EI Technical Committee
26 Mar 2014
Demonstrating
‘All Necessary Measures’
at Petroleum Bulk Stores
Pat Conneely
COMAH, Chemical Production & Storage
(CCPS)
Presentation Structure
• HSA/CCPS roles
• Legal requirements in PBS sector
• Dublin Port situation
• All Necessary Measures in practice
HSA Divisions
Chemicals & Prevention Division
CCPS Role
COMAH site distribution
18
12 10
12
7
10 12 12
0 2 4 6 8
10 12 14 16 18 20
Ph
arm
aceu
tica
l P
rod
uct
ion
Fert
ilize
r, f
uel
LPG
Bu
lk P
etro
leu
m
Gas
es,
Exp
losi
ves
War
eho
usi
ng,
W
aste
Pow
er, R
efin
ery.
.
Spir
its,
Ch
emic
al..
COMAH industry type
Background
• In 2005 – Fire Response Policy Group engaged consultants
Byrne O’Cleirigh (BO’C) to do a study to help develop a fire
protection strategy for Dublin Port
• All COMAH sites Covered
• Reviewed potential major accidents and performance of
current firewater systems
BO’C Report
• 2006 – BO’C Report completed.
Among Findings:
• Inadequate resources – full tank or bund fires
• Domino effects not considered
Among Options:
• New ring main (450mm) and associated infrastructure
for bund fire response
Buncefield (Dec 2005)
Legal Framework
• Operators must take ‘all necessary measures’ under COMAH
• Petroleum Bulk stores – shared with the proper authority
• Legal duties on DPC?
• Duties under SHWWA 2005
• Fire Services Act
Dublin Port Strategic Importance
• 45% ‘Oil’ through Dublin Port
• Economic Effect of an accident?
• Environmental & Health Effects?
• ‘Political’ Effects?
Main Actors in Dublin Port
• Dublin Port Company (DPC)
o Landlord
o Coordinator
o Port Infrastructure
• Dublin City Council (DCC) o Water
o Dublin Fire Brigade (DFG)
o Planning control
• Site operators o Petroleum Bulk Stores 1979
o COMAH - “take all necessary measures”
PBSs in Dublin Port
Lack of Progress
• Bulk Oil Stores Survey in 2006/7
• Obtained copy of BOC report in 2008
• HSA arranged meeting in 2009 to discuss progress
• Responsibility for the water supply?
• Who pays?
• Ongoing Communication process
Initiation of Process
• Consideration of legal and technical issues
• Twin-track
• December 2009 – Letter to operators
• Review of emergency response arrangements
• Written risk assessments, major fire scenarios, evidence of compliance with IP 19 or equivalent, reviews following Buncefield, Domino effects considered
• Documents to be available on day of inspection
Follow-up meetings DPC/DCC
• Review progress on water supply issue
• Clarification of DPC role under PBS and the Oil Jetties
Regulations – the proper authority
• Issuing of licenses and setting conditions
What are ANM?
• Basic duty on operators under COMAH
• Broadly – are the risks of MA reduced in so far as reasonably
practical?
• Good practice is the starting point
• Legislative provisions
• Standards – IS/EN’s, API,B.S.
• Guidance – HSG 176, CIRIA, BREF, EPA
• Upper end of scale – QRA, CBA
ANM on bunds
• Reg. 31(4) (a) of the 1979 regulations (dealing with petroleum only) require bunds to be impermeable: (4) Every retaining enclosure under paragraph (1) of this Regulation shall—
(a) be designed, constructed and constantly maintained so as to adequately—
(i) prevent escape or leakage of petroleum and the spread of fire,
(ii) resist, as far as is practicable, undue seepage or absorption into the ground of petroleum
• HSG 176 : The floor of the bund should be of concrete or other material substantially impervious to the liquid being stored, and with drainage where necessary to prevent minor spillage collecting near tanks. Stone chippings and similar materials may be used providing the underlying ground is impervious. A suitable buried membrane can also be used, as can specially designed systems using the water table to retain liquids not miscible with water.
• Environmental Protection Agency, Fire-water Retention Facilities, 1995
ANM on Firewater Supply
• PBS Regulation 75 - the owner ‘shall provide in accordance with good standards of practice…. a sufficient output of water at an adequate pressure… sufficient and suitable means for the cooling of storage tanks which may be affected by fire and mobile, portable or transportable fire-fighting equipment, devices, materials, smothering agents or other substances’
• IP 19 - Fire precautions at petroleum refineries and bulk storage installations
• NFPA 30, API publications
ANM on Emergency Response
• IP 19 (2nd Ed.) used as first choice
• It provides guidance on selecting, implementing and monitoring the continuing performance of site-specific justified risk reduction measures - from prevention through detection, protection systems to mitigation measures - to reduce the risk from design event fires at installations that process and store petroleum, intermediates and refined products.
• IP 19 takes a risk based approach to determine the necessary measures required (which includes both prevention and mitigation measures).
Questions for Inspection
1. Has a risk assessment been carried out?
2. Does the risk assessment identify site-specific tank-top fire and bund pool fire scenarios (excluding class III only sites)?
3. Are the firewater and foam resources that will be required to deal with events in point 2 calculated?
4. Are the calculations correct?
5. Are the facilities available to deliver the identified rates?
6. Are appropriate emergency response plans in place?
7. Has risk assessment identified the quantity of firewater and run-off and appropriate retention facilities.
Technical Advice
• Codes and Standards for Fire Fighting and Fire Protection Systems
• Overview of Buncefield Recommendations
• Use of Fire Protection Systems on Fixed Roof Tanks with Internal Floating Roofs
• Fire Fighting Water Mains - Underground and Aboveground Systems
Inspection follow-up
• Review of information gathered
• Sites assessed individually
• Calculations checked
• Improvement Notices to issue
Notices Issued
IP 19 – tank or bund fire involving flammable liquids:
1. Consequence distance to thermal radiation levels of 6.3, 8 & 32 kW/m2
2. Resources required
3. Resources available
4. Plan to remedy any shortfall
Process
• Focus maintained on operators
• Contact maintained with other stakeholders
• Stakeholders and operators interacting outside the enforcement process
2010-2013
• Notice Extensions
• Meetings…
• 2011: Sign off IN’s subject to suitable port infrastructure
• One lagging site – resolved
Infrastructure Project
• Meetings ,consultants ,detailed plans, meetings…
• Planning permission
• Aboveground Fire main
• Agreement
Outcome
• Fire main and associated services commissioned in Feb 2014
• Planning possibilities
• Site changes in prevention and emergency response
• Cost
• Ongoing process