August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis TIO Business Case Revised Architecture & Costs for Options 1, 2 & 3 based on changes in ACT scope
Transcript
Page 1: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

August 2006

Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis

TIO Business CaseRevised Architecture & Costs for Options 1, 2 & 3

based on changes in ACT scope

Page 2: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

Option 1 Description:

Migration of Novell NetWare, eDirectory, GroupWise to Novell’s Linux-based platform, and migration of the City’s existing Microsoft environment to an updated Microsoft environment

Option 1 Mixed Novell & Microsoft Environment

Page 3: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 3

Option 1 Key Assumptions1. City will continue to run a “mixed” platform that consists of Novell and Microsoft products and technologies2. City will begin migration from Novell Netware to Novell OES (Linux Kernel) beginning in 20093. City will upgrade their existing Microsoft environment to a “newer” Microsoft platform based on current Microsoft products and

technologies starting in January 20094. The “new” Novell and Microsoft products and technology will be phased in over a 4 year period of time, with basic upgrades and

maintenance completed every year thereafter, or until newer versions are deemed needed in the future5. TIO will have sponsorship from the Executive Office and Department heads. Executive Office is defined as Tim Ceis, Regina LaBelle,

and Dwight Dively (CFO)6. Depts. will be required to comply with prescribed architecture, standards and policies (Dept. exceptions may surface)7. Where feasible, server consolidation will be targeted for all new services, e.g., File/Print, Messaging, etc. (see Option 1 Architecture

slide)8. Administration responsibilities for services in the scope of TIO will for the most part remain the same9. Under Option 1, the labor costs for City Program Management and Enterprise Architecture are assumed to be the same as Option 310. Under Option 1, the labor costs for external Project Management and Technical Architecture are assumed to be the same as Option 311. Under Option 1, the labor costs for the Architecture, Design and Testing phases are assumed to be the same as Option 312. Where feasible and cost effective, Microsoft software licensing will be purchased through a 3 year Enterprise Agreement13. City will continue to pay for maintenance on Novell Open Enterprise Server (formerly Netware)14. City will continue maintenance on GroupWise15. No additional NetWare or Microsoft file servers will be installed after January 1, 2007 – assumed current environment will be sufficient

until major migration starts in 2009 (exception being annual server hardware replacement program and annual capacity expansion to existing servers)

16. Depts. have the option to load the Novell Client on client devices for access to the Novell environment17. Under Option 1, all City employees (qty. 10,000) will require a Windows Server CAL to access Corporate File shares, and for

authenticating to Active Directory (VPN, Citrix, other application access)18. Under Option 1, the native Microsoft migration tools will be leveraged for the Microsoft portion of the City’s environment19. Under Option 1, the cost estimates for Contact Management, Fax Integration and Mobile Messaging are assumed to be the same as

Option 2 and 320. Training cost estimates for Option 1 (Critical Enhancements & Additional Functionality) are assumed to be the same as Option 2 and 3

– not training for Novell base functionality required, estimated costs were allocated for limited training of Microsoft base functionality21. Microsoft Office SharePoint Server will be the information collaboration platform in Option 1, 2 or 322. Option 1 has an objective of attempting to reduce the server count while maintaining departmental administrator autonomy23. Software maintenance will be purchased with all software (Software Assurance with all Microsoft software, Software maintenance for

Novell and other 3rd parties)

Page 4: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 4

Option 1 Key Assumptions (continued)

24. Microsoft Office Live Communications Server will be purchased and deployed for secured Instant Messaging and Live Meetings if this “Additional Functionality” item is pursued / funded

25. Microsoft Rights Management Server will be purchased and deployed for digital rights management if this “Critical Enhancement” item is pursued / funded

26. Microsoft Certificate Server will be purchased and deployed for securing server to server communication. An external provider will be used for digital certificates for the purposes of signing or encrypting electronic mail digital certificates if this “Critical Enhancement” item is pursued / funded

27. Microsoft MOM (renamed to System Center Operations Manager starting with 2007 release) will be purchased and deployed to monitor / manage all elements of the TIO infrastructure.; MOM agents will be installed on application servers at departmental option and expense. all Windows-based servers

28. Office will be funded and purchased by a separate business case and budget; a decision of which Office version deployed and when is still pending

29. Windows Vista will be funded and purchased by a separate business case and budget; a decision of when Vista will be deployed will be made after the product is released and internally tested / adopted by the City – note if City chooses not to purchase Windows licensing as part of the EA, they won’t be eligible for a Platform EA

30. City will continue to leverage their existing Desktop Management tools / platforms – upgrade cost estimates for upgrade to newest version of ZenWorks are factored in for approximately ¾ of the City devices; other Depts. device management costs will be responsibility of each Dept.

31. The City will not implement a virtual-server computing architecture for production use – only for lab and development environments where appropriate

32. Server hardware required for a City-wide “test lab” is calculated at 30% of total Server hardware cost estimate for Option 1 – it is assumed the City will also repurpose server hardware as required

33. O&M Labor estimates under Option 1 are assumed to be the same as current O&M labor up until the start of the migration in 2009 - O&M Labor will increase after migration is complete due to the need to administer, manage and maintain a larger and more complex environment that includes the addition of specific “Critical Enhancements” and / or “Additional Functionality” items that are selected by the City

34. O&M costs for Labor and Hardware/Software are calculated estimates for 1 year – the City will use this information to extrapolate O&M costs through 2016 and perform their own NPV analysis

35. In Option 1 (2009 through 2012), the assumption is that City departments' other IT work (i.e., projects and/or operational work) will be deferred in order to free up the internal labor required for TIO, and the City will not incur any backfill/augmentation costs for such internal staff

36. Labor calculations are based on 2080 man hours of work per year, using a blended hourly rate of $85 for City staff (provided by DoIT Finance), and a blended hourly rate of $175 for external staff

37. 9% Sales Tax was applied to total costs38. 50% contingency was applied to total costs

Page 5: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 5

Option 1 - Program Timeline

Phase2

GroupWise Upgrade

NetWare & Windows

Note: "Each project has related migration tools, security and management components that are included as part of the timeline.

- Blue means "in scope" of TIO Budget and Cost Estimates

- Yellow means "out of scope" of TIO Budget and Cost Estimates

eDir & AD Upgrade

MOM & ZenWorks

File Svc. - Build, Test & Migration

AD - eDir Directory Synch

Server Mgmt Svc. - Build, Test & Implementation

PHASE IINetWare & Windows

2012

- DRAFT -

Print Svc. - Build, Test & Migration

PHASE IDirectory Svc - Build, Test & Migration

Messaging Svc - Build, Test & Migration

Office 2007 roll-out / upgrade

TIO - Planning, Architecture & Design

TIO Option 1 - Proposed Program Timeline (assumes 2009 start)

2009Project

PREPARATION / PLANNING

2010 2011

Arch - Phase 1

Data Center Facilities, Network, Storage, Power, etc. required to support TIO over Program Timeline

Migration Period

Future Microsoft Product Revision upgrades / deployment

Information Collaboration Svc - Build, Test & Migration

Desktop Mgmt Svc. - Build, Package & Test

FUTURE

ZenW Desktop

SharePoint 2007

TBD e.g. Vista & Line of Bus. Apps migration

Future Office upgradesOffice Roll-out (TIO Dependency)

Data Center Infra. (TIO Dependency)

Page 6: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 6

Option 1 - Proposed ArchitectureNote: The Architecture illustrated is subject

to change based on the following criteria:

1. Novell and Microsoft product changes – this architecture is based on products available today; if the City adopts the newer products coming in future, the architecture will change slightly, and so will the specific server counts, placement and licensing

2. Dept. changes – certain Depts may choose to alter the proposed architecture to accommodate specific business / technical needs

3. City organizational changes – if the City adds, merges or changes Dept. structure, geographies, then the resultant underlying network and system infrastructure will need to change accordingly

4. Technical changes – if the underlying Data Center or City network infrastructure changes or is not able to accommodate the proposed architecture, modifications will be required

SMT DataCenter

(9) Dept. File Servers

SCL Remote Sites

(3) eDirectory, GroupWise, File, Print, ZenWorks(8) eDirectory

Replica Servers

Internal Firewall

Perimeter Firewall

Existing SMTP Relay Servers (SPAM)

Remote Firewalls

(8) Print Servers

(2) Clustered Dept. Print

Servers

(8) Management Servers

(4) Dept. Management

Servers

(2) BES Servers(2) FAX Servers

(2) Contact Mgmt.

Shared Novell Infrastructure

Shared Novell Infrastructure

SCL Novell

Shared City Infrastructure

62 Shared Novell / DoIT Managed Infrastructure

49 Dept. Managed Novell Infrastructure

Existing City-wide Infrastructure

SCL

(16) Novell File Servers

Shared Novell Infrastructure

SCL

SPU

SPD EOC

Shared Novell Infrastructure

Shared Novell Infrastructure

(16) GroupWise Servers (14) Dept. GroupWise Servers

Shared Novell Infrastructure

SCL

SPU

SPD(5) Dept eDirectory

Servers

SCL

SPUSPD

SCL

SPUSPD

(8) Active Directory Servers

Shared Microsoft Infrastructure

(4) Provisioning Auditing Servers

(2) DHCP/WINS

Servers(2) Password Mgmt Servers

(2) RSA Servers

Shared Microsoft

Infrastructure

Shared Microsoft

Infrastructure

Shared Microsoft

Infrastructure

Shared Microsoft

Infrastructure

(7) LCS Servers

Shared Microsoft

Infrastructure

(4) Clustered Print Servers

Shared Microsoft

Infrastructure

(4) Dept. Print Servers

SPU

SPD

(6) SharePoint Servers

Shared Microsoft

Infrastructure

(6) Clustered File Servers

Shared Microsoft Infrastructure

(4) Clustered

SQL Servers

Shared MS Infrastructure

(3) Certificate Servers

(2) MOM Servers

(2) RMS Servers

Shared City Infrastructure

(2) Active Directory, LCS Proxy

SCL MS

(3) eDirectory, GroupWise, File, Print, ZenWorks

SCL Novell

(2) Active Directory, LCS Proxy

SCL MS

(3) eDirectory, GroupWise, File, Print, ZenWorks

SCL Novell

(2) Active Directory, LCS Proxy

SCL MS

(3) eDirectory, GroupWise, File, Print, ZenWorks

SCL Novell

(2) Active Directory, LCS Proxy

SCL MS

(3) eDirectory, GroupWise, File, Print, ZenWorks

SCL Novell

(2) Active Directory, LCS Proxy

SCL MS

Boundary

North Service Center

Skagit

South Service Center

System Ctrl. Center

(2) ISA Reverse Proxy Servers (2) LCS Access Proxy Servers

Microsoft-wide Shared Infrastructure Microsoft-wide Shared Infrastructure

58 Shared Microsoft / DoIT Managed Infrastructure

26 Dept. Managed Microsoft Infrastructure

(9) Dept AD Domain Controllers

SCL SPU

SPD

(3) Dept. File

Servers

SPD

(2) Archiving Servers

Shared Microsoft

Infrastructure

Page 7: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 7

Option 1 - Administration Model

Enterprise IT Architecture Governance

Shared City Infrastructure

Department Servers & Services

Dept. Users & Client Devices

Dept. Users & Client Devices

Dept. Users & Client Devices

Dept. Users & Client Devices

Dept Specific Infrastructure

Department Servers & Services

Department Infrastructure,

Servers & Services

DoIT provides Management & Administration

Depts. provide Management & Administration

IT Architecture Committee defines/governs Architecture & Standards

See file: TIO Mgmt & Administration Outline.doc for further details

Page 8: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 8

Option 1 - Program DependenciesOffice Rollout• DoIT is responsible for Office Rollout to “DoIT Supported” Depts., all other Depts.

responsible for their own Office Rollout• If an EA is pursued, DoIT will be responsible for execution and procurement of Office

licenses for balance of City users (SPU and SCL have EA already)• City decision on timing for rollout of Office 2007 is still pending – recommendation is

to deploy Office 2007• Depts. will utilize current “push” deployment tools as vehicle to rollout Office package

to users• Depts. will fund external deployment assistance (contractors) as required

Data Center Infrastructure• Provides core Infrastructure for TIO, including:

– Data Center Facilities for new TIO Servers (power, HVAC, UPS/generator, racks, space, etc)

– Network Connectivity for new TIO Servers (within Data Center)– Storage (SAN) and SAN Connectivity for new TIO Servers (within Data Center)– Service Level Agreements to maintain High-Availability for TIO environment– Backup & Recovery System (hardware, software and media) for TIO environment

• SLA Metrics - monitored, managed and reporting for TIO environment• Budgeted every two years – ongoing activity• Supports growth through estimated capacity planning• Costs covered by other Dept budgets

Page 9: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 9

Option 1 - PMO Resources

Assumption—the following resources are required for the entire duration of TIO, and will be provided from the City PMO:

• Full-time City Program Manager (48 months) – 8320hrs– Reports to City Executive Sponsors– Part of the City-wide PMO– Responsible for program schedule, milestones, budget, resource management– Loaded hourly rate of $85 = $707,200

• Full time City Enterprise Architect (48 months) – 8320hrs– Reports to City Program Manager– Responsible for technical solution, team direction / leadership and project

deliverables– Loaded hourly rate of $85 = $707,200

Page 10: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 10

Option1 - Program Resources

Assumption—the following external resources are required for TIO Program Duration:

• External TIO Project Manager (75% for 48 months) – 6240hrs– Reports to City Program Manager– Responsible for project schedules, milestones, budget, resource management of

team members– Blended rate of $175 = $1,092,000

• External TIO Technical Architect (75% for 48 months) – 6240hrs– Reports to External PM– Responsible for technical solution, team direction / leadership and project

deliverables– Blended rate of $175 = $1,092,000

Page 11: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

Option 2 Description:Migration of Novell NetWare, eDirectory, GroupWise, and migration of City’s existing Microsoft environment to a new standardized Microsoft platform over 4 years (starting in 2007)

Option 3 Description:Migration of Novell NetWare, eDirectory, GroupWise, and migration of City’s existing Microsoft environment to an new standardized Microsoft platform over 4 years (starting in 2009)

Option 2 & 3 Homogeneous Microsoft Environment

Page 12: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 12

Option 2 & 3 - Key AssumptionsIf TIO is approved / funded, the following assumptions apply:1. TIO will be implemented over two budget biennia – Option 2 (2007/08 and 2009/10), or Option 3 (2009/10 and 2011/12)2. TIO will have sponsorship from the Executive Office and Department heads. Executive Office is defined as Tim Ceis, Regina LaBelle, and Dwight

Dively (CFO)3. Depts. will be required to comply with prescribed architecture, standards and policies (Dept. exceptions may surface)4. Microsoft technology (as defined in services ‘stack’) will be phased in based on two phases (see Program Timeline slide)5. Where feasible, server consolidation will be targeted for all TIO services, e.g., File/Print, Messaging, etc. (see Architecture slide)6. Administration responsibilities for services in the scope of TIO will for the most part remain the same (see Administration model slide)7. Architecture, Design and Testing for the TIO Program will begin January 2007 and continue through June 20078. Microsoft software licensing for TIO will be purchased through a 3-year Enterprise Agreement9. City will attempt to drop maintenance on GroupWise by June 30, 2009 depending on actual migration timeline10. No additional Netware file servers will be installed after January 1, 2007 - City will drop maintenance on NetWare on June 30, 200911. The Novell Client will remain on desktops during the coexistence period to support access to the Novell environment12. City will migrate print services environment that is currently hosted on Windows and Netware to Windows by the end of 200813. Office SharePoint Server will not be implemented in 2007-2008 - a strategy around the City’s use of the SharePoint environment will be developed

- Windows SharePoint Services can be deployed to support team based collaboration14. MOM will be purchased and deployed in support of all new servers implemented under TIO15. Office will be funded and purchased by a separate business case and budget; a decision of which Office version deployed and when is still

pending16. Windows Vista will be funded and purchased by a separate business case and budget; a decision of when Vista will be deployed will be made

after the product is released and internally tested / adopted by the City17. The City will not implement a virtual-server computing architecture for production use – only for lab and development environments where

appropriate18. Server hardware required for a City-wide “test lab” is calculated at 30% of total Server hardware cost estimate for Option 2/3 – it is assumed the

City will also repurpose server hardware as required19. O&M Labor estimates under Option 2 / 3 are assumed to be the same up until the start of the migration in 2007 / 2009 respectively - O&M Labor

will increase after migration is complete due to the need to administer, manage and maintain a larger and more complex environment that includes the “Critical Enhancements” and / or “Additional Functionality” selected by the City

20. O&M costs for Labor and Hardware/Software are calculated estimates for 1 year – the City will use this information to extrapolate O&M costs through 2016 and perform their own NPV analysis

21. In Option 2/3, the assumption is that City departments' other IT work (i.e., projects and/or operational work) will be deferred in order to free up the internal labor required for TIO, and the City will not incur any backfill/augmentation costs for such internal staff.

22. Labor calculations are based on 2080 man hours of work per year, using a blended hourly rate of $85 for City staff (provided by DoIT Finance), and a blended hourly rate of $175 for external staff

23. 9% Sales Tax was applied to total costs for Options 2 and 324. 30% contingency was applied to total costs for Option 2, and 40% for Option 3

Page 13: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 13

Option 2 & 3 - Program TimelineNote: The Program Timeline below illustrates TIO projects that will deliver specific services in a specific sequence over a 4 year time period; Base

Functionality, Critical Enhancements and Additional Functionality (as defined by the ‘stack’) are components of each project. The City will choose which projects to undertake with “base functionality” and then whether they will fund/add “critical enhancements” and / or “additional functionality”. We pushed out Phase 2 to start in Jan 09 so that the budget could easily be split over the two budget biennia

Phase2

Note: "Each project has related migration tools, security and management components that are included as part of the timeline.

- Blue means "in scope" of TIO Budget and Cost Estimates

- Yellow means "out of scope" of TIO Budget and Cost Estimates

TBD e.g. Vista & Line of Bus. Apps migration

Future Office upgradesOffice Roll-out (TIO Dependency)

Data Center Infra. (TIO Dependency)

Win Srv "Longhorn" + related comp.

Deploy SMS Client / Decom. Zen

Future Microsoft Product Revision upgrades / deployment

Information Collaboration Svc - Build, Test & Migration

Desktop Mgmt Svc. - Build, Package & Test

FUTURE

SharePoint 2007 + related comp.

Proposed TIO Program Timeline (Option 2 assumes 2007 start, Option 3 assumes 2009 start)

2007Project

PREPARATION / PLANNING

2008 2009NOVELL & MICROSOFT COEXISTENCE PERIOD

2010

PHASE I

TIO - Planning, Architecture & Design

Office 200x

Arch - Phase 1

Data Center Facilities, Network, Storage, Power, etc. required to support TIO over Program Timeline

Messaging Svc - Build, Test & Migration

AD + related comp. AD - eDir Directory SynchDirectory Svc - Build, Test & Migration

- DRAFT -

Decommission Novell eDir

Decommission Novell Print

Decommission GWExchange 2007 + related comp.

Print Svc. - Build, Test & Migration

File Svc. - Build, Test & Migration

SMS v4 + related comp.

W2K3R2 + related comp.

Server Mgmt Svc. - Build, Test & Implementation

PHASE II

MOM2007+related comp.

Page 14: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 14

Option 2 & 3 - Proposed ArchitectureNote: The Architecture illustrated is subject

to change based on the following criteria:

1. Microsoft product changes – this architecture is based on products available today; if the City adopts the newer products coming in 2007, the architecture will change slightly, and so will the specific server counts, placement and licensing

2. Dept. changes – certain Depts may choose to alter the proposed architecture to accommodate specific business / technical needs

3. City organizational changes – if the City adds, merges or changes Dept. structure, geographies, then the resultant underlying network and system infrastructure will need to change accordingly

4. Technical changes – if the underlying Data Center or City network infrastructure changes or is not able to accommodate the proposed architecture, modifications will be required

Note: original Assessment called for 114 servers, new count based on decision to not move forward with consolidation under ACT calls for 132 total new servers for TIO

SMT Data Center

(6) Clustered Dept. File Servers

SCL Remote Sites

Boundary

(2) ISA Reverse Proxy Servers

(9) AD Domain Controllers

(4) Provisioning /

Auditing Servers

Internal Firewall

Perimeter Firewall

Existing SMTP Relay Servers (SPAM)

Remote Firewalls

(2) LCS Access Proxy Servers

(7) LCS Servers

(6) SharePoint Servers

(4) Clustered Print Servers

(6) Clustered Dept. Print Servers

(3) Certificate Servers(8) SMS Servers

(2) MOM Servers

(4) Clustered

SQL Servers

(2) DHCP/WINSServers

(2) BES Servers(2) FAX Servers

(2) Password Mgmt Servers

(2) RMS Servers

(2) RSA Servers

(4) Servers hosting - AD, Exchange, File, Print, LCS Proxy, SMS

(2) ContactMgmt.

North Service Center

(4) Servers hosting - AD, Exchange, File, Print, LCS Proxy, SMS

Skagit

(4) Servers hosting - AD, Exchange, File, Print, LCS Proxy, SMS

South Service Center

(4) Servers hosting - AD, Exchange, File, Print, LCS Proxy, SMS

System Ctrl. Center

(4) Servers hosting - AD, Exchange, File, Print, LCS Proxy, SMS

City-wide Shared Infrastructure City-wide Shared Infrastructure

Shared City InfrastructureShared City

InfrastructureShared City

InfrastructureShared City

InfrastructureShared City

Infrastructure

Shared City InfrastructureShared City

Infrastructure

SCL Infrastructure

SCL Infrastructure

SCL Infrastructure

SCL Infrastructure

SCL Infrastructure

City-wide Shared Infrastructure

83 Shared City / DoIT Managed Infrastructure

49 Dept. Managed Infrastructure

Existing City-wide Infrastructure

Shared City Infrastructure

Shared City Infrastructure

SCL

SPUSPD

(6) Clustered File Servers

Shared City Infrastructure

SCL

SPU

SPD

Shared City Infrastructure

Shared City InfrastructureShared City Infrastructure Shared City

Infrastructure

(10) Exchange Clustered Servers

(8) Clustered Dept. Exchange Servers

Shared City InfrastructureSCL SPU

SPD

(9) Dept AD Domain Controllers

SCL SPUSPD

(4) Clustered

SQL Servers

Shared City Infrastructure

Page 15: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 15

Option 2 & 3 - Administration Model

Enterprise IT Architecture Governance

Shared City Infrastructure

Department Servers & Services

Dept. Users & Client Devices

Dept. Users & Client Devices

Dept. Users & Client Devices

Dept. Users & Client Devices

Dept Specific Infrastructure

Department Servers & Services

Department Infrastructure,

Servers & Services

DoIT provides Management & Administration

Depts. provide Management & Administration

IT Architecture Committee defines/governs Architecture & Standards

See file: TIO Mgmt & Administration Outline.doc for further details

Page 16: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 16

Option 2 & 3 - Program DependenciesOffice Rollout• Current Office version rollout is a “best practice” prerequisite for Messaging migration• DoIT is responsible for Office Rollout to “DoIT Supported” Depts., all other Depts.

responsible for their own Office Rollout• If an EA is pursued, DoIT will be responsible for execution and procurement of Office

licenses for balance of City users (SPU and SCL have EA already)• City decision on timing for rollout of Office 2007 is still pending – recommendation is

to deploy Office 2007 Depts. will utilize current “push” deployment tools as vehicle to rollout Office package to users

• Depts. will fund external deployment assistance (contractors) as required

Data Center Infrastructure• Provides core Infrastructure for TIO, including:

– Data Center Facilities for new TIO Servers (power, HVAC, UPS/generator, racks, space, etc)

– Network Connectivity for new TIO Servers (within Data Center)– Storage (SAN) and SAN Connectivity for new TIO Servers (within Data Center)– Service Level Agreements to maintain High-Availability for TIO environment– Backup & Recovery System (hardware, software and media) for TIO environment

• SLA Metrics - monitored, managed and reporting for TIO environment• Budgeted every two years – ongoing activity• Supports growth through estimated capacity planning• Costs covered by other Dept budgets

Page 17: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 17

Option 2 & 3 - PMO Resources

Assumption—the following resources are required for the entire duration of TIO, and will be provided from the City PMO:

• Full-time City Program Manager (48 months) – 8320hrs– Reports to City Executive Sponsors– Part of the City-wide PMO– Responsible for program schedule, milestones, budget, resource management– Loaded hourly rate of $85 = $707,200

• Full time City Enterprise Architect (48 months) – 8320hrs– Reports to City Program Manager– Responsible for technical solution, team direction / leadership and project

deliverables– Loaded hourly rate of $85 = $707,200

Note: moved internal Program Mgmt and Enterprise Architect to “PMO” based on feedback from TIO Option 2/3 Review meeting on 7/20 – costs remained the same

Page 18: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 18

Option 2 & 3 - Program Resources

Assumption—the following external resources are required for TIO Program Duration:

• External TIO Project Manager (75% for 48 months) – 6240hrs– Reports to City Program Manager– Responsible for project schedules, milestones, budget, resource management of

team members– Blended rate of $175 = $1,092,000

• External TIO Technical Architect (75% for 48 months) – 6240hrs– Reports to External PM– Responsible for technical solution, team direction / leadership and project

deliverables– Blended rate of $175 = $1,092,000

Note: increased external TIO Project Management and Technical architect from 50% over 18 months to 75% over 48 months based on feedback from TIO Option 2/3 Review meeting on 7/20 – external labor costs doubled

Page 19: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 19

Option 2 & 3 - Architecture/DesignProject Assumptions

• Part of TIO Program – Preparation & Planning (see timeline)• 9 month effort, broken into parts phases :

– Phase 1 = 6 months, with start date of January 2007– Phase 2 = 3 months, with start date of January 2009

• Phase 1 scope - Architect, Design and conduct Design Validation Testing for:– Directory Services (AD + related components)– Messaging Services (Exchange + related components)– Print Services– Server Management Services (MOM)

• Phase 2 scope - Architect, Design and conduct Design Validation Testing for:– File Services (+ related components)– Desktop Management Services (SMS + related components)– Information Collaboration Services (SharePoint + related components)

• External Labor estimates for Phase 1:– Directory & Messaging SME (100% for 3 months) – 520hrs– Server & Management SME (100% for 3 months) – 520hrs– Test Engineer (100% for 3 months) – 520hrs– Blended labor rate of $175 = $273,000

• Internal Labor estimates for Phase 1:– SCL Architect (50% time for 3 months) – 260hrs– SCL Test Engineer (100% for 3 months) – 520hrs– SPU Architect (50% time for 3 months) – 260hrs– SPU Test Engineer (100% for 3 months) – 520hrs– SPD Architect (50% time for 3 months) – 260hrs– SPD Test Engineer (100% for 3 months) – 520hrs– SFD Architect (50% for 3 months) – 260hrs– SFD Test Engineer (100% for 3 months) – 520hrs– Parks Architect (50% for 3 months) – 260hrs– Parks Test Engineer (100% for 3 months) – 520hrs– (2) DoIT Test Engineer (100% for 3 months) – 1040hrs– Blended labor rate of $85 = $419,900

• External Labor estimates for Phase 2:– Desktop Management SME (100% 3 months) – 520hrs– Information Collaboration SME (100% 3 months) – 520hrs– Test Engineer (100% for 3 months) – 520hrs– Blended labor rate of $175 = $273,000

• Internal Labor estimates for Phase 2:– SCL Architect (25% time for 3 months) – 130hrs– SCL Test Engineer (100% for 3 months) – 520hrs– SPU Architect (25% time for 3 months) – 130hrs– SPU Test Engineer (100% for 3 months) – 520hrs– SPD Architect (25% time for 3 months) – 130hrs– SPD Test Engineer (100% for 3 months) – 520hrs– SFD Architect (25% for 3 months) – 130hrs– SFD Test Engineer (100% for 3 months) – 520hrs– Parks Architect (25% for 3 months) – 130hrs– Parks Test Engineer (100% for 3 months) – 520hrs– (2) DoIT Test Engineer (100% for 3 months) – 1040hrs– Blended labor rate of $85 = $364,650

Note: added Dept specific Test Engineers for Phase 1 and 2 based on feedback from TIO Option 2/3 Review meeting on 7/20 – internal Labor costs doubled

Page 20: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 20

Option 2 & 3 - Directory ServicesBuild, Test & Migration Project Assumptions

• Part of TIO Program – Phase 1 (see timeline)• 12 month effort, with start date of June 2007, after Arch/Design Phase 1 is complete• Base Functionality includes production build, pre-production testing, pilot and migration of:

– AD - preparing existing City AD Domains– Add remaining (assumes 5000) users and desktops to Active Directory– Add remaining AD domain controllers– DirSynch - establishing synchronization between AD and eDirectory

• Critical Enhancements includes addition of:– AD Auditing (compliance)– Public Key Infrastructure (SSL certificates)

• Additional Functionality includes addition of:– AD Provisioning (automation of AD administration)– Password Management (client-side reduced sign-on)

• Directory Service implementation assumptions:– Starts after core AD infrastructure is in place– AD client roll-out will require “Desktop Touch” (new profile will be established)– 3rd Party Migration tools from Quest Software will be leveraged– Existing backup/restore system will have capability and capacity to support new Microsoft infrastructure

• External Labor estimates for Base Functionality Directory Services:– AD Build, Test, Migration SME (100% for 3 months) – 520hrs @ $175 = $91,000– AD Deployment Lead (100% for 12 months) – 2080hrs @ $125 = $260,000

• Internal Labor estimates for Base Functionality Directory Services:Note: assumes Build / Test completed by External Labor (above)

1. SCL AD Migration Lead (10% for 12months) – 208hrs2. SPU AD Migration Lead (10% for 12months) – 208hrs3. SPD AD Migration Lead (10% for 12months) – 208hrs4. DoIT AD Migration Lead (100% for 6 months) – 1040hrs5. (8 person) City Architecture Team (5% for 12 months) – 832hrs6. AD Client Rollout Team (4 persons - 100% for 6 months) – 4160hrs7. Blended labor rate of $85 = $565,760

• External Labor estimates for Critical Enhancements to Directory Services:– AD Auditing SME (100% for 3 months) – 520hrs @ $175 = $91,000– PKI SME (100% for 3 months) – 520hrs @ $175 = $91,000

• External Labor estimates for Additional Functionality to Directory Services:– AD Provisioning SME (100% for 3 months) – 520hrs @ $175 = $91,000– Dual Factor Authentication SME (100% for 3 months) – 520hrs @ $175 = $91,000– Password Management SME (100% for 3 months) – 520hrs @ $175 = $91,000

Note: reduced effort of internal AD Migration Lead based on reduced scope from change in Forest/Domain approach – internal Labor costs decreased by $240K

Page 21: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 21

Option 2 & 3 - Messaging ServicesBuild, Test & Migration Project Assumptions

• Part of TIO Program – Phase 1 (see timeline)• 15 month effort, with start date of October 2007, after Arch/Design Phase 1 is complete• Base Functionality includes production build, pre-production testing, pilot and migration of:

– Exchange 2007 Server infrastructure and encryption (all Depts)– Remote access to Exchange via Web Access (OWA), Mobile Access (OMA)– Facsimile and CRM (establish new systems and integrate with Exchange for limited use)– Mobile Messaging integration (Blackberry)

• Critical Enhancements includes addition of: – Messaging Encryption

• Additional Functionality includes addition of: – Enterprise Archiving (messaging services)– Instant Messaging and Live Meetings

• Messaging Service implementation / migration:– Outlook will already be deployed to Desktops via prior Office roll-out– Exchange Server profile configuration will be automated for Outlook– GroupWise archives on file servers will be converted to Outlook PST files– 3rd Party Migration tools from Quest Software will be leveraged– Existing backup/restore system will have capability and capacity to support new Microsoft infrastructure

• External Labor estimates for Base Functionality Messaging Services:– Exchange Build, Test, Migration SME (100% for 3 months) – 520hrs @ $175 = $91,000– Exchange Deployment Lead (100% for 15 months) – 2595hrs @ $125 = $324,375

• Internal Labor estimates for Base Functionality Messaging Services:Note1: assumes Build / Test completed by External Labor (above)

– SCL Messaging Migration Lead (100% for 6 months) – 1040hrs– SPU Messaging Migration Lead (100% for 4 months) – 693hrs– SPD Messaging Migration Lead (100% for 4 months) – 693hrs– SFD Messaging Migration Lead (100% for 3 months) – 520hrs– Parks Messaging Migration Lead (100% for 3 months) – 520hrs– DoIT Messaging Migration Lead (100% for 6 months) – 1040hrs– (8 person) City Architecture Team (5% for 15 months) – 1040hrs– Blended labor rate of $85 = $471,410

• External Labor estimates for Critical Enhancements to Messaging Services:– Messaging Encryption SME (100% for 3 months) – 520hrs– Blended labor rate of $175 = $91,000

• External Labor estimates for Additional Functionality to Messaging Services:– Instant Messaging and Live Meetings SME (100% for 4 months) – 693hrs @ $175 = $121,275– Enterprise Archiving (messaging services) SME (100% for 3 months) – 520hrs @ $175 = $91,000

Page 22: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 22

Option 2 & 3 - Print ServicesBuild, Test & Implementation Project Assumptions

• Part of TIO Program – Phase 1 (see timeline)• 12 month effort, with start date of October 2007• Includes production build, pre-production testing, pilot and implementation of:

– Print Server infrastructure (all Depts.)• External Labor estimates for Base Functionality Print Services:

– Print Service Build, Test, Migration SME (100% for 2 months) – 346hrs @ $175 = $60,550– Print Deployment Lead (100% for 4 months) – 693hrs @ $125 = $86,625

• Internal Labor estimates for Base Functionality Print Services:Note1: assumes Build / Test completed by External Labor (above)

– SCL Print Service Migration Lead (50% for 4 months) – 347hrs– SPU Print Service Migration Lead (50% for 3 months) – 260hrs– SPD Print Service Migration Lead (50% for 3 months) – 260hrs– DoIT Print Service Migration Lead (50% for 6 months) – 520hrs– (8 person) City Architecture Team (5% for 9 months) – 622hrs– Blended labor rate of $85 = $170,765

Page 23: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 23

Option 2 & 3 – SysMgmt - ServerBuild, Test & Implementation Project Assumptions

• Part of TIO Program – Phase 1 (see timeline)• 9 months effort, with start date of October 2007• Includes production build, pre-production testing, pilot and implementation of:

– MOM 2007 Server infrastructure (all Depts.)– MOM Management Packs (as server components are deployed) including:

• IBM Server Hardware• Windows Base OS & Windows Server Cluster• Windows Active Directory• DNS, DHCP & WINS• Exchange, ISA & Live Communication Server• Windows DFS Service & DFS Replication• Print Service• Windows Rights Management Service• SharePoint• SMS

• External Labor estimates for Base Functionality Server Management Services:– MOM Build, Test, Migration SME (100% for 4 months) – 693hrs– Blended labor rate of $175 = $121,275

• Internal Labor estimates for Base Functionality Messaging Services:Note1: assumes Build / Test completed by External Labor (above)

– SCL Server Mgmt Lead (50% for 4 months) – 347hrs– SPU Server Mgmt Lead (50% for 3 months) – 260hrs– SPD Server Mgmt Lead (50% for 3 months) – 260hrs– DoIT Server Mgmt Lead (50% for 6 months) – 520hrs– (8 person) City Architecture Team (5% for 9 months) – 622hrs– Blended labor rate of $85 = $170,765

Page 24: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 24

Option 2 & 3 - File ServicesBuild, Test & Migration Project Assumptions

• Part of TIO Program – Phase 2 (see timeline)• 18 month effort, with start date of April 2009, after Arch/Design Phase 2 is complete• Base Functionality includes production build, pre-production testing, pilot and migration of:

– File Server infrastructure (all Depts.)• Critical Enhancements includes addition of:

– Digital Rights Management platform• Additional Functionality includes addition of:

– Enterprise Archiving (file services)• File Service implementation / migration:

– Key decision for City: ‘clean-up’ data before migration, or after migration?– City Depts. will be required to add digital tags to specific files as required– Existing backup/restore system will have capability and capacity to support new Microsoft infrastructure

• External Labor estimates for Base Functionality File Services:

– File Service Build, Test, Migration SME (100% for 3 months) – 520hrs @ $175 = $91,000– File Service Deployment Lead (100% for 18 months) – 3114 @ $125 = $389,250

• Internal Labor estimates for Base Functionality File Services:Note: assumes Build / Test completed by External Labor (above)

– SCL File Migration Lead (100% for 6 months) – 1040hrs– SCL File Migration Test Engineer (100% for 3 months) – 520hrs– SPU File Migration Lead (100% for 4 months) – 693hrs– SPU File Migration Test Engineer (100% for 2 months) – 347hrs– SPD File Migration Lead (100% for 4 months) – 693hrs– SPD File Migration Test Engineer (100% for 2 months) – 347hrs– SFD File Migration Lead (100% for 3 months) – 520hrs– SFD File Migration Test Engineer (100% for 1 month) – 173hrs– Parks File Migration Lead (100% for 3 months) – 520hrs– Parks File Migration Test Engineer (100% for 1 month) – 173hrs– DoIT File Migration Lead (100% for 6 months) – 1040hrs– (2) DoIT File Migration Test Engineers (100% for 8 months) – 2768hrs– (8 person) City Architecture Team (5% for 12 months) – 832hrs– Blended labor rate of $85 = $821,610

• External Labor estimates for Critical Enhancements to File Services:– Digital Rights Management SME (100% for 3 months) – 520hrs– Blended labor rate of $175 = $91,000

• External Labor estimates for Additional Functionality to File Services:– Enterprise Archiving (File Services) SME (100% for 3 months) – 520hrs– Blended labor rate of $175 = $91,000

Note: added Dept specific Test Engineers for File Migration testing based on feedback from TIO Option 2/3 Review meeting on 7/20 – internal Labor costs increased $424K

Page 25: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 25

Option 2 & 3 – SysMgmt - Desktop Build, Test & Implementation Project Assumptions

• Part of TIO Program – Phase 2 (see timeline)• 9 month effort, with start date of April 2009, after Arch/Design Phase 2 is complete• Includes production build, pre-production testing, pilot and implementation of:

– SMS v4 Server infrastructure (all Depts.)– SMS Functionality for Depts. to manage the following:

• Windows OS & Application Patching• Software Packaging & Distribution• Hardware & Software Inventory & Reporting• Remote Support• Software Metering & Usage Reporting

• Desktop Management implementation:– Dept File Servers will serve as SMS Distribution Points when necessary

• External Labor estimates for Base Functionality Desktop Mgmt Services:– SMS Build, Test, Migration SME (100% for 4 months) – 693hrs– Blended labor rate of $175 = $121,275

• Internal Labor estimates for Base Functionality Messaging Services:Note1: assumes Build / Test completed by External Labor (above)

– SCL Desktop Mgmt Lead (50% for 4 months) – 347hrs– SPU Desktop Mgmt Lead (50% for 3 months) – 260hrs– SPD Desktop Mgmt Lead (50% for 3 months) – 260hrs– SFD Desktop Mgmt Lead (50% for 3 months) – 260hrs– Parks Desktop Mgmt Lead (50% for 3 months) – 260hrs– DoIT Desktop Mgmt Lead (50% for 6 months) – 520hrs– (8 person) City Architecture Team (5% for 9 months) – 622hrs– Blended labor rate of $85 = $214,965

Page 26: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 26

Option 2 & 3 – Info. CollaborationBuild, Test & Implementation Project Assumptions

• Part of TIO Program – Phase 2 (see timeline)• 12 month effort, with start date of April 2009, after Arch/Design Phase 2 is complete• Includes production build, pre-production testing, pilot and implementation of:

– Office SharePoint Server 2007 infrastructure (all Depts.)– SharePoint Functionality for the following:

• City-wide Collaboration Workspaces• Department Collaboration Workspaces• Individual Workspaces• Project & Portfolio Management (future – out of scope for TIO)

• Information Collaboration implementation:– Scope includes implementation of based SharePoint infrastructure, no data migration

• External Labor estimates for Base Functionality Info Collaboration Services:– InfoCollab/SPS Build, Test, Migration SME (100% for 4 months) – 693hrs– Blended labor rate of $175 = $121,275

• Internal Labor estimates for Base Functionality Info Collaboration Services:Note1: assumes Build / Test completed by External Labor (above)

– SCL Info Collab Lead (50% for 4 months) – 347hrs– SPU Info Collab Lead (50% for 3 months) – 260hrs– SPD Info Collab Lead (50% for 3 months) – 260hrs– DoIT Info Collab (50% for 6 months) – 520hrs– (8 person) City Architecture Team (5% for 9 months) – 622hrs– Blended labor rate of $85 = $170,765

Page 27: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

City of Seattle

Department IT Profiles-information in the following slides is forthcoming from Depts. through John Jacobson-

Page 28: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 28

City Light• Total number of users: 1,750• Total number of devices (desktops, laptops, tablets, mobile): 1,610• Total number of network attached printers: 315• Primary Dept (HQ) location: Seattle Municipal Tower• Location of primary server room / data center: SMT 26th floor• Number of remote sites: 5• Number of remote site server rooms: 5• IT Administration model: Decentralized• Number of IT staff: ??• Number of FTE’s can dedicate to TIO: ??

Page 29: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 29

Public Utilities• Total number of users: 1,415• Total number of devices (desktops, laptops, tablets, mobile): 1,668• Total number of network attached printers: 298• Primary Dept (HQ) location: Seattle Municipal Tower• Location of primary server room / data center: SMT 26th floor• Number of remote sites: ??• Number of remote site server rooms: ??• IT Administration model: Decentralized• Number of IT staff: ??• Number of FTE’s can dedicate to TIO: ??

Page 30: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 30

Police• Total number of users: 1,722• Total number of devices (desktops, laptops, tablets, mobile): 1,154• Total number of network attached printers: 191• Primary Dept (HQ) location: Seattle Justice Center• Location of primary server room / data center: SMT 26th floor• Number of remote sites: ??• Number of remote site server rooms: ??• IT Administration model: Decentralized• Number of IT staff: ??• Number of FTE’s can dedicate to TIO: ??

Page 31: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 31

Fire• Total number of users: 1,065• Total number of devices (desktops, laptops, tablets, mobile): 470• Total number of network attached printers: 200• Primary Dept (HQ) location: Fire Station #10• Location of primary server room / data center: SMT 26th floor• Number of remote sites: ??• Number of remote site server rooms: ??• IT Administration model: Decentralized• Number of IT staff: ??• Number of FTE’s can dedicate to TIO: ??

Page 32: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 32

Parks• Total number of users: 847• Total number of devices (desktops, laptops, tablets, mobile): 681• Total number of network attached printers: 92• Primary Dept (HQ) location: Parks and Recreation Admin Building• Location of primary server room / data center: SMT 26th floor• Number of remote sites: ??• Number of remote site server rooms: ??• IT Administration model: Decentralized• Number of IT staff: ??• Number of FTE’s can dedicate to TIO: ??

Page 33: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 33

All other Depts. (DoIT Managed)

• Total number of users: ??• Total number of devices (desktops, laptops, tablets,

mobile): ??• Total number of network attached printers: ??• Primary Dept (HQ) location: ??• Location of primary server room / data center: ??• Number of remote sites: ??• Number of remote site server rooms: ??• IT Administration model: ??• Number of IT staff: ??• Number of FTE’s can dedicate to TIO: ??

Page 34: August 2006 Note: Information contained in this deck is subject to change; estimates are for the purposes of budget planning, cost-comparison and analysis.

04/18/23 - Confidential - for internal discussion purposes only - 34

City TotalsNote: TIO cost/budget derived from these totals

• Total number of users:• Total number of devices (desktops, laptops, tablets, mobile):• Total number of network attached printers: • Location of City primary data center:• Total number of remote sites:• Total number of remote site server rooms:• Total number of IT staff:• Total number of FTE’s can dedicate to TIO:


Recommended