Date post: | 27-Mar-2015 |
Category: |
Documents |
Upload: | lily-sparks |
View: | 216 times |
Download: | 1 times |
ATU-ITU|
T
Preparing for WTSA
Major Issues Related to Working Methods
Gary FishmanITU-T TSAG Chairman
Preparatory Meeting for Africa for WTSA-04Victoria Falls, 23-25 June 2004
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
2
ATU-ITU|
T
Changes of Substance Updating to recognize completed or
out of date elements New Resolution or Recommendation No change other than factual elements
(e.g., dates)
WTSA Resolutions and A-Series Recommendations
What are the options?
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
3
ATU-ITU|
T
Designed to introduce you to the major working method-related issues for TSAG and WTSA-04
Will group these issues by working method areas Will provide a list of all Resolutions and A-Series
Recommendations and where proposals have been made
Will provide contact information for the relevant TSAG correspondence groups
This Presentation
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
4
ATU-ITU|
T
Study Groups and “other groups” Definition Purpose Composition Lifetime Rules of Procedure Parent body and reporting relationship Financial aspects Relationship to: SG, Lead SG, JWP, JCG, ICG,
Focus Group, Rapporteur Group
Working Methods
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
5
ATU-ITU|
T
Starting new work that is responsive to membership proposalsWhen a relevant Question existsWhen a relevant Question does not
exist
When does a Question have to be officially approved?
Working Methods (continued)
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
6
ATU-ITU|
T
Where is the biggest opportunity for further improvement in work methods?
Working Methods (continued)
Activity Historical Currently Possible
Start work 2 to 4 years 1 day to a few weeks
Develop content and reach agreement
9 months to
2 or 3 years
weeks to
2 or 3 years
Approve a Recommendation
2 or 3 years 5 weeks to 9 months
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
7
ATU-ITU|
T
Alternative Approval Process (AAP) Role of Associates to be clarified Guidelines on AAP Implementation are in
preparation (TSAG action item, not for WTSA)
Suppress Resolution 37 (AAP) but retain process to change approval procedures
Voting of Sector Members and Member States on equal footing
Unopposed agreement of Member States for final decision-making (~2% of AAP Recs)
Working Methods (continued)
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
8
ATU-ITU|
T
Traditional Approval Process (TAP)What was learned from AAP that
can be used for TAP? Why not improve TAP with new
procedures to reduce cost and volume of documentation and to reduce time to market?
Working Methods (continued)
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
9
ATU-ITU|
T
Documents One type of input document – full or partial
merging of normal and delayed contributions?
New types of output document, in addition to:RecommendationsSupplementsImplementors’ AgreementHandbooksReportsLiaisons
Working Methods (continued)
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
10
ATU-ITU|
T
Work Methods – Resolutions & Recommendations
Doc. SubjectHave there
been proposals?
Is Res/Rec completed?
Res 1 Rules of procedure
Res 18Work alloc’n & coord’n between ITU-T & ITU-R
Res 20Procedures for alloc’n and mgt of international numbering resources
Res 22Authorization for TSAG to act between WTSAs
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
11
ATU-ITU|
T
Work Methods – Resolutions & Recommendations
Doc.Doc. SubjectSubjectHave there
been proposals?
Is Res/Rec completed?
Res 26Res 26Assistance to the Assistance to the
Regional Tariff GroupsRegional Tariff Groups
Res 31Res 31 AssociatesAssociates
Res 35Res 35Maximum term of office Maximum term of office
for chairs and VCsfor chairs and VCs
Res 37Res 37Alternative Approval Alternative Approval
ProcessProcess
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
12
ATU-ITU|
T
Work Methods – Resolutions & Recommendations
Doc. SubjectHave there
been proposals?
Is Res/Rec completed?
Res 38Coordination among ITU-T, -R and -D for IMT-2000
Res 40Regulatory aspects of ITU-T work
Rec A.1Work methods for SGs of ITU-T
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
13
ATU-ITU|
T
Work Methods – Resolutions & Recommendations
Doc. SubjectHave there
been proposals?
Is Res/Rec completed?
Rec A.7Focus Groups: Working methods and procedures
Rec A.8AAP for new and revised Recs
Rec A.9Working procedures for the SSG on IMT-2000 and beyond
Rec A.13Supplements to ITU-T Recommendations
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
14
ATU-ITU|
T
Working Between TSAG Meetings by Correspondence
Work Method Correspondence Groups
Working methodsWorking methods
Mr. Stewart Alexander (BT)Mr. Stewart Alexander (BT)Tel: +44 1277 264 037 Tel: +44 1277 264 037 Fax: +44 1277 324 015Fax: +44 1277 324 [email protected]@bt.com
Use by TSAG of Use by TSAG of “other group”“other group”
Mr. Stewart Alexander (BT)Mr. Stewart Alexander (BT)Tel: +44 1277 264 037 Tel: +44 1277 264 037 Fax: +44 1277 324 015Fax: +44 1277 324 [email protected]@bt.com
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
15
ATU-ITU|
T
Promotion, EDH and Publication Policy
Further use of electronic working methods How to change the old, incorrect
perceptions of ITU-T? (Note Promotion is a priority in Strategic Plan - should WTSA take any action?)
No WTSA issues other than Resolution 32 (Use of EDH in ITU-T)
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
16
ATU-ITU|
T
Promotion, EDH & Publication Policy
Doc.Doc. SubjectSubject Were there Were there proposals?proposals?
Is Res/Rec Is Res/Rec completed?completed?
Res 32Res 32Strengthening the use of Strengthening the use of EDH for the work of ITU-TEDH for the work of ITU-T
Rec A.2Rec A.2 Presentation of contributionsPresentation of contributions
Rec A.11Rec A.11Publication of ITU-T Recs Publication of ITU-T Recs and WTSA proceedingsand WTSA proceedings
Rec A.12Rec A.12Identification and layout of Identification and layout of ITU-T RecsITU-T Recs
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
17
ATU-ITU|
T
External Coordination and Cooperation (CoCo)
ITU-T relationship with Internet-related organizations
Relationship of new NGN Focus Group with other national and regional bodies
Recent examples of external bodies seeking to join ITU-T (FS-VDSL Forum, OCAF)
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
18
ATU-ITU|
T
External Cooperation
Doc.Doc. SubjectSubject Were there Were there proposals?proposals?
Is Res/Rec Is Res/Rec completed?completed?
Res 7Res 7Collaboration with the ISO and Collaboration with the ISO and IECIEC
Res 11Res 11Collaboration with the Postal Collaboration with the Postal Operations Council UPUOperations Council UPU
Rec A.4Rec A.4Communication process Communication process between ITU-T and forums and between ITU-T and forums and consortiaconsortia
Rec A.5Rec A.5Including reference to other Including reference to other org’s documents in ITU-T Recs org’s documents in ITU-T Recs
Rec A.6Rec A.6Cooperation and information Cooperation and information exchange between ITU-T and exchange between ITU-T and SDOsSDOs
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
19
ATU-ITU|
T
External Cooperation
Doc.Doc. SubjectSubject Were there Were there proposals?proposals?
Is Res/Rec Is Res/Rec completed?completed?
Rec Rec A.23A.23
Collaboration with the ISO Collaboration with the ISO and IEC on Information and IEC on Information TechnologyTechnology
Supp. 3Supp. 3IETF and ITU-T collaboration IETF and ITU-T collaboration guidelinesguidelines
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
20
ATU-ITU|
T
Working Between TSAG Meetings by Correspondence
CoCo Correspondence Group
Informal Forum Informal Forum Summit (IFS)Summit (IFS)
Mr. Fabio Bigi (Italy)Mr. Fabio Bigi (Italy)Tel: +41 79 574 3741Tel: +41 79 574 [email protected]@ties.itu.int
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
21
ATU-ITU|
T
Working Between TSAG Meetings by Correspondence
General TSAG Matters Correspondence Group
General TSAG General TSAG MattersMatters
Mr. Gary Fishman (Lucent Technologies) Mr. Gary Fishman (Lucent Technologies)
Tel: +1 732 949 3401Tel: +1 732 949 3401
Fax: +1 732 949 1196Fax: +1 732 949 1196
[email protected]@lucent.com
WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004
22
ATU-ITU|
T
Preparations for TSAG and WTSA-2004
Regional and national processes should be Regional and national processes should be fully engaged by nowfully engaged by now
Consultations with ITU-T leadership and Consultations with ITU-T leadership and between regions will assist good between regions will assist good preparationpreparation