    MONTGOMERY TOWNSHIPCOMMUNITY & RECREATION CENTERAUGUST 26, 2013 PROJECT UPDATE

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    2/12

    Community and Recreation Center Project Update August 26, 2013

    Since the Last Update KBA has:Since the Last Update KBA has:

    Had kick off meetings with the structural, mechanical, electricaland plumbing engineers.

    Continued to work with the Civil Engineer on the LandDevelopment plans.

    Reviewed the building with Township code officials.

    Received the Geotechnical Report.

    Reviewed the building requirements for phone, cable, data,security, Wi-Fi, access controls and A/V with the Township.

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    3/12

    Community and Recreation Center Project Update August 26, 2013

    Updated Site PlanUpdated Site Plan

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    4/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Spray Park / PlaygroundSpray Park / Playground

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    5/12

    Community and Recreation Center Project Update August 26, 2013

    Proposed Building ImageProposed Building ImageAerial View

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    6/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Exterior Materials Phenolic PanelsExterior Materials Phenolic Panels

    Wood look components proposed

    as phenolic panels to besympathetic with the existingwood on the township building.

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    7/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Exterior Materials Metal PanelsExterior Materials Metal Panels

    Blue areas on the building areproposed to be metal panels

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    8/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Exterior Materials Synthetic StuccoExterior Materials Synthetic Stucco

    White areas on the buildingare proposed to be syntheticstucco otherwise known as

    Dryvit or EIFS (exteriorinsulation & finish system).

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    9/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Selection of a HVAC SystemSelection of a HVAC System

    Geothermal or Conventional Heating and Air Conditioning

    The Mechanical Engineer prepared an Energy Model for the buildingusing the proposed materials for the exterior building envelope and

    the proposed hours of operation from the Feasibility Study.

    Conventional System consists of roof top mounted gas heating andelectric cooling units.

    Geothermal System consists of approximately 40 450 bore holeson the site, piping, manifolds and heat pump units throughout thebuilding.

    The proposed geothermal system has an additional up front

    installation cost of approximately $400,000 over a conventionalsystem.

    The energy model showed a simple payback of 40 years.

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    10/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Selection of a HVAC SystemSelection of a HVAC System

    Geothermal or Conventional Heating and Air Conditioning

    The payback of 40 years seemed counterintuitive to what we hadheard about geothermal systems.

    We collected real world data from Haverford Rec Center, YMCA andthe existing Township Building as a check.

    On a cost per year per square foot of building the Township Building

    uses $2.69, the gas system at the Rec Center uses $1.46 and the RecCenter with geothermal would use $1.25.

    Due to the low cost of natural gas and the high installation cost ofgeothermal the cost savings on the geothermal system is

    approximately $8200 per year. Equal to over 40 year payback.

    The BOS needs to provide direction on selection of an HVAC system.

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    11/12

    Community and Recreation Center Project Update August 26, 2013

    Major Topics at the Steering CommitteeMajor Topics at the Steering Committee

    Other Energy Saving OptionsOther Energy Saving Options

    Due to the current lack of rebates and grants solar power and windpower are not viable options.

    Daylight harvesting and motion detectors will be used for lightingcontrol.

    All lights will be either LED or fluorescent.

    Use of sophisticated HVAC control systems.

  • 7/30/2019 August 26 2013 Montgomery Township community center Update

    12/12

    Community and Recreation Center Project Update August 26, 2013

    Moving ForwardMoving Forward

    The bulk of the drawings will start to be created as we move intothe Construction Document Phase.

    Ongoing coordination between all the consultants.

    Proposed interior finishes, materials and colors will likely bepresented at the next progress meeting.

    Begin to review options for the Cardio and Weight RoomEquipment.