August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update
Transcript
Page 1: August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update.

August, 2009

ACARP project C18023CM2010 – Continuous Miner automationUpdate

Page 2: August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update.

Inertial navigation bench testing

• Benchmark testing of latest inertial navigation technology on a calibrated rotary table - complete

Page 3: August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update.

Inertial navigation test track testing

• Units under test on the CSIRO inertial test track - complete

Page 4: August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update.

Inertial navigation field testing

• Next phase inertial testing on modified (radio remote) Numbat skid-steer vehicle - scheduled for September

Page 5: August, 2009 ACARP project C18023 CM2010 – Continuous Miner automation Update.

Process mapping and field characterisation

• Mine visits currently underway across15 mines in NSW and Queensland to review roadway development process models against actual operating models utilising a range of differing mining equipment and practices in a variety of mining conditions