+ All Categories
Home > Documents > Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01...

Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01...

Date post: 24-Aug-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
25
NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 1 of 25 Attachment J-01 Integrated Crew Transportation System (CTS) Requirements
Transcript
Page 1: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 1 of 25

Attachment J-01

Integrated Crew Transportation System (CTS)Requirements

Page 2: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 2 of 25

Requirements DocumentsThe documents listed in Table J01-1, Commercial Crew Transportation Capability (CCtCap)Applicable Documents, are applicable for this contract and provide the Crew TransportationSystem (CTS) requirements for the International Space Station (ISS) Design Reference Mission(DRM). Documents listed as applicable within the documents in Table J01-1 are also applicabledocuments for this contract. In addition, documents listed as reference within the documents inTable J01-1 are also reference documents for this contract, except for CCT-PLN-1120, CrewTransportation Technical Management Processes. Although CCT-PLN-1120 is listed as areference document in CCT-REQ-1130, ISS Crew Transportation and Services RequirementsDocument, it is considered an applicable document for the contract. The applicable andreference documents are available at http://commercialcrew.nasa.gov/.

For the documents listed in Table J01-1, Commercial Crew Transportation Capability (CCtCap)Applicable Documents, the term “Commercial Provider” shall be construed to mean“Contractor.”

CCT-REQ-1130 Sections 4.0 through 4.3 establish verification requirements for the designrequirements established in Section 3.0. NASA recognizes numerous methods exist to verifycompliance to requirements and encourages the formulation of innovative verificationrequirements that satisfy the overall verification objectives. Once a specific contractor’sverification plan is approved by NASA, the content of the plan will supersede the specificverification statements in section 4.3 of CCT-REQ-1130 and will be considered approvedtailoring of the associated requirement.

Table J01-1: Commercial Crew Transportation Capability (CCtCap) ApplicableDocuments

Document Number Revision Document TitleCCT-PLN-1100 B-1 Crew Transportation Plan

CCT-DRM-1110 Basic-1Crew Transportation System Design ReferenceMissions

CCT-PLN-1120 CCrew Transportation Technical ManagementProcesses

CCT-REQ-1130 CISS Crew Transportation and ServicesRequirements Document

CCT-STD-1140 A-1Crew Transportation Standards and ProcessesCriteria

CCT-STD-1150 A-1 Crew Transportation Operations Standards

SSP 50808

E plus DCN0135B, 0146A,

0149, 0151,0152, 0153

International Space Station (ISS) to CommercialOrbital Transportation Services (COTS) InterfaceRequirements Document (IRD)

Variances and Alternate Standards, as described in Table J01-2a1 – Approved AlternateStandards, Table J01-2a2 – Approved Variances, Table J01-2b – Conditionally ApprovedVariances, Table J01-2c – Partially Approved Alternate Standards Approved Areas that wereapproved by NASA as part of Certification Products Contract (CPC) shall be incorporated asappendices to affected applicable documents.

Page 3: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 3 of 25

The following table lists the Alternate Standards that were approved by NASA as part of Certification Products Contract (CPC)and are incorporated as appendices to the affected applicable documents.

Table J01-2a1 – Approved Alternate Standards

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 4: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 4 of 25

Table J01-2a1 – Approved Alternate Standards - continued

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 5: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 5 of 25

Table J01-2a1 – Approved Alternate Standards - continued

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 6: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 6 of 25

Table J01-2a1 – Approved Alternate Standards - continued

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 7: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 7 of 25

Table J01-2a1 – Approved Alternate Standards - continued

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 8: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 8 of 25

Table J01-2a1 – Approved Alternate Standards - continued

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 9: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 9 of 25

DocumentNumber

Alternate Standard CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition

Letter Filename

Page 10: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 10 of 25

The following table lists the Variances that were approved by NASA as part of Certification Products Contract (CPC) and areincorporated as appendices to the affected applicable documents.

Table J01-2a2 – Approved Variances

DocumentNumber

Variance Title CCT-REQ-1130 RequirementSSP 50808

RequirementDisposition Letter

Filename

Page 11: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 11 of 25

The following table lists the Variances that were conditionally approved by NASA as part of Certification Products Contract(CPC) and are incorporated as appendices to the affected applicable documents. The table includes approval of all with the exceptionof items in the column labelled “Condition.”

Table J01-2b – Conditionally Approved Variances

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

RequirementDisposition

Letter FilenameCondition

Page 12: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 12 of 25

The following table lists the Alternate Standards that were dispositioned partially approved by NASA as part of CertificationProducts Contract (CPC) and are incorporated as appendices to the affected applicable documents. The table includes approval of allwith the exception of the items in the column labelled “All Areas Approved Except for …”.

Table J01-2c – Partially Approved Alternate Standards Approved Areas

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

11000-97-014

Page 13: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 13 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 14: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 14 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 15: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 15 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 16: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 16 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 17: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 17 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 18: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 18 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 19: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 19 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 20: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 20 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 21: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 21 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 22: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 22 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

HLS-BCPC-

Page 23: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 23 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 24: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 24 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …

Page 25: Attachment J-01 Integrated Crew Transportation System (CTS) … · 2015. 3. 2. · Attachment J-01 NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract Page 2

Attachment J-01

NNK14MA75C - Commercial Crew Transportation Capability (CCtCap) Contract

Page 25 of 25

Table J01-2c – Partially Approved Alternate Standards Approved Areas – continued

DocumentNumber

TitleCCT-REQ-1130

RequirementSSP 50808

Requirement

DispositionLetter

Filename

All Areas ApprovedExcept for …


Recommended