172.00
91.79
58.04
118.00
0DO NOT SCALE DRAWING SHEET 1 OF 1
06/07/17
06/07/17T. Brost
J. Venne
UNLESS OTHERWISE SPECIFIED:
SCALE: 1:48
REVDWG. NO.
ASIZE
TITLE:
NAME DATE
COMMENTS:
Q.A.
MFG APPR.
ENG APPR.
CHECKED
DRAWN
FINISH
MATERIAL
INTERPRET GEOMETRICTOLERANCING PER:
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONALANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFInduspec. ANY REPRODUCTION IN PARTOR AS A WHOLE WITHOUT THE WRITTENPERMISSION OF Induspec IS PROHIBITED.
Maximum Cart Size
lb
Induspec
AD-256-04
A A
B B
2
2
1
1
BACKGROUND
Induspec was selected as the general contractor to provide turn-key design and construction services for a new pressure vessel installation for an industrial customer in the North Bay Region.
INITIAL CONDITION
Induspec worked with the client to determine the exact location of where the vessel was to be located and then worked with the client and other service providers to deal with a number of sub-surface utilities and structural constraints.
GENERAL SCOPE
Induspec developed a foundation design which overcame the inherent constraints of the site, brought in a sub-contractor to perform the excavation, forming, pouring and finishing of concrete so that the entire foundation was safely built in accordance with specifications.
WORK PERFORMED
Induspec prepared detailed drawings of the foundation system, steam, condensate and compressed air piping designs, a new loading cart for the vessel, as well as a bridge and enclosure. Induspec oversaw all work including leading a PSSR process to ensure that no safety issues were overlooked
RECOMMENDATIONS
As is typical with large complex projects, there were certain problems. Weather, contractor timing and cost were all challenges which affected this project, but Induspec worked with the client to see the vessel in safe and successful operation.