busway  and ARU projects. Accordingly, BrisConnections has capitalised all costs  relating  to debt establishment, deferred costs or  intangible assets as appropriate.   BrisConnections  has,  as  Principal  Contractor,  appointed  Thiess  John  Holland  (TJH)  on  a  fixed  time  fixed  price contract to undertake design and construction activities. Airportlink is expected to open to traffic in mid‐2012. As at the end of the period ended 31 December 2011, approximately 95% of the three projects were complete with over 25 million manhours worked, and construction expenditure of almost $4 billion.  In  addition,  a number of milestones  since  1  July  2011 have been  achieved  to  the date  of  this  report  including completion  of  Bowen  Hills  ramps  and  bridges,  development  of  our  customer  processes,  growth  of  operations resources, continued acceptance testing of the tolling system, completion and relocation to our permanent home at  Airportlink  Operations  Centre  (ALOC)  ,  continued marketing with  briefings  to  over  3000  individuals  and  90 briefing sessions with stakeholder organisations, and further development and assessment of pricing options and innovative driver rewards programs.  Except for the matters disclosed, there are, at the date of this report, no other matters or circumstances which have arisen since 31 December 2011 that have significantly affected or may significantly affect:  (a)  the operations in future financial periods subsequent to the half year ended 31 December 2011, of the Group 

constituted by BrisConnections and the entities it controls from time to time; (b)  the results of those operations in future financial periods; or (c)   the state of affairs, in future financial periods, of the Group.  Distributions The Board announced on 20 November 2009 no  further distributions will be paid prior  to completion of  the  toll road. As such, no distributions were paid or declared during the half year to 31 December 2011.  Securities All BrisConnections stapled securities on issue, comprising 390,264,895 stapled securities, trade on ASX as fully paid securities under the ASX code BCS.  During the period ended 31 December 2011, no stapled securities were issued by BrisConnections.   Number of  

Stapled Securities 

Total $’000*

Opening balance – 1 July 2011  390,264,895  1,170,489

Closing Balance – 31 December 2011  390,264,895  1,170,489*excludes the impact of non‐controlling interests and the net present value (NPV) of the final instalment and equity raising costs. 

  

For

per

sona

l use

onl

y

Page 11: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Directors’ Report (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      5 

Events subsequent to reporting date There has not arisen in the interval between the end of the reporting period and the date of this report any item, transaction or event of a material and unusual nature likely, in the opinion of the Directors of BrisConnections, to affect  significantly  the  operations  of BrisConnections,  the  results  of  those  operations,  or  the  state  of  affairs  of BrisConnections in future financial years.   Future or Likely Developments, Operating Results and Prospects During the balance of the financial year, the Group will continue to work toward completion of construction and commencement of operations in mid 2012. The scheduled commencement of operations is 30 June 2012 and it is anticipated as at the date of this report that Airportlink will be open for traffic on the scheduled date. Pursuant to the requirements of the Project Deed with the State of Queensland granting the concession to operate Airportlink for 45 years from 2008, a toll free period will apply from commencement of operations.  BrisConnections recognises that it takes time to build the usage habit by motorists within the target market for use of Airportlink. Marketing, education programmes and demonstrating how to use Airportlink – that is how to access the  road  and  ability  to  use  interactive  testing  of  journey  options  via  the  Airportlink  website (www.airportlinkM7.com.au) –  commenced during  the half  year and will  continue until and beyond opening.  In addition, a number of pricing options to encourage use of Airportlink is also being considered.  The  future  results of  the Group will critically depend on various operating outcomes  including particularly  traffic patronage  on  Airportlink.  In  the  absence  of  knowing  actual  traffic  patronage,  the  Group  has  considered  and concluded  that  taken  collectively,  the  current  input  factors  are  not  materially  different  from  those  used  in developing the traffic forecasts, the outputs of which are contained in the Product Disclosure Statement dated 24 June 2008 (see Note 13).  The traffic forecast is an estimate and once Airportlink opens, actual traffic numbers may be different, possibly materially so, from this forecast.   Reference  is made to the BrisConnections’ Annual Report for financial year ended 30 June 2011 and  in particular the risk report contained therein which highlights that the Group  is subject to risks that can adversely  impact our business, results of operations, financial condition and future performance.   Financial Statement Sensitivities Note  13  to  the  Financial  Statements  provides  disclosure  in  respect  of  the  valuation  of  the  key  asset  of  the BrisConnections Group being Future Tolling Rights. That disclosure highlights that the value of Future Tolling Rights is most sensitive to movements in pre‐tax discount rates and to the actual traffic performance of the toll road once open.  It should be noted  that of  the discount  rates and  forecasts and  traffic sensitivities, while undertaken with consideration of relevant factors, discount rates may vary and traffic forecasts may not be achieved.  Environmental Issues BrisConnections pays due attention to the management of environmental matters. Significant environmental risks have been  considered  and BrisConnections  is not  aware of  any  current  environmental  issues  giving  rise  to  any obligations which have not been addressed.   Fees paid to the Responsible Entity and Associates Fees paid to the Responsible Entity out of BrisConnections’ property are disclosed in Notes 25 and 28.   Retirement, Election and Continuation in Office of Directors BrisConnections Management Company Limited  is a wholly owned subsidiary of BrisConnections RE Holdings Pty Limited  (“BREH”),  a wholly  owned  subsidiary  of  BCHT,  and  accordingly,  directors  are  nominated  by  BREH  and appointed by the Board of BrisConnections Management Company Limited. There is no requirement for Directors to retire by rotation. 

For

per

sona

l use

onl

y

Page 12: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Directors’ Report (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      6 

Directors’ and executives’ interests The  tables  below  show  the  interests  of  each  director  (as  notified  by  the Directors  to  the  Australian  Securities Exchange in accordance with section 205G(l) of the Corporations Act) and executives in the issued Securities of the Group as at the date of this report.    Fully Paid Ordinary Securities Mr TC Rowe   282,808 Dr RH Wilson  15,009 Mr JG Allpass  65,988 Ms AC Harcourt  9,178 Mr MDE Kriewaldt  57,179 Mr RJE Wharton  50,901 Mr MH Lynch  0 Ms TD Herbst  3,002 Mr N Lattimore  10,009 Dr CC MacDonald  5,000  Pursuant to the remuneration of Independent directors, their remuneration which would otherwise be applied to the purchase of BrisConnections units has been paid in cash during the period in accordance with BrisConnections’ Securities Trading Policy.   Directors’ Interests in Contracts No material contracts  involving Directors’  interests were entered  into during the period, or existed at the end of the year, other than those transactions detailed in Note 28.  Directors’ and officers’ indemnity BrisConnections has by way of deed of indemnity and access, indemnified each Director referred to in this report, BrisConnections’  Secretary,  Chief  Financial  Officer  and  previous  directors  and  secretaries  (Officers)  against  all liabilities or loss (other than to BrisConnections or a related body corporate) that may arise from their position as Officers of BrisConnections and  its controlled entities, except where the  liability arises out of conduct  involving a lack  of  good  faith  or  indemnification  is  otherwise  not  permitted  under  the  Corporations  Act.  The  indemnity stipulates that BrisConnections will meet the full amount of any such  liabilities,  including costs and expenses, and covers a period of seven years after ceasing to be an Officer of BrisConnections.   Directors’ and officers’ insurance BrisConnections  has  paid  insurance  premiums  for  one  year  cover  in  respect  of Directors’  and Officers’  liability insurance  contracts,  for  Officers  of  BrisConnections  and  of  its  controlled  entities.  The  insurance  cover  is  on standard  industry  terms  and  provides  cover  for  loss  and  liability  for wrongful  acts  in  relation  to  the  relevant person’s  role as an Officer, except  that cover  is not provided  for  loss  in  relation  to Officers gaining any profit or advantage  to which  they were not  legally entitled, or Officers committing any criminal, dishonest,  fraudulent or malicious act or omission, or any knowing or wilful violation of any statute or regulation. Cover is also only provided for fines and penalties in limited circumstances.   The  insurance  does  not  provide  cover  for  the  independent  auditors  of  BrisConnections  or  of  a  related  body corporate of BrisConnections.  In accordance with usual commercial practice, the insurance contract prohibits disclosure of details of the nature of the  liabilities  covered by  the  insurance,  the  limit of  indemnity  and  the amount of  the premium paid under  the contract.     

For

per

sona

l use

onl

y

Page 13: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Directors’ Report (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      7 

Infrastructure Entities BrisConnections notes the release by ASIC of Regulatory Guide 231: Infrastructure Entities: Improving disclosure for retail  investors  prior  to  the  date  of  this  report.  Consistent  with  BrisConnections’  belief  in  transparency  and disclosure,  and  to  provide  meaningful  and  consistent  information  enabling  investors  to  understand  the characteristics of and the risks associated with BrisConnections, the table below sets out the following disclosures:  

Key relationships  BrisConnections has key relationships with  ‐ its design and construction contractor, Thiess John Holland which has a right to appoint a director to the Board of BMCL – see Note 24 Commitments 

‐ its  operations  and  maintenance  contractor,  Thiess  John  Holland  Motorway Services – see Note 24 Commitments 

‐ its banking syndicate comprising 10 Australian and European banks ‐ see Note 22 Debt Funding Risks and Note 23 Borrowings 

‐ related parties – see Note 28 Related Party Transactions ‐ the State of Queensland as the party granting the concession and responsible to repay the State Bridge Facility – see Note 23 Borrowings 

Management  and performance fees 

See Notes 25 Acquisition of Subsidiary and 28 Related Party Transactions 

Related party transactions  See Note 28 Related Party Transactions 

Financial ratios  Interest cover ratios were disclosed in the Product Disclosure Statement dated June 2008. BrisConnections has covenants in relation to the interest cover ratio with its financiers which will be applied upon completion of the construction. 

Capital  expenditure  and debt maturities 

Planned capital expenditure  for  the next 12 months  is as detailed  in  the Product Disclosure Statement dated June 2008 namely the completion of the construction of Airportlink and commencement of operations ‐ see Notes 22 Debt Funding Risks, 23 Borrowings and 24 Commitments – Capital Expenditure 

Foreign  exchange  and interest rate hedging 

BrisConnections’ policy in relation to foreign exchange and interest rate hedging is contained in BrisConnections’ Annual Report for financial year ended 30 June 2011 Note 3(l). 

Base case financial model  The base case financial model  is regularly reviewed by management and has been externally  reviewed  by  two  independent  parties  and  a  check  undertaken  of  the mathematical accuracy.  Key assumptions contained  in the base case financial model were disclosed  in the Product  Disclosure  Statement  dated  June  2008.  Reference  is  also made  to  the BrisConnections’  Annual  Report  for  financial  year  ended  30  June  2011  and  in particular  the  Risk  Report  contained  therein which  highlights  that  the  Group  is subject  to  risks  that  can  adversely  impact  our  business,  results  of  operations, financial condition and future performance.  

Valuations  BrisConnections is in the design and construction phase of the Airportlink, Northern Busway  and  ARU  projects.  Accordingly,  BrisConnections  has  capitalised  all  costs relating to debt establishment, deferred costs or  intangible assets as appropriate. See Note 13 Non Current Assets – Intangibles for valuation of intangibles. 

Distribution policy  The Board announced on 20 November 2009 no further distributions will be paid prior to completion of the toll road. As such, no distributions were paid during the half year to 31 December 2011 ‐ see Note 21 Distributions 

For

per

sona

l use

onl

y

Page 14: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Di

Bris31 D

W

P

 AuThcoext Noext KP RoBriCobene Th Da 

TreCh 

 

irectors’ 

sConnections UniDecember 2011 I

Withdrawal p

ortfolio dive

udit Services e  statementmpliance witternal audito

o person whternal audito

MG continue

ounding of AisConnectionmmission, reen rounded arest dollar. 

is report is m

ted at Brisba

evor C Roweairman 

Report (

t Trusts nterim Financial 

policy 

ersification 

t by  the Groth the indepors, forms pa

o was an Ofor at a time w

es in office a

mounts ns  is of a kinelating to thoff  in accor

made in acco

ane this 27th 

  e AO DUniv 

   

(continu

Report 

Not ap

Pursuaprimardesign,2053.  

oup’s externpendence reqart of this Dir

fficer of Briswhen the Gr

as auditor in 

nd  referred e “rounding rdance with 

ordance with

 day of Febr

   

ed) 

plicable as B

ant  to  BrisCory role, unde, construct, 

al auditors  tquirements orectors’ Repo

sConnectionsoup’s extern

accordance 

to  in Class Oof” amountsthat Class O

 a resolution

ruary 2012.

   Ra  Ma

BrisConnectio

onnections’ er the Concescommission,

to  the memof the Corpoort, and is se

s during  thenal auditors c

with section

Order 98/10s in the DireOrder to the 

n of the Direc

aymond H Wanaging Dire

ons is a listed

constitutionssion Deed w, operate an

mbers of Brisorations Act et out on pag

e half year wconducted a

n 327 of the C

00,  issued byctors’ Repornearest tho

ctors and is s

Wilson ector  

d entity 

s,  it  is  a  sinwith the Statd maintain A

Connectionsand the profge 9. 

was a directon audit of th

Corporations

y  the Austrat. Amounts iusand dollar

signed for an

 

 

ngle  purposete of QueensAirportlink a

s  in  relationfessional cod

or or partnee Group. 

s Act 2001.  

alian Securitiin this Directrs, or  in cert

nd on behalf 

e  entity withsland, to finaas a tollroad 

to  the audde of conduc

er of  the Gro

es &  Investmtors’ Report tain cases, to

of the Direc

 

h  the ance, until 

itors’ ct for 

oup’s 

ment have o the 

ctors. 

For

per

sona

l use

onl

y

Page 15: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

9

Lead Auditor’s Independence Declaration under Section 307C of the Corporations Act 2001 To: the directors of BrisConnections Management Company Limited, the responsible entity of BrisConnections Investment Trust and BrisConnections Holding Trust

I declare that, to the best of my knowledge and belief, in relation to the audit for the half-year ended 31 December 2011 there have been:

(i) no contraventions of the auditor independence requirements as set out in the Corporations Act 2001 in relation to the audit; and

(ii) no contraventions of any applicable code of professional conduct in relation to the audit.

KPMG

Scott Guse Partner

Brisbane

27 February 2012

KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International, a Swiss cooperative.

Liability limited by a scheme approved under Professional Standards Legislation.

For

per

sona

l use

onl

y

Page 16: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

BrisConnections Group Consolidated Interim Financial Report   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      10 

Consolidated interim statement of financial position 

As at 31 December 2011 

Consolidated 

In thousands of AUD  Notes  31 Dec 2011  30 Jun 2011 

ASSETS    

Current Assets    

Cash   8  157,921  169,498 

Other financial assets  8  29,072  73,300 

Capital Work In Progress  11  255,524  ‐ 

Other Current Assets  640  290 

Receivables   12  7,805  10,206 

Total Current Assets   450,962  253,294 

 

Non‐Current Assets    

Receivables   12  177,572  173,087 

Plant & Equipment  10  406  209 

Intangible Assets   13  3,520,383  3,033,727 

Capital Work In Progress  ‐  244,304 

Other Non‐Current Assets  14  299  356 

Deferred Tax Assets   7  205,121  132,798 

Total Non‐Current Assets   3,903,781  3,584,481 

Total Assets   4,354,743  3,837,775 

 

LIABILITIES    

Current Liabilities    

Trade & Other Payables  15  42,610  89,005 

Other Financial Liabilities  16  96,294  70,451 

Employee Benefits  27  1,913  1,246 

Loans and borrowings  17  266,316  ‐ 

Current Tax Liability  104  ‐ 

Total Current Liabilities   407,237  160,702 

 

Non‐Current Liabilities    

Other Financial Liabilities   16  329,942  185,305 

Loans and borrowings   18  2,631,089  2,404,213 

Total Non‐Current Liabilities   2,961,031  2,589,518 

Total Liabilities   3,368,268  2,750,220 

 

Net Assets   986,475  1,087,555 

 

EQUITY    

Issued capital/units   1,064,371  1,064,371 

Deferred capital/unit contribution   120,130  120,130 

Hedging Reserve  16  (298,365)  (179,030) 

Retained Earnings   264,654  197,824 

Total equity attributable to unit holders  1,150,790  1,203,295 

Non‐controlling interest   (164,315)  (115,740) 

Total Equity    986,475  1,087,555 

The above Consolidated Interim statement of financial position should be read in conjunction with the accompanying Notes 

For

per

sona

l use

onl

y

Page 17: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

BrisConnections Group Consolidated Interim Financial Report   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      11 

Consolidated interim statement of comprehensive income For the six months ended 31 December 2011 

 

Consolidated 

In thousands of AUD   Notes  31 Dec 2011  31 Dec 2010

 

Revenue   450,994  722,162

Financial Income  4  5,791  5,602

Total revenue and income  456,785  727,764

 

Expenses    

Administrative Expenses  8,596  5,308

Construction Expenses  450,994  722,162

Total expenses  459,590  727,470

 

Profit (Loss) Before Income Tax  (2,805)  294

 

Income Tax (Expense) /Benefit  6  20,878  13,049

 

Net Profit/ (Loss) after income tax   18,073  13,343

    

Other comprehensive income   

Effective portion of changes in fair value of cash flow hedges, net of tax 

 (119,335)  54,951 

Other comprehensive income/(expense) for the period, net of Income Tax 

 (119,335)  54,951 

Total comprehensive income/(expense) for the period  (101,262)  68,294

 

Profit /(Loss) after income tax attributable to:   

Unit Holders  66,830  43,880

Non‐controlling interest  (48,757)  (30,537)

Profit for the period  18,073  13,343

 

Total comprehensive income/(expense) attributable to: 

 

Unit Holders  (52,505)  98,831

Non‐controlling interest  (48,757)  (30,537)

Total comprehensive income/(expense) for the period  (101,262)  68,294

 

Earnings per unit  20   

 

Basic earnings per unit (cents )(profit per unit)  17.12  11.24

 

Diluted earnings per unit (cents)(profit per unit)  14.13  8.94

     

The above Consolidated  Interim Statement of Comprehensive  Income should be read  in conjunction with the accompanying Notes. 

For

per

sona

l use

onl

y

Page 18: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

BrisConnections Group Consolidated Interim Financial Report               

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      12 

 

Interim statement of changes in equity ‐Consolidated 

For the six months ended 31 December 2011 Attributable to unit holders of the Parent 

Issued  Deferred  Accumulated  Hedging  Total  Non‐Controlling Total

In thousands of AUD  Capital  Capital Profit/(Loss) Reserve  Equity Interest Equity

Opening Balance 1 July 2011  1,064,371  120,130  197,824  (179,030)  1,203,295  (115,740)  1,087,555 Total comprehensive income for the period Profit or (Loss)   ‐  ‐ 66,830 ‐ 66,830 (48,757) 18,073Other comprehensive income Effective portion of changes in fair value of cashflow hedges, net of tax  ‐  ‐  ‐  (119,335)  (119,335)  ‐  (119,335) 

Total other comprehensive income  ‐  ‐  ‐  (119,335)  (119,335)  ‐  (119,335) 

Total comprehensive income  ‐  ‐  66,830  (119,335)  (52,505)  (48,757)  (101,262) 

Transactions with unit holders, recorded directly in equity Contributions by and distributions to unit holders Units issued  ‐  ‐ ‐ ‐ ‐ ‐ ‐DRP Underwriting Fee  ‐  ‐ ‐ ‐ ‐ ‐ ‐Deferred Tax ‐ Equity ‐  ‐ ‐ ‐ ‐ 182 182

Total transactions with unit holders  ‐  ‐  ‐  ‐  ‐  182  182 

Closing Balance at 31 December 2011  1,064,371  120,130*  264,654  (298,365)  1,150,790  (164,315)  986,475 

*This amount is equal to $122,309,545 less the non‐controlling interest of $2,180,056. 

The above Consolidated Interim Statement of Changes in Equity should be read in conjunction with the accompanying Notes. 

For

per

sona

l use

onl

y

Page 19: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

BrisConnections Group Consolidated Interim Financial Report             

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      13  

 

Statement of changes in equity ‐ Consolidated 

For the six months ended 31 December 2010  

Attributable to unit holders of the Parent 

Issued  Deferred  Accumulated  Hedging  Total  Non‐Controlling Total

In thousands of AUD  Capital Capital Profit/(Loss) Reserve  Equity Interest Equity

Opening Balance 1 July 2010  1,064,371  120,130  99,775  (208,229)  1,076,047  (45,529) 1,030,518

Total comprehensive income for the period 

 Profit or Loss   ‐  ‐  43,880  ‐  43,880  (30,537) 13,343

Other comprehensive income Effective portion of changes in fair value of cashflow hedges, net of tax  ‐  ‐  ‐  54,952  54,952  ‐  54,952 

Total other comprehensive income  ‐  ‐  ‐  54,952  54,952  ‐  54,952 

Total comprehensive income  ‐  ‐  43,880  54,952  98,832  (30,537)  68,295 

Transactions with unit holders, recorded directly in equity Contributions by and distributions to unit holders 

Other  ‐  ‐  ‐  ‐  ‐  179  179 

Total transactions with unit holders  ‐  ‐  ‐  ‐  ‐  179  179 

Closing Balance at 31 December 2010  1,064,371  120,130  143,655  (153,277)  1,174,879  (75,887)  1,098,992 

The above Consolidated interim Statement of Changes in Equity should be read in conjunction with the accompanying Notes. 

For

per

sona

l use

onl

y

Page 20: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      14  

Consolidated interim statement of cash flows 

For the six months ended 31 December 2011  

 

Consolidated

In thousands of AUD  Notes  31 Dec 2011  31 Dec 2010

 

Cash Flows from Operating Activities   

Cash paid to suppliers and employees  (9,668)  (8,862)

Interest Received  6,544  6,346

Interest Paid  (127,582)  (74,840)

Net Cash Outflow from Operating Activities  9  (130,706)  (77,356)

 

Cash Flows from Investing Activities   

Payments for intangible assets and capital work‐in‐progress   (414,655)  (593,011)

Payment for acquisition of: Physical non‐current assets  (215)  ‐

Net Cash Outflows from Investing Activities  (414,870)  (593,011)

 

Cash Flows from Financing Activities   

Receipts from State for Airport Roundabout Upgrade & Northern BuswayProjects 

84,144  155,885

Payments to contractor for Airport Roundabout Upgrade & Northern BuswayProjects 

(84,144)  (155,855)

Proceeds from borrowings  489,771  687,884

Net Cash Inflow from Financing Activities  489,771  687,884

 

Net Increase/(Decrease) in Cash Held  (55,805)  17,517

Cash & other financial assets at the beginning of the year  242,798  241,186

Cash & other financial assets at the end of the year  186,993  258,703

 

The above Consolidated  Interim Statement of cash  flows should be  read  in conjunction with  the accompanying Notes.

For

per

sona

l use

onl

y

Page 21: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report    

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      15  

Condensed Notes to the Financial Statements 1. Reporting entity 

The directors of BrisConnections Management Company Limited (”BMCL”) (ABN 67 128 614 291/AFSL 322 275),  being  the  responsible  entity  (“RE”)  of  the  BrisConnections  Investment  Trust  (“BCIT”)  & BrisConnections  Holding  Trust  (“BCHT”)  stapled  group  and  their  controlled  entities  (“BrisConnections Group” or  “the Group”),  submit  the  consolidated  interim  financial  statements of  the Group  for  the  six months ended 31 December 2011 and the auditor's report thereon. On 29 May 2008 the Group was registered with ASIC as a managed investment scheme. On 30 July 2008 the Group was listed on the ASX Limited (“ASX”) and commenced trading on 31 July 2008.  The  period  1  July  2011  to  31  December  2011  is  hereafter  referred  to  as  the  six months  ended  31 December 2011. The  comparative  for  the prior  reporting period are  from 1  July 2010  to 31 December 2010 with  the exception of  the  statement  for  financial position  (and  the notes  relating  thereto) which uses 30 June 2011 comparatives. The units of BCIT and BCHT are stapled together and quoted as one on ASX. BCIT and BCHT were established in Australia. Under each Trust Deed they have been set up as ‘indefinite’ life  trusts.  As  these  trusts  do  not  have  a  termination  date,  contributions  by  unitholders  have  been classified as equity in the balance sheet.  For the purposes of this report the Parent Entity is defined as BCIT. The ASX reserves the right (but without  limiting  its absolute discretion) to remove BCIT or BCHT or both from the official list if any of the units in BCIT and the units in BCHT cease to be stapled together, or any equity securities are issued by either of the Stapled Trusts which are not stapled to equivalent securities in the other entity. These consolidated financial statements of the Group as at and for the period ended 31 December 2011 are available upon request from the Group’s registered office at 43 Stafford Road, Kedron QLD 4031 or at www.brisconnections.com.au.  

2. Basis of preparation (a) Statement of compliance 

These condensed consolidated interim financial statements for the period ended 31 December 2011 have been prepared  in  accordance with Accounting  Standard AASB 134  Interim  Financial Reporting  and  the Corporations Act 2001. They do not  include all of the  information required for full financial statements, and should be read in conjunction with the consolidated financial statements of the Group as at and for the period ended 30 June 2011. The accounting policies of the group in these condensed consolidated interim financial statements are the same as those applied by Group  in  its consolidated financial statements as at and for the year ended 30 June 2011. This financial report was authorised for issue by the Directors of the RE on 27 February 2012. 

(b) Basis of measurement These financial statements have been prepared under the historical cost convention except for derivative financial instruments that are measured at fair value. The financial report is presented in Australian dollars unless otherwise stated and all values are rounded to the nearest thousand dollars ($’000) unless otherwise stated. 

(c) Functional and presentation currency These  consolidated  financial  statements  are  presented  in  Australian  dollars,  which  is  the  Parent’s functional currency. The Group is of a kind referred to in ASIC Class Order 98/100 dated 10 July 1998 and in  accordance with  that Class Order,  all  financial  information presented  in Australian dollars has been rounded to the nearest thousand unless otherwise stated.     

For

per

sona

l use

onl

y

Page 22: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      16    

2. Basis of preparation (continued) (d) Use of Estimates and Judgements 

The  preparation  of  financial  statements  requires  management  to  make  judgements,  estimates  and assumptions  that  affect  the  application  of  accounting  policies  and  the  reported  amounts  of  assets, liabilities, income and expenses. Actual results may differ from these estimates. Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognised  in the period in which the estimate is revised and in any future periods affected.  The  impairment  testing of  the BrisConnections Group’s major  intangible asset  relies upon  judgement  in respect  of  the  BrisConnections Group’s weighted  average  cost  of  capital  (“WACC”) which was  used  to discount project cash flows. The BrisConnections Group has applied a generally accepted approach to the calculation of  the WACC and has used a  range of  inputs drawn  from  independent market  sources. The WACC or discount rate and the potential for impairment is subject to sensitivities as outlined in Note 13.  Deferred  tax assets  relating  to  tax  losses are  recognised when  the BrisConnections Group believes  that recoverability  is probable.   Under some circumstances, adverse operating outcomes may  jeopardise  the recoverability of the deferred tax assets detailed in Note 7 of this Report.  The key critical estimate made by  the BrisConnections Group  is  that of “traffic usage of  the motorway” once  it opens. This  traffic  forecast  is key  in assessing whether  there  is any potential  impairment  to  the motorway’s carrying value or  its  related assets. The  traffic  forecasts used  in  the  impairment  testing are those outlined  in  the Product Disclosure Statement dated 24  June 2008. These  forecasts were made by independent traffic experts Arup Pty Ltd.  Refer to Note 13 of this Report.  With respect to the operations, the ability of the BrisConnections Group to continue as going concerns is dependent upon  a number of  factors but  in particular  the  actual  traffic  volumes  in  the  initial  ramp‐up phase and beyond not being significantly lower than those levels estimated in the 2008 Product Disclosure Statement (refer also Note 13).  There exist uncertainties, potentially significant, in respect of actual traffic volumes when the Airportlink Project commences operations during 2012 which may flow on to operating cashflows and debt covenants. The Directors  regularly monitor  the  inputs  into  the  traffic  forecasts and have  formed  the view  that  the Arup traffic forecast contained in the 2008 Product Disclosure Statement continues to represent the best available forecast of Airportlink traffic. On the basis that the actual traffic volumes approximate the traffic volumes  estimated  by  Arup  there  are  reasonable  grounds  to  believe  that  the  toll  road  business  will generate sufficient net cash inflows to meet the obligations of its financing arrangements and support the carrying of the Intangible Asset. The carrying value of the intangible assets has been considered in Note 13 of this Report. Based upon the views  outlined  above,  the  directors  believe  that whilst  there  exists  potentially  significant  uncertainties with  respect  to  revenues  resulting  from  actual  traffic  volumes  during  the  operating  period,  the  going concern basis of preparation for the consolidated entity is appropriate. 

 3. Significant accounting policies  

This financial report was authorised for issue by the Directors of BMCL as RE on 27  February 2012. The accounting policies of the group in these consolidated condensed interim financial statements are the same as those applied by the Group in its consolidated financial statement as at and for the year ended 30 June 2011. The Group’s financial risk management objectives and policies are consistent with those disclosed  in the consolidated financial statements as at and for the year ended 30 June 2011. 

      

For

per

sona

l use

onl

y

Page 23: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      17    

4. Income  

Consolidated 

Other Income  31 December 2011 

$’000 31 December 2010

$’000 

Amortised Interest on Deferred Capital  4,486  4,486 

Interest  1,305  1,116 

5,791  5,602 

 5. Employee Expenses 

Consolidated 

31 December 2011 $’000 

31 December 2010$’000 

Wages and Salaries  4,376  2,040 

Other associated personnel expenses  260  206 

Contributions to defined contribution superannuation funds  333  212 

Increase/(decrease) in Liability for annual leave  45  (31) 

Increase in provision for long term incentive (refer Note 27)  622  ‐ 

5,636  2,427 

  6. Current Tax Expense/(Benefit) 

Consolidated 

   31 December 2011 

$’000 31 December 2010

$’000 

Current tax expense/(benefit)   

Current period  154  69 Deferred tax expense/(benefit)   

Recognition of net temporary differences  (21,032)  (13,118)

Total income tax expense/(benefit)  (20,878)  (13,049) 

 

Income tax recognised directly in Equity   

Derivatives  127,871  65,690 

Total Income Tax Benefit recognised directly in Equity  127,871  65,690 

 Numerical reconciliation between tax expenses and pre‐tax net profit   

Profit for the period  18,073  13,343 

Total income tax benefit  (20,878)  (13,049) 

Profit/(Loss) excluding income tax  (2,805)  294 

Income tax at entity rate 30%  (841)  88 

Tax effect on income in entities not subject to tax  (20,016)  (13,138) 

Non‐deductible expenses  (21)  1 

Income tax expense/(benefit)  (20,878)  (13,049) 

 This Note presents the consolidated tax position for the Group which comprises both taxable and non‐taxable entities. 

   

For

per

sona

l use

onl

y

Page 24: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      18    

7. Tax Assets and Liabilities 

Consolidated 

31 December 2011 $’000 

30 June 2011$’000 

(a) Deferred tax asset and liability balance Deferred tax asset 

    

  Hedges (recognised in equity – see Note 16)  127,871  76,727 

  Tax Losses  104,045  80,510 

 Balance at 31 December 2011  231,916  157,237 

 

    Deferred tax liability   

Loans and borrowings  13,775  13,704 

Other Costs  13,020  10,735 

    Balance at 31 December 2011  26,795  24,439 

 

    Net deferred tax asset (see Note 2(d))  205,121  132,798 

 (b) Movement in deferred tax assets and liabilities

Deferred income tax expense/(benefit) comprises:   

 Decrease (increase) in deferred tax assets:   

 Hedges**  (51,144)  12,539 

 Other*  (1)  (45) 

 Tax losses*  (23,535)  (41,633) 

(Decrease) increase in deferred tax liabilities:   

Other costs*  2,357  11,213 

Total Movement in deferred tax balances  (72,323)  (17,926) 

* Recognised in Income Statement 

**Recognised in Equity 

This Note presents the consolidated tax position for the Group which comprises both taxable and non‐taxable entities. 

BrisConnections Investment Trust (BCIT) Pursuant to provisions of Division 6A of the Income Tax Assessment Act 1936 (“the Act”), it is intended that BCIT will not be  liable for  income tax under the Act, provided that the taxable  income of the Trust  is fully distributed to unitholders each year. Accordingly, income tax and tax‐effect accounting will not be applied in relation to BCIT. BrisConnections Holding Trust (BCHT) Pursuant to the provisions of Division 6C of the Act, it is intended BCHT will be treated as a public trading trust and effectively treated as a company for income tax purposes. The income tax expense or revenue for the period is the tax payable on the current period’s taxable income based  on  the  income  tax  rate  adjusted  by  changes  in  deferred  tax  assets  and  liabilities  attributable  to temporary differences between  the  tax bases of  assets  and  liabilities  and  their  carrying  amounts  in  the financial statements, and to unused tax losses. Tax consolidation legislation Under the Syndicated Facilities Agreement executed  in June 2008, the debt obligors within the Group are prevented from joining a consolidated group for tax. This undertaking will remain in place until July 2018. 

   

For

per

sona

l use

onl

y

Page 25: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      19    

 8. Cash and other financial assets 

Consolidated 

31 December 2011 $’000 

30 June 2011$’000 

Cash at Bank and on hand (1)  157,921  169,498 

Other Financial Assets (cash on deposit) (2)  29,072  73,300 

186,993  242,798 

(1) The amount shown in Cash at Bank and on hand includesi. $7,320,000 comprising an amount on deposit for market flex arrangements with 

the Bank syndicate. This money is not available for general use at 31 December 2011 (30 June 2011: $7,320,000).  

ii. $125,200,000 comprising an amount held in the Group’s disbursement account for payment of design and construction costs. This money is not available for general use at 31 December 2011 (30 June 2011: $143,150,000).  

(2) The amount shown in other financial assets includes i. $13,700,000 comprising an amount held in the Group’s disbursement account 

for payment of design and construction costs. This money is not available for general use at 31 December 2011 (30 June 2011: $61,100,000). 

ii. $5,072,123 comprising an amount relating to a bank guarantee held for a subsidiary of the Group to discharge its Net Tangible Assets requirement for its Australian Financial Services License. This money is not available for general use at 31 December 2011 (30 June 2011: $5,000,000) 

 

 

9. Reconciliation of cash flows from operating activities Cash flows from operating activities 

Consolidated 

31 December 2011 $’000 

31 December 2010$’000 

Profit (loss) for the period  18,073  13,343 

Adjustments for:   

Depreciation  (19)  (14) 

Amortisation of Intangible assets   

Net finance income  (1,305)  (1,116) 

Non‐cash income items (interest on deferred equity)  (4,485)  (4,486) 

Income tax expense  (20,878)  (13,049) 

Operating profit before changes in working capital and provisions  (8,614)  (5,322) 

Change in receivables  2,401  (175) 

Change in trade and other payables  (756)  34 

Change in prepayments  (350)  (182) 

Change in provisions and employee benefits  667  ‐ 

Other  (3,016)  (3,217) 

(9,668)  (8,862) 

Interest paid  (127,582)  (74,840) 

Interest received  6,544  6,346 

Net cash outflow from operating activities  (130,706)  (77,356) 

    

For

per

sona

l use

onl

y

Page 26: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      20    

10. Plant and equipment 

Consolidated 31 December 2011 

$’000 30 June 2011

$’000 

Cost   

Opening Balance  276  154 

Additions  216  122 

Balance   492  276 

Depreciation   

Opening Balance  67  32 

Depreciation for the period  19  35 

Balance   86  67 

Written down value   406  209 

 11. Capital Works in Progress 

Consolidated 

31 December 2011 $’000 

30 June 2011$’000 

Cost   

Opening Balance  244,304  159,032 

Costs capitalised  11,220  66,413 

Interest capitalised  ‐  18,859 

255,524  244,304 

 12. Receivables 

Consolidated 

Current  31 December 2011 

$’000 30 June 2011

$’000 

Sundry Debtors   2,038  2,230 

GST Refundable  5,767  7,976 

Total Current Receivables   7,805  10,206

Non Current    

Deferred Equity Contribution1  177,572  173,087 

Total Non Current Receivables   177,572  173,087 1  Thiess Infrastructure Trust & John Holland Infrastructure Trust have each subscribed for $100,000,000 

stapled units at $3.933 per stapled unit on the Deferred Equity contribution date (currently expected to occur 24 months after Construction Completion). $177,572,146 represents the present value of this contribution  at  a  discount  rate  of  5.35% which  represents  the Group’s  cost  of  borrowings  for  the Equity Facility. 

  The $177,572,146  receivable  is  shown  at present  value  at 31 December 2011. This  is  calculated  as $173,086,576  plus  interest  income  of  $4,485,570  for  the  period  ending  31  December  2011.  The increase in its present value each period will be reflected as interest income in the income statement. The  present  value  of  the  receivable will  increase  to  $200,000,000  at  the  time  the Deferred  Equity contribution is received.  Thiess Infrastructure Trust and John Holland Infrastructure Trust will contribute equity as follows: 

Thiess Infrastructure Trust: $100,000,000, representing approximately 5.5% of the Notional Equity 

in the BrisConnections Unit Trusts.  

 John Holland Infrastructure Trust: $100,000,000, representing approximately 5.5% of the Notional 

Equity in the BrisConnections Unit Trusts. 

   

For

per

sona

l use

onl

y

Page 27: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      21    

12. Receivables (continued)  Stapled Units issued under the Deferred Equity Commitment Deed will rank equally with previously 

issued Stapled Units. 

Notional Equity is the anticipated number of Stapled Units on issue including the Stapled Units issued to  Thiess  Infrastructure  Trust  and  John  Holland  Infrastructure  Trust  on  the  assumption  that  no additional Stapled Units are issued after the Allotment Date (29 July 2008). Thiess  Infrastructure  Trust  and  John Holland  Infrastructure  Trust  cannot novate,  assign,  transfer or otherwise dispose of all or any part of their rights, benefits or obligations under the Deferred Equity Commitment Deed prior to Construction Completion. In  the 24 month period after Construction Completion, Thiess  Infrastructure Trust and  John Holland Infrastructure  Trust  may  nominate  a  replacement  deferred  subscriber  to  assume  all  its  rights  to subscribe  for  the  Stapled  Units  provided  that  the  mechanism  set  out  in  the  Deferred  Equity Commitment Deed is observed. This mechanism requires Thiess Infrastructure Trust and John Holland Infrastructure Trust (as applicable) to provide at least seven days’ written notice to the deed’s parties of  its  intention  to  nominate  a  replacement  deferred  subscriber  and  stipulates  that  a  replacement deferred subscriber cannot be appointed until the State has consented in writing to the replacement, the replacement deferred subscriber has provided substitute equity support which is acceptable to the Security Trustee, the Security Trustee  is satisfied that the replacement deferred subscriber  is solvent and reputable and the replacement deferred subscriber and the remaining parties to the deed have entered into a deed of accession on certain specified terms. In the event of a capital reorganisation by consolidation,  sub‐division  or  bonus  issue,  the deferred  issue  price may  be  adjusted.  The deferred subscribers may also contribute their equity before the Deferred Equity Contribution Date in the event of a pro rata offer to existing Unitholders or if there is an unconditional takeover offer for at least 50% of the Stapled Units, or a similar procedure structured as a scheme for the Stapled Units. BMCL,  as  trustee  of  the BrisConnections Unit  Trusts,  has  agreed  that  it will  exercise  its  powers  as members of BrisConnections Investment Trust 2 and BrisConnections Holding 2 Pty Ltd to ensure that a  single  representative  of  Thiess  Infrastructure  Trust  and  John  Holland  Infrastructure  Trust  is appointed as a director of each of the BrisConnections Group entities and BMCL. The right to have a director appointed will apply only while Thiess  Infrastructure Trust and  John Holland  Infrastructure Trust collectively hold or are obliged  to subscribe  for at  least 10% of  the Notional Equity or Stapled Units to the maximum value of $200 million. A replacement deferred subscriber appointed by either of Thiess  Infrastructure Trust or  John Holland  Infrastructure Trust  in accordance with  the  terms of  the Deferred Equity Contribution Deed will not have the right to appoint a director to the abovementioned companies. 

 

13. Non‐Current Assets – Intangibles  Consolidated 

Future Tolling Rights  31 December 2011 

$’000 30 June 2011

$’000 

Design & development costs   3,131,838  2,767,698 

Capitalised Interest   388,545  266,029 

3,520,383  3,033,727 

 Interest was capitalised at an effective interest rate of 9.2817% (30 June 2011: 9.2672%). 

Consolidated 

Cost 31 December 2011 

$’000 30 June 2011

$’000 

Opening Balance  3,033,727  1,859,042 

Contract and interest payments during year  486,656  1,174,685 

Balance   3,520,383  3,033,727 

   

For

per

sona

l use

onl

y

Page 28: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      22    

13. Non‐Current Assets – Intangibles (continued) Impairment analysis – Principles Applied At each reporting date an assessment is made as to whether there is an indication that an asset may be impaired.  When impairment testing for an asset is required, the asset’s recoverable amount is estimated. The  recoverable amount  is  the higher of  its  fair value  less  costs  to  sell and  its value  in use, which are estimated  for  an  individual  asset,  unless  the  asset  does  not  generate  cash  inflows  that  are  largely independent of  those  from other assets or groups of assets and  consequently  the asset’s value  in use cannot be estimated. In such cases, the asset is tested for impairment as part of the cash generating unit to which it belongs. When the carrying amount of an asset or cash generating unit exceeds its recoverable amount, the asset or cash generating unit  is considered  impaired and  is written down to  its recoverable amount. In assessing value  in use,  the estimated  future cash  flows are discounted to  their present value using a discount rate that reflects current market assessments of the time value of money and the risks specific to the asset.  Impairment  losses  relating  to continuing operations  (if any) are  recognised  in  those expense categories consistent with the function of the impaired asset. An assessment  is also made at each reporting date as to whether there  is any  indication that previously recognised  impairment  losses may  no  longer  exist  or may  have  decreased.  If  such  indication  exists,  a previously  recognised  impairment  loss may be  reversed  to  the  extent  there has been  a  change  in  the estimate  of  the  asset’s  recoverable  amount.  If  that  is  the  case  the  carrying  amount  of  the  asset  is increased  to  its  recoverable  amount.  That  increased  amount  cannot  exceed  the  carrying  amount  that would have been determined, net of depreciation, had no impairment loss been recognised for the asset in prior years. Such reversal is recognised in profit or loss. After such a reversal the depreciation charge is adjusted  in  future periods  to allocate  the asset’s  revised carrying amount,  less any  residual value, on a systematic basis over its remaining useful life. No amortisation has been charged as the asset is still under construction. Impairment Testing The Group has assessed whether Airportlink may be  impaired. The Group has made an estimate of  the recoverable  amount  of  the  asset,  using  a  value  in  use  calculation.  In  assessing  the  value  in  use,  the estimated future operating cash flow from the road inclusive of future capital expenditure forecasts over the 41 year operating  life of the concession are discounted to their present value using a discount rate that reflects current market assessments of the time value of money and the risks specific to the asset.  As  its primary assessment, the BrisConnections Group has considered the traffic risks referred to  in the Product Disclosure Statement dated 24 June 2008 and a pre‐tax discount rate of 10.64% has been used (30 June 2011: 11.17%). Terminology used  in this note  is consistent with that used  in the 2008 Product Disclosure Statement. The reduction in the pre‐tax discount rate reflects a combination of the decline in long term interest rates and a reduced risk metric due to the fact that the project is now less than six months to completion. The  impairment test shows an excess value  in use of $1,290.7 million over the carrying current value of the asset and accordingly  the BrisConnections Group has determined  that  there  is no  impairment. The value  in  use  estimate  is most  sensitive  to  changes  in  assumptions  regarding  traffic  and  the  pre‐tax discount  rate. A  cash  flow model  covering  the  full  concession period has been used and  is  considered appropriate  for  these  testing  purposes  given  the  single  revenue  stream  and  long  term  cash  flows generated.  Airportlink  is  still  in  construction  and  as  such,  solely  for  the  purpose  of  the  value  in  use estimates, a series of assumptions have been made as to future traffic volumes. The steady state (2016 and  beyond)  traffic  volumes  as  set  out  in  the  2008  Product  Disclosure  Statement  are  considered appropriate and no change has been made to them.  

   

For

per

sona

l use

onl

y

Page 29: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      23    

 13. Non‐Current Assets – Intangibles (continued) 

Impairment Testing (continued) These  traffic  forecasts were derived by  independent  traffic experts  from a  complex modelling exercise incorporating a variety of economic and traffic parameter assumptions including ramp up (starting traffic, length of ramp up period, shape of ramp up curve), network and screenline growth  including growth  in peak  hour  traffic  and  expansion  factors,  capacity  constraints,  and  other  factors.  Accordingly,  in considering if the asset is impaired for accounting reporting, it has been determined an appropriate way to  test  sensitivity  to  changes  to  these multiple  assumptions  is  to  look  at  the  impact  of  a  permanent increase or reduction in forecast traffic volumes over the entire term of the concession period.  BrisConnections monitors a number of key assumptions used  in developing the original traffic forecasts, including: 

Forecast  growth  in  employment  at  Australia  TradeCoast  (ATC)  –  a  key market  and  the second largest employment zone in Brisbane, located at the eastern end of Airportlink. 

Actual and forecast growth  in passenger numbers at assets controlled by Brisbane Airport Corporation –  journeys to and  from the airport by passengers, visitors  (including meeters and greeters) and workers are a significant market. 

Forecast growth in CBD employment – the largest single employment zone in Brisbane and located at the southern end of Airportlink.  

Network  changes  including Clem7, GoBetween Bridge and Northern  Link  (Legacy Way)  –incremental network capacity delivering traffic into the Airportlink catchment. 

Public  Transport  utilisation  and  mode  share  –  the  available  capacity  and  pricing  of  Public Transport  alternatives  (predominantly  bus)  in  the  Airportlink  catchment  can  impact  toll  road utilisation.  

Urban development forecasts including those for Hamilton, Bowen Hills and Chermside – impacts employment and residential population. 

Actual  traffic growth across Airportlink  screenlines –  indicates  the general  strength of network utilisation and capacity and associated impacts on travel times. 

Population growth –a fundamental source of network traffic growth.  

Growth in Average Weekly Earnings and the Wage Price Index – a prime factor in the population’s capacity to pay tolls. 

Economic growth  factors  including state product,  retail sales, dwelling approvals, motor vehicle sales  and  finance  approvals  ‐  a  broad  indicator  of  economic  robustness  generating  increased traffic across the network. 

Key assumptions continue to perform variably against the forecast assumptions with some assumptions more positive and others negative.  It  is noted that population and employment growth has slowed and economic growth factors remain generally subdued, but with forecasts for strong activity in the next two years.  In addition, BrisConnections has adopted a proactive marketing strategy aimed at encouraging early and sustained  use  of  Airportlink.    As  a  consequence  it  is  felt  that,  taking  the  various  preceding  factors collectively, the traffic model used remains appropriate.  Sensitivity Testing Sensitivities have been applied to two scenarios as detailed below: a. The scenario as detailed  in the 2008 Product Disclosure Statement being 4 week toll free period 

and a 15 month ramp up period from toll road opening (“Scenario One”); and b. An alternative scenario incorporating a longer toll free period followed by an extended period of 

discounted tolls. This scenario adopts a 39 month ramp up period from toll road opening.  For this scenario, a pre‐tax discount rate of 10.24% has been used.  This rate reflects the different risk of obtaining steady state traffic due to a more conservative profile of traffic growth and the impact  

For

per

sona

l use

onl

y

Page 30: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      24    

13. Non‐Current Assets – Intangibles (continued) Sensitivity Testing (continued) 

of the longer toll free period and the benefit of an extended period of discounted tolls (“Scenario Two”). 

The  traffic  forecast  is an estimate and once Airportlink opens, actual  traffic numbers may be different, possibly materially  so,  from  this  forecast.    Accordingly,  the  table  below  shows  the  impact  of  various sensitivities on the current excess value in use (+$1,290.7 million for Scenario One and +$1,177.9 million for Scenario Two) over the carrying current value of the asset for a change in the forecast traffic over the entire concession period.  

% Change in traffic over whole of 

Concession period 

Change to Excess Value in Use$’million 

Scenario One June 2011 

Scenario One December 2011 

Scenario TwoDecember 2011 

‐25.0%  n/a ‐$1,144.4 ‐1,107.2

‐20.0%  ‐$798.8 ‐$869.8 ‐$836.7

‐15.0%  ‐$566.2 ‐$614.8 ‐$587.7

‐10.0%  ‐$357.5 ‐$386.5 ‐$367.1

‐5.0%  ‐$172.2 ‐$185.5 ‐$175.5

0%  0 0 0

+5.0%  +$160.1 +$171.9 +$161.5

+10.0%  +$307.6 +$330.9 +$309.7

+15.0%  +$446.9 +$477.4 +$445.2

+20.0%  +$569.7 +$609.2 +$564.9

+25.0%  n/a +$700.1 +$642.5

An excess value in use would still be arrived at under any of these percentage changes. In relation to Scenario One, sensitivities  in respect of the ramp up period showed that by  increasing the ramp up period to 36 months resulted  in a reduction of $46.7 million  in the current excess value  in use. Leaving the ramp up period at 36 months and doubling the discount of commencing traffic resulted in a further  reduction of $64.7 million  to a  total  reduction of $111.4 million.  In both  these sensitivities,  the shape of the ramp up curve was more conservative than assumed in the traffic model in the 2008 Product Disclosure Statement. Again, an excess value in use for both ramp up sensitivities in Scenario One would still be the result. Due to the more conservative ramp up profile in Scenario Two, it was not considered appropriate to apply similar tests to Scenario Two.  The current value  in use  is also sensitive to changes  in the discount rate. For example, a 50 basis point change in the pre‐tax discount rate will impact the current value in use by +/‐ $320.0 million for Scenario One and by +/‐ $335.0 million for Scenario Two.  Impact of Traffic on Borrowing Covenants Impairment testing is carried out for accounting purposes, and does not directly affect the actual capital structure of the BrisConnections Group.  In considering the actual capital structure of the BrisConnections Group, there are other factors that are relevant  including  the benefit of  reserve  facilities  and  the  impact of  covenants  and  ratios  in  the debt documents that may result from a reduction in traffic. Under Scenario One above, a 25% decline in traffic over the whole of the concession period would result in a reduction of the interest cover ratio to a level which would  result  in a  lock up of equity distributions  for a period of years but  remains above default covenant settings, while a 10% decline  in  traffic  for  the whole of  the concession period under Scenario Two could result  in a technical default  (but bank  interest would still be  fully  funded).  In both Scenarios there would be no impairment. 

  

For

per

sona

l use

onl

y

Page 31: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      25    

 14. Non‐Current Assets – other 

  Consolidated 

  31 December 2011 $’000 

30 June 2011$’000 

Insurance Prepayment  299  356

  299  356

 15. Current liabilities – trade and other payables 

Consolidated 31 December 2011 

$’000 30 June 2011

$’000 

Trade creditors and accruals*  42,610  89,005 

42,610  89,005 

  *Includes Design & Construction payment claims totalling $41,290,360 (30 June 2011: $86,928,786)   

16. Cashflow Hedges 

Consolidated 31 December 2011 

$’000 30 June 2011

$’000 

Present Value of Derivative Liability ‐ Current   96,294  70,451 

Present Value of Derivative Liability ‐ Non Current  329,942  185,305 

   426,236  255,756

Deferred Tax Assets ‐ Non Current (see Note 7)  127,871  76,726 

Cash Flow Hedge Reserve   298,365  179,030 

   426,236  255,756 

 17. Current liabilities – loans and borrowings 

  Consolidated 

  31 December 2011 $’000 

30 June 2011$’000 

State Bridge Facility  267,164  ‐

Sub total  267,164 

Less deferred debt establishment costs  (848)  ‐

  266,316  ‐

 18. Non‐current liabilities – loans and borrowings 

Consolidated 

31 December 2011 $’000 

30 June 2011$’000 

Equity Bridge Facility  170,267  170,267 State Bridge Facility  ‐  267,164Construction Facility  2,505,281  2,015,510

Sub total  2,675,548  2,452,941

Less deferred debt establishment costs  (44,459)  (48,728) 

   2,631,089  2,404,213 

    

For

per

sona

l use

onl

y

Page 32: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      26    

 19. Equity  

Consolidated Movement in ordinary stapled units issued  

Ordinary Stapled Units The  units  of  BCHT  and  BCIT  are  stapled  and  the  number  of  units  issued  by  each  entity  is  the  same, however, their values differ. Currently their respective values are apportioned 1% (BCHT) and 99% (BCIT). Deferred equity contribution Thiess Infrastructure Trust and John Holland Infrastructure Trust have each subscribed for $100,000,000 of  stapled units at $3.933 per  stapled unit  (50,851,767 units). The  timing of  this  subscription  is on  the earlier  of  24 months  after  completion,  71 months  after  financial  close,  or  demand made  by  security trustee on an event of default. As it is currently the Group’s expectation that this subscription will occur  24 months after construction completion, the amount of this subscription has been discounted to present value, and reflected in equity. A corresponding receivable was also taken up. The receivables in relation to the Deferred Equity Contribution from the contractor is guaranteed by way of bank guarantees. Hedging Reserve The  hedging  reserve  comprises  the  effective  portion  of  the  cumulative  net  change  in  the  fair  value cashflow  hedging  instruments  related  to  hedged  transactions  that  have  not  yet matured,  net  of  the related tax effect. 

 20. Earning per unit  

Basic Earnings per unit The calculation of earnings per unit at 31 December 2011 was based on a profit of $66,830,000 and a weighted average number of ordinary units outstanding of 390,264,895. Diluted Earnings per unit The calculation of diluted earnings per unit at 31 December 2011 was based on profit of $62,344,000 and a weighted average number of ordinary units outstanding of 441,116,662 after adjustment for the effects of all dilutive potential ordinary units of 50,851,767 calculated as follows:  Profit attributable to ordinary unitholders (diluted)   31 December 2011 

$,000 31 December 2010

$’000 

Net profit attributable to ordinary unitholders 66,830  43,880Amortised interest on deferred capital  (4,486)  (4,487)Adjusted Net profit attributable to ordinary unitholders 62,344  39,393

Weighted average number of ordinary units (diluted)     31 December 2011 

’000 31 December 2010

’000 

Weighted average number of ordinary units  390,265  390,265Effect of deferred capital contribution  50,852  50,852Weighted average number of ordinary units  441,117  441,117

  

December 2011  June 2011 

Date  Details  Number of Units   Number of units 

1 July 2010   Units on issue    390,264,895

30 June 2011  Balance  390,264,895 

1 July 2011  Units on Issue  390,264,895 

31 December 2011  Balance  390,264,895 

For

per

sona

l use

onl

y

Page 33: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      27    

21. Distributions – consolidated group There have been no distributions declared or paid for the interim period ended 31 December 2011.  

22. Debt and Liquidity Risk  (a) Debt funding risk The primary debt funding risk relates to the continued funding of BrisConnections’ primary debt funding facility which  is the Construction/Term Facility  (used to construct and then operate  the toll road).   This debt funding is secured with various financial institutions.  The Product Disclosure Statement dated 24 June 2008 highlighted a number of risk exposures. However, one particular risk, ‘Debt Funding Risk’ has increased as a result of the global credit crisis. The term of the Construction/Term Facility is locked in place for a period of 10 years (maturing 2018). This funding,  as  outlined  in  the  2008  Product  Disclosure  Statement,  is  being  provided  by  a  syndicate  of Australian and overseas banks. The  ability  of  the Group  to make  drawdowns  against  this  facility  is  subject  to  the Group meeting  its obligations under the funding arrangements. The  global  credit  crisis  has  significantly  impacted  the  banking  industry  and  events  in  Europe  have particularly  impacted European Banks. As a consequence since  the 30  June 2011 accounts, most of  the Group  lenders have experienced rating downgrades or are under review pending a possible downgrade. Notwithstanding the downgrades, at the date of this financial report all banks in the syndicate, apart from three, had a Standard and Poors’ rating of A‐ or greater. Two banks however have a Standard and Poors’ rating of BBB and  the other has a Standard and Poors’  rating of BB and  the same banks have Moody’s ratings of A1, Baa3 and Ba2 respectively. Two banks were re‐rated upwards by Standard and Poors during the same period. As at  the date of  this  financial  report all banks have met  their drawdown obligations. However,  in  the event that a bank  in the syndicate fails to continue providing funding for the construction activities,  it  is the Group’s responsibility to replace that bank in the syndicate as the obligation to provide debt by each of the financiers is a several obligation and not a joint obligation. The remaining amount to be drawn under the Construction/Term Facility has fallen from $912.49 million as at 30 June 2011 to $422.72 million as at 31 December 2011 (see Note 23).  (b) Liquidity risk The Group is subject to liquidity risk which is the risk that the Group will not be able to meet its financial obligations as they fall due.  The  Group’s  approach  to managing  liquidity  is  to  ensure,  as  far  as  possible,  that  it will  always  have sufficient  liquidity  to meet  its  liabilities when due, under both normal and stressed conditions, without incurring unacceptable losses or risking damage to the Group’s reputation. Prudent  liquidity risk management  implies maintaining sufficient cash and term deposits, the availability of funding through an adequate amount of committed credit facilities and the ability to close‐out market positions. At  reporting date  the Group has sufficient  funds and  facilities available  to meet payments as they arise. It  is expected that at the completion of construction, the Group will have  in excess of $300.0 million  in  liquidity of which $198.3 million will be drawn from the Construction Facility at completion of construction (refer Note 23). 

   For

per

sona

l use

onl

y

Page 34: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      28    

23. Borrowings Financing Arrangements Total facilities available to the BrisConnections Group at 31 December 2011 were as follows: 

Facility  Drawn Down 

Amount  Facility Limit  Maturity Date

State Bridge*   $267,164,299 $267,164,299  6 July 2012

Equity Bridge**   $170,267,194 $200,000,000  29 June 2014

Construction/Term ***   $2,505,281,428 $2,928,000,000  30 July 2018

Liquidity Facility ****  ‐ $110,156,240  30 July 2018

Total facilities available to the BrisConnections Group at 30 June 2011 were as follows: 

Facility  Drawn Down 

Amount  Facility Limit  Maturity Date

State Bridge*   $267,164,299 $267,164,299  6 July 2012

Equity Bridge**   $170,267,194 $200,000,000  29 June 2014

Construction/Term ***   $2,015,510,155 $2,928,000,000  30 July 2018

Liquidity Facility ****  ‐ $110,156,240  30 July 2018

*  The  State  Bridge  facility  is  fully  drawn  down &  it  is  repaid  7  days  after  the  date  of  completion  of construction, which  is  assumed  to  be  29  June  2012.   As  this  facility  is  due  to mature  in  less  than  12 months, it has been reclassified as a current liability in the statement of financial position. ** No further drawings under the Equity Bridge Facility are available until after 29 June 2012. ***Draw down  from  the Construction  facility  commenced  in December 2009.  It  converts  to  the  Term facility on completion of construction. This debt financing  is being provided through a syndicated senior bank debt facility comprising 10 banks. **** The  Liquidity  facility  is not available  to be drawn down until  completion of  construction which  is assumed to be 29 June 2012. Assets pledged as security BrisConnections Nominees Company Pty Limited in its own capacity and as trustee of the BrisConnections Asset  Trust,  BrisConnections  Operations  Pty  Limited,  Northern  Busway  Contracting  Pty  Limited BrisConnections Finance Pty Limited, BrisConnections Contracting Pty Limited, BrisConnections Holding 2 Pty Limited, BrisConnections Management Company Limited and Trust Company Limited as trustee and custodian  respectively  of  the  BrisConnections  Investment  Trust  2  and  BrisConnections  Management Company Limited  (in  its capacity of  responsible entity and manager of each of BrisConnections Holding Trust and BrisConnections Investment Trust) have granted charges over their assets and undertakings to secure the funding provided by the financiers and hedge providers. Equity Bridge Facility, State Bridge Facility and Construction Facility Funds drawn under the Equity Bridge Facility, State Bridge Facility and Construction Facility will be applied towards meeting costs incurred by the Group, specifically: 

construction  costs  –  certain  amounts  payable  to  the  construction  contractor  under  the  design  and construction contract; 

development costs – costs incurred at financial close and during the construction period; 

operating costs incurred prior to construction completion – costs payable to the operator, fees payable to the lenders’ engineer or the security trustee, operating expenses, amounts payable to comply with project documents, capital maintenance contributions and taxes (including GST); 

financing costs  incurred prior  to construction completion –  funding  interest  (net of payments under the swap arrangements), fees and other expenses  incurred during the construction period  in relation to the debt and other fees due; 

reserve  accounts  –  funding  the  required  debt  services  reserve  account,  ramp  up  reserve  account, equity contingency reserve account, DRP reserve; and 

For

per

sona

l use

onl

y

Page 35: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      29    

23. Borrowings (continued) Equity Bridge Facility, State Bridge Facility and Construction Facility (continued) 

other – meeting any other costs approved by the lenders. Drawings under the facilities may be requested monthly. The drawings are deposited  into an account controlled by  the  lenders. Withdrawals  from  the account are permitted subject  to certain conditions precedent: 

no specified event of default, potential event of default, or review event subsists or will occur; 

all necessary authorisations have been obtained for the withdrawal and for the relevant stage of the design and construction contract; 

a withdrawal notice has been received by the lenders’ agent; and 

receipt by the lenders’ agent of a progress certificate which demonstrates satisfaction of the costs to complete test (demonstrating that there are enough funds to finance construction until construction completion). 

The Equity Bridge  Facility will be  repaid with  the proceeds  from  the deferred equity  contribution. The State Bridge Facility will be repaid by the State of Queensland on construction completion.  Term Facility The  construction  facility will  be  converted  into  a  loan  owing  under  the  Term  Facility  at  construction completion (June 2012 or earlier). The Term Facility will comprise a medium‐term,  interest only tranche repayable as follows: Tranche A: 100% of principal outstanding, repayable 30 July 2018.  

24. Commitments Commitments for the cost of various goods and services to be supplied but not recognised as liabilities: Capital expenditure The Group has entered into a construction contract with an unincorporated joint venture comprising John Holland Pty  Ltd  and Thiess Pty  Ltd  (“TJHJV”)  to  complete  the  required  construction  activities over  the expected period of 47 months from July 2008. 

Construction commitments contracted for, but not recognised in the balance sheet, are payable as follows: 

Consolidated 

31 December 2011  30 June 2011

$'000  $'000

Within one year  202,080  645,065

One year or later and no later than five years  ‐  ‐

202,080  645,065

 Commitments related to the intangible asset included above are: Within One Year $159,393,000 (30 June 2011:$528,410,690) and one year or later and no later than five years $nil (30 June 2011:$nil). Maintenance Contract BrisConnections Group  has  entered  into  an  operations  and maintenance  agreement with  Thiess  John Holland Motorway  Services  Pty  Ltd,  with  a  term  that  ends  on  the  expiration  of  five  years  after  the completion  of  construction  unless  terminated  or  extended  in  accordance  with  the  contract  (O&M contract).  

   

For

per

sona

l use

onl

y

Page 36: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      30    

24. Commitments (continued) Maintenance Contract (continued) 

Construction period 

Amounts Payable during the forty‐seven month construction period (adjusted for CPI increases) are as follows: 

Consolidated 

31 December 2011  30 June 2011 

$'000  $'000 

Within one year  3,000  5,842

3,000  5,842

Commencement of Operations   

Amounts payable for the initial five year period following commencement of operations (adjusted for CPI increases) are as follows: 

Consolidated 

31 December 2011  30 June 2011 

$'000  $'000 

Within one year  23,362  23,127

One year or later and no later than five years  105,900  106,105

129,262  129,232

After five years the Group may either elect to extend the O&M contract, re‐tender the contract to other available service providers or bring road‐side operations and maintenance in‐house.  

25. Acquisition of Subsidiary  On 21 October 2010 the Group pursuant to the option agreement dated, 1 October 2008 acquired all the shares  in  BrisConnections Management  Company  Limited  (BMCL)  for  $294,050  in  cash.  BMCL  is  the responsible  entity  of  BCIT  and  BCHT.  Following  acquisition,  BMCL  is  a  wholly  owned  subsidiary  of BrisConnections RE Holdings Pty Ltd (BCREH). BCREH was established by the Group on 30 September 2010 and is wholly owned by BCHT.   

26. Contingent Liabilities The contract between the Group and a joint venture comprising TJHJV, whose ultimate parent is Leighton Holdings  Ltd  (“Leighton”),  is a  fixed price  fixed  term  contract  (subject  to usual  contractual  conditions). Leighton has announced to the market that it has suffered contracting losses on the contract and that it is considering  its options to seek recompense from a variety of parties. TJHJV has submitted claims under the contract for extensions of time and delay costs associated with alleged force majeure events. BrisConnections has  reviewed  its  contractual  terms with TJHJV  and  considers  that, on  the  information presently available, it is not appropriate to make any provision for this contingency. 

 27. Employee Benefits 

  Consolidated 

  31 December 2011 $’000 

30 June 2011$’000 

Current   Liability for long term incentives  1,722  1,100Liability for annual Leave  191  146

Total employee benefits  1,913  1,246

  

For

per

sona

l use

onl

y

Page 37: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      31    

28. Related Party Transactions  Aggregate amount of transactions with related parties incurred in relation to the BrisConnections Group  being awarded the concession to finance, design, build, maintain and operate Airportlink.  

31 December 2011  30 June 2011 $  $ 

BrisConnections Management Company Limited as Responsible Entity 

Management fees   ‐  155,266

 Responsible Entity ‐ The BrisConnections Group is a stapled entity and comprises the aggregation of BCHT and  its  wholly‐owned  controlled  entities  and  BCIT  and  its  wholly‐owned  controlled  entities.  The Responsible Entity of BCHT and BCIT  is BMCL. BMCL  is now wholly owned by the Group and as such the management  fee  of  $36,236  paid  to  31 December  2011  is  retained  by  the Group.  Refer Note  25  for further details.  TJHJV has been engaged to complete the design and construction activities. The amount payable during the period was $450,994,407 (30 June 2011: $1,308,761,356) which includes an amount outstanding at 31 December 2011 of $53,186,217  (30  June 2011: $100,991,567).  The  corresponding  receivable  from  the State  Government  in  relation  to  Northern  Busway &  Airport  Roundabout  Upgrade  projects  has  been offset from the accrual in the statement of financial position. 

 29. Investments in Controlled Entities  

The BrisConnections Group comprises the aggregation of the BCHT and BCIT.  

Name of entity Country of 

Incorporation Class of shares/ 

units 

Equity holding 30 June 2011 and 31 

Dec 2011 

The BrisConnections Investment Trust Group comprises: 

BrisConnections Investment Trust   Australia  Ordinary  

BrisConnections Asset Trust  Australia  Ordinary   100% 

BrisConnections Investment Trust 2  Australia  Ordinary  100% 

BrisConnections Finance Pty Limited   Australia  Ordinary   100% 

The BrisConnections Holding Trust Group comprises: 

BrisConnections Holding Trust   Australia  Ordinary  

BrisConnections Nominee Company Pty Limited   Australia  Ordinary   100% 

BrisConnections Holding 2 Pty Limited   Australia  Ordinary   100% 

BrisConnections Operations Pty Limited   Australia  Ordinary   100% 

AirportlinkM7 Pty Limited*  Australia  Ordinary  100% 

BrisConnections Management Company Limited  Australia  Ordinary  100% 

BrisConnections RE Holdings Pty Ltd  Australia  Ordinary  100% 

BrisConnections Contracting Pty Limited   Australia  Ordinary   100% 

Northern Busway Contracting Pty Limited   Australia  Ordinary   100% 

*31 December 2011 only 

 30. Events Occurring After Reporting Date  

No  matter  or  circumstance  arose  since  31  December  2011  that  has  significantly  affected,  or  may significantly affect  the operations of  the BrisConnections Group,  the  results of  those operations or  the state of affairs of the BrisConnections Group in subsequent periods.  

For

per

sona

l use

onl

y

Page 38: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

 

BrisConnections Group Consolidated Interim Financial Report  

Condensed Notes to the Financial Statements (continued)   

BrisConnections Unit Trusts 31 December 2011 Interim Financial Report      32    

31. Segment Information The  consolidated  entity operates  as one  segment being  the Airportlink, Northern Busway  (Windsor  to Kedron) and Airport Roundabout Upgrade Project, in one geographic location being Queensland. 

 

For

per

sona

l use

onl

y

Page 39: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

Br

Bris31 D 

Di

In Bri

ThCo

TreCh 27 

risConnect

sConnections UniDecember 2011 I

irectors’ D

the opinion isConnection

(a) the coin acco

(i)

(ii)

(b) there abecom

is  statemenmpany Limit

evor C Roweairman 

February 20

tions Gro

t Trusts nterim Financial 

Declaratio

of the Directns Holding Tr

nsolidated fiordance withcomplying the Corpor

) giving a truperformanended on t

are reasonabme due and p

t  is made  inted. 

  

e AO DUniv    

012 

up Conso

Report 

on 

tors of BrisCrust and Bris

inancial stath the Corporawith the Aurations Reguue and fair vnce, as  reprethat date; anble grounds tayable. 

n  accordanc

 

  

lidated In

onnections MConnections

ements for tations Act 20ustralian Acclations 2001view of the Gesented by  tnd  to believe th

e with  a  re

 

  

nterim Fina

 

Managemens Investment

the BrisConn001, includinounting Stan1; Group’s finanthe  results o

hat the Grou

solution  of 

ancial Rep

nt Company Lt Trust.  

nections Grog: ndard AASB 

ncial positionof  its operat

up will be ab

the  Directo

 

  Ra  M

port 

Limited as th

up as set ou

134 Interim 

n as at 31 Deions and  cas

le to pay its 

rs  of  BrisCo

aymond H Wanaging Dire

 

he Responsib

ut on pages 

Financial Re

ecember 201sh  flows,  fo

debts as and

nnections M

Wilson ector  

ble Entity for

10 to 32 are

eporting and

11 and of itsr  the period

d when they

Management

 

 

 

33 

s d 

For

per

sona

l use

onl

y

Page 40: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

34

KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International, a Swiss cooperative.

Liability limited by a scheme approved under Professional Standards Legislation.

Independent auditor’s report to the unit holders of BrisConnections Investment Trust and BrisConnections Holding Trust

We have audited the accompanying interim financial report of BrisConnections Investment Trust and BrisConnections Holding Trust, which comprises the consolidated statement of financial position as at 31 December 2011, consolidated statement of comprehensive income, consolidated statement of changes in equity and consolidated statement of cash flows for the half-year ended on that date, notes 1 to 31 comprising a summary of significant accounting policies and other explanatory information and the directors’ declaration of the Group comprising BrisConnections Investment Trust and BrisConnections Holding Trust and the entities they controlled at the half-year’s end or from time to time during the half-year.

Directors’ responsibility for the financial report

The directors of BrisConnections Management Company Limited, the responsible entity of BrisConnections Investment Trust and BrisConnections Holding Trust, are responsible for the preparation of the interim financial report that gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001 and for such internal control as the directors determine is necessary to enable the preparation of the financial report that is free from material misstatement, whether due to fraud or error.

Auditor’s responsibility

Our responsibility is to express an opinion on the interim financial report based on our audit. We conducted our audit in accordance with Australian Auditing Standards. These Auditing Standards require that we comply with relevant ethical requirements relating to audit engagements and plan and perform the audit to obtain reasonable assurance whether the interim financial report is free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the interim financial report. The procedures selected depend on the auditor’s judgement, including the assessment of the risks of material misstatement of the interim financial report, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation of the interim financial report that gives a true and fair view in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by the directors, as well as evaluating the overall presentation of the interim financial report.

We performed the procedures to assess whether, in all material respects, the interim financial report presents fairly, in accordance with the Corporations Act 2001 and Australian Accounting Standard AASB 134 Interim Financial Reporting a true and fair view which is consistent with our understanding of the Group’s financial position, and of its performance.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. F

or p

erso

nal u

se o

nly

Page 41: ASX HY12 final · 2012. 2. 27. · ASX Release BrisConnections Management Company Limited ABN 67 128 614 291 AFSL 322 275 as responsible entity for BrisConnections Holding Trust ARSN

35

Independence

In conducting our audit, we have complied with the independence requirements of the Corporations Act 2001.

Auditor’s opinion

In our opinion the interim financial report of the Group is in accordance with the Corporations Act 2001, including:

(a) giving a true and fair view of the Group’s financial position as at 31 December 2011 and of its performance for the half-year ended on that date; and

(b) complying with Australian Accounting Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 2001.

Emphasis of matter – Traffic estimates

Pursuant to Auditing Standard ASA 706, and without qualification of our opinion, we draw your attention to Note 13 of the financial report. This note outlines that the intangible asset’s value in use, used to support its carrying value, is highly sensitive to changes in estimated traffic forecasts and other assumptions. Given the subjectivity and long term nature of the traffic forecasts that support the carrying value of the intangible asset, there is significant uncertainty as to whether estimated traffic forecasts will represent actual traffic volumes which may result in material differences to the intangible asset’s value in use. As actual traffic numbers may differ materially from forecast, Note 13 provides sensitivity analysis to identify how a change in traffic estimates would impact the intangible asset’s value in use in the financial report.

KPMG

Scott Guse Partner

Brisbane

27 February 2012