Attachment D Project Manual FOR Rochester RNC Master Plan Design ON BEHALF OF VERIZON WIRELESS Prepared by: KDW, PS DOCUMENTS CONTAINED HEREIN ARE IMPORTANT; READ THEM CAREFULLY. October 6, 2010 Bid Set Revision #1
Transcript
Page 1: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

Attachment D Project Manual

FOR

Rochester RNC Master Plan Design

ON BEHALF OF

VERIZON WIRELESS

Prepared by: KDW, PS

DOCUMENTS CONTAINED HEREIN ARE IMPORTANT; READ THEM CAREFULLY.

October 6, 2010

Bid Set

Revision #1

Page 2: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 2 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 00005 – CERTIFICATIONS PAGE

VERIZON WIRELESS

PROJECT MANUAL

FOR

ROCHESTER RNC MASTER PLAN DESIGN

PREPARED BY: KDW, PS

Page 3: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 3 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 00007 – SEALS PAGE

Page 4: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 4 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 00010 – TABLE OF CONTENTS

DIVISION 00 – BIDDING AND CONTRACTING REQUIREMENTS

Section Title

00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawing Sheets 00116 Invitation to Bid 00119 Request for Proposal 002113 Instructions to Bidders 002300 Procurement Definitions 002500 Pre-Bid Meetings 004113 Bid Forms 005100 Notice of Award 005200 Agreement 005500 Notice to Proceed 006113 Performance and Payment Bond Form 007200 General Conditions 007300 Supplementary Conditions

Special Conditions and Forms

Special Conditions Daily Checklist Form Request for Information Template (Sample RFI Form) Substitution Request Form Welding or Cutting Permit Certificate of Substantial Completion Form

DIVISION 01 – GENERAL REQUIREMENTS

Section Title

011100 Summary of Work 012100 Allowances 012200 Unit Prices 012300 Alternates 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013119 Project Meetings 013200 Construction Progress Documentation

Page 5: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 5 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

Section Title

013300 Submittal Procedures 013500 Methods of Procedure 013530 Safety Lockout/Tagout Procedures 013550 Site Security and Safety 014000 Quality Requirements 014100 Regulatory Requirements 014213 Abbreviations and Acronyms 014216 Definitions 014523 Testing and Inspecting Services 015000 Temporary Facilities and Controls 015639 Temporary Tree and Plant Protection 016000 Product Requirements 017300 Execution 017329 Cutting and Patching 017400 Cleaning 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 017823 Operation and Maintenance Data 017836 Warranties 017839 Project Record Documents 017900 Demonstration and Training 019113 General Commissioning Requirements DIVISION 02 – EXISTING CONDITIONS

Section Title

024119 Selective Structure Demolition DIVISION 03 – CONCRETE

Section Title

033000 Cast-in-Place Concrete DIVISION 04 – MASONRY

Section Title

042000 Unit Masonry

Page 6: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 6 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

DIVISION 05 – METALS

Section Title

051200 Structural Steel Framing 054000 Cold-Formed Metal Framing 054500 Metal Support Assemblies 055000 Metal Fabrications 055100 Metal Stairs 055300 Metal Gratings

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

Section Title

061000 Rough Carpentry

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section Title

072100 Thermal Insulation 075323 Ethylene-Propylene-Diene-Monomer (EPDM) Single-Ply Membrane Roofing 076200 Sheet Metal Flashing and Trim 077200 Roof Accessories 078413 Penetration Firestopping 078446 Fire-Resistive Joint Systems 079200 Joint Sealants

DIVISION 08 – OPENINGS

Section Title

081113 Hollow Metal Doors and Frames 087100 Door Hardware 089000 Louvers

DIVISION 09 – FINISHES

Section Title

092216 Non-Structural Metal Framing 092900 Gypsum Board 099113 Exterior Painting 099123 Interior Painting 099600 High-Performance Coatings

Page 7: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 7 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

DIVISION 10 – SPECIALTIES

Section Title

Not Used DIVISION 11 – EQUIPMENT

Section Title

Not Used DIVISION 12 – FURNISHINGS

Section Title

Not Used DIVISION 13 – SPECIAL CONSTRUCTION

Section Title

Not Used DIVISION 14 – CONVEYING EQUIPMENT

Section Title

Not Used DIVISION 21 – FIRE SUPPRESSION

Section Title

210548 Vibration and Seismic Controls for Fire Suppression Piping and Equipment 210800 Commissioning of Fire Alarm and Fire Suppression Systems DIVISION 22 – PLUMBING

Section Title

220500 Common Work Results for Plumbing 220548 Vibration and Seismic Controls for Plumbing 220553 Identification for Plumbing Piping and Equipment

Page 8: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 8 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

Section Title

220700 Plumbing Insulation 220800 Commissioning of Plumbing 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties DIVISION 23 – HEATING, VENTILATION AND AIR CONDITIONING (HVAC)

Section Title

230500 Common Work Results for HVAC 230513 Common Motor Requirements for HVAC Equipment 230548 Vibration and Seismic Controls for HVAC Piping and Equipment 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting and Balancing for HVAC 230700 HVAC Insulation 230800 Commissioning of HVAC 230900 Instrumentation and Control for HVAC 231113 Facility Fuel-Oil Piping 232113 Hydronic Piping 232300 Refrigerant Piping 233113 Metal Ducts 233300 Air Duct Accessories 233416 Centrifugal HVAC Fans 233713 Diffusers, Registers and Grilles 238123 Computer Room Air-Conditioners (CRACs) DIVISION 25 – INTEGRATED AUTOMATION

Section Title

Not Used DIVISION 26 – ELECTRICAL

Section Title

260500 Common Work Results for Electrical 260502 Temporary Electrical 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceway and Boxes for Electrical Systems

Page 9: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 9 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

Section Title

260536 Cable Trays for Electrical Systems 260537 Switch Room Ladder Rack 260543 Underground Ducts and Raceways for Electrical Systems 260548 Vibration and Seismic Controls for Electrical Systems 260553 Identification for Electrical Systems 260800 Commissioning of Electrical Systems 262200 Low-Voltage Transformers 262416 Panelboards 262716 Electrical Cabinets and Enclosures 262726 Wiring Devices 262816 Enclosed Switches and Circuit Breakers 262913 Enclosed Controllers 263213 Diesel Engine-Driven Generator Sets 263600 Transfer Switches 264113 Lightning Protection for Structures 264300 Transient Voltage Surge Suppression (TVSS) 265100 Interior Lighting 265600 Exterior Lighting 269000 Testing

DIVISION 27 – COMMUNICATION

Section Title

Not Used

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

Section Title

280500 Common Work Results for Electronic Safety and Security 280513 Conductors and Cables for Electronic Safety and Security 280800 Commissioning of Electronic Safety and Security 281300 Access Control 282300 Video Surveillance 283145 Aspirating Smoke Detection Systems

DIVISION 31 – EARTHWORK

Section Title

311000 Site Clearing 312000 Earth Moving

Page 10: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 10 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section Title

321216 Asphalt Paving 321313 Concrete Paving 321373 Concrete Paving Joint Sealants 329200 Turf and Grasses 329300 Plants DIVISION 33 – UTILITIES

Section Title

Not Used

Page 11: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 11 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 000115 – LIST OF DRAWINGS GENERAL G001 GENERAL NOTES G002 GENERAL CONSTRUCTION NOTES G003 STANDARD REQUIREMENTS AND CODE REQUIREMENTS G004 BUILDING CODE ANALYSIS G010 STANDARDS REQUIREMENTS G011 PROJECT CLOSE OUT CHECKLIST G101 PHASING PLAN G102 PHASING PLAN CIVIL C100 CIVIL EXISTING FEATURES AND DEMOLITION PLAN C110 CIVIL SITE PLAN C550 DETAILS & NOTES C551 SHELTER ELEVATIONS & NOTES C552 SHELTER FOUNDATION PLAN, SECTIONS & NOTES LANDSCAPING L100 LANDSCAPING PLAN ARCHITECTURAL A001 ARCHITECTURAL GENERAL NOTES AND LEGEND AD111 DEMOLITION FLOOR PLAN A AD112 DEMOLITION FLOOR PLAN B AD131 DEMOLITION ROOF PLAN A AD132 DEMOLITION ROOF PLAN B AD142 DEMOLITION REFLECTED CEILING PLAN B A100 ARCHITECTURAL SITE PLAN A110 FLOOR PLAN A111 FLOOR PLAN A A112 FLOOR PLAN B A130 ROOF PLAN A131 ROOF PLAN A A132 ROOF PLAN B A140 REFLECTED CEILING PLAN A141 REFLECTED CEILING PLAN A A142 REFLECTED CEILING PLAN B A210 BUILDING ELEVATIONS AND EXTERIOR FINISH SCHEDULE A310 BUILDING SECTIONS A510 ROOF DETAILS A531 EXTERIOR DETAILS A541 DETAILS A571 HILTI FIRESTOPPING DETAILS AND NOTES A601 DOOR, FRAME, HARDWARE, & LOUVER SCHEDULES EQUIPMENT

Page 12: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 12 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

Q100 OWNERS EQUIPMENT LAYOUT Q101 OWNERS EQUIPMENT LAYOUT A Q102 OWNERS EQUIPMENT LAYOUT B STRUCTURAL S001 STRUCTURAL GENERAL NOTES, ABBREVIATIONS AND LEGEND S002 GENERAL NOTES AND LEGEND S003 EXISTING AUX IRON CAPACITY FRAMING PLAN S110 EXISTING FOUNDATION PLAN S120 ROOF FRAMING PLAN STRUCTURAL AUX IRON SAD110 EXISTING AUX IRON FRAMING AND DEMO PLAN AT NOMINAL 7' LEVEL SAD120 EXISTING AUX IRON FRAMING AND DEMO PLAN AT NOMINAL 8' LEVEL SAD130 EXISTING AUX IRON FRAMING AND DEMO PLAN AT NOMINAL 9' LEVEL SAD140 EXISTING AUX IRON FRAMING AND DEMO PLAN AT NOMINAL 10' LEVEL SAD150 EXISTING AUX IRON FRAMING AND DEMO PLAN AT NOMINAL 11' LEVEL SAD160 EXISTING AUX IRON FRAMING AND DEMO PLAN AT BOTTOM OF TRUSS SA110 EXISTING AUX IRON FRAMING RETROFIT PLAN AT NOMINAL 7' LEVEL SA120 EXISTING AUX IRON FRAMING RETROFIT PLAN AT NOMINAL 8' LEVEL SA130 EXISTING AUX IRON FRAMING RETROFIT PLAN AT NOMINAL 9' LEVEL SA140 EXISTING AUX IRON FRAMING RETROFIT PLAN AT NOMINAL 10' LEVEL SA150 EXISTING AUX IRON FRAMING RETROFIT PLAN AT NOMINAL 11' LEVEL SA160 EXISTING AUX IRON FRAMING RETROFIT PLAN AT BOTTOM OF TRUSS SA310 SWITCH A AND SWITCH B AUX IRON ELEVATIONS SA311 SWITCH A AUX IRON ELEVATIONS SA312 SWITCH B AUX IRON ELEVATIONS SA501 STRUCTURAL DETAILS SA502 STRUCTURAL DETAILS SA503 STRUCTURAL DETAILS SEISMIC BRACING SB001 SEISMIC GENERAL NOTES & LEGEND MECHANICAL M001 MECHANICAL GENERAL NOTES AND LEGEND MD101 MECHANICAL DEMOLITION PLAN MD102 OVERALL MECHANICAL DEMOLITION ROOF PLAN M110 OVERALL MECHANICAL PLAN M111 MECHANICAL FLOOR PLAN A (FOR REFERENCE ONLY) M112 MECHANICAL FLOOR PLAN B M120 OVERALL MECHANICAL PIPING PLAN M121 MECHANICAL FLOOR PIPING PLAN A (FOR REFERENCE ONLY) M122 MECHANICAL FLOOR PIPING PLAN B M130 OVERALL MECHANICAL ROOF PLAN M320 MECHANICAL SECTIONS M401 ENLARGED FUEL STORAGE PLAN M501 MECHANICAL DETAILS M502 MECHANICAL DETAILS

Page 13: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 13 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

M601 MECHANICAL SCHEDULES M602 MECHANICAL SCHEDULES M603 MECHANICAL SCHEDULES BUILDING AUTOMATION SYSTEMS BA001 BUILDING AUTOMATION SYSTEMS GENERAL NOTES AND LEGEND BA110 OVERALL BUILDING AUTOMATION SYSTEMS PLAN BA112 BUILDING AUTOMATION SYSTEMS FLOOR PLAN B BA501 BUILDING AUTOMATION SYSTEMS CONTROLS DIAGRAM BA502 BUILDING AUTOMATION SYSTEMS INTEGRATION DIAGRAM BA503 BUILDING AUTOMATION SYSTEMS CONTROLS DIAGRAM BA504 BUILDING AUTOMATION SYSTEMS CONTROLS DIAGRAM BA505 BUILDING AUTOMATION SYSTEMS CONTROLS DIAGRAM BA506 BUILDING AUTOMATION SYSTEMS CONTROLS DIAGRAM BA507 BUILDING AUTOMATION SYSTEMS CONTROLS DIAGRAM BA701 BUILDING AUTOMATION SYSTEMS DDC POINTS LIST BA702 BUILDING AUTOMATION SYSTEMS POINTS LIST AUXILIARY SYSTEM FIRE PROTECTION FP001 FIRE PROTECTION NOTES & LEGEND FD121 DEMOLITION FIRE ALARM AND FM200 TANK FLOOR PLAN FD122 DEMOLITION FIRE ALARM AND FM200 TANK FLOOR PLAN FP100 OVERALL FIRE PROTECTION SITE PLAN (SITE PLAN W/HYDRANTS, LOCK BOX,

KEY SWITCH, MAIN FACP PANEL LOCATION, FIRE PUMP AND FIRE SUPPRESSION WATER STORAGE TANK LOCATIONS IF APPLICABLE, TRUCK ACCESS POINT AND FIRE LANES, AND FIRE DEPARTMENT PROCEDURES)

FP111 OVERALL FIRE PROTECTION PLAN (HATCHED PLAN WITH CLEAN AGENT, SMOKE PURGE AND SPRINKLER ZONES)

FP121 FIRE DETECTION PLAN A (DETECTION, ALARM DEVICES AND CLEAN AGENT CYLINDER LOCATIONS)

FP122 FIRE DETECTION PLAN B (DETECTION, ALARM DEVICES AND CLEAN AGENT CYLINDER LOCATIONS)

FP501 FIRE PROTECTION DETAILS (TYPICAL DEVICE AND MOUNTING) FP504 FIRE PROTECTION DETAILS (TYPICAL INTERFACE WIRING) (APPROVED) FP601 FIRE PROTECTION SCHEDULES (SEQUENCE OF OPERATION, VOLUMETRICS) ELECTRICAL E001 ELECTRICAL GENERAL NOTES, ABBREVIATIONS, AND LEGEND ED100 ELECTRICAL SITE DEMOLITION PLAN ED101 ELECTRICAL GROUNDING DEMOLITION SITE PLAN ED111 ELECTRICAL DEMOLITION PLAN A ED112 ELECTRICAL DEMOLITION PLAN B ED113 ROOF DEMOLITION PLAN ED121 LIGHTING DEMOLITION PLAN A ED122 LIGHTING DEMOLITION PLAN B ED131 GROUNDING DEMOLITION PLAN A ED132 GROUNDING DEMOLITION PLAN B ED140 LIGHTNING PROTECTION DEMOLITION PLAN ED151 COMMUNICATIONS & SYSTEMS DEMOLITION PLAN A

Page 14: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 14 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

ED152 COMMUNICATIONS & SYSTEMS DEMOLITION PLAN B ED603 ELECTRICAL PANEL SCHEDULES - DEMOLITION ED604 ELECTRICAL PANEL SCHEDULES - DEMOLITION ED605 ELECTRICAL PANEL SCHEDULES - DEMOLITION ED606 ELECTRICAL PANEL SCHEDULES - DEMOLITION ED701 ELECTRICAL ONE-LINE DEMOLITION E100 ELECTRICAL SITE PLAN E101 ELECTRICAL GROUNDING SITE PLAN E111 POWER FLOOR PLAN A E112 POWER FLOOR PLAN B E113 ROOF POWER PLAN E121 LIGHTING FLOOR PLAN A E122 LIGHTING FLOOR PLAN B E131 GROUNDING FLOOR PLAN A E132 GROUNDING FLOOR PLAN B E140 LIGHTNING PROTECTION PLAN E151 COMMUNICATIONS AND SYSTEMS FLOOR PLAN A E152 COMMUNICATIONS AND SYSTEMS FLOOR PLAN B E401 ENLARGED POWER FLOOR PLAN A E501 ELECTRICAL DETAILS E502 ELECTRICAL DETAILS E503 ELECTRICAL DETAILS E504 ELECTRICAL DETAILS E505 ELECTRICAL DETAILS E506 ELECTRICAL DETAILS E507 ELECTRICAL DETAILS E601 MECHANICAL EQUIPMENT SCHEDULE E602 LIGHT FIXTURE SCHEDULE E603 AC POWER LOCAL AND NOC ALARMS SCHEDULE E604 ELECTRICAL PANEL SCHEDULES - EXISTING E605 ELECTRICAL PANEL SCHEDULES - EXISTING E606 ELECTRICAL PANEL SCHEDULES - EXISTING E607 ELECTRICAL PANEL SCHEDULES - EXISTING E701 ELECTRICAL ONE-LINE DIAGRAMS E702 FEEDER AND BRANCH CIRCUIT SCHEDULES SECURITY SS001 SECURITY LEGEND, ABBREVIATIONS AND DRAWING INDEX SSD100 SECURITY SITE DEMOLITION PLAN SSD111 SECURITY SYSTEM DEMOLITION FLOOR PLAN A SSD112 SECURITY SYSTEM DEMOLITION FLOOR PLAN B SS100 SECURITY SITE PLAN SS111 SECURITY SYSTEM FLOOR PLAN A SS112 SECURITY SYSTEM FLOOR PLAN B SS501 SECURITY ACCESS CONTROL DETAILS

Page 15: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 15 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 000116 – INVITATION TO BID Refer to Section 2.4, Intent to Respond, of Verizon Wireless RFP No. RFx-000249-2010.

Page 16: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 16 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 000119 – REQUEST FOR PROPOSAL Refer to Verizon Wireless RFP No. RFx-000249-2010.

Page 17: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 17 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 002113 – INSTRUCTION TO BIDDERS RFP No. RFx-000249-2010 PROJECT: Rochester RNC Master Plan Design The Contractor acknowledges in submitting a quotation that:

1. Contractor has received, read, and understands the Verizon Wireless RFP and this quota-tion is made in accordance therewith and with the Bid Drawings dated October 6, 2010 and Specifications dated October 6, 2010 and other Related Bid Documents included in this Attachment D.

2. Contractor has visited the work site and become familiar with the local conditions under which the work is to be performed, and has correlated all observations with the require-ments of the Verizon Wireless RFP.

3. Contractor agrees to:

a. Provide all required equipment, materials and labor to complete the project as specified in the construction documents without exception.

b. Provide at no additional expense to the owner, any overtime or additional expenses re-quired to meet the agreed upon construction schedule.

c. Include all applicable state and local sales and use taxes required for general construction projects.

d. Review and comply with all applicable Verizon Wireless construction standards in-cluded in Attachment F.

4. Contractor shall include in their proposal:

a. Cost for on site security during construction. Security to remain in effect until final completion and project closeout.

b. Cost to staff project with experienced and competent people. At a minimum to in-clude a full time on-site qualified superintendent and a full time on-site qualified pro-ject engineer. Resumes will be submitted on these key personnel to Verizon Wireless and they reserve the right to review and approve the personnel in these positions.

c. Cost to obtain a full payment and performance bond for the entire contract amount.

5. Contractor shall coordinate, schedule and manage:

a. Weekly scheduled conference calls shall be actively attended and supported to ensure targeted milestone completion of the overall Project Plan and timely issue resolution.

Page 18: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 18 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

b. Employees, staff, subcontractors, vendors, owners vendors and installation contrac-tors to meet major milestones per construction schedule and contract commitments required to complete the phases to on time and on budget. The Owners vendors and installation contractors may include, but not limited to, Ladder Rack, Telecommuni-cations, and DC Power.

Page 19: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 19 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 002300 – PROCUREMENT DEFINITIONS Refer to Section 2.12, Agreement Terms and Conditions, in Verizon Wireless RFP No. RFx-000249-2010.

Page 20: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 20 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 002500 – PRE-BID MEETINGS Refer to Section 1.4, Critical Proposal Dates, in Verizon Wireless RFP No. RFx-000249-2010.

Page 21: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 21 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 004113 – BID FORMS Refer to Verizon Wireless RFP No. RFx-000249-2010.

Page 22: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 22 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 005100 – NOTICE OF AWARD Refer to Section 2.11, Notification of Award, in Verizon Wireless RFP No. RFx-000249-2010.

Page 23: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 23 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 005200 – AGREEMENT Refer to Section 2.12, Agreement Terms and Conditions, in Verizon Wireless RFP No. RFx-000249-2010.

Page 24: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 24 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 005500 – NOTICE TO PROCEED [Pending; insert Notice to Proceed letter].

Page 25: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 25 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 006113 – PERFORMANCE AND PAYMENT BOND Refer to Attachment C, Proposed Agreement, to Verizon Wireless RFP No. RFx-000249-2010.

Page 26: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 26 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 007200 – GENERAL CONDITIONS Refer to Section 2.12, Agreement Terms and Conditions, in Verizon Wireless RFP No. RFx-000249-2010.

Page 27: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS DIVISION 00, PAGE 27 ROCHESTER RNC MASTER PLAN DESIGN CONTRACT AND BIDDING DOCUMENTS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 10/06/10, 1:00 PM VZW 00

SECTION 007300 – SUPPLEMENTARY CONDITIONS Refer to Section 2.12, Agreement Terms and Conditions, in Verizon Wireless RFP No. RFx-000249-2010.

Page 28: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS PAGE 1 ROCHESTER RNC MASTER PLAN DESIGN SPECIAL CONDITIONS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 08/19/09, 1:00 PM

SPECIAL CONDITIONS 1. FORMAT OF SPECIFICATIONS

The following specifications, for the greater part, are of the abbreviated type and frequently include incomplete sentences. Omission of words such as “the Contractor shall,” “shall be,” “as noted on the drawings,” “a,” “an,” “the,” “shall,” etc., is intentional. Omitted words and phrases shall be included by inference.

2. DEFINITIONS Verizon shall mean Verizon Wireless. The Project Manager shall mean the on-site Project Manager or other authorized representative. Verizon Wireless, the Architect/Engineer, and the Contractor are treated throughout as if each were of the singular number.

3. RESPONSIBILITY FOR THE CONTRACTORS Should the Contractor sustain any damage through any act or delay in performance of any other Contractor who holds a contract with Verizon Wireless, or through any act or delay in performance of a Subcontractor of any such other Contractor, the Contractor shall have no claim against Verizon Wireless of such damage, it being understood that Verizon Wireless does not assume any responsibility of the action of another Contractor.

4. COMPLETION DATE Contractual Completion Date, set forth in the proposal form, must be met, and shall mean completion of all work. Substantial completion shall be achieved prior to this date to allow for corrections as a result of final inspection.

5. COOPERATION WITH OTHER CONTRACTORS The Contractor shall allow other Contractors reasonable opportunity for the introduction and storage of materials and the execution of their work, and shall properly connect and coordinate his/her work with theirs.

6. CORRECTIONS Upon completion of the corrections noted on Verizon Wireless Punch List, Project Manager will inspect the corrected work. If any corrective work remains to be done after Verizon Wireless’ inspection, the Project Manager will inspect the remaining corrected work when he/she is notified it is complete. The Contractor will pay for the Project Manager and/or Architect/Engineer costs based on their normal hourly rate plus traveling expenses for all re-inspections required by the Project Manager and Architect/Engineer after the first inspection.

7. ONE YEAR GUARANTEE Where items on Verizon Wireless’ Punch List have not been corrected prior to expiration of the one year guarantee period, it shall nevertheless be the responsibility of the Contractor to permanently correct said items after the one year guarantee period, and the contract shall not be fully performed until such permanent corrections are made. Cracks or imperfections that may occur, from any reason, and within the one year guarantee period in plastered or gypsum wall board, concrete or concrete surfaces shall be repainted at no cost to Verizon Wireless and within the terms of the Agreement. This stipulation shall in no way effect the normal guarantee requirements applying to the whole contract. All corrective work performed by the Contractor in remedying defective work during the one year period following Verizon Wireless’ acceptance of the project shall be subject to the same guarantee requirements of the original work for a period of one year from the date of completion of the corrective work.

Page 29: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

VERIZON WIRELESS PAGE 2 ROCHESTER RNC MASTER PLAN DESIGN SPECIAL CONDITIONS ROCHESTER, NEW YORK

KDW, PS Project No. K-09-03400 Date: 08/19/09, 1:00 PM

8. RECORD DRAWINGS Upon completion and before final payment, Contractor shall turn over to the Project Manager one set of clean prints, marked in a neat legible manner, showing all deviations from the original design. These prints shall include architectural, landscape, civil, structural, mechanical, and electrical drawings.

9. HAZARDOUS MATERIALS Contractor shall comply with standards issued or requirements imposed by the Code of Federal Regulations for Hazardous Materials and State and Local Laws and Regulations during the term of this contract relating to transportation, handling, use and disposal of such materials. Contractor shall provide to the Project Manager current MATERIALS SAFETY DATE SHEETS (MSDS) for all hazardous materials used in the performance of this contract prior to its delivery to the job site. Contractor shall keep copies of MSDS on job site in three ring binder for reference. Contractor shall notify Project Manager or Verizon Wireless representative of any unsafe, hazardous, potential violation, or alleged violation of applicable health and safety acts, laws, statutes, ordinances, rules and regulations of any governmental entity having jurisdiction over the project and shall immediately cease work and take all necessary measures to correct any such condition or violation before proceeding with the work.

END OF SPECIAL CONDITIONS

Page 30: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

Daily Check List for VZW Occupied Spaces DATE: DAILY TASKS CHECKED YES NO COMMENT Sign in, record badge number. Sign out; turn in Badge at end of day. Positive air pressure inside building? Switch, DC Power, and Cell area. Negative air pressure in Construction areas? FM-200 system disabled? Time frame system will be disabled. FA devices Bagged? Identify location work is being done in: Switch, Battery/DC Room, Cell room, Other. Dust walls and Temporary walls in good condition, properly sealed and un-compromised. Belly Tank fuel gauge indicating? 1000 Gal fuel tank….Leaks? Temporary Generator state of Battery Charge… OK? Generator operation as scheduled? Check water level in Move & Cools condensate tank, emptied? Filters check on Move & Cools Weekly filter check/replace on HVAC Main unit Proper operation of HVAC System Indicate by percentage, open or closed the position of the outside air dampers. Operational Condition of the Battery Room Fan Is HVAC System operating properly? MOP in force today FM 200, other Fire Alarm requirements attended to? Equipment operating as necessary before leaving. Equipment cabinet filters need replacement? All tools and equipment picked up, or stored with permission. Housekeeping complete Protective measures in place? Verizon Wireless Tools, Books, Manuals, etc. Returned. Site security in proper operational state? Hose Bib Key Returned? Is Interior Switch in a clean and orderly condition? Room/Area Temperature Switch: Cell Room Temperature: DC Power Plant Temperature:

See attached log for contractor work in/on specific areas and on specific equipment.

Page 31: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

000000 - Form 3. 09034 RFI Form.doc

RFI No:

VERIZON WIRELESS ROCHESTER RNC

MASTER PLAN DESIGN

REQUEST FOR INFORMATION (RFI)

Date: Sent Via:

To: From:

Discipline:

Drawing Ref: Spec. Ref:

Priority: Date Response Required By:

Schedule Impact: Yes No Estimated Schedule Impact Time:

Schedule Impact Notes:

Cost Impact: Yes No Estimated Cost Impact Amount:

Cost Impact Notes:

Originator: Originator RFI No:

Originator Company:

Subject/Summary:

Question:

Proposed Solution:

Response Date: Sent Via:

Person Responding: Company:

Response:

Further Action Required:

Page 32: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

Page 1 of 2

SUBSTITUTION REQUEST FORM TO: PROJECT: We hereby submit for your consideration the following product instead of the specified item for the above noted project: Section Pararagraph Specified Item Proposed Substitution: Manufacturer Model No. Attach complete technical data, including laboratory tests, if applicable. Attach complete information on changes to Drawings and/or Specifications that proposed substitutions will require for its proper installation. Submit with request all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate quality in performance. Fill in Blanks Below: A. Does the substitution affect dimensions shown on drawings? No Yes If yes, clearly indicate changes. B. Will the undersigned pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? C. What affect does substitution have on other trades? D. What affect does substitution have on applicable code requirements? E. Differences between proposed substitution and specified item? F. Manufacturer's guarantees of the proposed and specified items are: Same ___Different (explain on attachment)

Page 33: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

Page 2 of 2

CERTIFICATION OF EQUAL PERFORMANCE For Use By Design Consultant: AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE ___Accepted ___Accepted As Noted ___Not Accepted ___Received Too Late ___Approved as alternate - See bid form By Date Remarks The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: Signature Title Firm Address Telephone Date Signature must be by person having authority to legally bind his/her firm to the above terms. Failure to provide legally binding signature will result in retraction of approval. Substitution Form-2001

Page 34: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

WELDING OR CUTTING PERMIT Contractor

Valid from to

Work Location

****CONDITIONS TO BE FOLLOWED****

1. Work area shall be kept free of all combustible material.

2. Fireproof tarpaulins are to be used around work area, including floor.

3. All welding and cutting equipment shall be kept outdoors whenever possible.

4. If acetylene and oxygen tanks are indoors, they shall be kept as far from the actual work location as possible.

5. All welding and cutting equipment shall, whenever practical, be removed from the building daily.

6. All equipment such as cables, hoses regulators, etc. shall be in good condition.

7. A fire watch consisting of at least one man furnished by the Contractor, with no other assigned duties, shall be posted to stand by and observe the area for any potential hazards at all times while cutting or welding is being done.

8. The fire watch shall be equipped with suitable personal eye protection and fire extinguishers as follows: ****WORK AREA**** ****EXTINGUISHER**** ****REQUIRED**** EQUIPMENT SPACES CO2 (10 lb.) 2 OTHER SPACES C02 (10 lb.) WATER (2-1/2 gal.) 1

9. All extinguishers are to be furnished by the Contractor.

10. When work operation ceases for the noon hour or at the end of the day, the work area and adjacent areas shall be inspected to be sure that no hazard exists.

11. The company supervisor approving this permit shall be notified daily upon completion of welding or cutting operations so that an inspection of the surrounding area can be made.

***************************************************************************************************************** I hereby agree to perform the necessary welding or cutting operations as outlined in this permit. (Contractor's Signature) (Date)

(Verizon Wireless Representative) (Date)

Page 35: Attachment D Project Manual - Climatech Incclimatech.com/jobs/Verizon-Rochester/Specs/Division 00 - Contract and Bidding...rochester rnc master plan design on behalf of verizon wireless

CERTIFICATE OF SUBSTANTIAL COMPLETION DATE: ARCHITECT: KDW, PS PROJECT NO.: K-09-03400 10202 – 5th Avenue NE, Ste 102 Seattle, WA 98125 CONTRACT DATE: PROJECT: Verizon Wireless CONTRACTOR: Rochester RNC Master Plan Design 175 Calkins Way Rochester, NY 14623 OWNER: Verizon Wireless – Joe Kelley Project Manager 225 Jordan RD Troy, NY 12180 The Work performed under this Agreement has been reviewed and found to be substantially complete. The Date of Substantial Completion of this Project (or designated portion thereof), is hereby established as . The Date of Substantial Completion of the Work (or designated portions thereof) is the Date certified by the Contractor that construction is sufficiently complete, in accordance with the Contract Documents, so that the Verizon Wireless can occupy, utilize or operate the Work (or designated portions thereof) for which it is intended. A list of items to be completed or corrected (Punch List), prepared by the Architect, is provided under separate cover. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance to the Contract Documents. The date of commencement of warranties for all items, including those noted on the "Punch List", will be the date of FINAL PAYMENT (release of retention) unless otherwise agreed to in writing. CONTRACTOR BY DATE