+ All Categories
Home > Documents > At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA),...

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA),...

Date post: 18-Mar-2018
Category:
Upload: hoangdan
View: 234 times
Download: 2 times
Share this document with a friend
17
Transcript
Page 1: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:
Page 2: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 1

(Formerly Vedanta Industries Limited)

APPENDIX - I

(See paragraph - 6)

FORM - 1

(I) Basic Information

S.

No. Item Details

1. Name of the project/s Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371

MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) at Village:

Ghorawat, Tehsil: Bhopalgarh, District: Jodhpur (Rajasthan) by M/s.

Marwar Cement Limited (Formerly Vedanta Industries Limited).

2. S. No. in the schedule As per EIA Notification dated 14th Sept., 2006 and as amended from time

to time; this project falls under S. No. 3 (Material Production), Project

Activity ‘3(b)’ Cement Plants.

3. Proposed capacity /area /length / tonnage to

be handled / command area/lease

area/number of wells to be drilled

S. No. Particulars Proposed capacity

1. Clinker (MTPA) 1.0

2. Cement (MTPA) 1.371

3. Captive power Plant (MW) 18

4. D.G. Set (MW) 5

Total Area is 160 ha.

4. New/Expansion/Modernization New Project

5. Existing Capacity/Area, etc. Not Applicable

6. Category of Project i.e. 'A' or 'B' Category “A”

7. Does it attract the general condition? If yes,

please specify.

No, it does not attract the general condition.

8. Does it attract the specific condition? If yes,

please specify.

No, it does not attract the specific condition.

9. Location

Plot/Survey/Khasra No. Khasra Details has been enclosed as Annexure - 1

Village Ghorawat

Tehsil Bhopalgarh

District Jodhpur

State Rajasthan

10. Nearest railway station / airport along

with distance in Km.

o Nearest railway station is Kharia Kangar (~13 km in NW direction from

the Project Site).

o Nearest Airport is Jodhpur Airport (~ 76 km in SW direction from the

project site).

Page 3: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 2

(Formerly Vedanta Industries Limited)

S.

No. Item Details

11. Nearest Town, city, District Headquarters

along with distance in Km.

o Nearest City is Merta City (~ 28 km in NE direction from the project

site)

12. Village Panchayats, Zila Parishad, Municipal

Corporation, Local body (complete postal

addresses with telephone nos. to be given)

Gram Panchayat : Sarpanch Khawaspura,

Tehsil - Bhopalgarh,

District - Jodhpur

13. Name of the applicant M/s. Marwar Cement Limited (Formerly Vedanta Industries Limited)

14. Registered Address Office no. 31, Saraswati Bhawan, off Ganjawala lane, Chamunda Circle,

Boriwali West, Mumbai-400 019

15. Address for correspondence: Project Proponent EIA Consultant

Name Mr. Motilal Chouhan Mr. B. M. Mathur

Designation (Owner/Partner/CEO) Director Associate Director

Address Ground Floor, Jodhpur Tower,

Dharam Narain ji Ka Hatha,

Paota, Jodhpur

J. M. EnviroNet Pvt. Ltd.

1st & 2nd Floor, S.C.O.- 16,

Sector- 10A, Gurgaon (Haryana)

Pin Code 342010 122 001

E-mail [email protected] [email protected]

Telephone No. 0291-2540550 0124 - 3206559

Fax No. - 0124 - 4141029

16. Details of Alternative Sites examined, if any.

Location of these sites should be shown on

a toposheet.

No alternative site has been examined; as the proposed project site has

been considered near to the captive limestone mine site.

17. Interlinked Projects Yes

18. Whether separate application of interlinked

project has been submitted?

Not Applicable

19. If yes, date of submission Not Applicable

20. If no, reason Environmental Clearance for the interlinked projects has already been

obtained from MoEFCC, New Delhi.

21. Whether the proposal involves

approval/clearance under: if yes, details of

the same and their status to be given.

(a) The Forest (Conservation) Act, 1980?

(b) The Wildlife (Protection) Act, 1972?

(c) The C.R.Z Notification, 1991?

The proposal does not involve any approval / clearance under any act as

mentioned in the condition.

NA

NA

NA

Page 4: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 3

(Formerly Vedanta Industries Limited)

S.

No. Item Details

22. Whether there is any Government Order/

Policy relevant/ relating to the site?

No

23. Forest land involved (hectares) No Forest land is involved.

24. Whether there is any litigation pending

against the project and/or land in which the

project is proposed to be set up?

(a) Name of the Court

(b) Case No.

(c) Orders/direction from the plant sites of

the Court, if any and its relevance with

the proposed project.

Yes

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.

No. Information / Checklist Confirmation

Yes /

No

Details thereof (with approximate quantities / rates, wherever

possible) with source of information data

1.1 Permanent or temporary change in land

use, land cover or topography including

increase in intensity of land use (with

respect to local land use plan)

Yes Total area for the Proposed Integrated Cement Project is ~ 160 ha.

Topography of the core zone is flat with minor undulations having

some shrubs & bushes and sparse vegetation.

Present land use of the core zone will be converted into Industrial

use after introduction of the project.

After installation of the plant, about 33% of the total project area

will be covered under green belt/ plantation, which will contribute

to increase the aesthetic beauty of the area and reduction of

pollution.

1.2 Clearance of existing land, vegetation

and buildings?

Yes The proposed project site is more or less flat and only little

levelling of ground will be required.

Only some shrubs and bushes will need to be cleared.

1.3 Creation of new land uses? Yes Construction of the plant will change the present land use to

industrial land.

It is proposed to develop 52.8 ha (~33 % of the total project area)

under green belt/ plantation, which will contribute to the aesthetic

beauty of the area and reduction in pollution.

1.4 Pre-construction investigations e.g. bore Yes Ground water samples have been taken from the bore wells. The

Page 5: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 4

(Formerly Vedanta Industries Limited)

S.

No. Information / Checklist Confirmation

Yes /

No

Details thereof (with approximate quantities / rates, wherever

possible) with source of information data

houses, soil testing? water quality parameters are found to be well within the

prescribed limits. Soil testing has also been done which shows that

the soil consistency is strong enough with required load bearing

capacity.

1.5 Construction works? Yes Construction will be done for installation of various units, raw

material storages & set up of colony for proposed cement project.

1.6 Demolition works? No No demolition work is required.

1.7 Temporary sites used for construction

works or housing of construction

workers?

Yes

During construction phase, temporary housing facilities will be

provided to the workers as they will come from the nearby

villages.

Proper sanitary facilities will be provided in order to avoid

contamination to the soil, surface and ground water in the nearby

area.

1.8 Above ground buildings, structures or

earthworks including linear structures,

cut and fill or excavations

Yes Administrative building, store, workshop, canteen, first aid

station, and weigh bridge along with plant installation will be

constructed.

1.9 Underground works including mining or

tunneling?

No No underground works including mining or tunneling is required.

1.10 Reclamation works? No No reclamation work is required.

1.11 Dredging? No No dredging is involved

1.12 Offshore structures? No Not Applicable

1.13 Production and manufacturing

processes?

Yes Cement Plant

Cement Plant is based on dry process consisting of following unit

operations:

o Transport of limestone from mine site

o Raw Mix Preparation & Homogenization

o Preheating and Calcination

o Clinker cooling

o Clinker storage and Transport

o Cement Production

Captive Power Plant

o Burning of fuel in the CFBC boiler to generate steam.

o Power generation in Turbine

o Air Cooled system

Page 6: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 5

(Formerly Vedanta Industries Limited)

S.

No. Information / Checklist Confirmation

Yes /

No

Details thereof (with approximate quantities / rates, wherever

possible) with source of information data

1.14 Facilities for storage of goods or

materials?

Yes Proper storage facilities for raw material and finished product will

be provided within the proposed project site. Limestone, clinker,

cement and fly ash will be stored in closed silos. Whereas, Gypsum

and coal will be stored in covered yards.

1.15 Facilities for treatment or disposal of

solid waste or liquid effluents?

Yes o Dust collected from APCEs like ESP, Bag house / Bag filters will

be totally recycled back into the system.

o Fly ash generated from CPP will be utilized in manufacturing of

PPC grade cement.

o Sludge generated from STP will be used as manure in green

belt development/ plantation.

o In cement plant, water used for cooling at various stages will

be totally absorbed in the process or will be subjected to

evaporation & recycling and hence, no waste water will be

discharged from the cement plant.

o Waste water generated from CPP after treatment will be

recycled back into the process and used for ash quenching,

dust suppression and for greenbelt development.

o The domestic wastewater generated from plant & colony will

be treated in STP and the treated water will be utilized for

green belt development/ plantation.

1.16 Facilities for long term housing of

operational workers?

Yes In the proposed Integrated Cement Plant Residential Colony will

be constructed.

1.17 New road, rail or sea traffic during

construction or operation?

Yes Approach roads connecting project site to the nearest main road

will be constructed.

1.18 New road, rail, air waterborne or other

transport infrastructure including new or

altered routes and stations, ports,

airports, etc?

Yes Approach roads connecting project site to the nearest main road

will be constructed.

1.19 Closure or diversion of existing transport

routes or infrastructure leading to

changes in traffic movements?

No No closure or diversion of existing transport routes or

infrastructure leading to changes in traffic movements will be

required.

1.20 New or diverted transmission lines or

pipelines?

No No new or diverted transmission lines or pipelines are there.

1.21 Impoundment, damming, culverting, No There will be no impoundment, damming, culverting, realignment

Page 7: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 6

(Formerly Vedanta Industries Limited)

S.

No. Information / Checklist Confirmation

Yes /

No

Details thereof (with approximate quantities / rates, wherever

possible) with source of information data

realignment or other changes to the

hydrology of watercourses or aquifers?

or other changes to the hydrology of watercourses or aquifers.

1.22 Stream crossings? No No stream crossing is there.

1.23 Abstraction or transfers of water from

ground or surface waters?

Yes The total water requirement for the proposed project will be 850

KLD which will be sourced from Ground Water.

1.24 Changes in water bodies or the land

surface affecting drainage or run-off?

No There will be no change in water bodies or the land surface

affecting drainage or run-off.

1.25 Transport of personnel or materials for

construction, operation or

decommissioning?

Yes During construction, transport arrangements will be made for the

personnel coming from distant villages / towns from where they

commute to and fro for work.

Transportation of raw materials other than limestone and finished

products will be done by road/ rail

Limestone from the proposed limestone mine will be transported

to the cement plant through covered conveyor belt.

1.26 Long-term dismantling or

decommissioning or restoration works?

No No long-term dismantling or decommissioning or restoration

works is required.

1.27 Ongoing activity during

decommissioning, which could have an

impact on the environment?

No Not Applicable

1.28 Influx of people to an area in either

temporarily or permanently?

Yes Total manpower requirement for the project will be 500 persons.

1.29 Introduction of alien species? No Introduction of alien species is not envisaged.

1.30 Loss of native species or genetic

diversity?

No No such case is reported from the area so far.

1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials

or energy, especially any resources which are non-renewable or in short supply):

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

2.1 Land especially undeveloped or

agricultural land (ha)

Yes 160 ha land will be required for setting up the proposed

Integrated Cement Project.

2.2 Water (expected source & competing

users) unit: KLD

Yes The total water requirement for the proposed project will be 850

KLD which will be sourced from Ground Water.

Page 8: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 7

(Formerly Vedanta Industries Limited)

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities /rates, wherever

possible) with source of information data

2.3 Minerals (MT) Yes Limestone, Iron Ore/Laterite/mill scale, Coal, Petcoke, Gypsum will

be procured for the proposed project during operation phase.

2.4 Construction material – stone,

aggregates, sand / soil (expected

source – MT)

Yes The required construction material required for the proposed

project will be purchased from nearby local market.

2.5 Forests and timber (source – MT) No No Forests and timber will be used during construction /

operation of the project activity.

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel

(MT), energy (MW)

Yes The power requirement for the Proposed Integrated Cement

Project will be 15 MW.

Source - State Electricity Board, Proposed CPP, D.G. Set

2.7 Any other natural resources (Use

appropriate standard units)

No Not Applicable

3. Use, storage, transport, handling or production of substances or materials, which could be harmful

to human health or the environment or raise concerns about actual or perceived risks to human

health.

S. No. Information/ Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

3.1 Use of substances or materials, which are

hazardous (as per MSIHC rules) to human

health or the environment (flora, fauna, and

Water supplies)

No No substances or materials will be used, which are hazardous

to human health or the environment.

3.2 Changes in occurrence of disease or affect

disease vectors (e.g. insect or water borne

diseases)

No Not Applicable

3.3 Affect the welfare of people e.g. by

changing living conditions?

Yes There will be positive impact of the project in the area as

mentioned below:

o Provide employment opportunities, both direct and

indirect, thus improving the economic status of the

villagers.

o Communication and transport facilities will be improved;

o Education facilities will be improved;

o Community Health care programmes provide better

health and medical facilities not only to the employees

but also to the villagers.

Page 9: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 8

(Formerly Vedanta Industries Limited)

S. No. Information/ Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates,

wherever possible) with source of information data

3.4 Vulnerable groups of people who could be

affected by the project e.g. hospital

patients, children, the elderly etc.,

No No effect envisaged.

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or Decommissioning (Tonnes/Month)

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

4.1 Spoil, overburden or mine wastes No No major spoil production is envisaged from cement plant as

there will be no demolition work. However, the spoil generated

during construction will be reused for filling.

4.2 Municipal waste (domestic and or

commercial wastes)

Yes Municipal solid waste generated from plant & colony will be

collected, segregated and disposed off scientifically.

4.3 Hazardous wastes (as per Hazardous

Waste Management Rules)

Yes Small quantity of used oil and grease will be generated, which will

be sold to the CPCB authorized recycler.

4.4 Other industrial process wastes Yes No industrial solid waste will be generated from the cement

manufacturing process.

Dust collected from various pollution control equipments will be

totally recycled back into the system.

Fly ash generated from the CPP will be utilized in manufacturing

of PPC grade cement.

4.5 Surplus product No Not Applicable

4.6 Sewage sludge or other sludge from

effluent treatment

Yes STP Sludge will be utilized as manure for greenbelt development /

plantation within the plant premises.

4.7 Construction or demolition wastes No No demolition or construction waste will be generated.

4.8 Redundant machinery or equipment No There will no redundant machinery or equipment.

4.9 Contaminated soils or other materials No There will not be any contaminated soils or other materials.

4.10 Agricultural wastes No There will not be any agricultural wastes.

4.11 Other solid wastes No There will not be any other solid wastes.

Page 10: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 9

(Formerly Vedanta Industries Limited)

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No. Information / Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

5.1 Emissions from combustion of fossil

fuels from stationary or mobile sources

Yes Emission from combustion of fossil fuels from stationary or

mobile sources will be maintained within the prescribed

environmental regulatory standards.

5.2 Emissions from production processes Yes Particulate and gaseous emissions from cement plant operations are

envisaged.

ESP, Bag House, Bag Filters will be installed to control PM emission

from the proposed plant within prescribed limits.

Adequate stack height will be provided as per CPCB norms for

proper dispersion of particulate matter and gaseous emissions.

5.3 Emissions from materials handling

including storage or transport

Yes In the cement plant, due to the transportation activity, vehicular

movements and material handling activities, fugitive emissions

will be generated.

Bag Filters will be installed at all material handling and feeding

points. Covered storage facilities will be provided for raw material

& finished products.

Road sweeping machines will be utilized for cleaning of paved

roads and proper house-keeping will be maintained to control

fugitive dust emissions.

Proper mitigation measures will also be adopted for the proposed

Integrated Cement Project.

5.4 Emissions from construction activities

including plant and equipment

No Fugitive dust emissions are likely to be generated from

construction activities and vehicular movements. These emissions

will be temporary and will be controlled by water spraying.

5.5 Dust or odors from handling of materials

including construction materials,

sewage and waste

Yes In the cement plant, dust will be generated from handling of raw

materials. Bag filters have been already installed at all transfer

points to maintain it within acceptable levels.

5.6 Emissions from incineration of waste No There will be no incineration of waste.

5.7 Emissions from burning of waste in open

air (e.g. slash materials, construction

debris)

No There will be no burning of waste in open air.

5.8 Emissions from any other sources No There will be no emissions from any other sources.

Page 11: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 10

(Formerly Vedanta Industries Limited)

6. Generation of Noise and Vibration, and Emissions of Light and Heat

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

6.1 From operation of equipment e.g.

engines, ventilation plant, crushers

Yes In the cement plant, noise will be generated from crushing and

grinding operations. Noise will be generated from turbine, fans,

centrifugal pumps, electric motors, etc. Noise level will be

maintained below the prescribed limit by CPCB.

Proper noise abatement measures will be taken and persons

working just close to machine & machine operators will be

provided with Personal Protective Equipment (PPEs) viz. Ear plugs

/ Ear muffs etc. for further protection.

6.2 From industrial or similar processes Yes Noise will be generated due to the running of the plant machinery.

Proper mitigation measures will be taken for the reduction of

noise levels viz. acoustic enclosures etc. The workers will be

provided with personal protective equipments.

6.3 From construction or demolition No The noise generated from construction activities will be

maintained within the prescribed noise standards.

6.4 From blasting or piling No Not Applicable

6.5 From construction or operational traffic Yes There will be some noise due to movement of machine / vehicle

but the same will be maintained within the prescribed limit.

6.6 From lighting or cooling systems No No noise will be generated from lighting or cooling systems.

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,

surface waters, groundwater, coastal waters or the sea:

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

7.1 From handling, storage, use or spillage

of hazardous materials

No In the cement plant, there will be no use/ handling of hazardous

material except used oil, which will be handled through closed

containers.

Also, care will be taken during its use for lubrication of external

part of equipment, so that nothing falls on ground, which

contaminates the soil.

Equipment will be kept well maintained, so that they may remain

leakage free.

7.2 From discharge of sewage or other

effluents to water or the land (expected

Yes In the cement plant, no effluent will be generated during the

process. Only domestic waste water will be generated which will

Page 12: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 11

(Formerly Vedanta Industries Limited)

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

mode and place of discharge) be treated in STP.

Treated water from STP will be used for greenbelt development /

plantation.

7.3 By deposition of pollutants emitted to air

into the land or into water

No In cement plant, due to proposed project, there is likelihood of

increase of air emissions. But proper mitigating measures will be

adopted to reduce the effect.

However, periodical monitoring will be done & results will be

analyzed. In case any change shows adverse effects, it will be

attended for improvement.

7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term buildup of

pollutants in the environment from

these sources?

No There will be no long-term build-up of pollutants in the

environment, however periodic monitoring will be done for the

air, water and soil in the cement plant premises and surroundings,

so that timely mitigation measures can be undertaken.

8. Risk of accidents during construction or operation of the Project, which could affect human health or

the environment

S. No. Information / Checklist Confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

8.1 From explosions, spillages, fires etc from

storage, handling, use or production of

hazardous substances

No Possibility of accidents on account of explosions, spillages, fires

etc. and from storage, handling, use or production of hazardous

substances etc. is very less. Proper maintenance, operation and

leakage proof condition of machineries will eliminate the

possibilities of fire.

Fire extinguishers will be installed near all machineries & all

persons would be properly trained to quench the fire at source

itself. No other major risk will be involved.

8.2 From any other causes No Not Applicable

8.3 Could the project be affected by natural

disasters causing environmental damage

(e.g. floods, earthquakes, landslides,

cloudburst etc)?

No No such case has been reported in the area and chances are

minimal. The project site falls under Low Damage Risk Zone, i.e.

Zone II, as per the BIS, 2002. Hence the chances of earthquake are

very less.

Page 13: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 12

(Formerly Vedanta Industries Limited)

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned

activities in the locality.

S. No. Information / Checklist confirmation Yes /

No

Details thereof (with approximate quantities/rates, wherever

possible) with source of information data

9.1 Lead to development of supporting

utilities, ancillary development or

development stimulated by the project

which could have impact on the

environment e.g.:

• Supporting infrastructure (roads,

power supply, waste or waste water

treatment, etc.)

• Housing development

• Extractive industries

• Supply industries

• Other

Yes Proposed project will result in considerable growth of the

surrounding areas by generating direct and indirect employment

opportunities in the region including ancillary development.

Greenery of the surrounding area will be enhanced which will

further add on to the area aesthetically.

Due to upcoming of this industry, several local house construction

and commercial construction may get accelerated, which will

contribute towards raising socio-economic status and standard of

living of the nearby population.

9.2 Lead to after-use of the site, which could

have an impact on the environment

No Not Applicable

9.3 Set a precedent for later developments Yes A better after use scenario which is likely to increase aesthetic

beauty of area and greenery would set precedence for

subsequent entrepreneurs who venture such projects.

9.4 Have cumulative effects due to proximity

to other existing or planned projects

with similar effects

No There will be no environmental effects or the potential for

cumulative impacts with other existing or planned activities in the

locality.

III. Environmental Sensitivity

S.

No. Areas

Name/

Identity

Aerial distance (within 15 Km.) Proposed

project location boundary

1. Areas protected under international

conventions, national or local legislation for

their ecological, landscape, cultural or other

related value

None Not Applicable

2. Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses or

Gaya Bhala Nadi ~ 2.5 km in N direction

Page 14: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 13

(Formerly Vedanta Industries Limited)

S.

No. Areas

Name/

Identity

Aerial distance (within 15 Km.) Proposed

project location boundary

other water bodies, coastal zone, biospheres,

mountains, forests

Jojri Nadi ~1.5 km in NW direction

3. Areas used by protected, important or sensitive

species of flora or fauna for breeding, nesting,

foraging, resting, over wintering, migration

None There are no areas used by protected,

important or sensitive species of flora or

fauna for breeding, nesting, foraging,

resting, over wintering, migration within 15

km radius of the proposed project site.

4. Inland, coastal, marine or underground waters None There is no inland, coastal, marine or

underground water within 15 km radius of

the proposed project site.

5. State, National boundaries None -

6. Routes or facilities used by the public for access

to recreation or other tourist, pilgrim areas

SH - 21 ~5.0 km in SE direction

Kharia Kangar

Railway Station

~13 km in NW direction

7. Defense installations None Not Applicable

8. Densely populated or built-up area None Not Applicable

9. Areas occupied by sensitive man-made land

uses (hospitals, schools, places of worship,

community facilities)

Yes There are many schools, dispensaries, small

hospitals, places of worship within 15 km

from the project site.

10. Areas containing important, high quality or

scarce resources (Ground water resources,

surface resources, forestry, agriculture,

fisheries, tourism, minerals)

None Not Applicable

11. Areas already subjected to pollution or

environmental damage.

None Not Applicable

12. Areas susceptible to natural hazard which could

cause the project to present environmental

problems

No The project site falls in Seismic Zone- II as

per IS:1893 (Part-I): 2002

IV. Proposed Terms of Reference for EIA Studies

M/s. Marwar Cement Limited (Formerly Vedanta Industries Limited) has obtained Environmental

Clearance for Integrated Cement Plant (Clinker 1.0 MTPA, Cement 1.371 MTPA), Captive Power Plant

(18 MW) and DG Set (5 MW) at Village - Ghorawat, Tehsil - Bhopalgarh, District - Jodhpur (Rajasthan)

vide MoEFCC letter no. J-11011/154/2009-IA II (I) dated 27th July, 2010.

Page 15: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

Proposed Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW)

At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: Jodhpur (Rajasthan)

Form - 1 /Appendix - I

M/s. Marwar Cement Limited 14

(Formerly Vedanta Industries Limited)

Due to some unavoidable reasons, the company have not been able to implement the said project

according to its schedule.

Now to implement the project, as per EIA notification dated 14th Sept., 2006, we request to consider

our case and grant us extension of validity of Environmental Clearance for the Integrated Cement

Project.

Page 16: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:
Page 17: At Village: Ghorawat, Tehsil: Bhopalgarh, Distict: … Integrated Cement Plant - Clinker (1.0 MTPA), Cement (1.371 MTPA), Captive Power Plant (18 MW) and D.G. Set (5 MW) At Village:

S.NO. K.NO. TOTAL LAND BIGHA

1 343/10 7 B-10 B

2 340/1 1 B- 8 B

3 343/12 15 B- 0 B

4 340 2 B- 17 B

5 343/10 7 B-10 B

6 340/1 1 B- 8 B

7 341 3 B- 5 B

8 340/2 1 B-18 B

9 343/6 0 B -10 B

10 343/11 15 B- 0 B

11 343/9 5 B-0 B

12 343/5 3 B-0 B

13 343/8 2 B- 0 B

14 343/33 5 B-0 B

15 343/32 5 B-0 B

16 343/2 2 B -0 B

17 343/14 6 B -5 B

18 343 378 B-9 B

TOTAL 463 B-2 B

MARWAR CEMENT LIMITED(Formerly Vedanta Industries Limited)

DETAILS OF LAND HELD FOR FACTORY

VILLAGE -GHORAWAT , TEHSIL- PIPAR CITY, DISTT. JODHPUR


Recommended